Page 1: Kumutoto Site 10

Kumutoto Site 10S92 Response

WCC 27 February 2015

Page 2: Kumutoto Site 10

27 February 2015 | 13-09_Kumutoto Site 10

P2

Fig 1. North East Elevation 1:200 @ A3

MATERIALS AND DETAIL

Creative Business Units:Integrated floor to ceiling glazing with entry doors and limited signage

Creative Business Units:Integrated floor to ceiling glazing with entry doors and limited signage

Carpark Entry/Exit:High quality carpark roller/panel door

L3 Deck:Glass balustrade with stainless steel stanchions

L3 Deck:Glass balustrade with stainless steel stantions

L3+4 Gantry Facade:Flush glazed system

Plant room:Combination of louvers, solid panels to lift overrunn and 2 exposed chillers.

Colonnade:Pre-finished compressed sheet / fibre cement soffit

Profiled solid panel:Fibreglass / GRC / aluminium panels integrated with glazing system

Profiled solid panel - UniSA, Adelaide, John Wardle Architects

Vertical Solar Shading - University of Queensland, Brisbane, John Wardle Architects

ASU Polytech Building, Mesa, Lake Flato

Window Box:Flush glazed system

L1&2 Window box:Unitised system with frit pattern applied to bottom 900mm. Frit or backpainted glass spandrel.

Vertical Solar Shading:Large format pre-finished aluminium / metal clad fins.Similar finish to soffit.

Page 3: Kumutoto Site 10

27 February 2015 | 13-09_Kumutoto Site 10

P3

Fig 2. South West Elevation 1:200 @ A3

MATERIALS AND DETAIL

Shopfront:Floor to ceiling glazing with wind lobbies fronting Whitmore Plaza

L3 + 4Flush glazed system with expressed steel structure behind.

Window Boxes:Flush glazed system with expressed spandrel

Suspended ‘Cab”Expressed steel structure with flush glazed cladding

Soffit and external cladding:Timber paneling with integrated lighting

Expressed Columns / Fins:Timber, pre-finished metal or fibreglass sculptured keel integrated with seating in Whitmore plaza

Portico, Undercroft - Centra Metropark, Iselin, Kohn Pederson Fox

Undercroft - Boston Institute of Contemporary Art, Boston, Diller Scofidio + Renfro

Expressed Gantry Structure - ABR building, Rotkreuz, Burckhardt & Partner AG

Expressed Gantry Structure - The Leadenhall Building, London, RSH+P

Plant room:Combination of louvers, solid panels to lift overrun and 2 exposed chillers.

L3 Deck:Glass balustrade with stainless steel stanchions

L1 + 2 Facade:Flush glazed system with frit or backpainted glass spandrel

L1&2 Window box:Unitised system with frit pattern applied to bottom 900mm. Frit or backpainted glass spandrel.

Page 4: Kumutoto Site 10

27 February 2015 | 13-09_Kumutoto Site 10

P4

Fig 3. North West Elevation

MATERIALS AND DETAIL

Chillers

Profiled solid panel - UniSA, Adelaide, John Wardle Architects

Large format solid panel - Old and New Flour Storage, Tallin, HGAThorndon Substaion

Window Box- (L)F40 Office Building, Berlin, Petersen Architekten(R)UBC Faculty of Pharmaceutical Sciences, British Columbia, Saucire + Perrotte Architects

Shed 21, Wellington

L3 Deck:Glass balustrade with stainless steel stanchions

Profiled solid panel:Fibreglass / GRC / aluminium panels integrated with glazing system

Sprinkler Valve Room & Substation:Terracite cladding to services access

Cross-site link window box:Flush glazed window box identifying cross-site link entry and separating the 2 Waterloo Quay facade systems

Plant Room & Lift Overun:Combination of louvers and compressed sheet cladding

Window Box:Flush glazed window opening

North West Facade:Pre-finished metal / GRC / fibreglass cladding. Horizontal format panels

North West Facade:Pre-finished metal / GRC/ fibreglass cladding.

Window Box: (L) Rendering of Northern Corner(R)Window Box precedent

Creative Business Units:Integrated floor to ceiling glazing with entry doors and limited signage

Page 5: Kumutoto Site 10

27 February 2015 | 13-09_Kumutoto Site 10

P5

Fig 4. North West Elevation

Cross-site link:Pre-finished compressed sheet with integrated lighting, high quality blue stone paving.

Large format panels:Pre-finished metal panels / GRC/ Fibreglass sitting off expressed concrete frame with inset windows.

‘Cab’Soffit:Pre-finished compressed sheet / fibre cement

Window boxes - University of Limerick, Limerick, Grafton Architects

Gantry - Royal Playhouse, Copenhagen, Lundgaard & Tranberg

Suspended ‘Cab’ - Rendering of proposed building as viewed from Customhouse Quay

Suspended ‘Cab’:Expressed steel structure with flush glazed cladding

L3 + 4:Flush glazed system with expressed steel structure behind.

Shopfront:Floor to ceiling glazing with lobby exiting onto Waterloo Quay colonnade

Entry / ExitCross Site Link

Plant Room & Lift Overun:Combination of louvers and compressed sheet cladding

Window Boxes:Flush glazed system with expressed spandrel

Potsdamer Platz, Berlin, Renzo Piano Building Workshop

Window Box- F40 Office Building, Berlin, Petersen ArchitektenUBC Faculty of Pharmaceutical Sciences, British Columbia, SAUCIER + PERROTTE ARCHITECTES

Page 6: Kumutoto Site 10

27 February 2015 | 13-09_Kumutoto Site 10

P6

Fig 5. South East Elevation

MATERIALS AND DETAIL

L3 + 4:Flush glazed system with expressed steel structure behind.

Expressed Columns / Fins:Timber, pre-finished metal or fibreglass sculptured keel integrated with seating in Whitmore plaza

L1&2 Window box:Unitised system with frit pattern applied to bottom 900mm. Frit or backpainted glass spandrel.

L3 Deck:Glass balustrade with stainless steel stanchions

Vertical Solar Shading:Large format pre-finished aluminium / metal / timber clad fins

Shopfront:Floor to ceiling glazing with wind lobbies fronting Whitmore Plaza

Cross-site link:Pre-finished compressed sheet / fibre cement with integrated lighting, high quality blue stone paving.

Creative Business Units:Integrated floor to ceiling glazing with entry doors and limited signage

Suspended ‘Cab’ - Rendering of proposed building as viewed from Customhouse Quay

Potsdamer Platz, Berlin, Renzo Piano Building Workshop

Gantry - Royal Playhouse, Copenhagen, Lundgaard & Tranberg

Gantry - De Brug, Rotterdam, JHK Architectin Vertical Fins - District of Columbia Public Library, Washington, Freelon Group Architects

Cross Site Link

Page 7: Kumutoto Site 10

27 February 2015 | 13-09_Kumutoto Site 10

P7

1 2 3

700 2435

3135

RETAIL

3300

1200

1770

1600

KEY:

1 : 25Unnamed

13-09Kumutoto - Site 10

RC2.10-

N

No. Description Date

1 : 25Section 40

COLONNADE SECTION

Fig 6. Colonnade Section 1:50 @ A3

The transverse chevron bracing is an integral element of the building’s seismic resisting system. The structure is relatively long and narrow with the effect that the transverse bracing (the steel chevrons) need to extend to the perimeter of the narrow direction to provide a sufficiently wide ‘footprint’ to safely resist lateral and torsional seismic loading.

Fig 7. Key plan showing colonnade brace locations

WAT

ERLO

O QU

AY

KUMU

TOTO

LAN

E

Brace location

Brace location

Brace location

Page 8: Kumutoto Site 10

27 February 2015 | 13-09_Kumutoto Site 10

P8SUN STUDY - SUMMER SOLSTICE

Fig 8. Summer Solstice (December 21st) 10AM Fig 9. Summer Solstice (December 21st) 12PM Fig 10. Summer Solstice (December 21st) 2PM Fig 11. Summer Solstice (December 21st) 4PM

WATER

LOO Q

UAY

WATER

LOO Q

UAY

WATER

LOO Q

UAY

WATER

LOO Q

UAY

WHITMORE PLAZA

WHITMORE PLAZA

WHITMORE PLAZA

WHITMORE PLAZA

Site 10 Building Shadow

Page 9: Kumutoto Site 10

27 February 2015 | 13-09_Kumutoto Site 10

P9SUN STUDY - AUTUMN EQUINOX

Fig 12. Autumn Equinox (March 20th) 10AM Fig 13. Autumn Equinox (March 20th) 12PM Fig 14. Autumn Equinox (March 20th) 2PM Fig 15. Autumn Equinox (March 20th) 4PM

WATER

LOO Q

UAY

WATER

LOO Q

UAY

WATER

LOO Q

UAY

WATER

LOO Q

UAY

WHITMORE PLAZA

WHITMORE PLAZA

WHITMORE PLAZA

WHITMORE PLAZA

Site 10 Building Shadow

Page 10: Kumutoto Site 10

27 February 2015 | 13-09_Kumutoto Site 10

P10

Fig 16. Winter Solstice (June 21st) 10AM Fig 17. Winter Solstice (June 21st) 12PM

NZ Post Building Shadow

Site 10 Building Shadow

Fig 18. Winter Solstice (June 21st) 2PM Fig 19. Winter Solstice (June 21st) 4PM

SUN STUDY - WINTER SOLSTICE

WATER

LOO Q

UAY

WATER

LOO Q

UAY

WHITMORE PLAZA

WHITMORE PLAZA

WHITMORE PLAZA

WATER

LOO Q

UAY

WHITMORE PLAZA

WATER

LOO Q

UAY

Page 11: Kumutoto Site 10

27 February 2015 | 13-09_Kumutoto Site 10

P11SUN STUDY - SPRING EQUINOX

Fig 20. Spring Equinox (September 27th) 10AM Fig 21. Spring Equinox (September 27th) 12PM Fig 22. Spring Equinox (September 27th) 2PM Fig 23. Spring Equinox (September 27th) 4PM

WATER

LOO Q

UAY

WATER

LOO Q

UAY

WATER

LOO Q

UAY

WATER

LOO Q

UAY

WHITMORE PLAZA

WHITMORE PLAZA

WHITMORE PLAZA

WHITMORE PLAZA

Site 10 Building Shadow

Page 12: Kumutoto Site 10

27 February 2015 | 13-09_Kumutoto Site 10

P12

Fig 24. Ground Floor Plan Area Diagram 1:400 @ A3

GROUND FLOOR AREA BREAKDOWN

Public Open Space1,235m2

Public Open Space

Public Open Space1,235m2 / 2750m2

70% of the total site area is Publicly Accessible(including tenancies + Lobbies)

TOTAL AREA2750m2

INTERNAL AREA1515m2

PUBLICLY ACCESSIBLETotal 1918m2

Creative Business Units412m2

Creative Business Units412m2

Tenancies572m2

Tenancies572m2 / 2750m2

Tenancies572m2

Lobbies111m2

Lobby

Lobby

Lobbies111m2 / 2750m2

Lobbies111m2

Services420m2

Services

Services

Creative Business Unit

Creative Business Unit

Creative Business Unit

Tenancy

Tenancy

Tenancy

Services420m2

45%

45%

15%

27%

21%

21%

38%

4%

4%

7%

15%

28%

Outline of building above

Page 13: Kumutoto Site 10

27 February 2015 | 13-09_Kumutoto Site 10

P13WCC NORTH KUMUTOTO BRIEF SITE BOUNDARY

Fig 25. Boundary definition drawing for Wellington Waterfront 2010 (not to scale)

Page 14: Kumutoto Site 10

27 February 2015 | 13-09_Kumutoto Site 10

P14WCC NORTH KUMUTOTO BRIEF SITE BOUNDARY OVERLAY

LOBBY

RETAIL

RETAILSu

bsta

tion

SPKLR

Switchroom

Recy

cling

Sec

Comm

s RETAILParking Ramp

RETAIL

CBH Unit CBH UnitCBH UnitCBH Unit

CBH UnitCBH UnitCBH UnitCBH Unit

KEY:

1 : 200 @ A1 ; 1 : 400 @ A3Unnamed

13-09Kumutoto - Site 10

RC2.11-

N

No. Description Date

1 : 200 @ A1 ; 1 : 400 @ A3RC_Ground Level Plan_WCC BOUNDARY

LOBBY

RETAIL

RETAIL

Subs

tatio

n

SPKLR

Switchroom

Recy

cling

Sec

Comm

s RETAILParking Ramp

RETAIL

CBH Unit CBH UnitCBH UnitCBH Unit

CBH UnitCBH UnitCBH UnitCBH Unit

KEY:

1 : 200 @ A1 ; 1 : 400 @ A3Unnamed

13-09Kumutoto - Site 10

RC2.11-

N

No. Description Date

1 : 200 @ A1 ; 1 : 400 @ A3RC_Ground Level Plan_WCC BOUNDARY

WCC Site Boundary (2010)

DPC78_Viewshaft 4 - Whitmore St(2014)

Site 10 Building Footprint

Fig 26. Boundary definition

Page 15: Kumutoto Site 10

27 February 2015 | 13-09_Kumutoto Site 10

P15SITE 9 CANOPY

Glass canopy 1200mm x 1600mm

Painted steel structureColumns at 3600mm spacing

2,500

mm~3

,000m

m

Folded perforated metal screens supported on secondary steel supports.

Garden bed with planting as per Isthmus dwg 4.080

Asphalt footpathWidth varies from 1800mm ~ 3300mm

CUSTOMHOUSE QUAY

Centreport windbreak/screen precedent

Waterloo Quay canopy Queens Wharf canopy

Cobblestone Park windbreak/screen precedent

Site 9 Canopy

The proposed canopy is a high quality interim shelter solution to the Customhouse Quay edge of Site 9.

The canopy is a continuation of the waterfront shelters extending from Waterloo Quay though to Queens Wharf and Waitangi park beyond.

The screening will provide localised shelter from wind and wind blown rain from the waterfront. The site 9 carpark is elevated approximately 500mm above the Waterloo Quay footpath. The perforated metal panels will provide some visual screening of the cars parked on site 9 when viewed from Customhouse Quay.Fig 27. Site 9 Customhouse Quay Canopy sketch