TRANSCRIPT
Your first-choice services provider
E X P E D I T I N G
What does that mean ???
To speed up a process
Where do we need Expediting ?
Every kind of business where a timely delivery is required.
Why do we need Expediting?
l To prevent delays in delivery l To support the flow of information between
the involved parties. l Signify problems and difficulties directly to
the customer
Manufacturer / Vendor
Customer
Expediting Process in Detail
l General information l Overall Status l Engineering & Documentation l Procurement Status l Production / Machining / Assembly l Test & Inspection l Special tools accessories and Spare Parts l Shipping information l Table of Sub-orders l Table of document Status
General information l Date of receipt of Purchase Order l Delivery Terms (Ex-works, FOB, onsite etc…) l Contractual Delivery date l Project No. l Manufacturers Reference No. l Are there Vendors in between, who is the contractor l Scope of Supply l Order confirmation sent ??? If Yes when? l All relevant Persons in charge with Tel. and E-mail l Is there a deviation between the delivery dates.
Overall Status
l What is the current status of the order ? l Are there any difficulties or problems
appeared ??? l Is a production plan / schedule available ? l If not already received from the client, Ask for
an unpriced copy of the P.O. and / or order confirmation
Engineering & Documentation l Is a documentation schedule / Index available ? l Have all documents, mentioend in the P.O., been received?
l Material Requisition l Approved Data sheets l Project Specifications l List of required documents
l Has Engineering work started already? l Are there Documents to be submitted to client for Info or Approval l Which documents were already submitted for Approval l Which documents are due or overdue l What is the approval status and Rev. l Are there any documents unclear
Engineering & Documentation l Example of documents to be submitted to for approval
l GA Drawings , Layout and foundation drawings l Welding Procedures and Qualifications l Welders Qualification l NDT Procedures and Operator Qualifications l Testing procedures l List of Subsuppliers l List of Instrumentation l Wiring diagram l Piping diagram
l Status of engineering has to be followed up each visit. l Are there problems or difficulties appeared that start of production is
jeopardized?
Procurement Status l What Parts are the major key parts of the order?
l Who are the sub-suppliers? Comapny & Location, order No.
l Has material already been ordered? l Are Confirmations of the Sub-suppliers available?
l Are the parts confirmed in accordance with the production schedule???
Production / Machining / Assembly
l Has Production already started ??? l Is the status of Production in accordance with the production
schedule? l Are there any parts manufactured by Sub-contractors
(machining, coating etc..) l Verify the status during shop visit. l What are the working hours in the shop???
2 shift / 3 shift / weekend / l What is the current shop load l Is a back up plan available
if something went wrong l Are there holidays or shutdowns planned within the delivery
period
Test & Inspection l Is for this order a Customer or 3rd party inspection
agreed? l Is an ITP available??? (Approval status???)
l What inhouse inspections will be carried out ???
l Are the inspections already scheduled? l Are there any inspections at Sub-contractors
l Are there any special conditions ???
Special tools, accessories and Spare Parts
l Does the order include any kind of special tools, accessories or Spare parts ???
l Are these needed for Technical Erection or commissioning?
l Are these to be separately ordered ???
l Is the order placed? Status
Shipping Information
l Has the shipping method been defined??? l Who is responsible for shipment l Is already shipment arranged ??? l Obtain info as there are:
l ETD (Estimated time of depature) l ETA (Estimated time of arrival) l Name of Vessel l Truck Forwarder l Airway Bill No. (only Airfreight)
l Is there special packing to be performed??? Sirex wood???
Conclusion l Evaluation of received information
l Is there any delay appeared ??? l What is the reason??? l If Yes what could be a possible solution ??? l If Yes, Discussion of possible improvements
l Expeditors Opinion, (refer to experiences)
l Expeditors recommendation. l Insist always on a deadline in case of
oustanding actions!