ks1-xw packer (7k) 4-1/2” x 2-3/8” upper completions · 2019-04-07 · technical data sheet...

234

Upload: others

Post on 10-Mar-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information
Page 2: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Technical Units – Table of Contents Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: January 2019

H O M E O F K L I N E T O O L S

SERVICE TOOLS Page Crest III Packer 3 CPW Retrievable Squeeze Packer 43 CPW Perf Wash Packer with Rod Assembly 79 Transpack Cementer 106 K-10 Packer 146 WLTC Retrievable Bridge Plug 165 SERVICE ACCESSORIES Spring Loaded Overshot 227 KH Locking Compression Unloader 240 KTC Tension Unloader 264 WLTC Ball Catcher 275 WLTC Wireline Adapter Kit 286 Tubing Swivel 293 Mechanical Collar Locater 302 Pressure Balanced Equalizing Valve 316 PRODUCTION TOOLS KS1-XW Packer 320 BDT Dual Tension Packer 394 Hydraulic Tandem Packer 402 Big Bore Tubing Packer 424 Scab Liner Assembly 428 Lockdown Anchor 464 Tubing Anchor/Catcher 511 Dual String Anchor 530 Downhole Swivel Joint 533 Downhole Shutoff Valve 536 PRODUCTION ACCESSORIES KT-2 On/Off Tool 542

Page 3: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-4520 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Kline Tools KS1-XW Packer is a production packer that is useful for several applications including zone isolation, injection, pumping and production. The packer is designed to hold significant pressure from above or below whether left in compression, tension or neutral. Large internal bypass included to reduce swabbing when running or retrieving. The bypass opens first when releasing to allow the pressure to equalize before releasing the upper slips. The KS1-XW packer has a rotational shear release feature as well as an optional straight pull adjustable shear release.

GENERAL SPECIFICATIONS

Casing Tool Size Weight OD ID Connections Part Number

4-1/2” 9.5-13.5 3.750

1.94 2-3/8 EUE 8 Rd 10A-4520-XXXX 13.5-15.1 3.656*

*3.719” across collapsed drag blocks

Features

• May be left in tension, compression or neutral. • Can be run on tubing or wireline. • Integrated bypass feature to aid releasing. • Rated for 7,000 psi differential pressure. • Stainless steel follow spring

Options

• Nickel coating • Red epoxy phenolic coating • Plastic coated ID • 316 stainless steel inner mandrel and top sub (reduced tool ratings)

Accessories

• KT-2 on-off tool • Stinger with or without profile • Adjustable straight pull shear release kit

Page 4: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-4520 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS

Attribute Value Maximum OD1 See Gage Diagram Minimum ID 1.932 in 49.07 mm Overall Length 75.96 in 1,929.38 mm Fluid Bypass Area 0.454 in2 292.90 mm2 Approximate Weight 112 lb. 50.8 kg External Working Pressure 7,000 psi 48,263 KPa Internal Working Pressure 7,000 psi 48,263 KPa Max Working Temperature2 250 °F 121 °C Min Working Temperature 70 °F 21 °C Tensile Rating 40,000 lb. 17,793 daN NACE Service No

(1) Base tool OD. Look at casing weight chart for gage OD. (2) Higher temperatures can be achieved with different elastomers. OPERATING INSTRUCTIONS Note: Ensure all connections are correctly tightened.

• Run to desired setting depth. • Pick up weight of tubing plus 1,000-3,000 lbs. • Apply right hand rotation and set down tubing string to set slips, close the bypass and pack off the elements.

(8,000-10,000 lbs. of weight should be used to fully set and pack off tool) • Tool may be left in compression, tension or neutral. • To remove the packer, set down weight then apply right hand rotation. • Pick while maintaining the right-hand rotation. • Pause when the bypass valve opens to allow pressure differential to equalize. • Once pressure equalizes, continue straight pull to finish releasing the tool.

ASSEMBLY INSTRUCTIONS Note: Care should be taken during assembly to insure all threads are greased adequately. Caution: Take care when handling rubber mandrel not to damage seal surface.

• Insert top sub (1) into vise with spring cage cap (2) slid over the top end. • Install follow spring (5) inside spring cage (4). • Install upper slips (7), releasing slip (8) and slip springs (6) into slip windows of spring cage (4). • Slide upper spring cage subassembly onto top end of inner mandrel (3) then thread inner

mandrel (3) into top sub (1). • Thread spring cage cap (2) onto spring cage (4). • Slide element retainer (16), elements (15) and element spacers (14) onto rubber mandrel (23).

Page 5: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-4520 - 2019 January

H O M E O F K L I N E T O O L S

• Install O-ring (13) into center coupling (12) and then thread center coupling (12) onto upper end of rubber mandrel (23).

• Install O-ring (11) onto bypass seal (10). • Install bypass seal (10) into center coupling (12) then thread upper cone (9) onto upper end. • Thread lower cone (17) onto lower end of element retainer (16). • Install lower slips (19) and lower slip springs (18) into slip windows of drag block body (21) then

slide subassembly over lower end of rubber mandrel (23). • Thread rubber mandrel cap (24) onto lower end of rubber mandrel (23). • Install drag blocks (21) and drag block springs (22) into drag block body (20) and then thread j-

body (25) onto drag block body (20).

CAUTION: This is a left-hand thread.

• Install set screws (28) into j-body. • Slide rubber mandrel subassembly onto lower end of inner mandrel subassembly. • Insert O-ring (26) into bottom sub (27) and then thread bottom sub (27) onto lower end of inner

mandrel (3). • Slide j-body up to reveal set screw hole in bottom sub (27) then install set screws (28). • Insert O-ring (26) into bottom sub (27) and then thread bottom sub (27) onto lower end of inner

mandrel (3). • Slide j-body up to reveal set screw hole in bottom sub (27) then install set screws (28).

DISASSEMBLY INSTRUCTIONS

• Insert tool into vise at top sub (1). • Slide j-body (25) up to reveal the set screws (28) in the bottom sub (27). Remove the set screws

(28). • Using the j-body (25) and left-hand rotation, remove the bottom sub (27) from the inner mandrel

(3). • Remove rubber mandrel sub assembly from inner mandrel subassembly. • Remove spring cage cap (2) from spring cage (4). • Break inner mandrel (3) from top sub (1) and slide spring cage offer inner mandrel (3). • Place j-body (25) in the vise and break connection to drag block body (20).

CAUTION: This is a left-hand thread. CAUTION: Drag blocks will spring out when retainer is removed if not restrained.

• Remove rubber mandrel cap (24) from rubber mandrel (23). • Remove drag block body (20) from rubber mandrel (23). • Break connection between upper cone (9) and center coupling (12) then remove bypass seal (10). • Break connection between rubber mandrel (23) and center coupling (12) then remove elements

(15) and element spacers (14). • Break connection between lower cone (17) and element retainer (16) and remove both from

rubber mandrel (23).

Page 6: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-4520 - 2019 January

H O M E O F K L I N E T O O L S

10A-4520-XXXX PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER 9.5-13.5# (3.750” OD) 13.5-15.1# (3.656” OD)

1 1 TOP 00043 2 1 SPRING CAGE CAP 00044 00044A 3 1 INNER MANDREL 00047 00047A 4 1 SPRING CAGE 00045-K 00045A-K 5 1 FOLLOW SPRING 603-45-920S 6 6 UPPER SLIP SPRING 00042 7 2 UPPER SLIP (CARBIDE OR WICKERED) 45KXUC or 45KXUW 8 1 RELEASING SLIP 45KXR 9 1 UPPER CONE 00048 00048A 10 1 SEAL 600-45-520 11 1 O-RING 19145 12 1 CENTER COUPLING 00049 00049A 13 1 O-RING 19232 14 2 RUBBER SPACER 00051 00051A 15 3 RUBBER ELEMENT 602-45-51X 602-46-51X 16 1 RUBBER RETAINER 00052 00052A 17 1 LOWER CONE 00053 00053A 18 4 LOWER SLIP SPRING 00041 19 4 LOWER SLIP (CARBIDE OR WICKERED) 45KXLC or 45KXLW 20 1 DRAG BLOCK BODY 00400 00400A 21 4 DRAG BLOCK 50450 22 16 DRAG BLOCK SPRING 50100 23 1 RUBBER MANDREL 00050 00050A 24 1 RUBBER MANDREL CAP 00055 25 1 J-BODY (RIGHT HAND OR LEFT HAND) 00057 or 00223 00057A or 00223A 26 1 O-RING 19227 27 1 BOTTOM SUB ASSEMBLY* 00056-K 28 6 ¼ - 20 UNC X 3/8 LG SOCKET SET SCREW 11146C

*For shearable bottom sub assembly: 00646 (shearable j-pin ring), 00647 (shearable bottom sub), and 11675CMS (shear screws, qty 10)

Page 7: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-4520 - 2019 January

H O M E O F K L I N E T O O L S

10A-4520-XXXX ASSEMBLY DRAWING

Page 8: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-4520 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONS

DIMENSION MEASUREMENT A 8.000 in 203.20 mm B 22.313 in 566.75 mm C 2.900 in 73.66 mm D 33.181 in 842.80 mm E 5.189 in 131.80 mm F 7.000 in 177.80 mm G 2.655 in 67.44 mm H 79.649 in 2,023.1 mm J 3.000 in 76.20 mm K GAGE DIAMETER L 2.342 in 59.49 mm M GAGE DIAMETER N GAGE DIAMETER P GAGE DIAMETER

Page 9: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer WLSK 4-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-4520-7001 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION This Kline Tools KS1-XW Wireline Setting Kit is designed to work with the KT-2 on/off tool and Baker 10 setting tool.

GENERAL SPECIFICATIONS

Casing Tool Size Weight OD Connections Part Number

4-1/2” 9.5-13.5# 3.750” 3” – 8 Stub Acme Box Up (External)

1” – 8 UNC Pin Up (Internal) 10A-4520-7001 5” 11.5-24.2#

Features • Works with Baker 10 Setting Tool

Related Products • 4-1/2” X 2-3/8” KS1-XW 7K (TU-10A-4520) • 4-1/2” X 2-3/8” KS1-XW 10K (TU-10B-4520) • 5” X 2-3/8” KS1-XW 7K • 5” X 2-3/8” KS1-XW 10K • 4-1/2” x 2-3/8” KT-2 On/Off Tool • 2-3/8” Stingers

SPECIFICATIONS

OPERATING INSTRUCTIONS Note: Ensure all connections are correctly tightened. Caution: It is recommended that a slow burn charge be used in the tool.

• Run packer to desired depth. • Activate setting tool to set packer. • Apply tension required to break the shear screws pinning the stinger to the inner adapter. • Pull string from well.

Attribute Value Maximum OD1 3.750 in 95.25 mm Overall Length 34.75 in 882.7 mm Approximate Weight 40 lb 18 kg Tensile Rating (Inner Adapter @ 1” – 8 UNC thread) 45,800 lb 20,373 daN Force per Shear Screw 3,159-4,274 lb 1,405-1,901 daN Maximum Shear Force 25,270-34,189 lb 11,241-15,208 daN

Page 10: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer WLSK 4-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-4520-7001 - 2019 January

H O M E O F K L I N E T O O L S

ASSEMBLY INSTRUCTIONS

Note: Care should be taken during assembly to insure all threads are greased adequately. • Ensure packer is pinned for wireline and stinger threaded into top sub. • Slide inner adapter (5) over stinger and install desired number of shear screws (6). • Slide setting sleeve (2) over lower end of setting tool. • Thread outer adapter (4) onto setting tool and install set screws (1). • Install lock spring (not provided) onto top thread of inner adapter (5). • Screw setting tool onto inner adapter until the flange of the lock spring is in the groove at the bottom end of the

tool. • Slide setting sleeve (2) down and engage thread with outer adapter (4) thread. • Screw this thread together until bottom of setting sleeve (2) is mated up on the spring cage cap shoulder of the

packer. • Install set screws (3).

DISASSEMBLY INSTRUCTIONS

• Remove set screws (3). • Thread setting sleeve (2) up and slide over setting tool. • Thread inner adapter off (5) setting tool. • Remove set screws (1) from outer adapter (4). • Thread outer adapter (4) off setting tool. • Slide setting sleeve (2) off setting tool. • Remove remainder of shear screws (6) from inner adapter (5).

10A-4520-7001 PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER

1 2 SET SCREW 11144C 2 1 SETTING SLEEVE (STANDARD) 00481-K 3 2 SET SCREW 11155C 4 1 OUTER ADAPTER 61880 5 1 INNER ADAPTER (STANDARD) 00480 6 8 SHEAR SCREW 11677C

Page 11: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer WLSK 4-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-4520-7001 - 2019 January

H O M E O F K L I N E T O O L S

10A-4520-7001 ASSEMBLY DRAWING

Page 12: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer WLSK 4-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-4520-7001 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONS

DIMENSIONS A 2.31 in 58.7 mm B 34.75 in 882.7 mm C 4.63 in 117.6 mm D 18.25 in 463.6 mm E 2.44 in 62.0 mm F 3.50 in 88.9 mm G 2.25 in 57.2mm H 3.75 in 95.3 mm J 3.38 in 85.9 mm K 2.00 in 50.8 mm L 3.28 in 83.3 mm

Page 13: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 5-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10-5520 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Kline Tools KS1-XW Packer is a production packer that is useful for several applications including zone isolation, injection, pumping and production. The packer is designed to hold significant pressure from above or below whether left in compression, tension or neutral. Large internal bypass included to reduce swabbing when running or retrieving. The bypass opens first when releasing to allow the pressure to equalize before releasing the upper slips. The KS1-XW packer has a rotational shear release feature as well as an optional straight pull adjustable shear release.

GENERAL SPECIFICATIONS

Casing Tool Size Weight OD ID Connections Part Number

5-1/2” 14-20# 4.625”

1.94” 2-3/8 EUE 8 Rd 10A-5520-XXXX 20-23# 4.500”

Features

• May be left in tension, compression or neutral. • Can be run on tubing or wireline. • Integrated bypass feature to aid releasing. • Rated for 10,000 psi differential pressure. • Stainless steel follow spring

Options

• Nickel coating • Red epoxy phenolic coating • Plastic coated ID • 316 stainless steel inner mandrel and top sub (reduced tool ratings)

Accessories

• KT-2 on-off tool • Stinger with or without profile • Adjustable straight pull shear release kit

Page 14: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 5-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10-5520 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS

Attribute Value Maximum OD1 4.500 in 114.3 mm Minimum ID 1.985 in 50.4 mm Overall Length 88.63 in 2,251.2 mm Fluid Bypass Area 0.864 in2 557.4 mm2 Approximate Weight 258 lb. 117 kg External Working Pressure 7,000 psi 48,263 KPa Internal Working Pressure 7,000 psi 48,263 KPa Max Working Temperature2 250 °F 121 °C Min Working Temperature 70 °F 21 °C Tensile Rating 75,500 lbf. 33,584 DaN NACE Service No

(1) Base tool OD. Look at casing weight chart for gage OD. (2) Higher temperatures can be achieved with different elastomers.

OPERATING INSTRUCTIONS Note: Ensure all connections are correctly tightened.

• Run to desired setting depth. • Pick up weight of tubing plus 1,000-3,000 lbs. • Apply right hand rotation and set down tubing string to set slips, close the bypass and pack off the elements.

(10,000-12,000 lbs. of weight should be used to fully set and pack off tool) • Tool may be left in compression, tension or neutral. • To remove the packer, set down weight then apply right hand rotation. • Pick while maintaining the right hand rotation. • Pause when the bypass valve opens to allow pressure differential to equalize. • Once pressure equalizes, continue straight pull to finish releasing the tool.

ASSEMBLY INSTRUCTIONS Note: Care should be taken during assembly to insure all threads are greased adequately. Caution: Take care when handling inner mandrel not to damage seal surface.

• Insert top sub (1) into vise with spring cage cap (2) slid over the top end. • Assemble upper slip housing (6) to spring cage (4). • Install follow spring (5) inside spring cage (4). • Install upper slips (8), releasing slip (9) and slip springs (7) into slip windows of upper slip housing

(6).

Page 15: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 5-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10-5520 - 2019 January

H O M E O F K L I N E T O O L S

• Slide upper spring cage subassembly onto top end of inner mandrel (3) then thread inner mandrel (3) into top sub (1).

• Thread spring cage cap (2) onto spring cage (4). • Slide element retainer (18), elements (17) and element spacers (16) onto rubber mandrel (26). • Install O-ring (14) into center coupling (13) and then thread center coupling (13) onto upper end of rubber

mandrel (26). • Install O-ring (12) onto bypass seal (11). • Install bypass seal (11) into center coupling (13) then thread upper cone (10) onto upper end. • Thread lower cone (19) onto lower end of element retainer (18). • Install lower slips (21) and lower slip springs (20) into slip windows of drag block body (23) then slide subassembly

over lower end of rubber mandrel (26). • Thread rubber mandrel cap (27) onto lower end of rubber mandrel (26). • Install drag blocks (23), drag block springs (24) and drag block retainer (25) onto drag block body (22) and then

thread j-body (28) onto drag block body (22). CAUTION: This is a left hand thread.

• Install set screws (31) into j-body (28). • Slide rubber mandrel subassembly onto lower end of inner mandrel subassembly. • Insert O-ring (29) into bottom sub (30) and then thread bottom sub (30) onto lower end of inner mandrel (3). • Slide j-body (28) up to reveal set screw hole in bottom sub (30) then install set screws (32).

DISASSEMBLY INSTRUCTIONS

• Insert tool into vise at top sub (1). • Slide j-body (28) up to reveal the set screws (32) in the bottom sub (30). Remove the set screws (32). • Using the j-body (28) and left hand rotation, remove the bottom sub (30) from the inner mandrel (3). • Remove rubber mandrel sub assembly from inner mandrel subassembly. • Remove spring cage cap (2) from spring cage (4). • Break inner mandrel (3) from top sub (1) and slide spring cage off inner mandrel (3). • Place j-body (28) in the vise and break connection to drag block body (22) and remove drag block retainer (25).

CAUTION: This is a left hand thread. CAUTION: Drag blocks will spring out when retainer is removed if not restrained.

• Remove rubber mandrel cap (27) from rubber mandrel (26). • Remove drag block body (22) from rubber mandrel (26). • Break connection between upper cone (10) and center coupling (13) then remove bypass seal (11). • Break connection between rubber mandrel (26) and center coupling (13) then remove elements (17) and element

spacers (16). • Break connection between lower cone (19) and element retainer (18) and remove both from rubber mandrel (26).

Page 16: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 5-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10-5520 - 2019 January

H O M E O F K L I N E T O O L S

10A-5520-XXXX PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER 14-20# (4.625” OD) 20-23# (4.500” OD)

1 1 TOP 00070 2 1 SPRING CAGE CAP 00075 00075A 3 1 INNER MANDREL 00082 00082A 4 1 SPRING CAGE 00069 5 1 FOLLOW SPRING 603-55-920S 6 1 UPPER SLIP HOUSING 00064-K 7 6 UPPER SLIP SPRING 00040 8 2 UPPER SLIP (CARBIDE OR WICKERED) 55KXUC (CARBIDE) or 55KXUW (WICKERED) 9 1 RELEASING SLIP 55KXR 10 1 UPPER CONE 00071 11 1 SEAL 600-55-520 12 1 O-RING 19149 13 1 CENTER COUPLING 00081 14 1 O-RING 19234 15 1 GAGE RING 00061 00061A 16 2 RUBBER SPACER 00074 00074A 17 3 RUBBER ELEMENT 602-55-51X 602-57-51X 18 1 RUBBER RETAINER 00073 00073A 19 1 LOWER CONE 00072 20 8 LOWER SLIP SPRING 00039 21 4 LOWER SLIP (CARBIDE OR WICKERED) 55KXLC (CARBIDE) or 55KXLW (WICKERED) 22 1 DRAG BLOCK BODY 00401 00401A 23 4 DRAG BLOCK 50550 50450 24 20 16 DRAG BLOCK SPRING 50100 25 1 DRAG BLOCK RETAINER 00080 26 1 RUBBER MANDREL 00076 00076A 27 1 RUBBER MANDREL CAP 00068 28 1 J-BODY (RIGHT HAND OR LEFT HAND) 00079 (RH) or 00224 (LH) 29 1 O-RING 19227 30 1 BOTTOM SUB ASSEMBLY 00078-K 31 4 5/16”-18 UNC x 3/8” SOCKET SET SCREW 11156C 32 2 ¼”-20 UNC X 3/8” SOCKET SET SCREW 11146C

Page 17: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 5-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10-5520 - 2019 January

H O M E O F K L I N E T O O L S

10A-5520-XXXX ASSEMBLY DRAWING

10A-5520-XXXX DIMENSIONS

DIMENSION MEASUREMENT DIMENSION MEASUREMENT A 7.644 in 194.2 mm K 3.062 in 77.8 mm B 15.390 in 390.9 mm L GAGE DIAMETER C 3.897 in 99.0 mm M 4.125 in 104.8 mm D 12.382 in 314.5 mm N 4.500 in 114.3 mm E 7.688 in 195.3 mm P 2.607 in 66.2 mm F 6.438 in 163.5 mm Q 4.440 in 112.8 mm G 3.250 in 82.6 mm R 2.875 in 73.0 mm H 7.719 in 196.1 mm S 4.500 in 114.3 mm J 88.626 in 2,251.1 mm T 4.500 in 114.3 mm

Page 18: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 5-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-5520 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Kline Tools KS1-XW Packer is a production packer that is useful for several applications including zone isolation, injection, pumping and production. The packer is designed to hold significant pressure from above or below whether left in compression, tension or neutral. Large internal bypass included to reduce swabbing when running or retrieving. The bypass opens first when releasing to allow the pressure to equalize before releasing the upper slips. The KS1-XW packer has a rotational shear release feature as well as an optional straight pull adjustable shear release.

GENERAL SPECIFICATIONS Casing Tool

Size Weight OD ID Connections Part Number

5-1/2” 23-26# 4.400 2.375 2-7/8” 10A-5525-XXXX

Features

• May be left in tension, compression or neutral. • Can be run on tubing or wireline. • Integrated bypass feature to aid releasing. • Rated for 7,000 psi differential pressure. • Stainless steel follow spring

Options

• Nickel coating • Red epoxy phenolic coating • Plastic coated ID • 316 stainless steel inner mandrel and top sub (reduced tool ratings)

Accessories

• KT-2 on-off tool • Stinger with or without profile • Adjustable straight pull shear release kit

Page 19: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 5-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-5520 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS

Attribute Value Maximum OD1 4.400 in 111.8 mm Minimum ID 2.375 in 60.5 mm Overall Length 85.569 in 2,173.5 mm Fluid Bypass Area 0.140 in2 90.3 mm2 Approximate Weight 202 lb. 91.7 kg External Working Pressure 7,000 psi 48,263 KPa Internal Working Pressure 7,000 psi 48,263 KPa Max Working Temperature2 250 °F 121 °C Min Working Temperature 70 °F 21 °C Tensile Rating 80,006 lbf. 35,588 DaN NACE Service No

(1) Base tool OD. Look at casing weight chart for gage OD. (2) Higher temperatures can be achieved with different elastomers.

OPERATING INSTRUCTIONS

Note: Ensure all connections are correctly tightened.

• Run to desired setting depth. • Pick up weight of tubing plus 1,000-3,000 lbs. • Apply right hand rotation and set down tubing string to set slips, close the bypass and pack off the elements.

(10,000-12,000 lbs. of weight should be used to fully set and pack off tool) • Tool may be left in compression, tension or neutral. • To remove the packer, set down weight then apply right hand rotation. • Pick while maintaining the right-hand rotation. • Pause when the bypass valve opens to allow pressure differential to equalize. • Once pressure equalizes, continue straight pull to finish releasing the tool.

ASSEMBLY INSTRUCTIONS Note: Care should be taken during assembly to insure all threads are greased adequately. Caution: Take care when handling inner mandrel not to damage seal surface.

• Insert top sub (1) into vise with spring cage cap (2) slid over the top end. • Assemble upper slip housing (6) to spring cage (4). • Install follow spring (5) inside spring cage (4). • Install upper slips (8), releasing slip (9) and slip springs (7) into slip windows of upper slip housing (6). • Slide upper spring cage subassembly onto top end of inner mandrel (3) then thread inner mandrel (3) into top sub

(1). • Thread spring cage cap (2) onto spring cage (4). • Slide element retainer (18), elements (16) and element spacers (17) onto rubber mandrel (20).

Page 20: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 5-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-5520 - 2019 January

H O M E O F K L I N E T O O L S

• Install O-ring (14) into center coupling (15) and then thread center coupling (15) onto upper end of rubber mandrel (20).

• Install O-ring (13) onto bypass seal (12). • Install bypass seal (12) into center coupling (15), followed by bearing bushing (11), then thread upper cone (10)

onto upper end. • Thread lower cone (19) onto lower end of element retainer (18). • Install lower slips (21) and lower slip springs (22) into slip windows of drag block body (23) then slide subassembly

over lower end of rubber mandrel (20). • Thread rubber mandrel cap (28) onto lower end of rubber mandrel (20). • Install drag blocks (24), drag block springs (25) and drag block retainer (26) onto drag block body

(23) and then thread j-body (27) onto drag block body (23). CAUTION: This is a left-hand thread.

• Install set screws (31) into j-body (27). • Slide rubber mandrel subassembly onto lower end of inner mandrel subassembly. • Insert O-ring (29) into bottom sub (30) and then thread bottom sub (30) onto lower end of inner mandrel (3). • Slide j-body (27) up to reveal set screw hole in bottom sub (30) then install set screws (32).

DISASSEMBLY INSTRUCTIONS

• Insert tool into vise at top sub (1). • Slide j-body (27) up to reveal the set screws (32) in the bottom sub (30). Remove the set screws (32). • Using the j-body (27) and left-hand rotation, remove the bottom sub (30) from the inner mandrel (3). • Remove rubber mandrel sub assembly from inner mandrel subassembly. • Remove spring cage cap (2) from spring cage (4). • Break inner mandrel (3) from top sub (1) and slide spring cage off inner mandrel (3). • Place j-body (27) in the vise and break connection to drag block body (23) and remove drag block retainer (26).

CAUTION: This is a left-hand thread. CAUTION: Drag blocks will spring out when retainer is removed if not restrained.

• Remove rubber mandrel cap (28) from rubber mandrel (20). • Remove drag block body (23) from rubber mandrel (20). • Break connection between upper cone (10) and center coupling (15) then remove bypass seal (12). • Break connection between rubber mandrel (20) and center coupling (15) then remove elements (16) and element

spacers (17). • Break connection between lower cone (19) and element retainer (18) and remove both from rubber mandrel (20).

Page 21: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 5-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-5520 - 2019 January

H O M E O F K L I N E T O O L S

10A-5520-XXXX PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER 23-26# (4.400” OD)

1 1 TOP 00091 2 1 SPRING CAGE CAP 00528 3 1 INNER MANDREL 00518 4 1 SPRING CAGE 00529 5 1 FOLLOW SPRING 603-56-920 6 1 UPPER SLIP HOUSING 00530 7 6 UPPER SLIP SPRING 00040 8 2 UPPER SLIP (CARBIDE OR WICKERED) 57KXUC (CARBIDE) or 57KXUW (WICKERED) 9 1 RELEASING SLIP 57KXR 10 1 UPPER CONE 00520 11 1 BEARING BUSHING 00101 12 1 BYPASS SEAL 600-56-520 13 1 O-RING 19151 14 1 O-RING 19235 15 1 CENTER COUPLING 00536 16 3 RUBBER ELEMENT 602-53-51X 17 2 RUBBER SPACER 00526 18 1 RUBBER RETAINER 00525 19 1 LOWER CONE 00519 20 1 RUBBER MANDREL 00524 21 4 LOWER SLIP (CARBIDE OR WICKERED) 57KXLC (CARBIDE) or 57KXLW (WICKERED) 22 8 LOWER SLIP SPRING 00213 23 1 DRAG BLOCK BODY 00523 24 4 DRAG BLOCK 50450 25 20 16 DRAG BLOCK SPRING 50100 26 1 DRAG BLOCK RETAINER 00524 27 1 J-BODY (RIGHT HAND OR LEFT HAND) 00521 (RH) or 00522 (LH) 28 1 RUBBER MANDREL CAP 00535 29 1 O-RING 19231 30 1 BOTTOM SUB ASSEMBLY 00648-K 31 3 5/16”-18 UNC x 3/8” SOCKET SET SCREW 11155C 32 2 ¼”-20 UNC X 3/8” SOCKET SET SCREW 11145C

Page 22: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 5-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-5520 - 2019 January

H O M E O F K L I N E T O O L S

10A-5520-XXXX ASSEMBLY DRAWING

10A-5520-XXXX DIMENSIONS

DIMENSION MEASUREMENT DIMENSION MEASUREMENT A 6.719 in 170.7 mm M 4.400 in 111.8 mm B 15.880 in 403.4 mm N 4.400 in 111.8 mm C 3.340 in 84.8 mm P 2.870 in 72.9 mm D 9.375 in 238.1 mm Q 4.400 in 111.8 mm E 7.513 in 190.8 mm R 4.400 in 111.8 mm F 6.750 in 171.5 mm S 4.400 in 111.8 mm G 2.681 in 68.1 mm T 3.000 in 114.3 mm H 7.188 in 182.6 mm U 4.400 in 111.8 mm J 85.569 in 2,173.5 mm V 4.400 in 111.8 mm K 3.688 in 93.7 mm W 4.400 in 111.8 mm L 4.400 in 111.8 mm

Page 23: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-7025 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Kline Tools KS1-XW Packer is a production packer that is useful for several applications including zone isolation, injection, pumping and production. The packer is designed to hold significant pressure from above or below whether left in compression, tension or neutral. Large internal bypass included to reduce swabbing when running or retrieving. The bypass opens first when releasing to allow the pressure to equalize before releasing the upper slips. The KS1-XW packer has a rotational shear release feature as well as an optional straight pull adjustable shear release.

GENERAL SPECIFICATIONS

Casing Tool Size Weight OD ID Connections Part Number

7”

17-26 6.000

2.50 2-7/8 EU8Rd 10A-7025-XXXX

26-32 5.875 29-35 5.812 26-35 5.844

Features • May be left in tension, compression or neutral. • Can be run on tubing or wireline. • Integrated bypass feature to aid releasing. • Rated for 7,000 psi differential pressure. • Stainless steel follow spring

Options • Nickel coating • Red epoxy phenolic coating • Plastic coated ID

Accessories • KT-2 on-off tool • Stinger with or without profile • Adjustable straight pull shear release kit

Page 24: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-7025 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS Attribute Value Maximum OD1 5.75 in 146.1 mm Minimum ID 2.49 in 63.2 mm Overall Length 91.25 in 2,338.3 mm Fluid Bypass Area 0.85 in2 548.4 mm2 Approximate Weight 291 lb 132 kg External Working Pressure 7,000 psi 48,263 KPa Internal Working Pressure 7,000 psi 48,263 KPa Max Working Temperature2 250°F 121°C Min Working Temperature 70°F 21°C Tensile Rating 96,400 lbf 42,881 DaN NACE Service No No

(1) Base tool OD. Look at casing weight chart for gage OD. (2) Higher temperatures can be achieved with different elastomers.

OPERATING INSTRUCTIONS Note: Ensure all connections are correctly tightened.

• Run to desired setting depth. • Pick up weight of tubing plus 1,000-3,000 lbs. • Apply right hand rotation and set down tubing string to set slips, close the bypass and pack off the elements.

(14,000-16,000 lbs. of weight should be used to fully set and pack off tool) • Tool may be left in compression, tension or neutral. • To remove the packer, set down weight then apply right hand rotation. • Pick while maintaining the right-hand rotation. • Pause when the bypass valve opens to allow pressure differential to equalize. • Once pressure equalizes, continue straight pull to finish releasing the tool.

ASSEMBLY INSTRUCTIONS Note: Care should be taken during assembly to insure all threads are greased adequately. Caution: Take care when handling inner mandrel not to damage seal surface.

• Insert top sub (1) into vise with spring cage cap (2) slid over the top end. • Install spring retainer (10) into upper slip housing (12) then thread upper slip housing (12) onto

spring cage (4) and install follow spring (5) inside spring cage (4). • Install upper slips (14), releasing slip (15) and slip springs (13) into upper slip housing (12). • Slide upper slip housing/spring cage subassembly onto top end of inner mandrel (3) then thread inner mandrel (3)

into top sub (1). • Thread spring cage cap (2) onto spring cage (4). • Slide element retainer (25), elements (24), element spacers (23) and element gage ring (22) onto rubber mandrel

(11).

Page 25: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-7025 - 2019 January

H O M E O F K L I N E T O O L S

• Install O-ring (21) into center coupling (20) and then thread center coupling onto upper end of rubber mandrel (11).

• Install O-ring (19) onto bypass seal (18). • Install bypass seal (18) and thrust ring (17) into center coupling (20) then thread upper cone (16) onto upper end. • Thread lower cone (26) onto lower end of element retainer (25). • Install lower slips (28) and lower slip springs (27) into slip windows of drag block body (29) then slide subassembly

over lower end of rubber mandrel (11). • Thread rubber mandrel cap (6) onto lower end of rubber mandrel (11). • Install drag blocks (34) and drag block springs (35) into drag block body (29) and then slide drag block retainer

(30) over lower end. • Slide retaining ring (33) onto upper end of j-body (7) and then thread j-body (7) onto drag block body (29).

CAUTION: This is a left-hand thread.

• Install set screws (32) into j-body (7) by aligning hole in drag block retainer (30) with each threaded hole in the

drag block body (29). There will be 3 holes total that require set screws installed. • Slide rubber mandrel subassembly onto lower end of inner mandrel subassembly. • Insert O-ring (8) into bottom sub (9). • Next thread bottom sub (9) onto lower end of inner mandrel (3). • Slide j-body up to reveal set screw hole in bottom sub (9) then install set screws (31).

DISASSEMBLY INSTRUCTIONS

• Insert tool into vise at top sub (1). • Slide j-body (7) up to reveal the set screws (31) in the bottom sub (9). Remove the set screws (31). • Using the j-body (7) and left-hand rotation, remove the bottom sub (9) from the inner mandrel (3). • Remove rubber mandrel sub assembly from inner mandrel subassembly. • Remove spring cage cap (2) from spring cage (4). • Break inner mandrel (3) from top sub (1) and slide spring cage/upper slip housing offer inner mandrel (3). • Remove set screws (32) from drag block body (29) then place j-body (7) in the vise and break connection to drag

block body (29).

CAUTION: This is a left-hand thread.

• Remove drag block retainer (30), drag blocks (34) and drag block springs (35) from drag block body.

CAUTION: Drag blocks will spring out when retainer is removed if not restrained.

• Remove rubber mandrel cap (6) from rubber mandrel (11). • Remove drag block body (29) from rubber mandrel (11). • Break connection between upper cone (16) and center coupling (20) then remove thrust ring (17), bypass seal (18). • Break connection between rubber mandrel (11) and center coupling (20) then remove elements (24) and element

spacers (23). • Break connection between lower cone (26) and element retainer (25) and remove both from rubber mandrel (11).

Page 26: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-7025 - 2019 January

H O M E O F K L I N E T O O L S

10A-7025-XXXX PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER 17-26# (6.000” OD) 26-32# (5.875” OD) 29-35# (5.812” OD) 26-35# (5.844” OD)

1 1 TOP 00107 2 1 SPRING CAGE CAP 00543 00876 00315 00544 3 1 INNER MANDREL 00108 4 1 SPRING CAGE 00110 5 1 FOLLOW SPRING 603-70-920S 6 1 RUBBER MANDREL CAP 00124 7 1 J-BODY ASSEMBLY (RH/LH) 00127-K2/00391-K2 8 1 O-RING 19233 9 1 BOTTOM SUB 00125-K 10 1 SPRING RETAINER 00129 11 1 RUBBER MANDREL 00550 12 1 UPPER SLIP HOUSING 00483 13 6 UPPER SLIP SPRING 00214 14 2 UPPER SLIP 70KXUC/70KXUW 15 1 RELEASING SLIP 70KXR 16 1 UPPER CONE 00113 17 1 THRUST RING 00120 18 1 SEAL 600-70-520 19 1 O-RING 19153 20 1 CENTER COUPLING 00114 21 1 O-RING 19242 22 1 GAGE RING 00541 00116 00316 00545 23 2 RUBBER SPACER 00516 00117 00317 00547 24 3 RUBBER ELEMENT 602-72-51X 602-70-51X 602-75-51X 602-70-51X 25 1 RUBBER RETAINER 00542 00118 00318 00546 26 1 LOWER CONE 00119 27 8 LOWER SLIP SPRING 00213 28 4 LOWER SLIP 70KXLC/70KXLW 29 1 DRAG BLOCK BODY 00403 30 1 DRAG BLOCK RETAINER 00319 31 2 ¼-20 UNC X 3/8 SHSS 11146C 32 3 5/16-18 UNC X 3/8 SHSS 11156C 33 1 RETAINING RING 00123 34 4 DRAG BLOCK 50800 50700 35 24 DRAG BLOCK SPRING 50110

Page 27: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-7025 - 2019 January

H O M E O F K L I N E T O O L S

10A-7025-XXXX ASSEMBLY DRAWING

10A-7025-XXXX DIMENSIONS

DIMENSION MEASUREMENT DIMENSION MEASUREMENT

A 7.43 in 188.7 mm M 3.69 in 93.7 mm B 2.39 in 60.7 mm N GAGE DIAMETER C 7.88 in 200.2 mm P 4.88 in mm D 4.38 in 111.3 mm Q GAGE DIAMETER E 4.82 in 122.4 mm R 3.25 in 82.6 mm F 9.82 in 249.4 mm S 5.75 in 146.1 mm G .41 in 10.4 mm T GAGE DIAMETER H 7.83 in 198.9 mm U GAGE DIAMETER J 8.06 in 204.7 mm V GAGE DIAMETER K 3.97 in 100.8 mm W 5.719 in mm L 91.25 in 2,317.8 mm X 5.50 in 139.7 mm

Page 28: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

WLSK FOR KS1-XW 5-1/2” X 2-7/8”, 7” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-7025-7001 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Kline Tools KS1-XW Wireline Setting Kit is designed to work with the KT-2 on/off tool and Baker 20 setting tool.

GENERAL SPECIFICATIONS Casing Tool

Size Weight OD Connections Part Number 5-1/2” 14-20#

4.500”

3.500” – 6 Full Acme Box Up (Outer Adapter)

2.000” – 6 Full Acme Box Up (Inner Adapter)

10A-7025-7001

5-1/2” 20-23# 7” 17-26# 7” 26-35#

Features

• Works with Baker 20 Setting Tool

Related Products • 5-1/2” X 2-7/8” KS1-XW 7K/10K • 5-1/2” x 2-7/8” KT-2 On/Off Tool • 7” X 2-7/8” KS1-XW 7K/10K • 7” x 2-7/8” KT-2 On/Off Tool • 2-7/8” Stingers

SPECIFICATIONS

Attribute Value Maximum OD 4.515 in 114.68 mm Overall Length 31.375 in 796.93 mm Approximate Weight 50 lb 22.68 kg Tensile Rating (Inner Adapter @ 2” – 6 Full Acme thread) 125,000 lb 55,603 daN

Force per Shear Screw 5,636-7,624 lb 2,507-3,391 daN Maximum Shear Force 45,088-60,992 lb 20,056-27,130 daN

Page 29: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

WLSK FOR KS1-XW 5-1/2” X 2-7/8”, 7” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-7025-7001 - 2019 January

H O M E O F K L I N E T O O L S

OPERATING INSTRUCTIONS Note: Ensure all connections are correctly tightened. Caution: It is recommended that a slow burn charge be used in the tool

• Run packer to desired depth. • Activate setting tool to set packer. • Apply tension required to break the shear screws pinning the stinger to the inner adapter. • Pull string from well.

ASSEMBLY INSTRUCTIONS Note: Care should be taken during assembly to insure all threads are greased adequately.

• Ensure packer is pinned for wireline and stinger threaded into top sub. • Slide inner adapter (6) over stinger and install desired number of shear screws (7). • Slide setting sleeve (4) over lower end of setting tool. • Thread outer adapter (2) onto setting tool and install set screws (1). • Install lock spring (not provided) onto top thread of inner adapter (6). • Screw setting tool onto inner adapter until the flange of the lock spring is in the groove at the bottom end of the

tool. Install setting screws (5) into inner adapter. • Slide setting sleeve (4) down and engage thread with outer adapter (2) thread. • Screw this thread together until bottom of setting sleeve (4) is mated up on the spring cage cap shoulder of the

packer. • Install set screws (3).

DISASSEMBLY INSTRUCTIONS

• Remove set screws (3). • Thread setting sleeve (4) up and slide over setting tool. • Remove set screws (5). • Thread inner adapter (6) off of setting tool. • Remove set screws (1) from outer adapter (2). • Thread outer adapter (2) off of setting tool. • Slide setting sleeve (4) off of setting tool. • Remove remainder of shear screws (7) from inner adapter (6).

Page 30: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

WLSK FOR KS1-XW 5-1/2” X 2-7/8”, 7” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-7025-7001 - 2019 January

H O M E O F K L I N E T O O L S

10A-4520-7001 PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER

1 2 SET SCREW 11144C 2 1 OUTER ADAPTER 00464 3 2 SET SCREW 11157C 4 1 SETTING SLEEVE (STANDARD) 00479-K 5 2 SET SCREW 11156C 6 1 INNER ADAPTER (STANDARD) 00466 7 8 SHEAR SCREW 11687C

Page 31: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

WLSK FOR KS1-XW 5-1/2” X 2-7/8”, 7” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-7025-7001 - 2019 January

H O M E O F K L I N E T O O L S

10A-4520-7001 ASSEMBLY DRAWING

Page 32: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

WLSK FOR KS1-XW 5-1/2” X 2-7/8”, 7” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-7025-7001 - 2019 January

H O M E O F K L I N E T O O L S

10A-4520-7001 DIMENSIONS

DIMENSIONS A 31.38 in 882.7 mm B 17.31 in 439.7 mm C 6.13 in 155.7 mm D 2.75 in 69.9 mm

ØE 4.50 in 114.3 mm ØF 3.28 in 83.31 mm ØG 4.00 in 101.6 mm ØH 3.25 in 82.6 mm ØJ 3.94 in 100.1 mm

Page 33: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 7” X 3-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-7035 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Kline Tools KS1-XW Packer is a production packer that is useful for several applications including zone isolation, injection, pumping and production. The packer is designed to hold significant pressure from above or below whether left in compression, tension or neutral. Large internal bypass included to reduce swabbing when running or retrieving. The bypass opens first when releasing to allow the pressure to equalize before releasing the upper slips. The KS1-XW packer has a rotational shear release feature as well as an optional straight pull adjustable shear release.

GENERAL SPECIFICATIONS

Casing Tool Size Weight OD ID Connections Part Number

7” 17-26 6.000

3.00 3-1/2 EU8Rd 10A-7035-XXXX 26-32 5.875

29-35 5.812

Features • May be left in tension, compression or neutral. • Can be run on tubing or wireline. • Integrated bypass feature to aid releasing. • Rated for 7,000 psi differential pressure. • Stainless steel follow spring

Options • Nickel coating • Red epoxy phenolic coating • Plastic coated ID

Accessories • KT-2 on-off tool • Stinger with or without profile • Adjustable straight pull shear release kit

Page 34: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 7” X 3-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-7035 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS

Attribute Value Maximum OD1 5.75 in Minimum ID 2.99 in Overall Length 93.94 in Fluid Bypass Area 1.42 in2 Approximate Weight 305 lb External Working Pressure 7,000 psi Internal Working Pressure 7,000 psi Max Working Temperature2 250 °F Min Working Temperature 70 °F Tensile Rating 130,000 lb Compression Rating 123,000 lb NACE Service No

(1) Base tool OD. Look at casing weight chart for gage OD. (2) Higher temperatures can be achieved with different elastomers. OPERATING INSTRUCTIONS Note: Ensure all connections are correctly tightened.

• Run to desired setting depth. • Pick up weight of tubing plus 1,000-3,000 lbs. • Apply right hand rotation and set down tubing string to set slips, close the bypass and pack off the elements.

(14,000-16,000 lbs. of weight should be used to fully set and pack off tool) • Tool may be left in compression, tension or neutral. • To remove the packer, set down weight then apply right hand rotation. • Pick while maintaining the right-hand rotation. • Pause when the bypass valve opens to allow pressure differential to equalize. • Once pressure equalizes, continue straight pull to finish releasing the tool.

ASSEMBLY INSTRUCTIONS Note: Care should be taken during assembly to insure all threads are greased adequately. Caution: Take care when handling inner mandrel not to damage seal surface.

• Insert top sub (1) into vise with spring cage cap (2) slid over the top end. • Thread upper slip housing (6) onto spring cage (4) and install follow spring (5) inside spring cage (4). • Install upper slips (8), releasing slip (9) and slip springs (7) into upper slip housing (6). • Slide upper slip housing/spring cage subassembly onto top end of inner mandrel (3) then thread inner mandrel (3)

into top sub (1). • Thread spring cage cap (2) onto spring cage (4). • Thread gage ring (16) onto both the center coupling (14) and the element retainer (19). • Slide element retainer (19), elements (18) and element spacers (17) onto rubber mandrel (27).

Page 35: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 7” X 3-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-7035 - 2019 January

H O M E O F K L I N E T O O L S

• Install O-ring (15) into center coupling (14) and then thread center coupling onto upper end of rubber mandrel (27).

• Install O-ring (13) onto bypass seal (12). • Install bypass seal (12) and bearing ring (11) into center coupling (14) then thread upper cone (10) onto upper

end. • Thread lower cone (20) onto lower end of element retainer (19). • Install lower slips (22) and lower slip springs (21) into slip windows of drag block body (23) then slide subassembly

over lower end of rubber mandrel (27). • Thread rubber mandrel cap (28) onto lower end of rubber mandrel (27). • Install drag blocks (25) and drag block springs (26) into drag block body (23) and then slide drag block retainer

(24) over lower end. • Thread j-body (29) onto drag block body (23).

CAUTION: This is a left-hand thread.

• Install set screws (32) into j-body. • Slide rubber mandrel subassembly onto lower end of inner mandrel subassembly. • Insert O-ring (30) into bottom sub (31) and then thread bottom sub (31) onto lower end of inner mandrel (3). • Slide j-body up to reveal set screw hole in bottom sub (31) then install set screws (33).

DISASSEMBLY INSTRUCTIONS

• Insert tool into vise at top sub (1). • Slide j-body (29) up to reveal the set screws (33) in the bottom sub (31). Remove the set screws (33). • Using the j-body (29) and left-hand rotation, remove the bottom sub (31) from the inner mandrel (3). • Remove rubber mandrel sub assembly from inner mandrel subassembly. • Remove spring cage cap (2) from spring cage (4). • Break inner mandrel (3) from top sub (1) and slide spring cage/upper slip housing offer inner mandrel (3). • Place j-body (29) in the vise and break connection to drag block body (23).

CAUTION: This is a left-hand thread.

• Remove drag block retainer (24), drag blocks (25) and drag block springs (26) from drag block body. CAUTION: Drag blocks will spring out when retainer is removed if not restrained.

• Remove rubber mandrel cap (28) from rubber mandrel (27). • Remove drag block body (23) from rubber mandrel (27). • Break connection between upper cone (10) and center coupling (14) then remove bearing ring (11), bypass seal

(12). • Break connection between rubber mandrel (27) and center coupling (14) then remove elements (18) and element

spacers (17). • Break connection between lower cone (20) and element retainer (19) and remove both from rubber mandrel (27).

Page 36: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 7” X 3-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-7035 - 2019 January

H O M E O F K L I N E T O O L S

10A-7035-XXXX PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER 17-26# (6.000” OD) 26-32# (5.875” OD) 29-35# (5.812” OD)

1 1 TOP 00494 2 1 SPRING CAGE CAP 00465 00690 00689 3 1 INNER MANDREL 00492 4 1 SPRING CAGE 00507 5 1 FOLLOW SPRING 603-73-920S 6 1 UPPER SLIP HOUSING 00500 7 6 UPPER SLIP SPRING 00214 8 2 UPPER SLIP 73KXUW or 73KXUC 9 1 RELEASING SLIP 73KXR 10 1 UPPER CONE 00496 11 1 THRUST RING 00506 12 1 SEAL 600-73-520 13 1 O-RING 19155 14 1 CENTER COUPLING 00501 15 1 O-RING 19243 16 2 GAGE RING 00504 00691 00688 17 2 RUBBER SPACER 00692 00693 00694 18 3 RUBBER ELEMENT 602-74-51X 602-73-51X 19 1 RUBBER RETAINER 00510 20 1 LOWER CONE 00486 21 8 LOWER SLIP SPRING 00213 22 4 LOWER SLIP 73KXLW or 73KXLC 23 1 DRAG BLOCK BODY 00502 24 1 DRAG BLOCK RETAINER 00503 25 4 DRAG BLOCK 50700 50600 26 24 DRAG BLOCK SPRING 50110 27 1 RUBBER MANDREL 00509 28 1 RUBBER MANDREL CAP 00508 29 1 J-BODY ASSEMBLY 00511-K 30 1 O-RING 19237 31 1 BOTTOM SUB ASSEMBLY 00488-K 32 4 3/8”-16 X 3/8” SET SCREW 11166C 33 2 ¼”-20 X 3/8” SET SCREW 11146C

Page 37: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 7” X 3-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-7035 - 2019 January

H O M E O F K L I N E T O O L S

10A-7035-XXXX ASSEMBLY DRAWING

Page 38: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 7” X 3-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10A-7035 - 2019 January

H O M E O F K L I N E T O O L S

10B-7035-XXXX DIMENSIONS

DIMENSION MEASUREMENT A 8.900 in 226.06 mm B 23.775 in 603.89 mm C 31.211 in 792.76 mm D 42.005 in 1,066.93 mm E 9.600 in 243.84 mm F 6.450 in 163.83 mm G 97.937 in 2,487.60 mm H 4.438 in 112.73 mm J GAGE DIA K GAGE DIA L 3.718 in 94.44 mm M 5.750 in 146.05 mm N 5.750 in 146.05 mm P 5.812 in 147.62 mm Q 5.500 in 139.70 mm R 5.750 in 146.05 mm

Page 39: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10k) 4-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-4520 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Kline Tools KS1-XW Packer is a production packer that is useful for several applications including zone isolation, injection, pumping and production. The packer is designed to hold significant pressure from above or below whether left in compression, tension or neutral. Large internal bypass included to reduce swabbing when running or retrieving. The bypass opens first when releasing to allow the pressure to equalize before releasing the upper slips. The KS1-XW packer has a rotational shear release feature as well as an optional straight pull adjustable shear release.

GENERAL SPECIFICATIONS Casing Tool

Size Weight OD ID Connections Part Number

4-1/2” 9.5-13.5 3.750

1.94 2-3/8 EUE 8 Rd 10B-4520-XXXX 13.5-15.1 3.656*

*3.719” across collapsed drag blocks

Features • May be left in tension, compression or neutral. • Can be run on tubing or wireline. • Integrated bypass feature to aid releasing. • Rated for 10,000 psi differential pressure. • Stainless steel follow spring

Options

• Nickel coating • Red epoxy phenolic coating • Plastic coated ID

Accessories

• KT-2 on-off tool (604-4520-XXXX) • Wireline Setting Kit (10B-4520-7001) • Stinger with or without profile • Adjustable straight pull shear release kit

Page 40: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10k) 4-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-4520 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS

Attribute Value Maximum OD1 See Gage Dia Minimum ID 1.932 in 49.07 mm Overall Length 75.96 in 1,929.38 mm Fluid Bypass Area 0.454 in2 292.90 mm2 Approximate Weight 115 lb. 52.2 kg Max Slip Expansion (Upper Slips) 4.014 in 102.0 mm Max Slip Expansion (Lower Slips) 4.067 in 103.3 mm External Working Pressure 10,000 psi 68,947 KPa Internal Working Pressure 10,000 psi 68,947 KPa Max Working Temperature2 250 °F 121 °C Min Working Temperature 70 °F 21 °C Tensile Rating 53,000 lb. 23,576 daN NACE Service Available Upon Request

(1) Base tool OD. Look at casing weight chart for gage OD. (2) Higher temperatures can be achieved with different elastomers. OPERATING INSTRUCTIONS Note: Ensure all connections are correctly tightened.

• Run to desired setting depth. • Pick up weight of tubing plus 1,000-3,000 lbs. • Apply right hand rotation and set down tubing string to set slips, close the bypass and pack off the elements.

(8,000-10,000 lbs. of weight should be used to fully set and pack off tool) • Tool may be left in compression, tension or neutral. • To remove the packer, set down weight then apply right hand rotation. • Pick while maintaining the right-hand rotation. • Pause when the bypass valve opens to allow pressure differential to equalize. • Once pressure equalizes, continue straight pull to finish releasing the tool.

ASSEMBLY INSTRUCTIONS Note: Care should be taken during assembly to insure all threads are greased adequately. Caution: Take care when handling rubber mandrel not to damage seal surface.

• Insert top sub (1) into vise with spring cage cap (2) slid over the top end. • Install follow spring (5) inside spring cage (4). • Install upper slips (7), releasing slip (8) and slip springs (6) into slip windows of spring cage (4). • Slide upper spring cage subassembly onto top end of inner mandrel (3) then thread inner mandrel (3) into top sub

(1). • Thread spring cage cap (2) onto spring cage (4).

Page 41: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10k) 4-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-4520 - 2019 January

H O M E O F K L I N E T O O L S

• Slide element retainer (16), elements (15) and element spacers (14) onto rubber mandrel (23). • Install O-ring (13) into center coupling (12) and then thread center coupling (12) onto upper end of rubber

mandrel (23). • Install O-ring (11) onto bypass seal (10). • Install bypass seal (10) into center coupling (12) then thread upper cone (9) onto upper end. • Thread lower cone (17) onto lower end of element retainer (16). • Install lower slips (19) and lower slip springs (18) into slip windows of drag block body (21) then slide

subassembly over lower end of rubber mandrel (23). • Thread rubber mandrel cap (24) onto lower end of rubber mandrel (23). • Install drag blocks (21) and drag block springs (22) into drag block body (20) and then thread j-body (25) onto

drag block body (20). CAUTION: This is a left-hand thread.

• Install set screws (28) into j-body. • Slide rubber mandrel subassembly onto lower end of inner mandrel subassembly. • Thread bottom nipple (29) into lower end of bottom sub (27). This connection should be tightened to the

appropriate torque for a standard P110 2-3/8” EUE 8 Rd connection. • Insert O-ring (26) into bottom sub (27) and then thread bottom sub (27) onto lower end of inner mandrel (3). • Slide j-body up to reveal set screw hole in bottom sub (27) then install set screws (28).

DISASSEMBLY INSTRUCTIONS

• Insert tool into vise at top sub (1). • Slide j-body (25) up to reveal the set screws (28) in the bottom sub (27). Remove the set screws (28). • Using the j-body (25) and left-hand rotation, remove the bottom sub (27) from the inner mandrel (3). • Remove rubber mandrel sub assembly from inner mandrel subassembly. • Remove spring cage cap (2) from spring cage (4). • Break inner mandrel (3) from top sub (1) and slide spring cage offer inner mandrel (3). • Place j-body (25) in the vise and break connection to drag block body (20).

CAUTION: This is a left-hand thread. CAUTION: Drag blocks will spring out when retainer is removed if not restrained.

• Remove rubber mandrel cap (24) from rubber mandrel (23). • Remove drag block body (20) from rubber mandrel (23). • Break connection between upper cone (9) and center coupling (12) then remove bypass seal (10). • Break connection between rubber mandrel (23) and center coupling (12) then remove elements (15) and element

spacers (14). • Break connection between lower cone (17) and element retainer (16) and remove both from rubber mandrel (23).

Page 42: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10k) 4-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-4520 - 2019 January

H O M E O F K L I N E T O O L S

10B-4520-XXXX PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER 9.5-13.5# (3.750” OD) 13.5-15.1# (3.656”

OD) 1 1 TOP 00043P 2 1 SPRING CAGE CAP 00044 00044A 3 1 INNER MANDREL 00047P 00047PA 4 1 SPRING CAGE 00045-K 00045A-K 5 1 FOLLOW SPRING 603-45-920S 6 6 UPPER SLIP SPRING 00042 7 2 UPPER SLIP (CARBIDE OR WICKERED) 45KXUC or 45KXUW 8 1 RELEASING SLIP 45KXR 9 1 UPPER CONE 00048P 00048PA

10 1 SEAL 600-45-520 11 1 O-RING 19145 12 1 CENTER COUPLING 00049 00049A 13 1 O-RING 19232 14 2 RUBBER SPACER 00051 00051A 15 3 RUBBER ELEMENT 602-45-51X 602-46-51X 16 1 RUBBER RETAINER 00052 00052A 17 1 LOWER CONE 00053P 00053PA 18 4 LOWER SLIP SPRING 00041 19 4 LOWER SLIP (CARBIDE OR WICKERED) 45KXLC or 45KXLW 20 1 DRAG BLOCK BODY 00400 00400A 21 4 DRAG BLOCK 50450 22 16 DRAG BLOCK SPRING 50100 23 1 RUBBER MANDREL 00050 00050A 24 1 RUBBER MANDREL CAP 00055 25 1 J-BODY (RIGHT HAND OR LEFT HAND) 00057 or 00223 00057A or 00223A 26 1 O-RING 19228 27 1 BOTTOM SUB 00059 28 6 ¼ - 20 UNC X 3/8 LG SOCKET SET SCREW 11146C 29 1 BOTTOM NIPPLE 00060

Page 43: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10k) 4-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-4520 - 2019 January

H O M E O F K L I N E T O O L S

10B-4520-XXXX ASSEMBLY DRAWING

Page 44: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10k) 4-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-4520 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONS

DIMENSION MEASUREMENT A 8.000 in 203.20 mm B 22.313 in 566.75 mm C 2.900 in 73.66 mm D 33.181 in 842.80 mm E 5.189 in 131.80 mm F 7.000 in 177.80 mm G 2.655 in 67.44 mm H 79.649 in 2,023.1 mm J 3.000 in 76.20 mm K GAGE DIAMETER L 2.342 in 59.49 mm M GAGE DIAMETER N GAGE DIAMETER P GAGE DIAMETER

Page 45: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 5-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5520 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Kline Tools KS1-XW Packer is a production packer that is useful for several applications including zone isolation, injection, pumping and production. The packer is designed to hold significant pressure from above or below whether left in compression, tension or neutral. Large internal bypass included to reduce swabbing when running or retrieving. The bypass opens first when releasing to allow the pressure to equalize before releasing the upper slips. The KS1-XW packer has a rotational shear release feature as well as an optional straight pull adjustable shear release.

GENERAL SPECIFICATIONS

Casing Tool Size Weight OD ID Connections Part Number

5-1/2” 14-20# 4.625”

2.000” 2-3/8” 10B-5520-XXXX 20-23# 4.500”

Features

• May be left in tension, compression or neutral. • Can be run on tubing or wireline. • Integrated bypass feature to aid releasing. • Rated for 10,000 psi differential pressure. • Stainless steel follow spring

Options • Nickel coating • Red epoxy phenolic coating • Plastic coated ID • 316 stainless steel inner mandrel and top sub (reduced tool ratings)

Accessories • KT-2 on-off tool • Stinger with or without profile • Adjustable straight pull shear release kit

Page 46: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 5-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5520 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS

Attribute Value Maximum OD1 4.625 in 117.5 mm Minimum ID 2.000 in 50.8 mm Overall Length 88.81 in 2,255.8 mm

Fluid Bypass Area 14-20# 20-23#

0.984 in2 634.8 mm2 Approximate Weight 191 lb. 86.6 kg External Working Pressure 10,000 psi 68,948 KPa Internal Working Pressure 10,000 psi 68,948 KPa Max Working Temperature2 250 °F 121 °C Min Working Temperature 70 °F 21 °C Tensile Rating 72,000 lbf. 320.3 kN NACE Service No

(1) Base tool OD. Look at casing weight chart for gage OD. (2) Higher temperatures can be achieved with different elastomers. OPERATING INSTRUCTIONS Note: Ensure all connections are correctly tightened.

• Run to desired setting depth. • Pick up weight of tubing plus 1,000-3,000 lbs. • Apply right hand rotation and set down tubing string to set slips, close the bypass and pack off the elements.

(10,000-12,000 lbs. of weight should be used to fully set and pack off tool) • Tool may be left in compression, tension or neutral. • To remove the packer, set down weight then apply right hand rotation. • Pick while maintaining the right-hand rotation. • Pause when the bypass valve opens to allow pressure differential to equalize. • Once pressure equalizes, continue straight pull to finish releasing the tool.

ASSEMBLY INSTRUCTIONS Note: Care should be taken during assembly to insure all threads are greased adequately. Caution: Take care when handling inner mandrel not to damage seal surface.

• Insert top sub (1) into vise with spring cage cap (2) slid over the top end. • Assemble upper slip housing (5) to spring cage (4). • Install follow spring (5) inside spring cage (4). • Install releasing slip (6), upper slips (7), and slip springs (8) into slip windows of upper slip housing (5). • Slide spring cage subassembly onto top end of inner mandrel (9) then thread inner mandrel into top sub (1). • Thread spring cage cap (2) onto spring cage (4). • Slide element retainer (18), elements (16), element spacers (17), and element gauge ring (15) onto rubber mandrel

(20).

Page 47: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 5-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5520 - 2019 January

H O M E O F K L I N E T O O L S

• Install O-ring (14) into center coupling (11) and then thread center coupling onto upper end of rubber mandrel (20).

• Install O-ring (12) onto bypass seal (13). • Install bypass seal (13) into center coupling (11) then thread upper cone (10) onto upper end of center coupling. • Thread lower cone (19) onto lower end of element retainer (18). • Install lower slips (21) and lower slip springs (22) into slip windows of control body (23) then slide subassembly

over lower end of rubber mandrel (21). • Thread rubber mandrel cap (29) onto lower end of rubber mandrel (20). • Install drag blocks (24), drag block springs (25) and drag block retainer (26) onto control body (23) and then

thread j-body (28) onto control body. CAUTION: This is a left-hand thread.

• Install set screws (27) into j-body (28). • Slide rubber mandrel subassembly onto lower end of inner mandrel subassembly. • Insert O-ring (31) into bottom sub (32) and then thread bottom sub onto lower end of inner mandrel (9). • Thread nipple (33) into bottom end of bottom sub (32). • Slide j-body (28) up to reveal set screw hole in bottom sub (32) then install set screws (30).

DISASSEMBLY INSTRUCTIONS

• Insert tool into vise at top sub (1). • Slide j-body (28) up to reveal the set screws (30) in the bottom sub (32). Remove the set screws. • Using the j-body (28) and left-hand rotation, remove the bottom sub (32) from the inner mandrel (9). • Remove rubber mandrel sub assembly from inner mandrel subassembly. • Remove spring cage cap (2) from spring cage (4). • Break inner mandrel (9) from top sub (1) and slide spring cage off inner mandrel. • Place j-body (28) in the vise and break connection to control body (23) and remove drag block retainer (26).

CAUTION: This is a left-hand thread. CAUTION: Drag blocks will spring out when retainer is removed if not restrained.

• Remove rubber mandrel cap (29) from rubber mandrel (20). • Remove control body (23) from rubber mandrel (20). • Break connection between upper cone (10) and center coupling (11) then remove bypass seal (13). • Break connection between rubber mandrel (20) and center coupling (11) then remove element gauge ring (15),

elements (16), and element spacers (17). • Break connection between lower cone (19) and element retainer (18) and remove both from rubber mandrel (20).

Page 48: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 5-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5520 - 2019 January

H O M E O F K L I N E T O O L S

10B-5520-XXXX PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER 14-20# (4.625” OD) 20-23# (4.500” OD)

1 1 TOP 00070P 2 1 SPRING CAGE CAP 00075 00075A 3 1 FOLLOWER SPRING 603-55-920S 4 1 SPRING CAGE 00069 5 1 UPPER SLIP HOUSING 00064-K 6 1 RELEASING SLIP 55KXR 7 2 UPPER SLIP 55KXUW (WICKERED) OR 55KXUC (CARBIDE) 8 6 UPPER SLIP SPRING 00040 9 1 INNER MANDREL 00082P 00082-AP

10 1 UPPER CONE 00071P 11 1 CENTER COUPLING 00081 12 1 O-RING 19149 13 1 BYPASS SEAL 600-55-520 14 1 O-RING 19234 15 1 ELEMENT GAUGE RING 00061 00061A 16 3 ELEMENT 602-55-51X 602-57-51X 17 2 RUBBER SPACER 00074 00074A 18 1 RUBBER RETAINER 00073 00073A 19 1 LOWER CONE 00072P 20 1 RUBBER MANDREL 00076 00076A 21 4 LOWER SLIP 55KXLW (WICKERED) OR 55KXLC (CARBIDE) 22 8 LOWER SLIP SPRING 00039 23 1 CONTROL BODY 00401 00401A 24 4 DRAG BLOCK 50550 25 20 DRAG BLOCK SPRING 50100 26 1 DRAG BLOCK RETAINER 00080 00080A 27 4 SET SCREW 11156C 28 1 J-BODY 00079 29 1 RUBBER MANDREL CAP 00068 30 2 SET SCREW 11146C 31 1 O-RING 19228 32 1 BOTTOM SUB 00083 33 1 NIPPLE 00060

Page 49: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 5-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5520 - 2019 January

H O M E O F K L I N E T O O L S

10A-5520-XXXX ASSEMBLY DRAWING

Page 50: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 5-1/2” X 2-3/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5520 - 2019 January

H O M E O F K L I N E T O O L S

10A-5520-XXXX DIMENSIONS

DIMENSION MEASUREMENT DIMENSION MEASUREMENT 14-20# 20-23#

A 7.64 in 194.1 mm 7.64 in 194.1 mm M 4.13 in 10.5 mm 4.13 in 10.5 mm B 15.39 in 390.9 mm 15.39 in 390.9 mm N 4.50 in 11.43 mm 4.50 in 11.43 mm C 2.50 in 63.5 mm 2.50 in 63.5 mm P 2.60 in 6.6 mm 2.60 in 6.6 mm D 12.25 in 311.2 mm 12.25 in 311.2 mm Q 4.44 in 11.3 mm 4.44 in 11.3 mm E 7.81 in 198.4 mm 7.81 in 198.4 mm R 4.63 in 11.8 mm 4.50 in 11.43 mm F 6.44 in 163.6 mm 6.44 in 163.6 mm S 4.63 in 11.8 mm 4.50 in 11.43 mm G 3.19 in 81.0 mm 3.19 in 81.0 mm T 4.63 in 11.8 mm 4.50 in 11.43 mm H 7.63 in 193.8 mm 7.63 in 193.8 mm U 2.88 in 7.3 mm 2.88 in 7.3 mm J 88.87 in 225.7 cm 88.87 in 225.7 cm V 4.50 in 11.43 mm 4.50 in 11.43 mm K 3.06 in 7.8 mm 3.06 in 7.8 mm W 4.63 in 11.8 mm 4.50 in 11.43 mm L 4.63 in 11.8 mm 4.50 in 11.8 mm X 4.50 in 11.43 mm 4.50 in 11.43 mm

Page 51: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 5-1/2” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5525 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Kline Tools KS1-XW Packer is a production packer that is useful for several applications including zone isolation, injection, pumping and production. The packer is designed to hold significant pressure from above or below whether left in compression, tension or neutral. Large internal bypass included to reduce swabbing when running or retrieving. The bypass opens first when releasing to allow the pressure to equalize before releasing the upper slips. The KS1-XW packer has a rotational shear release feature as well as an optional straight pull adjustable shear release.

GENERAL SPECIFICATIONS

Casing Tool Size Weight OD ID Connections Part Number

5-1/2” 14-20# 4.625”

2.375” 2-7/8” 10B-5525-XXXX 20-23# 4.500” 23-26# 4.400”

Features

• May be left in tension, compression or neutral. • Can be run on tubing or wireline. • Integrated bypass feature to aid releasing. • Rated for 10,000 psi differential pressure. • Stainless steel follow spring

Options • Nickel coating • Red epoxy phenolic coating • Plastic coated ID • 316 stainless steel inner mandrel and top sub (reduced tool ratings)

Accessories • KT-2 on-off tool • Stinger with or without profile • Adjustable straight pull shear release kit

Page 52: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 5-1/2” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5525 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS

Attribute Value Maximum OD1 4.625 in 117.5mm Minimum ID 2.375 in 60.5 mm Overall Length 89.942 in 2,173.5 mm

Fluid Bypass Area 14-20# 20-23# 23-26#

0.55 in2 354.8 mm2 0.55 in2 354.8 mm2 0.140 in2 90.3 mm2 Approximate Weight 202 lb. 91.7 kg External Working Pressure 10,000 psi 68,948 KPa Internal Working Pressure 10,000 psi 68,948 KPa Max Working Temperature2 250 °F 121 °C Min Working Temperature 70 °F 21 °C Tensile Rating 88,000 lbf. 391.4 kN NACE Service No

(1) Base tool OD. Look at casing weight chart for gage OD. (2) Higher temperatures can be achieved with different elastomers. OPERATING INSTRUCTIONS Note: Ensure all connections are correctly tightened.

• Run to desired setting depth. • Pick up weight of tubing plus 1,000-3,000 lbs. • Apply right hand rotation and set down tubing string to set slips, close the bypass and pack off the elements.

(10,000-12,000 lbs. of weight should be used to fully set and pack off tool) • Tool may be left in compression, tension or neutral. • To remove the packer, set down weight then apply right hand rotation. • Pick while maintaining the right-hand rotation. • Pause when the bypass valve opens to allow pressure differential to equalize. • Once pressure equalizes, continue straight pull to finish releasing the tool.

ASSEMBLY INSTRUCTIONS Note: Care should be taken during assembly to insure all threads are greased adequately. Caution: Take care when handling inner mandrel not to damage seal surface.

• Insert top sub (1) into vise with spring cage cap (2) slid over the top end. • Assemble upper slip housing (6) to spring cage (4). • Install follow spring (5) inside spring cage (4). • Install upper slips (8), releasing slip (9) and slip springs (7) into slip windows of upper slip housing (6). • Slide upper spring cage subassembly onto top end of inner mandrel (3) then thread inner mandrel (3) into top sub

(1). • Thread spring cage cap (2) onto spring cage (4). • Slide element retainer (18), elements (16) and element spacers (17) onto rubber mandrel (20).

Page 53: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 5-1/2” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5525 - 2019 January

H O M E O F K L I N E T O O L S

• Install O-ring (14) into center coupling (15) and then thread center coupling (15) onto upper end of rubber mandrel (20).

• Install O-ring (13) onto bypass seal (12). • Install bypass seal (12) into center coupling (15), followed by bearing bushing (11), then thread upper cone (10)

onto upper end. • Thread lower cone (19) onto lower end of element retainer (18). • Install lower slips (21) and lower slip springs (22) into slip windows of drag block body (23) then slide subassembly

over lower end of rubber mandrel (20). • Thread rubber mandrel cap (28) onto lower end of rubber mandrel (20). • Install drag blocks (24), drag block springs (25) and drag block retainer (26) onto drag block body (23) and then

thread j-body (27) onto drag block body (23). CAUTION: This is a left-hand thread.

• Install set screws (31) into j-body (27). • Slide rubber mandrel subassembly onto lower end of inner mandrel subassembly. • Insert O-ring (29) into bottom sub (30) and then thread bottom sub (30) onto lower end of inner mandrel (3). • Slide j-body (27) up to reveal set screw hole in bottom sub (30) then install set screws (32).

DISASSEMBLY INSTRUCTIONS

• Insert tool into vise at top sub (1). • Slide j-body (28) up to reveal the set screws (34) in the bottom sub (31). Remove the set screws (34). • Using the j-body (28) and left-hand rotation, remove the bottom sub (31) from the inner mandrel (3). • Remove rubber mandrel sub assembly from inner mandrel subassembly. • Remove spring cage cap (2) from spring cage (4). • Break inner mandrel (3) from top sub (1) and slide spring cage off inner mandrel (3). • Place j-body (28) in the vise and break connection to drag block body (24) and remove drag block retainer (27).

CAUTION: This is a left-hand thread. CAUTION: Drag blocks will spring out when retainer is removed if not restrained.

• Remove rubber mandrel cap (29) from rubber mandrel (21). • Remove drag block body (24) from rubber mandrel (21). • Break connection between upper cone (10) and center coupling (15) then remove bypass seal (12). • Break connection between rubber mandrel (21) and center coupling (15) then remove element gauge ring (16)

(14-20# & 20-23# tools only), elements (17), and element spacers (18). • Break connection between lower cone (20) and element retainer (19) and remove both from rubber mandrel (21).

Page 54: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 5-1/2” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5525 - 2019 January

H O M E O F K L I N E T O O L S

10A-5520-XXXX PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER 14-20# (4.625” OD) 20-23# (4.500” OD) 23-26# (4.400” OD)

1 1 TOP 00091P 00091P 00091P 2 1 SPRING CAGE CAP 00089 00089B 00528 3 1 INNER MANDREL 00085P 00085A-P 00531 4 1 SPRING CAGE 00088-K 00088A-K 00529 5 1 FOLLOW SPRING 603-56-920S 603-56-920S 603-56-920S 6 1 UPPER SLIP HOUSING N/A N/A 00530 7 6 UPPER SLIP SPRING 00040 00040 00040

8 2 UPPER SLIP (CARBIDE OR WICKERED)

57KXUC (CARBIDE) or 57KXUW (WICKERED)

57KXUC (CARBIDE) or 57KXUW (WICKERED)

57KXUC (CARBIDE) or 57KXUW (WICKERED)

9 1 RELEASING SLIP 57KXR 57KXR 57KXR 10 1 UPPER CONE 00094P 00094P 00534 11 1 BEARING BUSHING 00101 00101 00636 12 1 BYPASS SEAL 600-56-520 600-56-520 600-56-520 13 1 O-RING 19151 19151 19151 14 1 O-RING 19235 19235 19235 15 1 CENTER COUPLING 00093 00093 00536 16 1 ELEMENT GAUGE RING 00097 00097B N/A 17 3 RUBBER ELEMENT 602-56-51X 602-59-51X 602-53-51X 18 2 RUBBER SPACER 00098 00098B 00526 19 1 RUBBER RETAINER 00096 00096B 00525 20 1 LOWER CONE 00095P 00095P 00533 21 1 RUBBER MANDREL 00103 00103A 00524

22 4 LOWER SLIP (CARBIDE OR WICKERED)

57KXLC (CARBIDE) or 57KXLW (WICKERED)

57KXLC (CARBIDE) or 57KXLW (WICKERED)

57KXLC (CARBIDE) or 57KXLW (WICKERED)

23 8 LOWER SLIP SPRING 00039 00039 00039 24 1 DRAG BLOCK BODY 00402 00402A 00523 25 4 DRAG BLOCK 50550 50450 50450 26 20 16 16 DRAG BLOCK SPRING 50100 50100 50100 27 1 DRAG BLOCK RETAINER 00100 00100B 00527

28 1 J-BODY (RIGHT HAND OR LEFT HAND)

00090 (RH) 00222 (LH)

00090 (RH) 00222 (LH)

00521 (RH) 00522 (LH)

29 1 RUBBER MANDREL CAP 00099 00099 00535 30 1 O-RING 19231 19231 19231 31 1 BOTTOM SUB 00084 00084 00532 32 1 BOTTOM NIPPLE 00170 00170 00170

33 3 5/16”–NC SOCKET SET SCREW 11156C 11156C 11155C

34 2 ¼”–NC SOCKET SET SCREW 11146C 11146C 11145C

Page 55: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 5-1/2” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5525 - 2019 January

H O M E O F K L I N E T O O L S

10A-5520-XXXX ASSEMBLY DRAWING

Page 56: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (7K) 5-1/2” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5525 - 2019 January

H O M E O F K L I N E T O O L S

10A-5520-XXXX DIMENSIONS

DIMENSION MEASUREMENT 14-20# 20-23# 23-26#

A 6.719 in 170.7 mm 6.719 in 170.7 mm 6.719 in 170.7 mm B 16.256 in 412.9mm 16.256 in 412.9mm 15.880 in 403.4 mm C 3.526 in 89.6mm 3.526 in 89.6mm 4.076 in 103.5 mm D 9.375 in 238.1 mm 9.375 in 238.1 mm 9.375 in 238.1 mm E 7.500 in 190.5 mm 7.500 in 190.5 mm 7.513 in 190.8 mm F 6.938 in 176.2 mm 6.938 in 176.2 mm 6.750 in 171.5 mm G 1.843 in 46.8 mm 1.843 in 46.8 mm 2.001 in 50.8 mm H 7.156 in 181.8 mm 7.156 in 181.8 mm 7.188 in 182.6 mm J 59.563 in 1,512.9 mm 59.563 in 1,512.9 mm 89.943 in 2,284.6 mm K 3.688 in 93.7 mm 3.688 in 93.7 mm 3.688 in 93.7 mm L

4.625 in 117.5 mm 4.500 in 114.3 mm 4.400 in 111.8 mm M N P 2.870 in 72.9 mm 2.870 in 72.9 mm 2.870 in 72.9 mm Q

4.625 in 117.5 mm 4.500 in 114.3 mm 4.400 in 111.8 mm R S T 3.250 in 82.6 mm 3.125 in 79.4 mm 3.000 in 114.3 mm U

4.625 in 117.5 mm 4.500 in 114.3 mm 4.400 in 111.8 mm V W 4.500 in 114.3 mm 4.500 in 114.3 mm 4.400 in 111.8 mm

Page 57: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 5-1/2” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5525 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Kline Tools KS1-XW Packer is a production packer that is useful for several applications including zone isolation, injection, pumping and production. The packer is designed to hold significant pressure from above or below whether left in compression, tension or neutral. Large internal bypass included to reduce swabbing when running or retrieving. The bypass opens first when releasing to allow the pressure to equalize before releasing the upper slips. The KS1-XW packer has a rotational shear release feature as well as an optional straight pull adjustable shear release.

GENERAL SPECIFICATIONS

Casing Tool Size Weight OD ID Connections Part Number

5-1/2” 14-20# 4.625”

2.375” 2-7/8” 10B-5525-XXXX 20-23# 4.500” 23-26# 4.400”

Features

• May be left in tension, compression or neutral. • Can be run on tubing or wireline. • Integrated bypass feature to aid releasing. • Rated for 10,000 psi differential pressure. • Stainless steel follow spring

Options • Nickel coating • Red epoxy phenolic coating • Plastic coated ID • 316 stainless steel inner mandrel and top sub (reduced tool ratings)

Accessories • KT-2 on-off tool • Stinger with or without profile • Adjustable straight pull shear release kit

Page 58: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 5-1/2” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5525 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS Attribute Value Maximum OD1 4.625 in 117.5mm Minimum ID 2.375 in 60.5 mm Overall Length 89.942 in 2,173.5 mm

Fluid Bypass Area 14-20# 20-23# 23-26#

0.55 in2 354.8 mm2 0.55 in2 354.8 mm2 0.140 in2 90.3 mm2 Approximate Weight 202 lb. 91.7 kg External Working Pressure 10,000 psi 68,948 KPa Internal Working Pressure 10,000 psi 68,948 KPa Max Working Temperature2 250 °F 121 °C Min Working Temperature 70 °F 21 °C Tensile Rating 88,000 lbf. 391.4 kN NACE Service No

(1) Base tool OD. Look at casing weight chart for gage OD. (2) Higher temperatures can be achieved with different elastomers. OPERATING INSTRUCTIONS Note: Ensure all connections are correctly tightened.

• Run to desired setting depth. • Pick up weight of tubing plus 1,000-3,000 lbs. • Apply right hand rotation and set down tubing string to set slips, close the bypass and pack off the elements.

(10,000-12,000 lbs. of weight should be used to fully set and pack off tool) • Tool may be left in compression, tension or neutral. • To remove the packer, set down weight then apply right hand rotation. • Pick while maintaining the right-hand rotation. • Pause when the bypass valve opens to allow pressure differential to equalize. • Once pressure equalizes, continue straight pull to finish releasing the tool.

ASSEMBLY INSTRUCTIONS Note: Care should be taken during assembly to insure all threads are greased adequately. Caution: Take care when handling inner mandrel not to damage seal surface.

• Insert top sub (1) into vise with spring cage cap (2) slid over the top end. • Assemble upper slip housing (6) to spring cage (4). • Install follow spring (5) inside spring cage (4). • Install upper slips (8), releasing slip (9) and slip springs (7) into slip windows of upper slip housing (6). • Slide upper spring cage subassembly onto top end of inner mandrel (3) then thread inner mandrel (3) into top sub

(1). • Thread spring cage cap (2) onto spring cage (4). • Slide element retainer (18), elements (16) and element spacers (17) onto rubber mandrel (20).

Page 59: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 5-1/2” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5525 - 2019 January

H O M E O F K L I N E T O O L S

• Install O-ring (14) into center coupling (15) and then thread center coupling (15) onto upper end of rubber mandrel (20).

• Install O-ring (13) onto bypass seal (12). • Install bypass seal (12) into center coupling (15), followed by bearing bushing (11), then thread upper cone (10)

onto upper end. • Thread lower cone (19) onto lower end of element retainer (18). • Install lower slips (21) and lower slip springs (22) into slip windows of drag block body (23) then slide subassembly

over lower end of rubber mandrel (20). • Thread rubber mandrel cap (28) onto lower end of rubber mandrel (20). • Install drag blocks (24), drag block springs (25) and drag block retainer (26) onto drag block body (23) and then

thread j-body (27) onto drag block body (23).

CAUTION: This is a left-hand thread.

• Install set screws (31) into j-body (27). • Slide rubber mandrel subassembly onto lower end of inner mandrel subassembly. • Insert O-ring (29) into bottom sub (30) and then thread bottom sub (30) onto lower end of inner mandrel (3). • Slide j-body (27) up to reveal set screw hole in bottom sub (30) then install set screws (32).

DISASSEMBLY INSTRUCTIONS

• Insert tool into vise at top sub (1). • Slide j-body (28) up to reveal the set screws (34) in the bottom sub (31). Remove the set screws (34). • Using the j-body (28) and left-hand rotation, remove the bottom sub (31) from the inner mandrel (3). • Remove rubber mandrel sub assembly from inner mandrel subassembly. • Remove spring cage cap (2) from spring cage (4). • Break inner mandrel (3) from top sub (1) and slide spring cage off inner mandrel (3). • Place j-body (28) in the vise and break connection to drag block body (24) and remove drag block retainer (27).

CAUTION: This is a left-hand thread. CAUTION: Drag blocks will spring out when retainer is removed if not restrained.

• Remove rubber mandrel cap (29) from rubber mandrel (21). • Remove drag block body (24) from rubber mandrel (21). • Break connection between upper cone (10) and center coupling (15) then remove bypass seal (12). • Break connection between rubber mandrel (21) and center coupling (15) then remove element gauge ring (16)

(14-20# & 20-23# tools only), elements (17), and element spacers (18). • Break connection between lower cone (20) and element retainer (19) and remove both from rubber mandrel (21).

Page 60: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 5-1/2” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5525 - 2019 January

H O M E O F K L I N E T O O L S

10A-5520-XXXX PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER 14-20# (4.625” OD) 20-23# (4.500” OD) 23-26# (4.400” OD)

1 1 TOP 00091P 00091P 00091P 2 1 SPRING CAGE CAP 00089 00089B 00528 3 1 INNER MANDREL 00085P 00085A-P 00531 4 1 SPRING CAGE 00088-K 00088A-K 00529 5 1 FOLLOW SPRING 603-56-920S 603-56-920S 603-56-920S 6 1 UPPER SLIP HOUSING N/A N/A 00530 7 6 UPPER SLIP SPRING 00040 00040 00040

8 2 UPPER SLIP (CARBIDE OR WICKERED)

57KXUC (CARBIDE) or 57KXUW (WICKERED)

57KXUC (CARBIDE) or 57KXUW (WICKERED)

57KXUC (CARBIDE) or 57KXUW (WICKERED)

9 1 RELEASING SLIP 57KXR 57KXR 57KXR 10 1 UPPER CONE 00094P 00094P 00534 11 1 BEARING BUSHING 00101 00101 00636 12 1 BYPASS SEAL 600-56-520 600-56-520 600-56-520 13 1 O-RING 19151 19151 19151 14 1 O-RING 19235 19235 19235 15 1 CENTER COUPLING 00093 00093 00536 16 1 ELEMENT GAUGE RING 00097 00097B N/A 17 3 RUBBER ELEMENT 602-56-51X 602-59-51X 602-53-51X 18 2 RUBBER SPACER 00098 00098B 00526 19 1 RUBBER RETAINER 00096 00096B 00525 20 1 LOWER CONE 00095P 00095P 00533 21 1 RUBBER MANDREL 00103 00103A 00524

22 4 LOWER SLIP (CARBIDE OR WICKERED)

57KXLC (CARBIDE) or 57KXLW (WICKERED)

57KXLC (CARBIDE) or 57KXLW (WICKERED)

57KXLC (CARBIDE) or 57KXLW (WICKERED)

23 8 LOWER SLIP SPRING 00039 00039 00039 24 1 DRAG BLOCK BODY 00402 00402A 00523 25 4 DRAG BLOCK 50550 50450 50450 26 20 16 16 DRAG BLOCK SPRING 50100 50100 50100 27 1 DRAG BLOCK RETAINER 00100 00100B 00527

28 1 J-BODY (RIGHT HAND OR LEFT HAND)

00090 (RH) 00222 (LH)

00090 (RH) 00222 (LH)

00521 (RH) 00522 (LH)

29 1 RUBBER MANDREL CAP 00099 00099 00535 30 1 O-RING 19231 19231 19231 31 1 BOTTOM SUB 00084 00084 00532 32 1 BOTTOM NIPPLE 00170 00170 00170

33 3 5/16”–NC SOCKET SET SCREW 11156C 11156C 11155C

34 2 ¼”–NC SOCKET SET SCREW 11146C 11146C 11145C

Page 61: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 5-1/2” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5525 - 2019 January

H O M E O F K L I N E T O O L S

10A-5520-XXXX ASSEMBLY DRAWING

Page 62: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 5-1/2” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-5525 - 2019 January

H O M E O F K L I N E T O O L S

10A-5520-XXXX DIMENSIONS

DIMENSION MEASUREMENT 14-20# 20-23# 23-26#

A 6.719 in 170.7 mm 6.719 in 170.7 mm 6.719 in 170.7 mm B 16.256 in 412.9 mm 16.256 in 412.9 mm 15.880 in 403.4 mm C 3.526 in 89.6 mm 3.526 in 89.6 mm 4.076 in 103.5 mm D 9.375 in 238.1 mm 9.375 in 238.1 mm 9.375 in 238.1 mm E 7.500 in 190.5 mm 7.500 in 190.5 mm 7.513 in 190.8 mm F 6.938 in 176.2 mm 6.938 in 176.2 mm 6.750 in 171.5 mm G 1.843 in 46.8 mm 1.843 in 46.8 mm 2.001 in 50.8 mm H 7.156 in 181.8 mm 7.156 in 181.8 mm 7.188 in 182.6 mm J 59.563 in 1,512.9 mm 59.563 in 1,512.9 mm 89.943 in 2,284.6 mm K 3.688 in 93.7 mm 3.688 in 93.7 mm 3.688 in 93.7 mm L

4.625 in 117.5 mm 4.500 in 114.3 mm 4.400 in 111.8 mm M N P 2.870 in 72.9 mm 2.870 in 72.9 mm 2.870 in 72.9 mm Q

4.625 in 117.5 mm 4.500 in 114.3 mm 4.400 in 111.8 mm R S T 3.250 in 82.6 mm 3.125 in 79.4 mm 3.000 in 114.3 mm U

4.625 in 117.5 mm 4.500 in 114.3 mm 4.400 in 111.8 mm V W 4.500 in 114.3 mm 4.500 in 114.3 mm 4.400 in 111.8 mm

Page 63: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-7025 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Kline Tools KS1-XW Packer is a production packer that is useful for several applications including zone isolation, injection, pumping and production. The packer is designed to hold significant pressure from above or below whether left in compression, tension or neutral. Large internal bypass included to reduce swabbing when running or retrieving. The bypass opens first when releasing to allow the pressure to equalize before releasing the upper slips. The KS1-XW packer has a rotational shear release feature as well as an optional straight pull adjustable shear release.

GENERAL SPECIFICATIONS Casing Tool

Size Weight OD ID Connections Part Number

7”

17-26 6.000

2.50 2-7/8 EU8Rd 10B-7025-XXXX 26-32 5.875 29-35 5.812 26-35 5.844

Features

• May be left in tension, compression or neutral. • Can be run on tubing or wireline. • Integrated bypass feature to aid releasing. • Rated for 10,000 psi differential pressure. • Stainless steel follow spring

Options • Nickel coating • Red epoxy phenolic coating • Plastic coated ID

Accessories • KT-2 on-off tool • Stinger with or without profile • Adjustable straight pull shear release kit

Page 64: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-7025 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS

Attribute Value Maximum OD1 5.75 in 146.1 mm Minimum ID 2.49 in 63.2 mm Overall Length 92.06 in 2,338.3 mm Fluid Bypass Area 0.85 in2 548.4 mm2 Approximate Weight 296 lb 134 kg External Working Pressure 10,000 psi 68,948 KPa Internal Working Pressure 10,000 psi 68,948 KPa Max Working Temperature2 250°F 121°C Min Working Temperature 70°F 21°C Tensile Rating 144,700 lbf 64,366 DaN Compression Rating 142,600 lbf 63,432 DaN NACE Service No

OPERATING INSTRUCTIONS Note: Ensure all connections are correctly tightened.

• Run to desired setting depth. • Pick up weight of tubing plus 1,000-3,000 lbs. • Apply right hand rotation and set down tubing string to set slips, close the bypass and pack off the elements.

(14,000-16,000 lbs. of weight should be used to fully set and pack off tool) • Tool may be left in compression, tension or neutral. • To remove the packer, set down weight then apply right hand rotation. • Pick while maintaining the right-hand rotation. • Pause when the bypass valve opens to allow pressure differential to equalize. • Once pressure equalizes, continue straight pull to finish releasing the tool.

ASSEMBLY INSTRUCTIONS Note: Care should be taken during assembly to insure all threads are greased adequately. Caution: Take care when handling inner mandrel not to damage seal surface.

• Insert top sub (1) into vise with spring cage cap (2) slid over the top end. • Install spring retainer (10) into upper slip housing (12) then thread upper slip housing (12) onto spring cage (4)

and install follow spring (5) inside spring cage (4). • Slide both support sleeve washers (11) and upper slip support sleeve (9) onto inner mandrel (3). • Install spring ring (7) into groove on inner mandrel (3) and then slide follow spring support sleeve (6) over the

spring ring (7) and install 3 set screws (8) • Install upper slips (14), releasing slip (15) and slip springs (13) into upper slip housing (12). • Slide upper slip housing/spring cage subassembly onto top end of inner mandrel (3) then thread inner mandrel (3)

into top sub (1).

Page 65: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-7025 - 2019 January

H O M E O F K L I N E T O O L S

• Thread spring cage cap (2) onto spring cage (4). • Thread gage ring (16) onto both the center coupling (14) and the element retainer (19). • Slide element retainer (25), elements (24), element spacers (23) and element gage ring (22) onto rubber mandrel

(36). • Install O-ring (21) into center coupling (20) and then thread center coupling onto upper end of rubber mandrel

(36). • Install O-ring (19) onto bypass seal (18). • Install bypass seal (18) and thrust ring (17) into center coupling (20) then thread upper cone (16) onto upper end. • Thread lower cone (26) onto lower end of element retainer (25). • Install lower slips (28) and lower slip springs (27) into slip windows of drag block body (29) then slide subassembly

over lower end of rubber mandrel (36). • Thread rubber mandrel cap (37) onto lower end of rubber mandrel (36). • Install drag blocks (34) and drag block springs (35) into drag block body (29) and then slide drag block retainer

(30) over lower end. • Slide retaining ring (33) onto upper end of j-body (38) and then thread j-body (38) onto drag block body (29).

CAUTION: This is a left-hand thread.

• Install set screws (32) into j-body (38) by aligning hole in drag block retainer (30) with each threaded hole in the

drag block body (29). There will be 3 holes total that require set screws installed. • Slide rubber mandrel subassembly onto lower end of inner mandrel subassembly. • Insert O-ring (39) into bottom sub (40) and thread bottom nipple (41) into bottom end of bottom sub (40) with

appropriate torque for 2-7/8” EUE 8 RD thread (API 5C1 Table 3 recommends 2,950 ft.-lbs.). • Next thread bottom sub (40) onto lower end of inner mandrel (3). • Slide j-body up to reveal set screw hole in bottom sub (40) then install set screws (31).

DISASSEMBLY INSTRUCTIONS

• Insert tool into vise at top sub (1). • Slide j-body (38) up to reveal the set screws (31) in the bottom sub (40). Remove the set screws (31). • Using the j-body (38) and left-hand rotation, remove the bottom sub (40) from the inner mandrel (3). • Remove rubber mandrel sub assembly from inner mandrel subassembly. • Remove spring cage cap (2) from spring cage (4). • Break inner mandrel (3) from top sub (1) and slide spring cage/upper slip housing offer inner mandrel (3). • Remove set screws (32) from drag block body (29) then place j-body (38) in the vise and break connection to drag

block body (29). CAUTION: This is a left-hand thread.

• Remove drag block retainer (30), drag blocks (34) and drag block springs (35) from drag block body. CAUTION: Drag blocks will spring out when retainer is removed if not restrained.

• Remove rubber mandrel cap (37) from rubber mandrel (36). • Remove drag block body (29) from rubber mandrel (36).

Page 66: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-7025 - 2019 January

H O M E O F K L I N E T O O L S

• Break connection between upper cone (16) and center coupling (20) then remove thrust ring (17), bypass seal (18). • Break connection between rubber mandrel (36) and center coupling (20) then remove elements (24) and element

spacers (23). • Break connection between lower cone (26) and element retainer (25) and remove both from rubber mandrel (36).

Page 67: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-7025 - 2019 January

H O M E O F K L I N E T O O L S

10B-7025-XXXX PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER 17-26#

(6.000” OD) 26-32#

(5.875” OD) 29-35#

(5.812” OD) 26-35#

(5.844” OD) 1 1 TOP 00468 2 1 SPRING CAGE CAP 00811 00812 00813 00818 3 1 INNER MANDREL 00476 4 1 SPRING CAGE 00458 5 1 FOLLOW SPRING 603-73-920S 6 1 FOLLOW SPRING SUPPORT SLEEVE 00472 7 1 SPRING RING 00477 8 3 5/16—18 UNC X 5/16 SHSS 11155C 9 1 UPPER SLIP SUPPORT 00461

10 1 SPRING RETAINER 00462 11 2 SUPPORT SLEEVE WASHER 00471 12 1 UPPER SLIP HOUSING 00469 13 6 UPPER SLIP SPRING 00214 14 2 UPPER SLIP 73KXUC/73KXUW 15 1 RELEASING SLIP 73KXR 16 1 UPPER CONE 00470 17 1 THRUST RING 00473 18 1 SEAL 600-70-520 19 1 O-RING 19152 20 1 CENTER COUPLING 00114 21 1 O-RING 19242 22 2 GAGE RING 00541 00116 00316 00545 23 2 RUBBER SPACER 00516 00117 00317 00547 24 3 RUBBER ELEMENT 602-72-51X 602-70-51X 602-75-51X 602-70-51X 25 1 RUBBER RETAINER 00542 00118 00318 00546 26 1 LOWER CONE 00460 27 8 LOWER SLIP SPRING 00213 28 4 LOWER SLIP 70KXLC/70KXLW 29 1 DRAG BLOCK BODY 00403 30 1 DRAG BLOCK RETAINER 00319 31 2 ¼-20 UNC X ½ SHSS 11148C 32 3 5/16-18 UNC X ½ SHSS 11158C 33 1 RETAINING RING 00123 34 4 DRAG BLOCK 50800 50700 35 24 DRAG BLOCK SPRING 50110 36 1 RUBBER MANDREL 00550 37 1 RUBBER MANDREL CAP 00124 38 1 J-BODY ASSEMBLY 00127-K2 39 1 O-RING 19233 40 1 BOTTOM SUB 00463 41 1 BOTTOM NIPPLE 00170

Page 68: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-7025 - 2019 January

H O M E O F K L I N E T O O L S

10B-7025-XXXX ASSEMBLY DRAWING

Page 69: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-7025 - 2019 January

H O M E O F K L I N E T O O L S

10B-7025-XXXX DIMENSIONS

DIMENSION MEASUREMENT DIMENSION MEASUREMENT A 5.75 in 146.1 mm M 3.75 in 95.3 mm B 2.50 in 63.5 mm N 4.38 in 111.3 mm C 12.50 in 317.5 mm P GAGE DIAMETER D 3.38 in 85.9 mm Q 5.38 in 136.7 mm E 3.69 in 93.7 mm R 5.84 in 148.3 mm F 4.25 in 107.95 mm S 3.25 in 82.6 mm G 5.74 in 145.8 mm T 5.75 in 146.1 mm H 7.83 in 198.9 mm U GAGE DIAMETER J 8.06 in 204.7 mm V GAGE DIAMETER K 3.75 in 95.3 mm W GAGE DIAMETER L 92.06 in 2,338.3 mm X 5.72 in 145.3 mm Y 5.75 in 146.1 mm

Page 70: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 3-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-7035 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Kline Tools KS1-XW Packer is a production packer that is useful for several applications including zone isolation, injection, pumping and production. The packer is designed to hold significant pressure from above or below whether left in compression, tension or neutral. Large internal bypass included to reduce swabbing when running or retrieving. The bypass opens first when releasing to allow the pressure to equalize before releasing the upper slips. The KS1-XW packer has a rotational shear release feature as well as an optional straight pull adjustable shear release.

GENERAL SPECIFICATIONS

Casing Tool Size Weight OD ID Connections Part Number

7” 17-26 6.000

3.00 3-1/2 EU8Rd 10B-7035-XXXX 26-32 5.875 29-35 5.812

Features

• May be left in tension, compression or neutral. • Can be run on tubing or wireline. • Integrated bypass feature to aid releasing. • Rated for 10,000 psi differential pressure. • Stainless steel follow spring

Options • Nickel coating • Red epoxy phenolic coating • Plastic coated ID

Accessories • KT-2 on-off tool • Stinger with or without profile • Adjustable straight pull shear release kit

Page 71: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 3-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-7035 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS

Attribute Value Maximum OD1 5.75 in 146.1 mm Minimum ID 2.99 in 75.9 mm Overall Length 98.50 in 2,501.9 mm Fluid Bypass Area 1.42 in2 916.1 mm2 Approximate Weight 311 lb 141.1 kg External Working Pressure 10,000 psi 68,948 KPa Internal Working Pressure 10,000 psi 68,948 KPa Max Working Temperature2 250 °F 121 °C Min Working Temperature 70 °F 21 °C Tensile Rating 173,500 lbf 77,177 DaN Compression Rating 169,000 lbf 75,175 DaN NACE Service No (1) Base tool OD. Look at casing weight chart for gage OD. (2) Higher temperatures can be achieved with different elastomers.

OPERATING INSTRUCTIONS Note: Ensure all connections are correctly tightened.

• Run to desired setting depth. • Pick up weight of tubing plus 1,000-3,000 lbs. • Apply right hand rotation and set down tubing string to set slips, close the bypass and pack off the elements.

(14,000-16,000 lbs. of weight should be used to fully set and pack off tool) • Tool may be left in compression, tension or neutral. • To remove the packer, set down weight then apply right hand rotation. • Pick while maintaining the right-hand rotation. • Pause when the bypass valve opens to allow pressure differential to equalize. • Once pressure equalizes, continue straight pull to finish releasing the tool.

ASSEMBLY INSTRUCTIONS Note: Care should be taken during assembly to insure all threads are greased adequately. Caution: Take care when handling inner mandrel not to damage seal surface.

• Insert top sub (1) into vise with spring cage cap (2) slid over the top end. • Thread upper slip housing (6) onto spring cage (4) and install follow spring (5) inside spring cage (4). • Install upper slips (8), releasing slip (9) and slip springs (7) into upper slip housing (6). • Slide upper slip housing/spring cage subassembly onto top end of inner mandrel (3) then thread inner mandrel (3)

into top sub (1). • Thread spring cage cap (2) onto spring cage (4). • Thread gage ring (16) onto both the center coupling (14) and the element retainer (19).

Page 72: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 3-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-7035 - 2019 January

H O M E O F K L I N E T O O L S

• Slide element retainer (19), elements (18) and element spacers (17) onto rubber mandrel (27). • Install O-ring (15) into center coupling (14) and then thread center coupling onto upper end of rubber mandrel

(27). • Install O-ring (13) onto bypass seal (12). • Install bypass seal (12) and bearing ring (11) into center coupling (14) then thread upper cone (10) onto upper

end. • Thread lower cone (20) onto lower end of element retainer (19). • Install lower slips (22) and lower slip springs (21) into slip windows of drag block body (23) then slide subassembly

over lower end of rubber mandrel (27). • Thread rubber mandrel cap (28) onto lower end of rubber mandrel (27). • Install drag blocks (25) and drag block springs (26) into drag block body (23) and then slide drag block retainer

(24) over lower end. • Thread j-body (29) onto drag block body (23).

CAUTION: This is a left-hand thread.

• Install set screws (32) into j-body. • Slide rubber mandrel subassembly onto lower end of inner mandrel subassembly. • Insert O-ring (30) into bottom sub (31) and thread bottom nipple (34) into bottom end of bottom sub (31) with

appropriate torque for 3-1/2” EUE 8 RD thread (API 5C1 Table 3 recommends 4,200 ft.-lbs.). • Next thread bottom sub (31) onto lower end of inner mandrel (3). • Slide j-body up to reveal set screw hole in bottom sub (31) then install set screws (33).

DISASSEMBLY INSTRUCTIONS

• Insert tool into vise at top sub (1). • Slide j-body (29) up to reveal the set screws (33) in the bottom sub (31). Remove the set screws (33). • Using the j-body (29) and left-hand rotation, remove the bottom sub (31) from the inner mandrel (3). • Remove rubber mandrel sub assembly from inner mandrel subassembly. • Remove spring cage cap (2) from spring cage (4). • Break inner mandrel (3) from top sub (1) and slide spring cage/upper slip housing offer inner mandrel (3). • Place j-body (29) in the vise and break connection to drag block body (23).

CAUTION: This is a left-hand thread. Remove drag block retainer (24), drag blocks (25) and drag block springs (26) from drag block body. CAUTION: Drag blocks will spring out when retainer is removed if not restrained.

• Remove rubber mandrel cap (28) from rubber mandrel (27). • Remove drag block body (23) from rubber mandrel (27). • Break connection between upper cone (10) and center coupling (14) then remove bearing ring (11), bypass seal

(12).

Page 73: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 3-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-7035 - 2019 January

H O M E O F K L I N E T O O L S

• Break connection between rubber mandrel (27) and center coupling (14) then remove elements (18) and element spacers (17).

• Break connection between lower cone (20) and element retainer (19) and remove both from rubber mandrel (27).

Page 74: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 3-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-7035 - 2019 January

H O M E O F K L I N E T O O L S

PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER 17-26# (6.000” OD) 26-32# (5.875” OD) 29-35# (5.812” OD)

1 1 TOP 00495 2 1 SPRING CAGE CAP 00465 00690 00689 3 1 INNER MANDREL 00493 4 1 SPRING CAGE 00507 5 1 FOLLOW SPRING 603-73-920S 6 1 UPPER SLIP HOUSING 00500 7 6 UPPER SLIP SPRING 00214 8 2 UPPER SLIP 73KXUW or 73KXUC 9 1 RELEASING SLIP 73KXR 10 1 UPPER CONE 00497 11 1 THRUST RING 00506 12 1 SEAL 600-73-520 13 1 O-RING 19155 14 1 CENTER COUPLING 00501 15 1 O-RING 19243 16 2 GAGE RING 00504 00691 00688 17 2 RUBBER SPACER 00692 00693 00694 18 3 RUBBER ELEMENT 602-74-51X 602-73-51X 19 1 RUBBER RETAINER 00510 20 1 LOWER CONE 00487 21 8 LOWER SLIP SPRING 00213 22 4 LOWER SLIP 73KXLW or 73KXLC 23 1 DRAG BLOCK BODY 00502 24 1 DRAG BLOCK RETAINER 00503 25 4 DRAG BLOCK 50700 50600 26 24 DRAG BLOCK SPRING 50110 27 1 RUBBER MANDREL 00509 28 1 RUBBER MANDREL CAP 00508 29 1 J-BODY ASSEMBLY 00511-K 30 1 O-RING 19237 31 1 BOTTOM SUB 00490 32 4 3/8”-16 X 3/8” SET SCREW 11166C 33 2 ¼”-20 X 3/8” SET SCREW 11146C 34 1 BOTTOM NIPPLE 00491

Page 75: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 3-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-7035 - 2019 January

H O M E O F K L I N E T O O L S

10B-7035-XXXX ASSEMBLY DRAWING

Page 76: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KS1-XW Packer (10K) 7” X 3-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-10B-7035 - 2019 January

H O M E O F K L I N E T O O L S

10B-7035-XXXX DIMENSIONS

DIMENSION MEASUREMENT A 8.900 in 226.06 mm B 23.775 in 603.89 mm C 31.211 in 792.76 mm D 42.005 in 1,066.93 mm E 9.600 in 243.84 mm F 6.450 in 163.83 mm G 97.937 in 2,487.60 mm H 4.438 in 112.73 mm J GAGE DIA K GAGE DIA L 3.718 in 94.44 mm M 5.750 in 146.05 mm N 5.750 in 146.05 mm P 5.812 in 147.62 mm Q 5.500 in 139.70 mm R 5.750 in 146.05 mm

Page 77: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5-1/2” x 1.900” x 1.900” BDT Dual Tension Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: 5-1/2”x1.900”x1.900” - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS CASING WEIGHT MAX O.D. MIN.I.D. CONNECTIONS 5-1/2”" 14-20# 4.641" 1.50" 1.900 EU10RD

*When seal unit is shear pinned to selective head

Page 78: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5-1/2” x 1.900” x 1.900” BDT Dual Tension Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: 5-1/2”x1.900”x1.900” - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The BDT Dual Tension Packer is a snap set retrievable packer for use where a set-down packer cannot be used, usually because the location is too shallow to provide sufficient tubing weight to pack off the elements. Both the long (or fixed) string and the short (or retrievable) string have a full opening for their tubing size. This packer is set with tension on the short string, which is resisted by the long string. The pressure rating for this packer varies according to the amount of tension pulled. For this size packer 8,000 lb. is the minimum amount of tension required to effect pack off. The pressure differential allowed from above packer varies from zero at 8,000 lb. Tension to 2,500 psi with 50,500 lb. Pulled.

PART NUMBERS KEY # QTY PART # NAME KEY# QTY PART # NAME KEY# QTY PART# NAME

1 1 88980 LONG STRING TOP 11 1 88840 SHORT STRING MANDREL 21 2 88780 ELEMENT BACK-UP

2 1 88830 LONG STRING MANDREL 12 1 88930 SNAP SLEEVE 22 2 88820 ELEMENT GAGE RING

3 1 88960 STINGER ** 13 1 88750 SNAP RING 24 3 905-55-51X* PACKING ELEMENT

4 1 19030 O-RING ** 14 5 11638F SHEAR SCREW 25 2 88770 ELEMENT SPACER 5 1 88940 SEAL SUB ** 15 2 88850 SUPPORT BOLT 26 1 88870 UPPER CONNECTOR 6 2 31200 SEAL ** 16 1 88810 SLIP RING RETAINER 27 1 88880 LOWER CONNECTOR 7 2 88950 O-RING ** 17 5 88760 SPLIT RING 28 1 11134C SET SCREW 8 2 11668C SEAL RETAINER** 18 1 88800 SLIP HOLDER 29 1 88920 RETAINING NUT 9 1 88890-K SELECTIVE HEAD 19 4 88970 SLIP 30 1 88865 SHORT STRING BOTTOM 10 1 88910 SEAL RECEPTACLE 20 1 88790 CONE 31 1 88860 LONG STRING BOTTOM

* PARTS TO BE USED WHEN RUNNING TAILPIPE ON SHORT STRING (SPECIAL ORDER) ** PARTS FOR SEAL/LATCH UNIT

DIMENSIONS A B C D E F G H J K L M N

1.900 EU10RD 1.094” 4.62” 1.875” 4.62” 4.64” 31.03” 4.00” 36.53” 9.69” 6.44” 114.75” 1.50”

Page 79: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5-1/2” x 1.900” x 1.900” BDT Dual Tension Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: 5-1/2”x1.900”x1.900” - 2019 January

H O M E O F K L I N E T O O L S

SETTING INSTRUCTIONS Run the packer to setting depth on the long string. Run the short string, with the latch unit provided on bottom, and land into the packer. The lugs on the latch unit will automatically latch into the selective head at the top of the packer. Pull tension on the short string to break the shear screws in the snap sleeve and the snap ring to expand the snap sleeve. With additional tension, the cone will pull into the slips, which will expand against the casing, preventing any upward movement, and allow sufficient tension to be pulled to pack off the elements. Tension must be maintained on the short string while the packer is in use. RELEASING INSTRUCTIONS Remove the tension applied to the short string and set approximately 1,000 lb. Down on the packer. The elements will relax, and the slips will retract. The snap ring will move back inside the snap sleeve. Rotate the short string to the right and pick up, releasing the latch unit. Remove the short string from the well. At this point, the packer can be removed with the long string, or be relocated and reset using the setting procedures above. ASSEMBLY INSTRUCTIONS

1. Install long string bottom (30) onto long string mandrel (2) and short string bottom (29) onto short string mandrel (11).

2. Slide retaining nut (28) onto long string mandrel, below lowest groove, then install 2 segments of split ring (17) into lowest groove, then slide lower connector (26) onto long string mandrel, over split ring segments, and screw retaining nut into lower connector.

3. Slide upper end of short string mandrel through bottom end of lower connector until lowest groove is above lower connector.

4. Slide upper connector (25) on to upper end of long string mandrel, then on to upper end of short string mandrel, until upper connector is below lowest groove on short string mandrel.

5. Install two segments of split ring (17) into lowest groove on short string mandrel, then slide element back-up (21) onto both mandrels and down against split ring segments. Slide element gage ring (22) on and screw to upper connector, thus trapping split ring and element back-up.

6. Slide packing elements (23) and both element spacers (24) onto both mandrels, then slide second element back-up (21) into second element gage ring (22) and slide this assembly onto both mandrels.

7. Install two split ring segments (17) into next groove up in short string mandrel. 8. Assemble slip ring retainer (16) onto slip holder (18) by sliding the two support bolts (15) through slip ring

retainer and partially screwing into slip holder. 9. With cone (20) laying on a flat surface, install the four slips (19) into t-slots in slip holder and guide slips into

dove-tailed grooves in cone. Then finish screwing support bolts into slip holder. 10. Slide slip/cone assembly onto both mandrels, with threaded side of slip ring retainer on short string mandrel.

Screw element gage ring onto cone, thus retaining element back-up and split ring. 11. By partially backing off support bolts, install 2 segments of split ring (17) between slip ring retainer and slip

holder, and into next groove in short string mandrel. Install another 2 segments in the same location on the long string mandrel. Retighten support bolts.

Page 80: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5-1/2” x 1.900” x 1.900” BDT Dual Tension Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: 5-1/2”x1.900”x1.900” - 2019 January

H O M E O F K L I N E T O O L S

12. Install snap ring (13) into uppermost groove in short string mandrel, slide snap sleeve (12) onto short string mandrel and screw into slip ring retainer. Screw shear screws (14) into holes in snap sleeve, insuring shear screws bottom out in remaining groove in short string mandrel.

13. Screw seal receptacle (10) into selective head (9), slide this assembly on long string mandrel and screw short string mandrel in bottom end of seal receptacle.

14. Screw long string top (1) onto long string mandrel. Tighten all threads. Install set screw (27) into lower connector. 15. To assemble seal/latch unit, screw seal sub (5) into stinger (3), with O-rings (4) installed. Slide both seals (6) onto

seal sub and retain with seal retainer (7). 16. If required, slide finished deal/latch unit into top end of selective head until it engages j-slot, then pull up to stop.

Install shear screws (8) through threaded holes in selective head and into groove in stinger.

Page 81: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

7" x 2-3/8" x 2-3/8" BDT Dual Tension Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1059 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS CASING WEIGHT MAX O.D. MIN.I.D. CONNECTIONS

7" 17-23# 6.200"

1.938" 2-3/8" EU8RD 23-29# 5.950"

*When seal unit is shear pinned to selective head

Page 82: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

7" x 2-3/8" x 2-3/8" BDT Dual Tension Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1059 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The BDT Dual Tension Packer is a snap set retrievable packer for use where a set-down packer cannot be used, usually because the location is too shallow to provide sufficient tubing weight to pack off the elements. Both the long (or fixed) string and the short (or retrievable) string have a full opening for their tubing size. This packer is set with tension on the short string, which is resisted by the long string. The pressure rating for this packer varies according to the amount of tension pulled. For this size packer 10,000 lb. Is the minimum amount of tension required to effect pack off. The pressure differential allowed from above packer varies from zero at 10,000 lb. Tension to 2,000 psi with 70,000 lb. pulled.

PART NUMBERS KEY # QTY PART # NAME KEY# QTY PART # NAME KEY# QTY PART# NAME

1 1 71170 LONG STRING TOP 11 1 71160 SHORT STRING MANDREL 22 2 SEE CHART ELEMENT GAGE RING

2 1 71150 LONG STRING MANDREL 12 1 71220 SNAP SLEEVE 23 3 SEE CHART PACKING ELEMENT

3 1 71360 STINGER ** 13 1 71215 SNAP RING 24 2 SEE CHART ELEMENT SPACER

4 1 19139 O-RING ** 14 2 11655C SHEAR SCREW 25 1 71260 UPPER CONNECTOR 5 1 71370 SEAL SUB ** 15 2 71240 SUPPORT BOLT 26 1 71350 LOWER CONNECTOR 6 2 71390 SEAL ** 16 1 71280 SLIP RING RETAINER 27 2 11155C SET SCREW 7 2 19034 O-RING ** 17 5 71210 SPLIT RING 28 1 19229 O-RING * 8 1 71380 SEAL RETAINER** 18 1 71320 SLIP HOLDER 29 1 71230 RETAINING NUT 9 1 71200-K SELECTIVE HEAD 19 4 71330 SLIP 30 1 71185 SHORT STRING BOTTOM *

9A 2 1166BC SHEAR SCREW 20 1 71340 CONE 31 1 71180 LONG STRING BOTTOM 10 1 71190 SEAL RECEPTACLE 21 2 71290 ELEMENT BACK-UP

* PARTS TO BE USED WHEN RUNNING TAILPIPE ON SHORT STRING (SPECIAL ORDER) ** PARTS FOR SEAL/LATCH UNIT

DRESSING CHART CASING WT GAGE O.D. ELEMENT GAGE RING PACKING ELEMENT * ELEMENT SPACER

17 - 23# 6.200" 71251 905-72-51X 71271 23 - 29# 5.950" 71250 905-71-51X 71270

*REPLACE X WITH 0 FOR 60 DUROMETER, 1 FOR 70, 2 FOR 80 OR 3 FOR 90. DIMENSIONS

A B C D E F G H J & K L M N P Q R S T 2-3/8" EU8RD 1.375" 1.375" 2-3/8" EU8RD 5.950" 2.500" 5.950" SEE SPECS 2-3/8" EU8RD 24.25" 5.00" 31.56" 11.25" 10.38" 10.1 FT. 1.938" 1.938"

Page 83: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

7" x 2-3/8" x 2-3/8" BDT Dual Tension Packer

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1059 - 2019 January

H O M E O F K L I N E T O O L S

SETTING INSTRUCTIONS Run the packer to setting depth on the long string. Run the short string, with the latch unit provided on bottom, and land into the packer. The lugs on the latch unit will automatically latch into the selective head at the top of the packer. Pull tension on the short string to break the shear screws in the snap sleeve and the snap ring to expand the snap sleeve. With additional tension, the cone will pull into the slips, which will expand against the casing, preventing any upward movement, and allow sufficient tension to be pulled to pack off the elements. Tension must be maintained on the short string while the packer is in use. RELEASING INSTRUCTIONS Remove the tension applied to the short string and set approximately 1,000 lb. Down on the packer. The elements will relax, and the slips will retract. The snap ring will move back inside the snap sleeve. Rotate the short string to the right and pick up, releasing the latch unit. Remove the short string from the well. At this point, the packer can be removed with the long string, or be relocated and reset using the setting procedures above. ASSEMBLY INSTRUCTIONS

1. Install long string bottom (31) onto long string mandrel (2). 2. Slide retaining nut (29) onto long string mandrel, below lowest groove, then install 2 segments of split ring (17)

into lowest groove, then slide lower connector (26) onto long string mandrel, over split ring segments, and screw retaining nut into lower connector.

3. Slide upper end of short string mandrel (11) through bottom end of lower connector until the lowest groove is above lower connector. If short string bottom (30) will be used, install O-ring (28) and screw bottom into lower connector.

4. Slide upper connector (25) on to upper end of long string mandrel, then on to upper end of short string mandrel, until upper connector is below lowest groove on short string mandrel.

5. Install two segments of split ring (17) into lowest groove on short string mandrel and retain by sliding upper connector up and over it. Then slide one element back-up (21) onto both mandrels and down against element back-up. Slide one element gage ring (22) on both mandrels and screw to upper connector, thus trapping split ring and element back-up.

6. Slide packing elements (23) element spacers (24), second element back-up and second element gage ring onto both mandrels.

7. Install two split ring segments (17) into next groove up in short string mandrel (now located inside top element gage ring).

8. Assemble slip ring retainer (16) onto slip holder (18) by sliding the two support bolts (15) through slip ring retainer and partially screwing into slip holder.

9. With cone (20) laying on a flat surface, install the four slips (19) into t-slots in slip holder and guide slips into dove-tailed grooves in cone. Then finish screwing support bolts into slip holder.

10. Slide slip/cone assembly from step 9 onto both mandrels, with threaded side of slip ring retainer on short string mandrel. Screw top element gage ring onto cone, thus retaining top element back-up and the last split ring installed.

Page 84: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

7" x 2-3/8" x 2-3/8" BDT Dual Tension Packer

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1059 - 2019 January

H O M E O F K L I N E T O O L S

11. By partially backing off support bolts, install 2 segments of split ring (17) between slip ring retainer and slip holder, and into next groove in short string mandrel. Install another 2 segments in the same location on the long string mandrel. Retighten support bolts.

12. Install snap ring (13) into uppermost groove in short string mandrel, slide snap sleeve (12) onto short string mandrel and screw into slip ring retainer. Install shear screws (14) into snap sleeve, insuring shear screws bottom out in remaining groove in short string mandrel.

13. Screw seal receptacle (10) into selective head (9), slide this assembly on long string mandrel and screw short string mandrel in bottom end of seal receptacle.

14. Assemble latch unit: screw seal sub (5) into stinger (3), with O-ring (4) installed, install O-rings (7), then slide seals (6) onto seal sub and retain with seal retainer (8). Tighten threads in latch unit and in packer.

15. If latch unit will be run in place, stab the unit into selective head until it rotates through j-slots. Pull unit up to stop and install shear screws (9a).

16. Screw long string top (1) onto upper end of long string mandrel. Tighten all threads. Install set screws (27) into lower connector (one will lock retaining nut and one will lock short string bottom, if used).

Page 85: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5-1/2" x 2-7/8" EU8RD Hydraulic Tandem Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1024 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS CASING WEIGHT MAX O.D. MIN.I.D. CONNECTIONS 5-1/2" 13 - 20 # 4.625" 2.44" 2-7/8" EU8RD

DESCRIPTION The Hydraulic Tandem Packer is normally run above another hydraulic retrievable packer to isolate a zone between them for various operations. It can also be run below another packer. Several of these tandem packers can be run on one tubing string at the same time. It is set by pressure in the tubing string and, while set, the pack-off is maintained by a ratchet ring. The simple design and straight pull release make this packer a cost-effective tool to isolate zones in low pressure applications. The shear release screws are unaffected by differential pressure, allowing adjustments to the release force before running.

PART NUMBERS

KEY # QTY PART # NAME KEY# QTY PART # NAME KEY# QTY PART# NAME

1 1 71405 MANDREL 5 1 61620 LOWER GAGE 10 1 71445 CYLINDER 2 1 71416 UPPER GAGE 6 1 71710 PACK OFF RING 11 1 17338 O-RING

3 3 602-55-51X PACKING ELEMENT * 7 3 11666F SETTING SHEAR SCREW 12 2 17343 O-RING

4 2 80600 ELEMENT SPACER 8 1 66390 LOCK RING 13 12 11666F RELEASE SHEAR SCREW

For packing elements, replace the x in part number with 0 for 60 durometer, 1 for 70, 2 for 80, or 3 for 90 9 1 71435 PISTON 14 1 71455 BOTTOM

Page 86: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5-1/2" x 2-7/8" EU8RD Hydraulic Tandem Packer

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1024 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONS

A B C D E F 3.75" SEE SPECS 4.625" 3.38" 9.94" 27.50"

RUNNING INSTRUCTIONS Make up packer on the tubing string, together with another packer that can resist vertical movement. Include a device that allows build-up of pressure to the inside of this packer, such as a pump out plug with a ball seat, located just below the packer. Run packers to setting depth and set other packer. Activate pressure inducing device (such as dropping the ball) and build up pressure to 1600 psi. This will break the setting shear screws and initiate pack off. Continue building up pressure to at least 2000 psi, which will complete pack off. Pressure operations between the two packers may now be completed. RELEASING INSTRUCTIONS This packer is released by a straight pull and usually does not require breaking the release screws. Simply release the other packer in its normal way, then pull both packers out of the hole. This will damage the elements, requiring their replacement before re-running. If the packer becomes stuck, a tensile force of 38,000 lb. Will break the release screws, causing the elements to relax so the packer can be retrieved.

TECHNICAL SPECIFICATIONS INITIAL SETTING PRESSURE 1600 PSI MAX. DIFFERENTIAL WITH TUBING HIGHER 6000 PSI

PRESSURE REQUIRED TO COMPLETE PACKOFF 2000 PSI MAX. DIFFERENTIAL WITH ANNULUS HIGHER 4500 PSI FORCE REQUIRED TO BREAK RELEASING SCREWS 38,000 LB. SETTING PISTON AREA 5.841 SQ. IN.

ASSEMBLY PROCEDURES

1. With mandrel (1) in vise, slide upper gage (2) onto lower end of mandrel to stop. Follow that with the packing elements (3) and the element spacers (4).

2. Screw & tighten lower gage (5) to pack off ring (6) and slide lower over lower end of mandrel. Install the setting shear screws (7).

3. Screw lock ring (8) into upper end of cylinder (10) until its top end is flush with the top of the cylinder. Screw further just until split in lock ring aligns with hole in cylinder and insert 1/4" diameter x 3/8" long screw through hole and split. Tape over head of screw to hold in place.

4. With O-rings (11 & 12) installed on piston (9), slide piston into bottom end of cylinder until it protrudes from the upper end. Insure ratchet thread on piston does not engage ratchet thread inside lock ring. Slide this assembly onto mandrel until upper tip of piston contacts pack off ring.

5. With O-ring (12) installed on bottom (14), screw bottom onto mandrel and tighten. Slide cylinder up or down until threaded holes align with groove on the bottom.

6. Install release shear screws (13). Remove tape and screw from hole in cylinder.

Page 87: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5-1/2" x 2-7/8" EU8RD Hydraulic Tandem Packer

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1024 - 2019 January

H O M E O F K L I N E T O O L S

DISASSEMBLY PROCEDURES Note: These procedures describe disassembly from the set position with release screws unbroken.

1. With mandrel (1) in vise, break bottom (14) off mandrel, and remove, along with cylinder (10). Set these parts aside.

2. Remove setting shear screws (7) from pack off ring (6) and slide it, packing elements (3), element spacers (4), and upper gage (2) off mandrel.

3. Remove release shear screws (13) from cylinder, slide bottom out and set aside. 4. Screw cylinder down and off piston (9) leaving lock ring (8) engaged to piston. 5. Screw lock ring up and off piston (left hand thread). 6. Before reassembling, replace all three O-rings (11 & 12). It is recommended that packing elements also be

replaced.

Page 88: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

3-1/2" x 1.900" EU8RD Hydraulic Tandem Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1027 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONAL SPECIFICATIONS CASING WEIGHT MAX O.D. MIN.I.D. CONNECTIONS 3-1/2" 7.7 - 9.3 # 2.844" 1.50" 1.900 EU10RD

DESCRIPTION The Hydraulic Tandem Packer is normally run above another hydraulic retrievable packer to isolate a zone between them for various operations. It can also be run below another packer. Several of these tandem packers can be run on one tubing string at the same time. It is set by pressure in the tubing string and, while set, the pack-off is maintained by a ratchet ring. The simple design and straight pull release make this packer a cost-effective tool to isolate zones in low pressure applications. The shear release screws are unaffected by differential pressure, allowing adjustments to the release force before running.

PART NUMBERS KEY # QTY PART # NAME KEY# QTY PART # NAME KEY# QTY PART# NAME

1 1 71060 MANDREL 5 1 71100 LOWER GAGE 9 1 71110 CYLINDER 2 1 71070 UPPER GAGE 6 2 VS1XW SETTING SHEAR SCREW 10 1 19226 O-RING 3 3 603-35-51X PACKING ELEMENT 7 1 66930 LOCK RING 11 2 19227 O-RING 4 2 71090 ELEMENT SPACER 8 1 71130 PISTON 12 5 VS1XW RELEASE SHEAR SCREW

* FOR PACKING ELEMENTS, REPLACE THE X IN PART NUMBER WITH 0 FOR 60 DUROMETER, 1 FOR 70, 2 FOR 80, OR 3 FOR 90 13 1 71140 BOTTOM

Page 89: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

3-1/2" x 1.900" EU8RD Hydraulic Tandem Packer

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1027 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONS

A B C D E

2.45" SEE SPECS 2.56" 6.06" 19.62"

RUNNING INSTRUCTIONS Make up packer on the tubing string, together with another packer that can resist vertical movement. Include a device that allows build-up of pressure to the inside of this packer, such as a pump out plug with a ball seat, located just below the packer. Run packers to setting depth and set other packer. Activate pressure inducing device (such as dropping the ball) and build up pressure to 2200 psi. This will break the setting shear screws and initiate pack off. Continue building up pressure to at least 3500 psi, which will complete pack off. Pressure operations between the two packers may now be completed. RELEASING INSTRUCTIONS This packer is released by a straight pull and usually does not require breaking the release screws. Simply release the other packer in its normal way, then pull both packers out of the hole. This will damage the elements, requiring their replacement before re-running. If the packer becomes stuck, a tensile force of 8800 lb. Will break the release screws, causing the elements to relax so the packer can be retrieved.

TECHNICAL SPECIFICATIONS INITIAL SETTING PRESSURE 2000 PSI MAX. DIFFERENTIAL WITH TUBING HIGHER 8000 PSI

PRESSURE REQUIRED TO COMPLETE PACKOFF 3500 PSI MAX. DIFFERENTIAL WITH ANNULUS HIGHER 1900 PSI

FORCE REQUIRED TO BREAK RELEASING SCREWS 8800 LB. SETTING PISTON AREA 1.718 SQ. IN.

ASSEMBLY PROCEDURES

1. With mandrel (1) in vise, slide upper gage (2) onto lower end of mandrel to stop. Follow that with the packing elements (3) and the element spacers (4).

2. Slide lower gage (5) over lower end of mandrel and install the setting shear screws (6). 3. Screw lock ring (7) into upper end of cylinder (9) until its top end is flush with the top of the cylinder. Screw

further just until split in lock ring aligns with hole in cylinder and insert 1/4" diameter x 5/16" long screw through the hole and the split. Tape over head of screw to hold in place.

4. With O-ring (10) and O-ring (11) installed on piston (8), slide piston into bottom end of cylinder until it protrudes from the upper end. Insure ratchet thread on piston does not engage ratchet thread inside lock ring. Slide this assembly onto mandrel until upper tip of piston contacts lower gage.

5. With O-ring (11) installed on bottom (13), screw bottom onto mandrel and tighten. Slide cylinder up or down until threaded holes align with groove on the bottom.

6. Install release shear screws (12). Remove tape and screw from hole in cylinder.

Page 90: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

3-1/2" x 1.900" EU8RD Hydraulic Tandem Packer

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1027 - 2019 January

H O M E O F K L I N E T O O L S

DISASSEMBLY PROCEDURES Note: These procedures describe disassembly from the set position with release screws unbroken.

1. With mandrel (1) in vise, break bottom (13) off mandrel, and remove, along with cylinder (9). Set these parts aside.

2. Remove setting shear screws (6) from lower gage (5) and slide lower gage, packing elements (3), element spacers (4), and upper gage (2) off mandrel.

3. Remove release shear screws (12) from cylinder, slide bottom out and set aside. 4. Screw cylinder down and off piston (8) leaving lock ring (7) engaged to piston. 5. Screw lock ring up and out of piston (left hand thread). 6. Before reassembling, replace all three O-rings (10 & 11). It is recommended that packing elements also be

replaced.

Page 91: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

4" x 2-3/8" EU8RD Hydraulic Tandem Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1028 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS CASING WEIGHT MAX O.D. MIN.I.D. CONNECTIONS

4" 9.5 - 11 # 3.281" 1.62" 2-3/8" EU8RD

DESCRIPTION The Hydraulic Tandem Packer is normally run above another hydraulic retrievable packer to isolate a zone between them for various operations. It can also be run below another packer. Several of these tandem packers can be run on one tubing string at the same time. It is set by pressure in the tubing string and, while set, the pack-off is maintained by a ratchet ring. The simple design and straight pull release make this packer a cost-effective tool to isolate zones in low pressure applications. The shear release screws are unaffected by differential pressure, allowing adjustments to the release force before running.

PART NUMBERS KEY # QTY PART # NAME KEY# QTY PART # NAME KEY# QTY PART# NAME

1 1 1E2E1J TOP 5 2 71000 ELEMENT SPACER 9 1 71040 PISTON 2 1 70970 MANDREL 6 1 71010 LOWER GAGE 10 1 17329 O-RING 3 1 70980 UPPER GAGE 7 1 71030 LOCK RING 11 2 17332 O-RING 4 3 602-40-51X PACKING ELEMENT * 8 1 71020 CYLINDER 12 9 VS1XW SHEAR SCREW

* for packing elements, replace the x in part number with 0 for 60 durometer, 1 for 70, 2 for 80, or 3 for 90 13 1 71050 BOTTOM

Page 92: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

4" x 2-3/8" EU8RD Hydraulic Tandem Packer

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1028 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONS

A B C D E F 3.12" 3.28" 4.81" 1.75" 7.62" 25.56"

RUNNING INSTRUCTIONS Make up packer on the tubing string, together with another packer that can resist vertical movement. Include a device that allows build-up of pressure to the inside of this packer, such as a pump out plug with a ball seat, located just below the packer. Run packers to setting depth and set other packer. Activate pressure inducing device (such as dropping the ball) and build up pressure to 1700 psi. This will break the setting shear screws and initiate pack off. Continue building up pressure to at least 2500 psi, which will complete pack off. Pressure operations between the two packers may now be completed. RELEASING INSTRUCTIONS This packer is released by a straight pull and usually does not require breaking the release screws. Simply release the other packer in its normal way, then pull both packers out of the hole. This will damage the elements, requiring their replacement before re-running. If the packer becomes stuck, a tensile force of 10,500 lb. Will break the release screws, causing the elements to relax so the packer can be retrieved. ASSEMBLY PROCEDURES

1. Screw mandrel (2) into top sub (1) and clamp top sub in vise. 2. Slide upper gage (3) onto lower end of mandrel to stop. Follow that with the packing elements (4) and the

element spacers (5). 3. Slide lower gage (6) over lower end of mandrel and install three shear screws (12). 4. Screw lock ring (7) into upper end of cylinder (8) until its top end is flush with the top of the cylinder. Screw

further just until split in lock ring aligns with hole in cylinder and insert 1/4" diameter x 5/16" long screw through hole and split. Tape over head of screw to hold in place.

5. With O-rings (10 & 11) installed on piston (9), slide piston into bottom end of cylinder until it protrudes from the upper end. Insure ratchet thread on piston does not engage ratchet thread inside lock ring. Slide this assembly onto mandrel until upper tip of piston contacts lower gage.

6. With O-ring (11) installed on bottom (13), screw bottom onto mandrel and tighten. Slide cylinder up or down until threaded holes align with groove on the bottom.

7. Install six shear screws (12). Remove tape and screw from hole in cylinder.

Page 93: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

4" x 2-3/8" EU8RD Hydraulic Tandem Packer

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1028 - 2019 January

H O M E O F K L I N E T O O L S

DISASSEMBLY PROCEDURES Note: These procedures describe disassembly from the set position with release screws unbroken.

1. With top sub (1) in vise, break bottom (13) off mandrel (2) and remove, along with cylinder (8). Set these parts aside.

2. Remove three shear screws (12) from lower gage (6) and slide lower gage, packing elements (4), element spacers (5), and upper gage (3) off mandrel.

3. Remove six shear screws (12) from cylinder, slide bottom out and set aside. 4. Screw cylinder down and off piston (9) leaving lock ring (7) engaged to piston. 5. Screw lock ring up and off piston (left hand thread). 6. Before reassembling, replace all three O-rings (10 & 11). It is recommended that packing elements also be

replaced.

Page 94: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

4-1/2" x 2-3/8" EU8RD Hydraulic Tandem Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1029 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONAL SPECIFICATIONS CASING WEIGHT MAX O.D. MIN.I.D. CONNECTIONS

4-1/2" 13.5-16.6# 3.625"

1.94" 2-3/8" EU8RD 9.5-13.5# 3.750"

DESCRIPTION The Hydraulic Tandem Packer is normally run above another hydraulic retrievable packer to isolate a zone between them for various operations. It can also be run below another packer. Several of these tandem packers can be run on one tubing string at the same time. It is set by pressure in the tubing string and, while set, the pack-off is maintained by a ratchet ring. The simple design and straight pull release make this packer a cost-effective tool to isolate zones in low pressure applications. The shear release screws are unaffected by differential pressure, allowing adjustments to the release force before running.

PART NUMBERS KEY # QTY PART # NAME KEY# QTY PART # NAME KEY# QTY PART# NAME

1 1 71400 MANDREL 5 4 VS1XW SETTING SHEAR SCREW 9 1 71430 PISTON 2 1 SEE CHARTS UPPER GAGE 6 1 SEE CHARTS LOWER GAGE 10 1 SEE CHARTS CYLINDER 3 3 SEE CHARTS PACKING ELEMENT 7 2 19230 O-RING 11 2 19336 O-RING 4 2 SEE CHARTS ELEMENT SPACER 8 1 65690 LOCK RING 12 8 11666F RELEASE SHEAR SCREW 13 1 71450 BOTTOM

Page 95: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

4-1/2" x 2-3/8" EU8RD Hydraulic Tandem Packer

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1029 - 2019 January

H O M E O F K L I N E T O O L S

DRESSING CHART

CASING WEIGHT UPPER GAGE PACKING ELEMENT * ELEMENT SPACER LOWER GAGE CYLINDER 13.5-16.6# 71411 602-45-51X 81641 71421 71441 9.5-13.5# 71410 602-45-51X 81640 71420 71440

*On all packing element part numbers, the last digit in the part number indicates durometer. Use ‘3’ for 90 durometer, ’2’ for 80, ‘1’ for 70, ‘0’ for 60

DIMENSIONS A B C D E

3.06" SEE SPECS 4.00" 10.12" 25.94"

RUNNING INSTRUCTIONS Make up packer on the tubing string, together with another packer that can resist vertical movement. Include a device that allows build-up of pressure to the inside of this packer, such as a pump out plug with a ball seat, located just below the packer. Run packers to setting depth and set other packer. Activate pressure inducing device (such as dropping the ball) and build up pressure to 1925 psi. This will break the setting shear screws and initiate pack off. Continue building up pressure to at least 2500 psi, which will complete pack off. Pressure operations between the two packers may now be completed. RELEASING INSTRUCTIONS This packer is released by a straight pull and usually does not require breaking the release screws. Simply release the other packer in its normal way, then pull both packers out of the hole. This will damage the elements, requiring their replacement before re-running. If the packer becomes stuck, a tensile force of 25,000 lb. Will break the release screws, causing the elements to relax so the packer can be retrieved.

TECHNICAL SPECIFICATIONS INITIAL SETTING PRESSURE 1925 PSI MAXIMUM DIFFERENTIAL WITH TUBING HIGHER 7500 PSI *

PRESSURE REQUIRED TO COMPLETE PACKOFF 2500 PSI MAXIMUM DIFFERENTIAL WITH ANNULUS HIGHER 3000 PSI FORCE REQUIRED TO BREAK RELEASING SCREWS 25,000 LB. SETTING PISTON AREA 3.620 SQ. IN.

* For 13.5 - 16.6#, 6000 PSI maximum

ASSEMBLY PROCEDURES

1. With mandrel (1) in vise, slide upper gage (2) onto lower end of mandrel to stop. Follow that with the packing elements (3) and the element spacers (4).

2. Slide lower gage (6) over lower end of mandrel and install the setting shear screws (5). 3. Screw lock ring (8) into upper end of cylinder (10) until its top end is flush with the top of the cylinder. Screw

further just until split in lock ring aligns with hole in cylinder and insert 1/4" diameter x 3/8" long screw through the hole and the split. Tape over head of screw to hold in place.

Page 96: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

4-1/2" x 2-3/8" EU8RD Hydraulic Tandem Packer

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1029 - 2019 January

H O M E O F K L I N E T O O L S

4. With both O-rings (7) and O-ring (11) installed on piston (9), slide piston into bottom end of cylinder until it protrudes from the upper end. Insure ratchet thread on piston does not engage ratchet thread inside lock ring. Slide this assembly onto mandrel until upper tip of piston slides inside lower gage.

5. With O-ring (11) installed on bottom (13), screw bottom onto mandrel and tighten. Slide cylinder up or down until threaded holes align with groove on the bottom.

6. Install release shear screws (12). Remove tape and screw from hole in cylinder.

DISASSEMBLY PROCEDURES Note: These procedures describe disassembly from the set position with release screws unbroken.

1. With mandrel (1) in vise, break bottom (13) off mandrel, and remove, along with cylinder (10). Set these parts aside.

2. Remove setting shear screws (5) from lower gage (6) and slide lower gage, packing elements (3), element spacers (4), and upper gage (2) off mandrel.

3. Remove release shear screws (12) from cylinder, slide bottom out and set aside. 4. Screw cylinder down and off piston (9) leaving lock ring (8) engaged to piston. 5. Screw lock ring up and off piston (left hand thread). 6. Before reassembling, replace all four O-rings (7 & 11). It is recommended that packing elements also be replaced.

Page 97: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5" EU8RD Hydraulic Tandem Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1030 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONAL SPECIFICATIONS CASING WEIGHT MAX O.D. MIN.I.D. CONNECTIONS

5" 11.5 -15 # 4.250"

1.94" 2-3/8" EU8RD 15 18 # 4.125"

DESCRIPTION The Hydraulic Tandem Packer is normally run above another hydraulic retrievable packer to isolate a zone between them for various operations. It can also be run below another packer. Several of these tandem packers can be run on one tubing string at the same time. It is set by pressure in the tubing string and, while set, the pack-off is maintained by a ratchet ring. The simple design and straight pull release make this packer a cost-effective tool to isolate zones in low pressure applications. The shear release screws are unaffected by differential pressure, allowing adjustments to the release force before running.

PART NUMBERS KEY # QTY PART # NAME KEY# QTY PART # NAME KEY# QTY PART# NAME

1 1 71400 MANDREL 5 4 VS1XW SETTING SHEAR SCREW 9 1 71430 PISTON 2 1 SEE CHARTS UPPER GAGE 6 1 SEE CHARTS LOWER GAGE 10 1 71440 CYLINDER 3 3 602-50-51X PACKING ELEMENT * 7 2 19230 O-RING 11 2 19336 O-RING 4 2 53475 ELEMENT SPACER 8 1 65690 LOCK RING 12 8 11666F RELEASE SHEAR SCREW

* For packing elements, replace the x in part number with 0 for 60 durometer, 1 for 70, 2 for 80, or 3 for 90 13 1 71450 BOTTOM

Page 98: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5" EU8RD Hydraulic Tandem Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1030 - 2019 January

H O M E O F K L I N E T O O L S

DRESSING CHART CASING WEIGHT UPPER GAGE LOWER GAGE

11.5 - 15 # 89231 89241 15 - 18 # 89230 89240

*On all packing element part numbers, the last digit in the part number indicates durometer. Use ‘3’ for 90 durometer, ’2’ for 80, ‘1’ for 70, ‘0’ for 60

DIMENSIONS A B C D E F

3.06" SEE SPECS 3.75" 4.00" 10.12" 25.94"

RUNNING INSTRUCTIONS Make up packer on the tubing string, together with another packer that can resist vertical movement. Include a device that allows build-up of pressure to the inside of this packer, such as a pump out plug with a ball seat, located just below the packer. Run packers to setting depth and set other packer. Activate pressure inducing device (such as dropping the ball) and build up pressure to 1925 psi. This will break the setting shear screws and initiate pack off. Continue building up pressure to at least 2500 psi, which will complete pack off. Pressure operations between the two packers may now be completed. RELEASING INSTRUCTIONS This packer is released by a straight pull and usually does not require breaking the release screws. Simply release the other packer in its normal way, then pull both packers out of the hole. This will damage the elements, requiring their replacement before re-running. If the packer becomes stuck, a tensile force of 25,000 lb. Will break the release screws, causing the elements to relax so the packer can be retrieved.

TECHNICAL SPECIFICATIONS INITIAL SETTING PRESSURE 1925 PSI MAXIMUM DIFFERENTIAL WITH TUBING HIGHER 7500 PSI

PRESSURE REQUIRED TO COMPLETE PACKOFF 2500 PSI MAXIMUM DIFFERENTIAL WITH ANNULUS HIGHER 2250 PSI FORCE REQUIRED TO BREAK RELEASING SCREWS 25,000 LB. SETTING PISTON AREA 3.620 SQ. IN.

ASSEMBLY PROCEDURES

1. With mandrel (1) in vise, slide upper gage (2) onto lower end of mandrel to stop. Follow that with the packing elements (3) and the element spacers (4).

2. Slide lower gage (6) over lower end of mandrel and install the setting shear screws (5). 3. Screw lock ring (8) into upper end of cylinder (10) until its top end is flush with the top of the cylinder. Screw

further just until split in lock ring aligns with hole in cylinder and insert 1/4" diameter x 3/8" long screw through the hole and the split. Tape over head of screw to hold in place.

4. With both O-rings (7) and O-ring (11) installed on piston (9), slide piston into bottom end of cylinder until it protrudes from the upper end. Insure ratchet thread on piston does not engage ratchet thread inside lock ring. Slide this assembly onto mandrel until upper tip of piston slides inside lower gage.

5. With O-ring (11) installed on bottom (13), screw bottom onto mandrel and tighten. Slide cylinder up or down until threaded holes align with groove on the bottom.

6. Install release shear screws (12). Remove tape and screw from hole in cylinder.

Page 99: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5" EU8RD Hydraulic Tandem Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1030 - 2019 January

H O M E O F K L I N E T O O L S

DISASSEMBLY PROCEDURES Note: These procedures describe disassembly from the set position with release screws unbroken.

1. With mandrel (1) in vise, break bottom (13) off mandrel, and remove, along with cylinder (10). Set these parts aside.

2. Remove setting shear screws (5) from lower gage (6) and slide lower gage, packing elements (3), element spacers (4), and upper gage (2) off mandrel.

3. Remove release shear screws (12) from cylinder, slide bottom out and set aside. 4. Screw cylinder down and off piston (9) leaving lock ring (8) engaged to piston. 5. Screw lock ring up and off piston (left hand thread). 6. Before reassembling, replace all four O-rings (7 & 11). It is recommended that packing elements also be replaced.

Page 100: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5-1/2" x 2-3/8" EU8RD Hydraulic Tandem Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1031 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS CASING WEIGHT MAX O.D. MIN.I.D. CONNECTIONS

5-1/2" 13 - 20 # 4.625"

1.94" 2-3/8" EU8RD 17 - 23 # 4.500"

DESCRIPTION The Hydraulic Tandem Packer is normally run above another hydraulic retrievable packer to isolate a zone between them for various operations. It can also be run below another packer. Several of these tandem packers can be run on one tubing string at the same time. It is set by pressure in the tubing string and, while set, the pack-off is maintained by a ratchet ring. The simple design and straight pull release make this packer a cost-effective tool to isolate zones in low pressure applications. The shear release screws are unaffected by differential pressure, allowing adjustments to the release force before running.

Page 101: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5-1/2" x 2-3/8" EU8RD Hydraulic Tandem Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1031 - 2019 January

H O M E O F K L I N E T O O L S

PART NUMBERS

KEY # QTY PART # NAME KEY# QTY PART # NAME KEY# QTY PART# NAME 1 1 71460 MANDREL 5 4 VS1XW SETTING SHEAR SCREW 9 1 71430 PISTON 2 1 SEE CHARTS UPPER GAGE 6 1 SEE CHARTS LOWER GAGE 10 1 71440 CYLINDER 3 3 SEE CHARTS PACKING ELEMENT * 7 2 19230 O-RING 11 2 19336 O-RING 4 2 61590 ELEMENT SPACER 8 1 65690 LOCK RING 12 8 11666F RELEASE SHEAR SCREW 13 1 71450 BOTTOM

DRESSING CHART

CASING WEIGHT UPPER GAGE PACKING ELEMENT LOWER GAGE 13 - 20# 71470 720-55-51X 71480 17 - 23# 71471 720-56-51X 71481

* For packing elements, replace the x in part number with 0 for 60 durometer, 1 for 70, 2 for 80, or 3 for 90

DIMENSIONS

A B C D E F 3.06" SEE SPECS 3.75" 4.00" 13.12" 28.94"

Page 102: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5-1/2" x 2-3/8" EU8RD Hydraulic Tandem Packer

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1031 - 2019 January

H O M E O F K L I N E T O O L S

RUNNING INSTRUCTIONS Make up packer on the tubing string, together with another packer that can resist vertical movement. Include a device that allows build-up of pressure to the inside of this packer, such as a pump out plug with a ball seat, located just below the packer. Run packers to setting depth and set other packer. Activate pressure inducing device (such as dropping the ball) and build up pressure to 1925 psi. This will break the setting shear screws and initiate pack off. Continue building up pressure to at least 2500 psi, which will complete pack off. Pressure operations between the two packers may now be completed. RELEASING INSTRUCTIONS This packer is released by a straight pull and usually does not require breaking the release screws. Simply release the other packer in its normal way, then pull both packers out of the hole. This will damage the elements, requiring their replacement before re-running. If the packer becomes stuck, a tensile force of 25,000 lb. Will break the release screws, causing the elements to relax so the packer can be retrieved.

TECHNICAL SPECIFICATIONS INITIAL SETTING PRESSURE 1925 PSI MAX. DIFFERENTIAL WITH TUBING HIGHER 7500 PSI

PRESSURE REQUIRED TO COMPLETE PACKOFF 2750 PSI MAX. DIFFERENTIAL WITH ANNULUS HIGHER 1750 PSI FORCE REQUIRED TO BREAK RELEASING SCREWS 25,000 LB. SETTING PISTON AREA 3.620 SQ. IN.

ASSEMBLY PROCEDURES

1. With mandrel (1) in vise, slide upper gage (2) onto lower end of mandrel to stop. Follow that with the packing elements (3) and the element spacers (4).

2. Slide lower gage (6) over lower end of mandrel and install the setting shear screws (5). 3. Screw lock ring (8) into upper end of cylinder (10) until its top end is flush with the top of the cylinder. Screw

further just until split in lock ring aligns with hole in cylinder and insert 1/4" diameter x 3/8" long screw through hole and split. Tape over head of screw to hold in place.

4. With both O-rings (7) and O-ring (11) installed on piston (9), slide piston into bottom end of cylinder until it protrudes from the upper end. Insure ratchet thread on piston does not engage ratchet thread inside lock ring. Slide this assembly onto mandrel until upper tip of piston slides inside of lower gage.

5. With O-ring (11) installed on bottom (13), screw bottom onto mandrel and tighten. Slide cylinder up or down until threaded holes align with groove on the bottom.

6. Install release shear screws (12). Remove tape and screw from hole in cylinder.

Page 103: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5-1/2" x 2-3/8" EU8RD Hydraulic Tandem Packer

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1031 - 2019 January

H O M E O F K L I N E T O O L S

DISASSEMBLY PROCEDURES Note: These procedures describe disassembly from the set position with release screws unbroken.

1. With mandrel (1) in vise, break bottom (13) off mandrel, and remove, along with cylinder (10). Set these parts aside.

2. Remove setting shear screws (5) from lower gage (6) and slide lower gage, packing elements (3), element spacers (4), and upper gage (2) off mandrel.

3. Remove release shear screws (12) from cylinder, slide bottom out and set aside. 4. Screw cylinder down and off piston (9) leaving lock ring (8) engaged to piston. 5. Screw lock ring up and off piston (left hand thread). 6. Before reassembling, replace all four O-rings (7 & 11). It is recommended that packing elements also be replaced.

Page 104: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

7" x 2-7/8" EU8RD Hydraulic Tandem Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1032 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS CASING WEIGHT MAX O.D. MIN.I.D. CONNECTIONS

7" 20 - 29 # 5.969" 2.44" 2-7/8" EU8RD

DESCRIPTION The Hydraulic Tandem Packer is normally run above another hydraulic retrievable packer to isolate a zone between them for various operations. It can also be run below another packer. Several of these tandem packers can be run on one tubing string at the same time. It is set by pressure in the tubing string and, while set, the pack-off is maintained by a ratchet ring. The simple design and straight pull release make this packer a cost-effective tool to isolate zones in low pressure applications. The shear release screws are unaffected by differential pressure, allowing adjustments to the release force before running.

PART NUMBERS

KEY # QTY PART # NAME KEY# QTY PART # NAME KEY# QTY PART# NAME 1 1 71405 MANDREL 5 1 71425 LOWER GAGE 10 1 71445 CYLINDER 2 1 71415 UPPER GAGE 6 1 71710 PACK OFF RING 11 1 17338 O-RING 3 3 720-70-51X PACKING ELEMENT * 7 3 11666F SETTING SHEAR SCREW 12 2 17343 O-RING 4 2 71465 ELEMENT SPACER 8 1 66390 LOCK RING 13 12 11666F RELEASE SHEAR SCREW 9 1 71435 PISTON 14 1 71455 BOTTOM

* For packing elements, replace the x in part number with 0 for 60 durometer, 1 for 70, 2 for 80, or 3 for 90

Page 105: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

7" x 2-7/8" EU8RD Hydraulic Tandem Packer

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1032 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONS

A B C D E F 3.75" SEE SPECS 4.75" 3.38" 9.94" 27.50"

RUNNING INSTRUCTIONS Make up packer on the tubing string, together with another packer that can resist vertical movement. Include a device that allows build-up of pressure to the inside of this packer, such as a pump out plug with a ball seat, located just below the packer. Run packers to setting depth and set other packer. Activate pressure inducing device (such as dropping the ball) and build up pressure to 1925 psi. This will break the setting shear screws and initiate pack off. Continue building up pressure to at least 2500 psi, which will complete pack off. Pressure operations between the two packers may now be completed. RELEASING INSTRUCTIONS This packer is released by a straight pull and usually does not require breaking the release screws. Simply release the other packer in its normal way, then pull both packers out of the hole. This will damage the elements, requiring their replacement before re-running. If the packer becomes stuck, a tensile force of 25,000 lb. Will break the release screws, causing the elements to relax so the packer can be retrieved.

TECHNICAL SPECIFICATIONS INITIAL SETTING PRESSURE 1600 PSI MAX. DIFFERENTIAL WITH TUBING HIGHER 7000 PSI

PRESSURE REQUIRED TO COMPLETE PACKOFF 3000 PSI MAX. DIFFERENTIAL WITH ANNULUS HIGHER 1400 PSI FORCE REQUIRED TO BREAK RELEASING SCREWS 38,000 LB. SETTING PISTON AREA 5.841 SQ. IN.

ASSEMBLY PROCEDURES

1. With mandrel (1) in vise, slide upper gage (2) onto lower end of mandrel to stop. Follow that with the packing elements (3) and the element spacers (4).

2. Screw & tighten lower gage (5) to pack off ring (6) and slide this over lower end of mandrel. Install the setting shear screws (7).

3. Screw lock ring (8) into upper end of cylinder (10) until its top end is flush with the top of the cylinder. Screw further just until split in lock ring aligns with hole in cylinder and insert 1/4" diameter x 3/8" long screw through hole and split. Tape over head of screw to hold in place.

4. With O-rings (11 & 12) installed on piston (9), slide piston into bottom end of cylinder until it protrudes from the upper end. Insure ratchet thread on piston does not engage ratchet thread inside lock ring. Slide this assembly onto mandrel until upper tip of piston contacts pack off ring.

5. With O-ring (12) installed on bottom (14), screw bottom onto mandrel and tighten. Slide cylinder up or down until threaded holes align with groove on the bottom.

6. Install release shear screws (13). Remove tape and screw from hole in cylinder.

Page 106: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

7" x 2-7/8" EU8RD Hydraulic Tandem Packer

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1032 - 2019 January

H O M E O F K L I N E T O O L S

DISASSEMBLY PROCEDURES Note: These procedures describe disassembly from the set position with release screws unbroken.

1. With mandrel (1) in vise, break bottom (14) off mandrel, and remove, along with cylinder (10). Set these parts aside.

2. Remove setting shear screws (7) from pack off ring (6) and slide it, packing elements (3), element spacers (4), and upper gage (2) off mandrel.

3. Remove release shear screws (13) from cylinder, slide bottom out and set aside. 4. Screw cylinder down and off piston (9) leaving lock ring (8) engaged to piston. 5. Screw lock ring up and off piston (left hand thread). 6. Before reassembling, replace all three O-rings (11 & 12). It is recommended that packing elements also be

replaced.

Page 107: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

2-7/8" x 1.900" NU10RD Big Bore Tubing Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1023 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONAL SPECIFICATIONS

CASING WEIGHT MAX O.D. MIN.I.D. CONNECTIONS 2-7/8" 6.4 - 6.5# 2.281" 1.50" 1.900 NU10RD

DESCRIPTION This simple packer is designed to provide a leak-free seal inside a tubing string, with a bore that is larger than normally provided with other tubing packers. It can be run as a tension packer or a "hook wall" compression packer. It has a left-hand safety joint when run in tension, in case it becomes stuck. Options include a double element packing element system and box or pin connections at either end. Various tubing connections are available on special order; however, the standard connection is shown in the chart below. This packer can also be used as a tension anchor, by replacing the packing element with a steel sleeve.

PART NUMBERS

KEY # QTY PART # NAME KEY# QTY PART # NAME KEY# QTY PART# NAME 1 1 42410 TOP 5 3 42460 DRAG SPRING 8 3 60280 SLIP 2 1 42470-K MANDREL 6 3 42450 SLIP ARM 9 1 42440 CONE 3 12 11332F J-BODY SCREW 7 6 11334C SLIP SCREW 10 1 403-27-512 PACKING ELEMENT (80D) 4 1 N/A J-BODY (NOTE THAT J-BODY IS SLIDABLY CONNECTED TO THE MANDREL) 11 1 42420 BOTTOM

PERFORMANCE SPECIFICATIONS PRESSURE DIFFERENTIAL (PSI) TENSION (LB) TEMPERATURE (°F) MIN ELEMENT PACKOFF (LB)

8,500 (BELOW)/7,900 (ABOVE) 38,000 250 5,750

Page 108: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

2-7/8" x 1.900" NU10RD Big Bore Tubing Packer

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1023 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONS

A B C D E F G 2.25" 1.75" SEE SPECS 3.88" .81" * 7.25" 18.94"

* In position shown

RUNNING INSTRUCTIONS Make up packer at the bottom of the tubing string and run to desired setting depth. If setting in tension, rotate to the right and pick up. The slips will set, and the packing element will begin to pack off. Pull at least 5,000 lb. Tension, which should provide a leak-free seal. Packer is now ready to perform tasks required. Maintain tension (30,000 lb. Maximum) throughout operations. If setting in compression, pick up tubing string, hold left hand torque, and sit down. Weight on packer should be at least 5,000 lb. Packer is now ready to perform tasks required. Maintain compression weight throughout operations. RELEASING INSTRUCTIONS If packer is set in compression, simply pick up tubing string and pull from well. If packer needs to be re-set lower in well, rotate to the right before moving down. If packer is set in tension, lower tubing and rotate to the left. When tubing is now picked up, slips will release and packing element will relax. If packer is stuck, try moving up and down and repeating release instructions. To use safety release, hold tension and rotate to the right until the top separates from the mandrel. Tubing string can now be removed from well, leaving remainder of packer in well. This may be fished or pushed to bottom. ASSEMBLY PROCEDURES

1. With top (1) in vise, screw in mandrel assembly (2 & 4), and tighten (left hand thread). Do not wrench on lower end

of mandrel. 2. Slide cone (9) on mandrel to shoulder, followed by packing element (10). 3. Screw on bottom (11) and tighten. 4. Screw drag springs to j-body (4) using j-body screws (3). 5. Screw slip arms (6) to slips (8) using slip screws (7). Screw slip arms to j-body using j-body screws.

DISASSEMBLY PROCEDURES

1. With top (1) in vise, unscrew bottom from mandrel (2). Slide off packing element (10) and cone (9). 2. Unscrew mandrel from top (1) (left hand thread). 3. Remove drag springs (5) and slip arms (6) by removing j-body screws (3). 4. Remove slips (8) from slip arms by removing slip screws (7).

Page 109: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

3-1/2" X 1.900" Eu10rd Big Bore Tubing Packer Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1048 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONAL SPECIFICATIONS CASING WEIGHT MAX O.D. MIN.I.D. CONNECTIONS 3-1/2" 7.7 - 9.3# 2.812" 1.75" 1.900 EU10RD

DESCRIPTION This simple packer is designed to provide a leak-free seal inside a tubing string, with a bore that is larger than normally provided with other tubing packers. It can be run as a tension packer or a "hook wall" compression packer. It has a left-hand safety joint when run in tension, in case it becomes stuck. Options include a double element packing element system and box or pin connections at either end. Various tubing connections are available on special order; however, the standard connection is shown in the chart below. This packer can also be used as a tension anchor, by replacing the packing element with a steel sleeve.

PART NUMBERS

KEY # QTY PART # NAME KEY# QTY PART # NAME KEY# QTY PART# NAME 1 1 71870 TOP 5 3 42460 DRAG SPRING 8 3 90360 SLIP 2 1 71890-K MANDREL 6 3 42450 SLIP ARM 9 1 71910 CONE 3 12 11334F J-BODY SCREW 7 6 11333C SLIP SCREW 10 1 403-35-512 PACKING ELEMENT 4 1 N/A J-BODY (NOTE THAT J-BODY IS SLIDABLY CONNECTED TO THE MANDREL) 11 1 71865 BOTTOM

Page 110: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

3-1/2" X 1.900" Eu10rd Big Bore Tubing Packer

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU1048 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONS

A B C D E F G 3.88" 2.09" SEE SPECS 3.88" 1.50" 8.69" 19.50"

RUNNING INSTRUCTIONS Make up packer at the bottom of the tubing string and run to desired setting depth. If setting in tension, rotate to the right and pick up. The slips will set, and the packing element will begin to pack off. Pull at least 5,000 lb. Tension, which should provide a leak-free seal. Packer is now ready to perform tasks required. Maintain tension (48,000# maximum) throughout operations. If setting in compression, pick up tubing string, hold left hand torque, and sit down. Weight on packer should be at least 5,000 lb. Packer is now ready to perform tasks required. Maintain compression weight throughout operations. RELEASING INSTRUCTIONS If packer is set in compression, simply pick up tubing string and pull from well. If packer needs to be re-set lower in well, rotate to the right before moving down. If packer is set in tension, lower tubing and rotate to the left. When tubing is now picked up, slips will release and packing element will relax. If packer is stuck, try moving up and down and repeating release instructions. To use safety release, hold tension and rotate to the right until the top separates from the mandrel. Tubing string can now be removed from well, leaving remainder of packer in well. This may be fished or pushed to bottom. ASSEMBLY PROCEDURES

1. With top (1) in vise, screw in mandrel assembly (2 & 4), and tighten (left hand thread). Do not wrench on lower

end of mandrel. 2. Slide cone (9) on mandrel to shoulder, followed by packing element (10). 3. Screw on bottom (11) and tighten. 4. Screw drag springs (5) to j-body (4) using j-body screws (3). 5. Screw slip arms (6) to slips (8) using slip screws (7). Screw slip arms to j-body using j-body screws.

DISASSEMBLY PROCEDURES

1. With top (1) in vise, unscrew bottom from mandrel (2). Slide off packing element (10) and cone (9). 2. Unscrew mandrel from top (1) (left hand thread). 3. Remove drag springs (5) and slip arms (6) by removing j-body screws (3). 4. Remove slips (8) from slip arms by removing slip screws (7).

Page 111: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Scab Liner Assembly 5” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-107-5025 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Logan Kline Tools Scab Liner Assembly is an economical method of isolating casing leaks or existing perforations in producing and injection wells. It can eliminate repetitive squeezing and the need to install a full liner. This assembly is fully retrievable and incorporates a unique design with large bore sizes, enabling standard tubing to run through the liner.

GENERAL SPECIFICATION Casing Tool

Size Weight OD ID Liner Connection Part No. 5” 11.5-15# 4.200” 2.50” 2-7/8 EUE 8 Rd 107-5025-XXXX 5” 15-18# 4.075” 2-7/8 EUE 8 Rd 107-5025-XXXX

Features

• Large thru bore ID. • Adjustable liner length.

Options

• Available with optional P-110 packing sleeve for increased burst/collapse rating. SPECIFICATIONS

(1) Base tool OD. Look at casing weight chart for gage OD. (2) Higher temperatures can be achieved with different elastomers.

Attribute Value Maximum OD1 See Gage Diagram Minimum ID 2.485 in 63.12 mm

Overall Length (Upper Section) 35.64 in 905.26 mm Overall Length (Lower Section) 53.70 in 1,363.98 mm

Approximate Weight (Upper Section) 33.0 lb 15.0 kg Approximate Weight (Lower Section) 59.2 lb 26.9 kg

External Working Pressure 8,000 psi 55,158 kPa Internal Working Pressure 9,000 psi 62,053 kPa

Max Working Temperature2 250 °F 121°C Min Working Temperature 70 °F 21°C Maximum Hanging Weight 128,000 lb 56,937 DaN

Pulling Sub Lug Shear 120,000 lb 53,379 DaN Maximum Allowable Liner Weight 96,000 lb 42,703 DaN Minimum Required Setting Weight 10,500 lb 4,671 DaN

Upper J Shear Screw Rating (each screw) 3,830 lb 1,704 DaN Sleeve Shear Screw Rating (each screw) 1,750 lb 778 DaN

NACE Service No

Page 112: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Scab Liner Assembly 5” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-107-5025 - 2019 January

H O M E O F K L I N E T O O L S

1. OPERATING INSTRUCTIONS

Note: Ensure all connections are correctly tightened.

1.1 Running a. Run the Scab Liner Assembly to the desired location. b. Pick up and rotate to the right ¼ turn (at the lower packer) and set down weight. The slips on the lower

packer will then set into the casing wall. c. Set down enough weight to shear the shear screws in the upper packer, lower packer and running sub. d. The elements on both packers will then pack off. This pack-off is maintained by the lock rings in each

section. e. The tubing can now be disconnected by rotating to the left ¼ turn (at the upper packer) and picking up. f. The SLP is now set and will remain in place, isolating the section of casing between the two packer

sections. g. Remove the tubing from the well and make up the desired piece on bottom, to connect to the tool set

below. h. The tubing can then be run back in through the Scab Liner assembly.

1.2 Retrieval

a. In order to retrieve the Scab Liner Assembly, run the tubing back in with the run-in sub installed. b. The run-in sub will land into the upper j-slot in the upper top. c. Rotate to the right to re-latch, then pick up a little weight and continue rotating to the right to release the

pack off. (this could require 25 or 30 turns depending on the ID and condition of the casing) d. The entire assembly can then be retrieved by removing the tubing string. e. If right hand rotation is prevented for some reason, the SLP assembly can be removed with the elements

still packed off. f. If it is necessary to move back down hole, the bottom J can be re-latched by rotating to the left in the

picked-up position.

2. ASSEMBLY INSTRUCTIONS Note: Care should be taken during assembly to insure all threads are greased adequately. Caution: Take care when handling inner mandrel not to damage seal surface. 2.1 Upper Packer Assembly

a. Install lock ring (10) into lower end of one sleeve (5), ensuring threads are oriented correctly and top end of ring can be seen through uppermost ¼” hole.

b. Install 3 drive-loc pins (9) through other 3 holes and through the slot in the lock ring (10). c. Install 2 O-rings (6) in grooves in packing mandrel (8). d. Slide packing mandrel (8) through top end of sleeve (5) until ¾” hole in sleeve lines up with ¾”

counterbore in packing mandrel (8). Note: Packing mandrel will need to be rotated and pushed to get through lock ring and engaged with clutch inside of sleeve (5).

Page 113: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Scab Liner Assembly 5” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-107-5025 - 2019 January

H O M E O F K L I N E T O O L S

e. Slide one back-up ring (11), two packing elements (12) and one element spacer (13) onto Packing mandrel (8).

f. Screw upper bottom (14) onto packing mandrel (8) and tighten using assembly pin through ¾” hole in sleeve (5) and into counterbore in packing mandrel (8).

g. Tighten upper j-body (2) into upper sleeve (5) and install three set screws (4). h. Install six brass body shear screws (7) into other threaded holes in sleeve (5).

2.2 Lower Packer Assembly

a. Repeat steps in upper packer instructions above. b. Screw cone coupling (16) onto packing mandrel (8) and tighten using assembly pin through ¾” hole in

sleeve (5) and into counterbore in packing mandrel (8). c. Install O-ring (6) on lower top (15) and tighten top into top end of sleeve (5) and install three set screws

(4). d. Install five brass body shear screws (7) into other threaded holes in sleeve (5).

Note: there should be fewer screws in the lower sleeve then the upper to ensure lower packer sets first.

e. With cone coupling (16) in vise, tighten lower mandrel (22) into cone coupling (16) and bottom guide (23) onto lower mandrel (22), with drag spring screw holes down.

f. Screw slips (17) to slip arms (19) and screw the arms and drag springs to the lower mandrel (22) using the provided screws (18) & (21).

2.3 Running Sub Assembly a. Slide running sub (1) into upper j-body (2). Apply right hand rotation and slide up till it hits a stop. b. Install two brass upper shear screws (3) through the holes in the upper j-body and into groove in running

sub.

3. DISASSEMBLY INSTRUCTIONS 3.1 Upper Packer Disassembly

a. Remove the three set screws (4) from the upper end of the sleeve (5) and the brass body shear screws (7) in the lower end.

b. Insert assembly pin through the large hole in the sleeve (5) and into the counterbore in the packing mandrel (8). Clamp sleeve in vise.

c. Unscrew upper j-body (2) from sleeve and then upper bottom (14) from packing mandrel (8). d. Clamp sleeve (5) in vise. e. Slide off packing elements (12), element spacer (13) and element backup (11). f. Push packing mandrel (8) up and out of sleeve (5).

Note: This requires ratcheting through the lock thread.

g. Using a punch, push the three drive-loc pins (9) in sleeve through to the inside and remove. h. Unscrew lock ring (10) from sleeve (5).

Page 114: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Scab Liner Assembly 5” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-107-5025 - 2019 January

H O M E O F K L I N E T O O L S

3.2 Lower Packer Disassembly

a. Repeat steps 1 & 2 from upper packer disassembly instructions above. b. Unscrew lower top (15) from sleeve (5). c. Unscrew cone coupling (16) from packing mandrel (8). d. Repeat steps 4 & 5 in upper packer disassembly instructions above. e. Clamp cone coupling (16) in vise and unscrew bottom guide (23) from lower mandrel (22). f. Unscrew lower mandrel (22) from cone coupling (16).

g. Remove slip arms (19) and drag springs (20) as required. h. Remove slips (17) from slip arms (19) if required.

4. 107-5025-XXXX PARTS LIST ITEM QTY DESCRIPTION PART NUMBER

11.5-15# (4.200” OD) 15-18# (4.075” OD) 1 1 RUN-IN SUB 65670 2 1 UPPER J-BODY 65700-K 3 2 UPPER SHEAR SCREW 1167DC 4 6 SET SCREW 11156C 5 2 SLEEVE 65650-K 6 5 O-RING 17335 7 11 BODY SHEAR SCREW 000HE 8 2 PACKING MANDREL 65560 9 6 DRIVE-LOC PIN 66395 10 2 LOCK RING 65690 11 2 ELEMENT BACK-UP 89520 89521 12 4 PACKING ELEMENT 89561 89560 13 2 ELEMENT SPACER 89530 89531 14 1 UPPER BOTTOM 89510 89511 15 1 LOWER TOP 65620 16 1 CONE COUPLING 89540 89541 17 3 SLIP 89500 18 6 5/16 – 18 UNC X ¼ BUTTON HEAD CAP SCREW 11356C 19 3 SLIP ARM SLPSA 20 3 DRAG SPRING SLPDS 21 15 5/16 – 24 UNF X ¼ BUTTOM HEAD CAP SCREW 11354F 22 1 LOWER MANDREL 65680-K 23 1 BOTTOM GUIDE 89550 89551

Page 115: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Scab Liner Assembly 5” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-107-5025 - 2019 January

H O M E O F K L I N E T O O L S

5. 107-5025-XXXX ASSEMBLY DRAWING

6. 107-5025-XXXX DIMENSIONS

Page 116: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Scab Liner Assembly 5” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-107-5025 - 2019 January

H O M E O F K L I N E T O O L S

SEE PREVIOUS PAGE FOR DRAWING

DIMENSION MEASUREMENT A 39.39 in 1000.5 mm B 35.64 in 905.3 mm C 19.00 in 482.6 mm D 8.13 in 206.5 mm E 5.14 in 130.6 mm F 6.00 in 152.4 mm G 53.70 in 1,365.0 mm H Ø 2.50 in Ø 63.5 mm J Ø 1.75 in Ø 44.5 mm K Ø 3.75 in Ø 95.3 mm L Ø 2.63 in Ø 66.8 mm M Ø 3.20 in Ø 81.3 mm N Ø 2.515 in Ø 63.88 mm P Ø 2.50 in Ø 63.5 mm Q Ø 4.06 in Ø 103.1 mm R SEE GAGE DIAMETER S Ø 2.81 in Ø 71.4 mm T Ø 3.31 in Ø 84.1 mm U Ø 2.84 in Ø 72.1 mm V SEE GAGE DIAMETER

Page 117: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

2-1/2" X 4-1/2" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4022 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS CASING SIZE WEIGHT LINER CONNECTIONS MAX O.D. MIN.I.D.

4-1/2" 9.5 - 13# 2-7/8" EU8RD* 3.750" 2.50" * OTHER CONNECTIONS AVAILABLE ON SPECIAL ORDER

Page 118: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

2-1/2" X 4-1/2" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4022 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Kline Scab Liner Assembly is an economical method of isolating casing leaks or existing perforations in producing and injection wells. It can eliminate repetitive squeezing and the need to install a full liner. This assembly is fully retrievable and incorporates a unique design with large bore sizes, normally allowing standard tubing to run through the liner. The assembly consists of two packer type sections, separated by a liner (not provided). This is carried in the hole using a running tool attached to a tubing string and set with minimal rotation and compression. Lock rings in both upper and lower packer sections retain the pack-off force. The scab liner assembly is released from the tubing and is not affected by production or injection tubing movement. The assembly can be easily retrieved using the running tool, which is greatly facilitated because no upper slips are required to be pulled free. For casing leaks in producing wells, a tubing anchor/catcher can be installed below, and gas can be produced through the annulus past the isolated zone to the surface, thus preventing gas locking of the rod pump. Casing leaks can be isolated in injection wells by using a seal bore packer or retrievable injection packer with an on/off tool, then installing the scab liner assembly above to isolate the leak. The tubing string can run through the assembly and be stung into the seal bore packer or latched onto the injection packer.

PART NUMBERS

KEY #

QTY PART # NAME KEY# QTY PART # NAME KEY# QTY PART# NAME

1 1 65670 RUNNING SUB 8 2 65560 ** PACKING MANDREL 15 1 65620 LOWER TOP

2 1 65700-K UPPER J BODY 9 6 66395 DRIVE-LOC PIN 16 1 65730 CONE

COUPLING

3 2 1167DC UPPER SHEAR SCREW 10 2 65690 LOCK RING 17 3 60490 SLIP

4 6 11156C SET SCREW 11 2 65590 ELEMENT BACK-UP 18 6 11356C SLIP SCREW

5 2 65650-K ** SLEEVE 12 4 400-45-

512* PACKING ELEMENT 19 3 SLPSA SLIP ARM

6 5 17335 O-RING 13 2 65600 ELEMENT SPACER 20 1 65680-K LOWER

MANDREL

7 12 000HE BODY SHEAR SCREW 14 1 65660 UPPER

BOTTOM 21 3 SLPDS DRAG SPRING

* FOR HSN MATERIAL, ADD H TO PART NUMBER 22 15 11354F J BODY SCREW ** FOR P-110 EQUIVALENT MATERIAL, ADD P TO PART NUMBER 23 1 65635 *** BOTTOM GUIDE *** 65631 FOR 2-7/8" EU8RD PIN DOWN BOTTOM

DIMENSIONS A B C D E F

9.88" 40.12" 56.56" 1.75" 2.50" 2.62"

STANDARD RUNNING SUB CONNECTIONS: 2-7/8" EU8RD PIN UP X 1.900" EU10RD BOX DOWN

Page 119: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

2-1/2" X 4-1/2" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4022 - 2019 January

H O M E O F K L I N E T O O L S

ASSEMBLY INSTRUCTIONS – UPPER PACKAGE

1. Install lock ring (10) into lower end of one sleeve (5), insuring threads are in correct directions, and top end of ring can be seen through uppermost 1/4" hole. Install 3 drive-loc pins (9) through other three holes and through slot in lock ring.

2. Install two O-rings (6) in grooves in one packing mandrel (8). Slide packing mandrel through top end of sleeve until 3/4" hole in sleeve lines up with 3/4" counterbore in packing mandrel (mandrel will need to be rotated and pushed to get through lock ring and meshed with clutch inside sleeve).

3. Slide one back-up ring (11), two packing elements (12) and one element spacer (13) onto packing mandrel. 4. Screw upper bottom (14) onto packing mandrel and tighten, using assembly pin through 3/4" hole in sleeve and

into counterbore in packing mandrel. 5. Tighten upper j-body (2) into upper sleeve and install three thread lock set screws (4). 6. Install six brass body shear screws (7) into other threaded holes in sleeve.

ASSEMBLY INSTRUCTIONS – LOWER PACKAGE

1. Repeat steps in upper packer instructions above. 2. Screw cone coupling (16) onto packing mandrel (8) and tighten, using assembly pin through 3/4" hole in sleeve (5)

and into counterbore in packing mandrel. 3. Install O-ring (6) on lower top (15) and tighten top into top end of sleeve and install three thread lock set screws

(4). 4. Install five brass body shear screws (7) into other threaded holes in sleeve (note that there should be fewer screws

in the lower sleeve than the upper, to insure the lower packer sets first). 5. With cone coupling in vise, tighten lower mandrel (20) into cone coupling and bottom guide (23) onto lower

mandrel, with drag spring screw holes down. 6. Screw slips (17) to slip arms (19) and screw the arms and drag springs (21) to lower mandrel, using j-body screws

(22).

ASSEMBLY INSTRUCTIONS – RUNNING SUB

1. Slide running sub (1) into upper j-body (2), rotate right and slide up to stop. Install two brass upper shear screws (3) through holes in upper j-body and into groove in running sub.

DISASSEMBLY INSTRUCTIONS – UPPER PACKER

1. Remove the three thread locking set screws (4) in the upper end of the sleeve (5), and the brass shear screws (7) in its lower end.

2. Insert assembly pin through large hole in sleeve and into counterbore in packing mandrel (8). Clamp sleeve in vise.

3. Unscrew upper j-body (2) from sleeve, then upper bottom (14) from packing mandrel. Remove upper shear screws (3) from upper j-body.

4. Slide off packing elements (12), element spacer (13) and element back-up (11). Push packing mandrel up and out of sleeve (this requires ratcheting through the lock thread).

Page 120: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

2-1/2" X 4-1/2" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4022 - 2019 January

H O M E O F K L I N E T O O L S

5. Using a punch, push the three drive-loc pins (9) in sleeve through to the inside and remove. Then unscrew lock ring (10) from sleeve.

DISASSEMBLY INSTRUCTIONS – LOWER PACKER

1. Repeat steps 1 & 2 in upper packer instructions above. 2. Unscrew lower top (15) from sleeve (5), then cone coupling (16) from packing mandrel (8). 3. Repeat steps 4 & 5 in upper packer instructions above. 4. Clamp cone coupling in vise and unscrew bottom guide (23) from lower mandrel (20). 5. Unscrew lower mandrel from cone coupling, then remove slip arms (19) and drag springs (21) as required. Remove

slips (17) from slip arms if required. Note: That lower j-body and lower mandrel will not separate.

TECHNICAL SPECIFICATIONS

MAXIMUM WORKING PRESSURE

MAXIMUM ALLOWABLE

LINER WEIGHT

MINIMUM WEIGHT REQUIRED TO SET

ASSEMBLY SHEAR SCREW RATING

Std Assembly

P110 Option Upper (in

upper J-Body) Lower (in each sleeve)

8500 PSI 11,000 PSI 96,000 LB 10,500 LB 3,830 LB EACH 1,750 LB EACH

INSTALLATION After running and setting the desired tool below, the scab liner is run in and set across the zone to be isolated. Make up the SLP assembly with the lower packer on bottom, then a suitable length of liner, then the upper packer. The upper and lower packers are shear pinned to prevent premature setting. Insure that there are fewer shear screws on the bottom packer than the upper packer to insure it sets first. Install the running sub onto the bottom of the tubing string and into the j slot in the top of the upper packer. Pin in place with one or two shear screws. RUNNING Run the scab liner assembly to the desired location, pick up, rotate to the right one quarter turn (at the lower packer) and sit down. The slips on the lower packer will then set into the casing wall. Sit down enough weight to shear the screws in both the lower and upper packers, and in the running sub. The elements on both packers will pack off. The pack off is retained by lock rings in each section. The tubing can now be disconnected by rotating to the left one-quarter turn (at the upper packer) and picking up. The SLP, now set and packed off, will remain in place, isolating the section of casing between the two packer sections. Remove tubing from well and make up the desired piece on bottom, to connect to the tool set below. The tubing is then run back in, through the scab liner assembly.

Page 121: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

2-1/2" X 4-1/2" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4022 - 2019 January

H O M E O F K L I N E T O O L S

RETRIEVAL To retrieve the scab liner packer assembly, run the tubing back in with the running sub installed, until the running sub lands in the upper j slot. Rotate to the right to re-latch, then pick up a little weight and continue rotating to the right to release the pack off. This could require 25 or 30 turns, depending on the casing in which it's set. The entire assembly can then be retrieved by removing the tubing string. If right hand rotation is prevented for some reason, the SLP assembly can be removed with the elements still packed off. If it is necessary to move back down hole, the bottom j can be re-latched by rotating to the left, in the picked-up position.

Page 122: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5” X 7” Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4024 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS

CASING SIZE WEIGHT LINER CONNECTIONS MAX O.D. MIN.I.D.

7" 20 - 29#

4-1/2", 5" OR 5-1/2" 5.970"

4.50" * 26-32# 5.880"

* WITH 5" OR LARGER CONNECTIONS. WITH 4-1/2" CONNECTIONS, THIS IS 4.00"

Page 123: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5” X 7” Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4024 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION Kline's Scab Liner Assembly is an economical method of isolating casing leaks or existing perforations in producing and injection wells. It can eliminate repetitive squeezing and the need to install a full liner. This assembly is fully retrievable and incorporates a unique design with large bore sizes, normally allowing standard tubing to run through the liner. The assembly consists of two packer type sections, separated by a liner (not provided). This is carried in the hole using a running tool attached to a tubing string and set with minimal rotation and compression. Lock rings in both upper and lower packer sections retain the pack-off force. The scab liner assembly is released from the tubing and is not affected by production or injection tubing movement. The assembly can be easily retrieved using the running tool, which is greatly facilitated because no upper slips are required to be pulled free. For casing leaks in producing wells, a tubing anchor/catcher can be installed below, and gas can be produced through the annulus past the isolated zone to the surface, thus preventing gas locking of the rod pump. Casing leaks can be isolated in injection wells by using a seal bore packer or retrievable injection packer with an on/off tool, then installing the scab liner assembly above to isolate the leak. The tubing string can run through the assembly and be stung into the seal bore packer or latched onto the injection packer.

PART NUMBERS KEY # QTY PART # NAME KEY# QTY PART # NAME KEY# QTY PART# NAME

1 1 66582 RUNNING SUB 8 2 66530 ** PACKING MANDREL 15 1 SEE CHART LOWER TOP 2 1 66590-K UPPER J BODY 9 6 66396 DRIVE-LOC PIN 16 1 58080 CONE COUPLING 3 2 1167DC UPPER SHEAR SCREW 10 2 66510 LOCK RING 17 3 70SLP SLIP 4 6 11156C SET SCREW 11 2 58090 ELEMENT BACK-UP 18 6 11354C SLIP SCREW 5 2 66630-K ** SLEEVE 12 4 441-72-512* PACKING ELEMENT 19 3 SLPSA SLIP ARM 6 5 17352 O-RING 13 2 58060 ELEMENT SPACER 20 1 66540-K LOWER MANDREL 7 11 000HE BODY SHEAR SCREW 14 1 SEE CHART UPPER BOTTOM 21 3 SLPDS DRAG SPRING

* FOR HSN MATERIAL, ADD H TO PART NUMBER 22 15 11354F J BODY SCREW ** FOR P-110 EQUIVALENT MATERIAL, ADD P TO PART NUMBER 23 1 SEE CHART BOTTOM GUIDE

Page 124: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5” X 7” Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4024 - 2019 January

H O M E O F K L I N E T O O L S

DRESSING CHART

LINER CONNECTION UPPER BOTTOM LOWER TOP BOTTOM GUIDE 4-1/2" 8RD 66550 66570 RE-ENTRY 58070

5" 8RD 66551 66571 4-1/2 PIN DOWN 66554 5-1/2" 8RD 66552 66573 5" PIN DOWN 66555

DIMENSIONS

A B C D E F 11.75" 39.94" 58.81" 2.50" 4.38" 4.54"

Standard running sub connections: 2-7/8" eu8rd box up and box down ASSEMBLY INSTRUCTIONS – UPPER PACKAGE

1. Install lock ring (10) into lower end of one sleeve (5), insuring threads are in correct directions, and top end of ring can be seen through uppermost 1/4" hole. Install 3 drive-loc pins (9) through other three holes and through slot in lock ring.

2. Install two O-rings (6) in grooves in one packing mandrel (8). Slide packing mandrel through top end of sleeve until 3/4" hole in sleeve lines up with 3/4" counterbore in packing mandrel (mandrel will need to be rotated and pushed to get through lock ring and meshed with clutch inside sleeve).

3. Slide one back-up ring (11), two packing elements (12) and one element spacer (13) onto packing mandrel. 4. Screw upper bottom (14) onto packing mandrel and tighten, using assembly pin through 3/4" hole in sleeve and

into counterbore in packing mandrel. 5. Tighten upper j-body (2) into upper sleeve and install three thread lock set screws (4). 6. Install six brass body shear screws (7) into other threaded holes in sleeve.

ASSEMBLY INSTRUCTIONS – LOWER PACKAGE

1. Repeat steps in upper packer instructions above. 2. Screw cone coupling (16) onto packing mandrel (8) and tighten, using assembly pin through 3/4" hole in sleeve (5)

and into counterbore in packing mandrel. 3. Install O-ring (6) on lower top (15) and tighten top into top end of sleeve and install three thread lock set screws

(4). 4. Install five brass body shear screws (7) into other threaded holes in sleeve (note that there should be fewer screws

in the lower sleeve than the upper, to insure the lower packer sets first). 5. With cone coupling in vise, tighten lower mandrel (20) into cone coupling and bottom guide (23) onto lower

mandrel, with drag spring screw holes down. 6. Screw slips (17) to slip arms (19) and screw the arms and drag springs (21) to lower mandrel, using j-body screws

(22).

Page 125: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5” X 7” Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4024 - 2019 January

H O M E O F K L I N E T O O L S

ASSEMBLY INSTRUCTIONS – RUNNING SUB

1. Slide running sub (1) into upper j-body (2), rotate right and slide up to stop. Install two brass upper shear screws (3) through holes in upper j-body and into groove in running sub.

DISASSEMBLY INSTRUCTIONS – UPPER PACKER

1. Remove the three thread locking set screws (4) in the upper end of the sleeve (5), and the brass shear screws (7) in its lower end.

2. Insert assembly pin through large hole in sleeve and into counterbore in packing mandrel (8). Clamp sleeve in vise.

3. Unscrew upper j-body (2) from sleeve, then upper bottom (14) from packing mandrel. Remove upper shear screws (3) from upper j-body.

4. Slide off packing elements (12), element spacer (13) and element back-up (11). Push packing mandrel up and out of sleeve (this requires ratcheting through the lock thread).

5. Using a punch, push the three drive-loc pins (9) in sleeve through to the inside and remove. Then unscrew lock ring (10) from sleeve.

DISASSEMBLY INSTRUCTIONS – LOWER PACKER

1. Repeat steps 1 & 2 in upper packer instructions above. 2. Unscrew lower top (15) from sleeve (5), then cone coupling (16) from packing mandrel (8). 3. Repeat steps 4 & 5 in upper packer instructions above.’ 4. Clamp cone coupling in vise and unscrew bottom guide (23) from lower mandrel (20). 5. Unscrew lower mandrel from cone coupling, then remove slip arms (19) and drag springs (21) as required.

Remove slips (17) from slip arms if required.

Note that lower j-body and lower mandrel will not separate.

TECHNICAL SPECIFICATIONS

MAXIMUM WORKING PRESSURE

MAXIMUM ALLOWABLE

LINER WEIGHT

MINIMUM WEIGHT REQUIRED TO SET

ASSEMBLY SHEAR SCREW RATING

Std Assembly

P110 Option Upper (in

upper J-Body) Lower (in each sleeve)

4,500 PSI 6,000 PSI 105,000 LB 14,000 LB 3,830 LB EACH 1,750 LB EACH INSTALLATION After running and setting the desired tool below, the scab liner is run in and set across the zone to be isolated. Make up the SLP assembly with the lower packer on bottom, then a suitable length of liner, then the upper packer. The upper and lower packers are shear pinned to prevent premature setting. Insure that there are fewer shear screws on the bottom packer than the upper packer to insure it sets first. Install the running sub onto the bottom of the tubing string and into the j slot in the top of the upper packer. Pin in place with one or two shear screws.

Page 126: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5” X 7” Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4024 - 2019 January

H O M E O F K L I N E T O O L S

RUNNING Run the scab liner assembly to the desired location, pick up, rotate to the right one quarter turn (at the lower packer) and sit down. The slips on the lower packer will then set into the casing wall. Sit down enough weight to shear the screws in both the lower and upper packers, and in the running sub. The elements on both packers will pack off. The pack off is retained by lock rings in each section. The tubing can now be disconnected by rotating to the left one-quarter turn (at the upper packer) and picking up. The SLP, now set and packed off, will remain in place, isolating the section of casing between the two packer sections. Remove tubing from well and make up the desired piece on bottom, to connect to the tool set below. The tubing is then run back in, through the scab liner assembly. RETRIEVAL To retrieve the scab liner packer assembly, run the tubing back in with the running sub installed, until the running sub lands in the upper j slot. Rotate to the right to re-latch, then pick up a little weight and continue rotating to the right to release the pack off. This could require 25 or 30 turns, depending on the casing in which it's set. The entire assembly can then be retrieved by removing the tubing string. If right hand rotation is prevented for some reason, the SLP assembly can be removed with the elements still packed off. If it is necessary to move back down hole, the bottom j can be re-latched by rotating to the left, in the picked-up position.

Page 127: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

4” X 5-1/2” Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4025 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS CASING SIZE WEIGHT LINER CONNECTIONS MAX O.D. MIN.I.D.

5-1/2" 13 - 17# 3-1/2", 4" OR 4-1/2" 4.641" 3.38" * * WITH 4" OR LARGER CONNECTIONS. WITH 3-1/2" CONNECTIONS, THIS IS 3.00"

Page 128: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

4” X 5-1/2” Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4025 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION Kline's Scab Liner Assembly is an economical method of isolating casing leaks or existing perforations in producing and injection wells. It can eliminate repetitive squeezing and the need to install a full liner. This assembly is fully retrievable and incorporates a unique design with large bore sizes, normally allowing standard tubing to run through the liner. The assembly consists of two packer type sections, separated by a liner (not provided). This is carried in the hole using a running tool attached to a tubing string and set with minimal rotation and compression. Lock rings in both upper and lower packer sections retain the pack-off force. The scab liner assembly is released from the tubing and is not affected by production or injection tubing movement. The assembly can be easily retrieved using the running tool, which is greatly facilitated because no upper slips are required to be pulled free. For casing leaks in producing wells, a tubing anchor/catcher can be installed below, and gas can be produced through the annulus past the isolated zone to the surface, thus preventing gas locking of the rod pump. Casing leaks can be isolated in injection wells by using a seal bore packer or retrievable injection packer with an on/off tool, then installing the scab liner assembly above to isolate the leak. The tubing string can run through the assembly and be stung into the seal bore packer or latched onto the injection packer.

PART NUMBERS

KEY # QTY PART # NAME KEY# QTY PART # NAME KEY# QTY PART# NAME 1 1 72510 RUNNING SUB 8 2 66380 ** PACKING MANDREL 15 1 SEE CHART LOWER TOP 2 1 66350-K UPPER J BODY 9 6 66395 DRIVE-LOC PIN 16 1 66490 CONE COUPLING 3 2 1167DC UPPER SHEAR SCREW 10 2 66390 LOCK RING 17 3 55SLP*** SLIP 4 6 11156C SET SCREW 11 2 66450 ELEMENT BACK-UP 18 6 11356C SLIP SCREW 5 2 66430-K ** SLEEVE 12 4 400-55-512* PACKING ELEMENT 19 3 SLPSA SLIP ARM 6 5 17343 O-RING 13 2 66460 ELEMENT SPACER 20 1 66400-K LOWER MANDREL 7 11 000HE BODY SHEAR SCREW 14 1 SEE CHART UPPER BOTTOM 21 3 SLPDS DRAG SPRING

* FOR HSN MATERIAL, ADD H TO PART NUMBER 22 15 11354F J BODY SCREW ** FOR P-110 EQUIVALENT MATERIAL, ADD P TO PART NUMBER 23 1 SEE CHART BOTTOM GUIDE *** FOR CARBIDE USE P/N 60421

Page 129: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

4” X 5-1/2” Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4025 - 2019 January

H O M E O F K L I N E T O O L S

DRESSING CHART

LINER CONNECTION UPPER BOTTOM LOWER TOP BOTTOM GUIDE 3-1/2" EU8RD 66330 66320 RE-ENTRY 66410

4" NU8RD 66331 66321 3-1/2 PIN DOWN 66310 4-1/2" REG 8RD 66332 66322 4" PIN DOWN 66311

DIMENSIONS

A B C D E F 11.62" 42.19" 60.56" 2.00" 3.25" 3.41"

Standard running sub connections: 2-7/8" eu8rd pin up x 2-3/8" Eu8rd box down ASSEMBLY INSTRUCTIONS – UPPER PACKAGE

1. Install lock ring (10) into lower end of one sleeve (5), insuring threads are in correct directions, and top face of ring can be seen through uppermost 1/4" hole. Install 3 drive-loc pins (9) through other three holes and through slot in lock ring.

2. Install two O-rings (6) in grooves in one packing mandrel (8). Slide packing mandrel through top end of sleeve until 3/4" hole in sleeve lines up with 3/4" counterbore in packing mandrel (mandrel will need to be rotated and pushed to get through lock ring and meshed with clutch inside sleeve).

3. Slide one back-up ring (11), two packing elements (12) and one element spacer (13) onto packing mandrel. 4. Screw upper bottom (14) onto packing mandrel and tighten, using assembly pin through 3/4" hole in sleeve and

into counterbore in packing mandrel. 5. Tighten upper j-body (2) into upper sleeve and install three thread lock set screws (4). 6. Install six brass body shear screws (7) into other threaded holes in sleeve.

ASSEMBLY INSTRUCTIONS – LOWER PACKAGE

1. Repeat steps in upper packer instructions above. 2. Screw cone coupling (16) onto packing mandrel (8) and tighten, using assembly pin through 3/4" hole in sleeve (5)

and into counterbore in packing mandrel. 3. Install O-ring (6) on lower top (15) and tighten top into top end of sleeve and install three thread lock set screws

(4). 4. Install five brass body shear screws (7) into other threaded holes in sleeve (note that there should be fewer screws

in the lower sleeve than the upper, to insure the lower packer sets first). 5. With cone coupling in vise, tighten lower mandrel (20) into cone coupling and bottom guide (23) onto lower

mandrel, with drag spring screw holes down. 6. Screw slips (17) to slip arms (19) and screw the arms and drag springs (21) to lower mandrel, using j-body screws

(22).

Page 130: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

4” X 5-1/2” Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4025 - 2019 January

H O M E O F K L I N E T O O L S

ASSEMBLY INSTRUCTIONS – RUNNING SUB

1. Slide running sub (1) into upper j-body (2), rotate right and slide up to stop. Install two brass upper shear screws (3) through holes in upper j-body and into groove in running sub.

DISASSEMBLY INSTRUCTIONS – UPPER PACKER

1. Remove the three thread locking set screws (4) in the upper end of the sleeve (5), and the brass shear screws (7) in its lower end.

2. Insert assembly pin through large hole in sleeve and into counterbore in packing mandrel (8). Clamp sleeve in vise.

3. Unscrew upper j-body (2) from sleeve, then upper bottom (14) from packing mandrel. Remove upper shear screws (3) from upper j-body.

4. Slide off packing elements (12), element spacer (13) and element back-up (11). Push packing mandrel up and out of sleeve (this requires ratcheting through the lock thread).

5. Using a punch, push the three drive-loc pins (9) in sleeve through to the inside and remove. Then unscrew lock ring (10) from sleeve.

DISASSEMBLY INSTRUCTIONS – LOWER PACKER

1. Repeat steps 1 & 2 in upper packer instructions above. 2. Unscrew lower top (15) from sleeve (5), then cone coupling (16) from packing mandrel (8). 3. Repeat steps 4 & 5 in upper packer instructions above. 4. Clamp cone coupling in vise and unscrew bottom guide (23) from lower mandrel (20). 5. Unscrew lower mandrel from cone coupling, then remove slip arms (19) and drag springs (21) as required.

Remove slips (17) from slip arms if required.

Note that lower j-body and lower mandrel will not separate.

TECHNICAL SPECIFICATIONS MAXIMUM WORKING

PRESSURE MAXIMUM

ALLOWABLE LINER

WEIGHT

MINIMUM WEIGHT

REQUIRED TO SET ASSEMBLY

SHEAR SCREW RATING STD.

ASSEMBLY P-110

OPTION UPPER (IN

UPPER J BODY LOWER (IN EACH

SLEEVE) 5000 PSI 7500 PSI 88,000 LB. 11,000 LB. 3830 LB. EACH 1750 LB. EACH

INSTALLATION After running and setting the desired tool below, the scab liner is run in and set across the zone to be isolated. Make up the SLP assembly with the lower packer on bottom, then a suitable length of liner, then the upper packer. The upper and lower packers are shear pinned to prevent premature setting. Insure that there are fewer shear screws on the bottom packer than the upper packer to insure it sets first. Install the running sub onto the bottom of the tubing string and into the j slot in the top of the upper packer. Pin in place with one or two shear screws.

Page 131: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

4” X 5-1/2” Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4025 - 2019 January

H O M E O F K L I N E T O O L S

RUNNING Run the scab liner assembly to the desired location, pick up, rotate to the right one quarter turn (at the lower packer) and sit down. The slips on the lower packer will then set into the casing wall. Sit down enough weight to shear the screws in both the lower and upper packers, and in the running sub. The elements on both packers will pack off. The pack off is retained by lock rings in each section. The tubing can now be disconnected by rotating to the left one-quarter turn (at the upper packer) and picking up. The SLP, now set and packed off, will remain in place, isolating the section of casing between the two packer sections. Remove tubing from well and make up the desired piece on bottom, to connect to the tool set below. The tubing is then run back in, through the scab liner assembly. RETRIEVAL To retrieve the scab liner packer assembly, run the tubing back in with the running sub installed, until the running sub lands in the upper j slot. Rotate to the right to re-latch, then pick up a little weight and continue rotating to the right to release the pack off. This could require 25 or 30 turns, depending on the casing in which it's set. The entire assembly can then be retrieved by removing the tubing string. If right hand rotation is prevented for some reason, the SLP assembly can be removed with the elements still packed off. If it is necessary to move back down hole, the bottom j can be re-latched by rotating to the left, in the picked-up position.

Page 132: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5-1/2" X 7-5/8" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4026 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS CASING SIZE WEIGHT LINER CONNECTIONS MAX O.D. MIN.I.D.

7-5/8" 24 - 39# 5-1/2" REG 8RD THD 6.469" 5.00"

Page 133: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5-1/2" X 7-5/8" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4026 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION Kline's Scab Liner Assembly is an economical method of isolating casing leaks or existing perforations in producing and injection wells. It can eliminate repetitive squeezing and the need to install a full liner. This assembly is fully retrievable and incorporates a unique design with large bore sizes, normally allowing standard tubing to run through the liner. The assembly consists of two packer type sections, separated by a liner (not provided). This is carried in the hole using a running tool attached to a tubing string and set with minimal rotation and compression. Lock rings in both upper and lower packer sections retain the pack-off force. The scab liner assembly is released from the tubing and is not affected by production or injection tubing movement. The assembly can be easily retrieved using the running tool, which is greatly facilitated because no upper slips are required to be pulled free. For casing leaks in producing wells, a tubing anchor/catcher can be installed below, and gas can be produced through the annulus past the isolated zone to the surface, thus preventing gas locking of the rod pump. Casing leaks can be isolated in injection wells by using a seal bore packer or retrievable injection packer with an on/off tool, then installing the scab liner assembly above to isolate the leak. The tubing string can run through the assembly and be stung into the seal bore packer or latched onto the injection packer.

PART NUMBERS KEY # QTY PART # NAME KEY# QTY PART # NAME KEY# QTY PART# NAME

1 1 66290 RUNNING SUB 8 2 66160 ** PACKING MANDREL 15 1 66300 LOWER TOP 2 1 66170-K UPPER J BODY 9 6 DLP025469 DRIVE-LOC PIN 16 1 66280 CONE COUPLING 3 2 1167DC UPPER SHEAR SCREW 10 2 66240 LOCK RING 17 3 70SLP SLIP 4 6 11156C SET SCREW 11 2 66210 ELEMENT BACK-UP 18 6 11356C SLIP SCREW 5 2 66270-K ** SLEEVE 12 4 440-75-512* PACKING ELEMENT 19 3 SLPSA SLIP ARM 6 5 17356 O-RING 13 2 66220 ELEMENT SPACER 20 1 66190-K LOWER MANDREL 7 11 000HE BODY SHEAR SCREW 14 1 66230 UPPER BOTTOM 21 3 SLPDS DRAG SPRING

* FOR HSN MATERIAL, ADD H TO PART NUMBER ** FOR P-110 EQUIVALENT MATERIAL, ADD P TO PART NUMBER

22 15 11354F J BODY SCREW 23 1 66140 BOTTOM GUIDE

DIMENSIONS

A B C D E F 11.75" 39.94" 58.81" 3.00" 4.88" 5.040"

Standard running sub connections: 3-1/2" eu8rd box up and box down

Page 134: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5-1/2" X 7-5/8" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4026 - 2019 January

H O M E O F K L I N E T O O L S

ASSEMBLY INSTRUCTIONS – UPPER PACKAGE

1. Install lock ring (10) into lower end of one sleeve (5), insuring threads are in correct directions, and top end of ring can be seen through uppermost 1/4" hole. Install 3 drive-loc pins (9) through other three holes and through slot in lock ring.

2. Install two O-rings (6) in grooves in one packing mandrel (8). Slide packing mandrel through top end of sleeve until 3/4" hole in sleeve lines up with 3/4" counterbore in packing mandrel (mandrel will need to be rotated and pushed to get through lock ring and meshed with clutch inside sleeve).

3. Slide one back-up ring (11), two packing elements (12) and one element spacer (13) onto packing mandrel. 4. Screw upper bottom (14) onto packing mandrel and tighten, using assembly pin through 3/4" hole in sleeve and

into counterbore in packing mandrel. 5. Tighten upper j-body (2) into upper sleeve and install three thread lock set screws (4). 6. Install six brass body shear screws (7) into other threaded holes in sleeve.

ASSEMBLY INSTRUCTIONS – LOWER PACKAGE

1. Repeat steps in upper packer instructions above. 2. Screw cone coupling (16) onto packing mandrel (8) and tighten, using assembly pin through 3/4" hole in sleeve (5)

and into counterbore in packing mandrel. 3. Install O-ring (6) on lower top (15) and tighten top into top end of sleeve and install three thread lock set screws

(4). 4. Install five brass body shear screws (7) into other threaded holes in sleeve (note that there should be fewer screws

in the lower sleeve than the upper, to insure the lower packer sets first). 5. With cone coupling in vise, tighten lower mandrel (20) into cone coupling and bottom guide (23) onto lower

mandrel, with drag spring screw holes down. 6. Screw slips (17) to slip arms (19) and screw the arms and drag springs (21) to lower mandrel, using j-body screws

(22).

ASSEMBLY INSTRUCTIONS – RUNNING SUB

1. Slide running sub (1) into upper j-body (2), rotate right and slide up to stop. Install two brass upper shear screws (3) through holes in upper j-body and into groove in running sub.

DISASSEMBLY INSTRUCTIONS – UPPER PACKER

1. Remove the three thread locking set screws (4) in the upper end of the sleeve (5), and the brass shear screws (7) in its lower end.

2. Insert assembly pin through large hole in sleeve and into counterbore in packing mandrel (8). Clamp sleeve in vise.

3. Unscrew upper j-body (2) from sleeve, then upper bottom (14) from packing mandrel. Remove upper shear screws (3) from upper j-body.

4. Slide off packing elements (12), element spacer (13) and element back-up (11). Push packing mandrel up and out of sleeve (this requires ratcheting through the lock thread).

Page 135: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5-1/2" X 7-5/8" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4026 - 2019 January

H O M E O F K L I N E T O O L S

5. Using a punch, push the three drive-loc pins (9) in sleeve through to the inside and remove. Then unscrew lock ring (10) from sleeve.

DISASSEMBLY INSTRUCTIONS – LOWER PACKER

1. Repeat steps 1 & 2 in upper packer instructions above. 2. Unscrew lower top (15) from sleeve (5), then cone coupling (16) from packing mandrel (8). 3. Repeat steps 4 & 5 in upper packer instructions above. 4. Clamp cone coupling in vise and unscrew bottom guide (23) from lower mandrel (20). 5. Unscrew lower mandrel from cone coupling, then remove slip arms (19) and drag springs (21) as required.

Remove slips (17) from slip arms if required. Note that lower j-body and lower mandrel will not separate.

TECHNICAL SPECIFICATIONS MAXIMUM WORKING

PRESSURE MAXIMUM ALLOWABLE

LINER WEIGHT

MINIMUM WEIGHT

REQUIRED TO SET ASSEMBLY

SHEAR SCREW RATING STD.

ASSEMBLY P-110

OPTION UPPER (IN

UPPER J BODY LOWER (IN EACH

SLEEVE) 4,000 PSI 5,500 PSI 98,000 LB. 15,000 LB. 3,830 LB. EACH 1,750 LB. EACH

INSTALLATION After running and setting the desired tool below, the scab liner is run in and set across the zone to be isolated. Make up the SLP assembly with the lower packer on bottom, then a suitable length of liner, then the upper packer. The upper and lower packers are shear pinned to prevent premature setting. Insure that there are fewer shear screws on the bottom packer than the upper packer to insure it sets first. Install the running sub onto the bottom of the tubing string and into the j slot in the top of the upper packer. Pin in place with one or two shear screws. RUNNING Run the scab liner assembly to the desired location, pick up, rotate to the right one quarter turn (at the lower packer) and sit down. The slips on the lower packer will then set into the casing wall. Sit down enough weight to shear the screws in both the lower and upper packers, and in the running sub. The elements on both packers will pack off. The pack off is retained by lock rings in each section. The tubing can now be disconnected by rotating to the left one-quarter turn (at the upper packer) and picking up. The SLP, now set and packed off, will remain in place, isolating the section of casing between the two packer sections. Remove tubing from well and make up the desired piece on bottom, to connect to the tool set below. The tubing is then run back in, through the scab liner assembly.

Page 136: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5-1/2" X 7-5/8" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4026 - 2019 January

H O M E O F K L I N E T O O L S

RETRIEVAL To retrieve the scab liner packer assembly, run the tubing back in with the running sub installed, until the running sub lands in the upper j slot. Rotate to the right to re-latch, then pick up a little weight and continue rotating to the right to release the pack off. This could require 25 or 30 turns, depending on the casing in which it's set. The entire assembly can then be retrieved by removing the tubing string. If right hand rotation is prevented for some reason, the SLP assembly can be removed with the elements still packed off. If it is necessary to move back down hole, the bottom j can be re-latched by rotating to the left, in the picked-up position.

Page 137: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

7-5/8" X 9-5/8" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4027 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS CASING SIZE WEIGHT LINER CONNECTIONS MAX O.D. MIN.I.D.

9-5/8" 28 - 40#

7" OR 7-5/8" REG 8RD THREAD 8.44"

6.50" 43 - 53# 8.312"

Page 138: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

7-5/8" X 9-5/8" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4027 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION Kline's Scab Liner Assembly is an economical method of isolating casing leaks or existing perforations in producing and injection wells. It can eliminate repetitive squeezing and the need to install a full liner. This assembly is fully retrievable and incorporates a unique design with large bore sizes, normally allowing standard tubing to run through the liner. The assembly consists of two packer type sections, separated by a liner (not provided). This is carried in the hole using a running tool attached to a tubing string and set with minimal rotation and compression. Lock rings in both upper and lower packer sections retain the pack-off force. The scab liner assembly is released from the tubing and is not affected by production or injection tubing movement. The assembly can be easily retrieved using the running tool, which is greatly facilitated because no upper slips are required to be pulled free. For casing leaks in producing wells, a tubing anchor/catcher can be installed below, and gas can be produced through the annulus past the isolated zone to the surface, thus preventing gas locking of the rod pump. Casing leaks can be isolated in injection wells by using a seal bore packer or retrievable injection packer with an on/off tool, then installing the scab liner assembly above to isolate the leak. The tubing string can run through the assembly and be stung into the seal bore packer or latched onto the injection packer.

PART NUMBERS KEY # QTY PART # NAME KEY# QTY PART # NAME KEY# QTY PART# NAME

1 1 71980 RUNNING SUB 8 2 57790 2 PACKING MANDREL 15 1 SEE CHART LOWER TOP 2 1 57820-K UPPER J BODY 9 6 66396 DRIVE-LOC PIN 16 1 SEE CHART CONE COUPLING 3 2 1167DC UPPER SHEAR SCREW 10 2 57930 LOCK RING 17 4 57970 SLIP 4 6 11158C SET SCREW 11 2 57940 ELEMENT BACK-UP 18 8 11356C SLIP SCREW 5 2 SEE CHART 2 SLEEVE 12 4 SEE CHART 1 PACKING ELEMENT 19 4 SLPSA SLIP ARM 6 5 17365 O-RING 13 2 SEE CHART ELEMENT SPACER 20 1 SEE CHART LOWER MANDREL 7 14 000HE BODY SHEAR SCREW 14 1 SEE CHART UPPER BOTTOM 21 8 SLPDS DRAG SPRING

1 FOR HSN MATERIAL, ADD H TO PART NUMBER 22 20 11355F J BODY SCREW 2 FOR P-110 EQUIVALENT MATERIAL, ADD P TO PART NUMBER 23 1 SEE CHART 3 BOTTOM GUIDE

3 FOR 7" PIN DOWN BOTTOM GUIDE, P/N IS 57880. FOR 7-5/8" PIN DOWN, P/N IS 57890

Page 139: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

7-5/8" X 9-5/8" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4027 - 2019 January

H O M E O F K L I N E T O O L S

DRESSING CHART CASING WT. RANGE 28 - 40# 43 - 53# SLEEVE 2 57800-K 57802-K PACKING ELEMENT 1 57960 57962 ELEMENT SPACER 57810 57811

UPPER BOTTOM 7" 57830 57831 7-5/8" 57840 57841

LOWER TOP 7" 57852 57853 7-5/8" 57850 57851

CONE COUPLING 57860 57861 LOWER MANDREL 57910-K 57901-K BOTTOM GUIDE 3 57870 57871

Standard running sub connections: 3-1/2" eu8rd box up and box down ASSEMBLY INSTRUCTIONS – UPPER PACKAGE

1. Install lock ring (10) into lower end of one sleeve (5), insuring threads are in correct directions, and top end of ring can be seen through uppermost 1/4" hole. Install 3 drive-loc pins (9) through other three holes and through slot in lock ring.

2. Install two O-rings (6) in grooves in one packing mandrel (8). Slide packing mandrel through top end of sleeve until 3/4" hole in sleeve lines up with 3/4" counterbore in packing mandrel (mandrel will need to be rotated and pushed to get through lock ring and meshed with clutch inside sleeve).

3. Slide one back-up ring (11), two packing elements (12) and one element spacer (13) onto packing mandrel. 4. Screw upper bottom (14) onto packing mandrel and tighten, using assembly pin through 3/4" hole in sleeve and

into counterbore in packing mandrel. 5. Tighten upper j-body (2) into upper sleeve and install three thread lock set screws (4). 6. Install eight brass body shear screws (7) into other threaded holes in sleeve.

ASSEMBLY INSTRUCTIONS – LOWER PACKAGE

1. Repeat steps in upper packer instructions above. 2. Screw cone coupling (16) onto packing mandrel (8) and tighten, using assembly pin through 3/4" hole in sleeve (5)

and into counterbore in packing mandrel. 3. Install O-ring (6) on lower top (15) and tighten top into top end of sleeve and install three thread lock set screws

(4). 4. Install six brass body shear screws (7) into other threaded holes in sleeve (note that there should be fewer screws

in the lower sleeve than the upper, to insure the lower packer sets first).

DIMENSIONS A B C D E F

12.75" 47.94" 68.81" 3.00" 4.50" 6.62"

Page 140: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

7-5/8" X 9-5/8" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4027 - 2019 January

H O M E O F K L I N E T O O L S

5. With cone coupling in vise, tighten lower mandrel (20) into cone coupling and bottom guide (23) onto lower mandrel, with drag spring screw holes down.

6. Screw slips (17) to slip arms (19) and screw the arms and drag springs (21) to lower mandrel, using j-body screws (22).

ASSEMBLY INSTRUCTIONS – RUNNING SUB

1. Slide running sub (1) into upper j-body (2), rotate right and slide up to stop. Install two brass upper shear screws (3) through holes in upper j-body and into groove in running sub.

DISASSEMBLY INSTRUCTIONS – UPPER PACKER

1. Remove the three thread locking set screws (4) in the upper end of the sleeve (5), and the brass shear screws (7) in its lower end.

2. Insert assembly pin through large hole in sleeve and into counterbore in packing mandrel (8). Clamp sleeve in vise.

3. Unscrew upper j-body (2) from sleeve, then upper bottom (14) from packing mandrel. Remove upper shear screws (3) from upper j-body.

4. Slide off packing elements (12), element spacer (13) and element back-up (11). Push packing mandrel up and out of sleeve (this requires ratcheting through the lock thread).

5. Using a punch, push the three drive-loc pins (9) in sleeve through to the inside and remove. Then unscrew lock ring (10) from sleeve.

DISASSEMBLY INSTRUCTIONS – LOWER PACKER

1. Repeat steps 1 & 2 in upper packer instructions above. 2. Unscrew lower top (15) from sleeve (5), then cone coupling (16) from packing mandrel (8). 3. Repeat steps 4 & 5 in upper packer instructions above. 4. Clamp cone coupling in vise and unscrew bottom guide (23) from lower mandrel (20). 5. Unscrew lower mandrel from cone coupling, then remove slip arms (19) and drag springs (21) as required.

Remove slips (17) from slip arms if required. Note that lower j-body and lower mandrel will not separate.

TECHNICAL SPECIFICATIONS

CASING WEIGHT RANGE

MAXIMUM WORKING PRESSURE MAXIMUM

ALLOWABLE LINER WEIGHT

MINIMUM WEIGHT REQUIRED TO SET

ASSEMBLY

SHEAR SCREW RATING STD. ASSEMBLY

P-110 OPTION

UPPER (IN UPPER J BODY

LOWER (IN EACH SLEEVE)

28 - 40# 3800 PSI 5800 PSI 154,000 LB. 19,000 LB. 3830 LB. EACH 1750 LB. EACH 43 - 53# 3400 PSI

Page 141: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

7-5/8" X 9-5/8" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4027 - 2019 January

H O M E O F K L I N E T O O L S

INSTALLATION After running and setting the desired tool below, the scab liner is run in and set across the zone to be isolated. Make up the SLP assembly with the lower packer on bottom, then a suitable length of liner, then the upper packer. The upper and lower packers are shear pinned to prevent premature setting. Insure that there are fewer shear screws on the bottom packer than the upper packer to insure it sets first. Install the running sub onto the bottom of the tubing string and into the j slot in the top of the upper packer. Pin in place with one or two shear screws. RUNNING Run the scab liner assembly to the desired location, pick up, rotate to the right one quarter turn (at the lower packer) and sit down. The slips on the lower packer will then set into the casing wall. Sit down enough weight to shear the screws in both the lower and upper packers, and in the running sub. The elements on both packers will pack off. The pack off is retained by lock rings in each section. The tubing can now be disconnected by rotating to the left one-quarter turn (at the upper packer) and picking up. The SLP, now set and packed off, will remain in place, isolating the section of casing between the two packer sections. Remove tubing from well and make up the desired piece on bottom, to connect to the tool set below. The tubing is then run back in, through the scab liner assembly. RETRIEVAL To retrieve the scab liner packer assembly, run the tubing back in with the running sub installed, until the running sub lands in the upper j slot. Rotate to the right to re-latch, then pick up a little weight and continue rotating to the right to release the pack off. This could require 25 or 30 turns, depending on the casing in which it's set. The entire assembly can then be retrieved by removing the tubing string. If right hand rotation is prevented for some reason, the SLP assembly can be removed with the elements still packed off. If it is necessary to move back down hole, the bottom j can be re-latched by rotating to the left, in the picked-up position.

Page 142: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

7" X 8-5/8" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4028 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS CASING SIZE WEIGHT LINER CONNECTIONS MAX O.D. MIN.I.D.

8-5/8" 28 - 40# 7" REG 8RD THD 7.62" 6.00"

Page 143: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

7" X 8-5/8" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4028 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION Kline's Scab Liner Assembly is an economical method of isolating casing leaks or existing perforations in producing and injection wells. It can eliminate repetitive squeezing and the need to install a full liner. This assembly is fully retrievable and incorporates a unique design with large bore sizes, normally allowing standard tubing to run through the liner. The assembly consists of two packer type sections, separated by a liner (not provided). This is carried in the hole using a running tool attached to a tubing string and set with minimal rotation and compression. Lock rings in both upper and lower packer sections retain the pack-off force. The scab liner assembly is released from the tubing and is not affected by production or injection tubing movement. The assembly can be easily retrieved using the running tool, which is greatly facilitated because no upper slips are required to be pulled free. For casing leaks in producing wells, a tubing anchor/catcher can be installed below, and gas can be produced through the annulus past the isolated zone to the surface, thus preventing gas locking of the rod pump. Casing leaks can be isolated in injection wells by using a seal bore packer or retrievable injection packer with an on/off tool, then installing the scab liner assembly above to isolate the leak. The tubing string can run through the assembly and be stung into the seal bore packer or latched onto the injection packer.

PART NUMBERS KEY # QTY PART # NAME KEY# QTY PART # NAME KEY# QTY PART# NAME

1 1 65320 RUNNING SUB 8 2 65280 2 PACKING MANDREL 15 1 65450 LOWER TOP 2 1 65370-K UPPER J BODY 9 6 DLP025469 DRIVE-LOC PIN 16 1 65440 CONE COUPLING 3 2 1167DC UPPER SHEAR SCREW 10 2 65430 LOCK RING 17 4 85SLP SLIP 4 6 11156C SET SCREW 11 2 65390 ELEMENT BACK-UP 18 8 11356C SLIP SCREW 5 2 65410-K 2 SLEEVE 12 4 403-96-512 1 PACKING ELEMENT 19 4 SLPSA SLIP ARM 6 5 17363 O-RING 13 2 65400 ELEMENT SPACER 20 1 65341-K LOWER MANDREL 7 16 000HE BODY SHEAR SCREW 14 1 65420 UPPER BOTTOM 21 8 SLPDS DRAG SPRING

1 FOR HSN MATERIAL, ADD H TO PART NUMBER 22 20 11354F J BODY SCREW 2 FOR P-110 EQUIVALENT MATERIAL, ADD P TO PART NUMBER 23 1 65455 3 BOTTOM GUIDE 3 FOR 7" PIN DOWN BOTTOM GUIDE, P/N IS 65332

Page 144: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

7" X 8-5/8" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4028 - 2019 January

H O M E O F K L I N E T O O L S

Standard running sub connections: 3-1/2" eu8rd box up and box down ASSEMBLY INSTRUCTIONS – UPPER PACKAGE

1. Install lock ring (10) into lower end of one sleeve (5), insuring threads are in correct directions, and top end of ring can be seen through uppermost 1/4" hole. Install 3 drive-loc pins (9) through other three holes and through slot in lock ring.

2. Install two O-rings (6) in grooves in one packing mandrel (8). Slide packing mandrel through top end of sleeve until 3/4" hole in sleeve lines up with 3/4" counterbore in packing mandrel (mandrel will need to be rotated and pushed to get through lock ring and meshed with clutch inside sleeve).

3. Slide one back-up ring (11), two packing elements (12) and one element spacer (13) onto packing mandrel. 4. Screw upper bottom (14) onto packing mandrel and tighten, using assembly pin through 3/4" hole in sleeve and

into counterbore in packing mandrel. 5. Tighten upper j-body (2) into upper sleeve and install three thread lock set screws (4). 6. Install eight brass body shear screws (7) into other threaded holes in sleeve.

ASSEMBLY INSTRUCTIONS – LOWER PACKAGE

1. Repeat steps in upper packer instructions above. 2. Screw cone coupling (16) onto packing mandrel (8) and tighten, using assembly pin through 3/4" hole in sleeve (5)

and into counterbore in packing mandrel. 3. Install O-ring (6) on lower top (15) and tighten top into top end of sleeve and install three thread lock set screws

(4). 4. Install six brass body shear screws (7) into other threaded holes in sleeve (note that there should be fewer screws

in the lower sleeve than the upper, to insure the lower packer sets first). 5. With cone coupling in vise, tighten lower mandrel (20) into cone coupling and bottom guide (23) onto lower

mandrel, with drag spring screw holes down. 6. Screw slips (17) to slip arms (19) and screw the arms and drag springs (21) to lower mandrel, using j-body screws

(22).

ASSEMBLY INSTRUCTIONS – RUNNING SUB

1. Slide running sub (1) into upper j-body (2), rotate right and slide up to stop. Install two brass upper shear screws (3) through holes in upper j-body and into groove in running sub.

DIMENSIONS A B C D E F

12.00” 44.25” 60.62” 3.00” 4.50” 6.12”

Page 145: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

7" X 8-5/8" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4028 - 2019 January

H O M E O F K L I N E T O O L S

DISASSEMBLY INSTRUCTIONS – UPPER PACKER

1. Remove the three thread locking set screws (4) in the upper end of the sleeve (5), and the brass shear screws (7) in its lower end.

2. Insert assembly pin through large hole in sleeve and into counterbore in packing mandrel (8). Clamp sleeve in vise.

3. Unscrew upper j-body (2) from sleeve, then upper bottom (14) from packing mandrel. Remove upper shear screws (3) from upper j-body.

4. Slide off packing elements (12), element spacer (13) and element back-up (11). Push packing mandrel up and out of sleeve (this requires ratcheting through the lock thread).

5. Using a punch, push the three drive-loc pins (9) in sleeve through to the inside and remove. Then unscrew lock ring (10) from sleeve.

DISASSEMBLY INSTRUCTIONS – LOWER PACKER

1. Repeat steps 1 & 2 in upper packer instructions above. 2. Unscrew lower top (15) from sleeve (5), then cone coupling (16) from packing mandrel (8). 3. Repeat steps 4 & 5 in upper packer instructions above. 4. Clamp cone coupling in vise and unscrew bottom guide (23) from lower mandrel (20). 5. Unscrew lower mandrel from cone coupling, then remove slip arms (19) and drag springs (21) as required.

Remove slips (17) from slip arms if required. Note that lower j-body and lower mandrel will not separate.

TECHNICAL SPECIFICATIONS

MAXIMUM WORKING PRESSURE

MAXIMUM ALLOWABLE

LINER WEIGHT

MINIMUM WEIGHT

REQUIRED TO SET

ASSEMBLY

SHEAR SCREW RATING

STD. ASSEMBLY P-110 OPTION UPPER (IN UPPER J BODY LOWER (IN EACH SLEEVE) 4200 PSI 5800 PSI 141,000 LB. 17,000 LB. 3830 LB. EACH 1750 LB. EACH

INSTALLATION After running and setting the desired tool below, the scab liner is run in and set across the zone to be isolated. Make up the SLP assembly with the lower packer on bottom, then a suitable length of liner, then the upper packer. The upper and lower packers are shear pinned to prevent premature setting. Insure that there are fewer shear screws on the bottom packer than the upper packer to insure it sets first. Install the running sub onto the bottom of the tubing string and into the j slot in the top of the upper packer. Pin in place with one or two shear screws. RUNNING Run the scab liner assembly to the desired location, pick up, rotate to the right one quarter turn (at the lower packer) and sit down. The slips on the lower packer will then set into the casing wall. Sit down enough weight to shear the screws in both the lower and upper packers, and in the running sub. The elements on both packers will pack off. The pack off is retained by lock rings in each section. The tubing can now be disconnected by rotating to the left one-quarter turn (at the

Page 146: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

7" X 8-5/8" Scab Liner Assembly Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4028 - 2019 January

H O M E O F K L I N E T O O L S

upper packer) and picking up. The SLP, now set and packed off, will remain in place, isolating the section of casing between the two packer sections. Remove tubing from well and make up the desired piece on bottom, to connect to the tool set below. The tubing is then run back in, through the scab liner assembly. RETRIEVAL To retrieve the scab liner packer assembly, run the tubing back in with the running sub installed, until the running sub lands in the upper j slot. Rotate to the right to re-latch, then pick up a little weight and continue rotating to the right to release the pack off. This could require 25 or 30 turns, depending on the casing in which it's set. The entire assembly can then be retrieved by removing the tubing string. If right hand rotation is prevented for some reason, the SLP assembly can be removed with the elements still packed off. If it is necessary to move back down hole, the bottom j can be re-latched by rotating to the left, in the picked-up position.

Page 147: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5” X 2-3/8” Lock Down Anchor/Catcher Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5020 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Lockdown Anchor/Catcher is set and released with only right-hand rotation (one-quarter turn right hand rotation at the tool to set or to release). Once set, the tubing string can be landed in tension to facilitate rod pumping operations, and vertical movement of the tubing string is eliminated. When the normal releasing method is not possible, an emergency release requires only straight pull. The amount of tension required is adjustable.

GENERAL SPECIFICATIONS CASING TOOL

SIZE WEIGHT OD ID CONNECTIONS PART NUMBER 5” 15-20.8# 4.000” 1.940” 2-3/8 EU8Rd 402-5020-XXXX

Features • Heavy Duty design • Drag blocks rather than drag springs • Adjustable tension shear release • L-80 Material Standard

Options • Carbide or Wickered Slips available

Page 148: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5” X 2-3/8” Lock Down Anchor/Catcher Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5020 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS

ATTRIBUTE VALUE Maximum OD 4.000 in 101.6 mm Minimum ID 1.938 in 49.2 mm

Overall Length 45.000 in 1,143 mm Max Casing ID 4.486 in 113.9 mm Min Casing ID 4.065 in 103.3 mm

External Working Pressure 10,000 psi 68,947 kPa Internal Working Pressure 10,000 psi 68,947 kPa Max Working Temperature 350 °F 176 °C Min Working Temperature 32 °F 0 °C

Tensile Rating 104,000 lbs 462 kN Max Number of Shear Screws 12

Max Safety Shear 52,188 – 58,860 lbs 232 – 261 kN Safety Shear Per Screw 4,349-4,905 lbs 19 – 22 kN

NACE Service YES 1. OPERATING INSTRUCTIONS NOTE: Ensure all connections are correctly tightened.

1.1 Run to desired setting depth. 1.2 Pick up weight of tubing plus 1,000-3,000 lbs. 1.3 Apply right hand rotation and set down tubing string to set lower slips. 1.4 Pick up weight of tubing plus 5,000-10,000 lbs to set upper slips. 1.5 Cycle once more by setting weight down and then picking up again to ensure slips are adequately set. 1.6 Apply desired tension and leave in place. 1.7 To remove the anchor, set down weight then apply right hand rotation. 1.8 Pick up while maintaining the right hand rotation to release anchor. 1.9 If tool fails to release the secondary method is actuated by setting down weight, then pulling tension to

break shear pins. Continue pulling until tool releases. 2. ASSEMBLY INSTRUCTIONS NOTE: Care should be taken during assembly to insure all threads are greased adequately. NOTE: When equipped, Control line slots in Slip Housing, Cone, and Control Body must be lined up together. CAUTION: Take care when handling inner mandrel not to damage seal surface.

2.1 Install lower Retaining Ring (15) into Mandrel (2) groove and slide Stop Ring (14) over Retaining Ring until it snaps into Stop Ring Groove. Install ¼-20 Socket Set Screw (17) to lock in the Retaining Ring.

2.2 Slide j-pin ring (10) onto the Mandrel (2) and install shear screws (18).

Page 149: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5” X 2-3/8” Lock Down Anchor/Catcher Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5020 - 2019 January

H O M E O F K L I N E T O O L S

2.3 Slide j-pin ring (10) onto the Mandrel (2) and install shear screws (18). 2.4 Slide J-Body (13) from top side of Mandrel and position J-Pin Ring in upper J-Body Window as shown. 2.5 Slide Lower Slip Sleeve (5) through Control Body (6) and assemble lower slips (8), slip springs (9), drag

blocks (11), drag block springs (12) and thread into J-Body (17). Install Set Screws (16) 2.6 Thread Cone (4) onto Lower Slip Sleeve (5) 2.7 Insert Releasing Slip (7), Upper Slips (8) and Upper Slip Springs (9) into Upper Slip Housing (6) and slide

subassembly onto Mandrel (2). 2.8 Slide upper Retaining Ring (15) onto top side of Mandrel (2). 2.9 With Upper Slip Support subassembly in correct position on Mandrel (2), just below Pin Thread upset,

slide Retaining Ring (15) from above until it snaps in ID Groove of the Upper Slip Housing (6). Groove is indicated by the window on the Upper Slip Housing.

2.10 Insert Top Sub (1) into vise. 2.11 Slide Follower Spring (19) onto top side of Mandrel (2). 2.12 Thread Mandrel (2) into Top Sub (1).

3. DISASSEMBLY INSTRUCTIONS

3.1 Insert tool into vise at top sub (1). 3.2 Using window of Upper Slip Housing and a screwdriver force Upper Slip Housing down the Mandrel to

expose the upper Retaining Ring (15). 3.3 Unscrew cone (4) from lower slip sleeve (5), using pin through holes in the lower slip sleeve. 3.4 Reverse Assembly Directions.

Page 150: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5” X 2-3/8” Lock Down Anchor/Catcher Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5020 - 2019 January

H O M E O F K L I N E T O O L S

402-5020-00XX PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER

1 1 Top Sub 00837 2 1 Mandrel 00838 3 1 Upper Slip Housing 00839 4 1 Cone 00840 5 1 Lower Slip Sleeve 00841 6 1 Control Body 00842 7 1 Releasing Slip 51KXR 8 5 Carbide Upper Slip 51KXUC 9 6 Upper Slip Spring 00042

10 1 J-pin Ring 00556 11 3 Drag Block 50450 12 9 Drag Block Spring 50100 13 1 J-Body 00843 14 1 Stop Ring 00845 15 2 Retaining Ring 00846 16 4 1/4" NC x 3/8" Socket Set Screw 11146C 17 4 1/4" - 20 UNC x 3/16" Socket Set Screw 11143C 18 12 Mild Steel Shear Screw 11766FMS 19 1 Follower Spring 00787

Page 151: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5” X 2-3/8” Lock Down Anchor/Catcher Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5020 - 2019 January

H O M E O F K L I N E T O O L S

402-5020-XXXX ASSEMBLY DRAWING

Page 152: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5” X 2-3/8” Lock Down Anchor/Catcher Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5020 - 2019 January

H O M E O F K L I N E T O O L S

402-5020-XXXX DIMENSIONAL REFERENCES

Page 153: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

5” X 2-3/8” Lock Down Anchor/Catcher Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5020 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSION MEASUREMENT A 3.750 in. 95.3 mm B 2.550 in. 64.8 mm C 4.000 in. 101.6 mm D 4.000 in. 101.6 mm E 4.000 in. 101.6 mm F 3.750 in. 95.3 mm G 1.940 in. 49.3 mm H 2.000 in. 50.8 mm I 6.00 in. 152.4 mm J 1.88 in. 47.8 mm K 3.75 in. 95.3 mm L 45.0 in. 1143 mm

Page 154: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

DB LDAC Anchor 5-1/2” x 2-7/8” (23-26#)

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: LKT-0042-TU - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Kline DB LDAC (Lock Down Anchor Catcher) is a mechanically set tubing anchor that operates like a KS1-XW packer. It sets and releases with a ¼ turn and includes a secondary shear release feature.

GENERAL SPECIFICATIONS Casing Tool

SIZE WEIGHT OD ID CONNECTIONS

5 ½” 23-26 LB/FT 4.40” 2.38” 2 7/8” EUE

8RD Box X Pin Features

• Heavy Duty design • Drag blocks rather than drag springs • Adjustable tension shear release

1. SPECIFICATIONS

PERFORMANCE SPECIFICATIONS

BURST RATING* 10,000 PSI COLLAPSE RATING* 10,000 PSI

TENSILE RATING* (MANDREL) 85,000 LB SHEAR SCREW RATING* (PER SCREW) 5,248-5,919 LB

MAX SAFETY SHEAR (12 SCREWS) 62,976-71,028 LB SLIP RANGE (UPPER) 4.405 -4.900 IN SLIP RANGE (LOWER) 4.371-4.967 IN

DRAG BLOCK RANGE (SOLID-FULL EXPANSION) 4.405-4.895 IN *Ratings calculated using 1.25 Safety Factor.

Page 155: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

DB LDAC Anchor 5-1/2” x 2-7/8” (23-26#)

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: LKT-0042-TU - 2019 January

H O M E O F K L I N E T O O L S

2. OPERATING INSTRUCTIONS

NOTE: Ensure all connections are correctly tightened.

2.1 SETTING: a. Run to desired setting depth. b. Pick up string weight. c. Apply right hand rotation and set down. d. Pick up and set down 2-3 times to set upper and lower slips sufficiently.

2.2 RELEASING:

a. Set down if necessary. b. Apply right hand rotation and then pick up to release the anchor. Upper slips will release first.

2.3 SHEAR RELEASE:

a. Should this still fail to free anchor, set down weight. b. Then pull tension to break shear pins in the bottom sub and continue pulling till tool releases.

3. ASSEMBLY INSTRUCTIONS NOTE: Care should be taken during assembly to insure all threads are greased adequately. CAUTION: Do not torque mandrel to bottom sub with excessive torque (800 ft-lb max).

3.1 Insert top sub (1) into vise. 3.2 Slide follower spring (25) onto top side of inner mandrel (2). 3.3 Thread inner mandrel (2) into top sub (1). 3.4 Slide split ring retainer (3) over inner mandrel (2). 3.5 Insert releasing slip (8), upper slips (9) and upper slip springs (7) into upper slip housing (6) and slide

subassembly onto inner mandrel (2). 3.6 Insert split ring segments (5) into upper slip housing (6) and thread split ring retainer (3) into upper end of

housing. 3.7 Insert set screws (4) into upper slip housing (6). 3.8 Slide lower slip support sleeve (19) through drag block body (13) and assemble lower slips (11), lower slip

springs (12), drag blocks (14), drag block springs (15) and drag block retainer to drag block body (13). 3.9 Thread cone (10) onto lower slip support sleeve (19) and slide sub assembly onto inner mandrel (2). 3.10 Thread j-body (17) onto drag block body (13) and install set screws (18).

CAUTION: This is a LEFT-HAND thread.

3.11 Slide j-pin ring (22) onto bottom sub (24) and install shear screws (23). 3.12 Install O-ring (21) into bottom sub (24) then thread bottom sub assembly onto inner mandrel (2) and install set

screws (20).

Page 156: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

DB LDAC Anchor 5-1/2” x 2-7/8” (23-26#)

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: LKT-0042-TU - 2019 January

H O M E O F K L I N E T O O L S

4. DISASSEMBLY INSTRUCTIONS

4.1 Insert tool into vise at top sub (1). 4.2 Remove set screws (20) from bottom sub (24). 4.3 Remove bottom sub (24) from inner mandrel (2). 4.4 Remove j-body/drag block body subassembly from inner mandrel (2). 4.5 Remove j-body (17) from drag block body (13).

CAUTION: This is a LEFT-HAND thread.

4.6 Unthread cone (10) from lower slip support sleeve (19). 4.7 Remove set screws (4) and unthread split ring retainer (3) from upper slip housing (6). 4.8 Remove split ring (5) and then slide upper slip housing (6) and split ring retainer (3) from inner mandrel (2). 4.9 Unthread inner mandrel (2) from top sub (1).

Page 157: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

DB LDAC Anchor 5-1/2” x 2-7/8” (23-26#)

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: LKT-0042-TU - 2019 January

H O M E O F K L I N E T O O L S

5. PARTS LIST (44-5525-1)

44-5525-1 ITEM QTY DESCRIPTION P/N

1 1 Top Sub 00664 2 1 Inner Mandrel 00665 3 1 Split Ring Retainer 00678 4 3 Set Screw 11134C 5 1 Split Ring 00669 6 1 Upper Slip Housing 00668 7 3 Upper Slip Spring 00040 8 1 Releasing Slip 57KXR 9 2 Upper Slip 57KXUC 10 1 Cone 00670 11 4 Lower Slip 57KXLC 12 4 Lower Slip Spring 00213 13 1 Drag Block Body 00523 14 4 Drag Block 50450 15 16 Drag Block Spring 50100 16 1 Drag Block Retainer 00527 17 1 J-Body 00672 18 3 Set Screw 11155C 19 1 Lower Slip Sleeve 00671 20 2 Set Screw 11145C 21 1 O-ring 19231 22 1 J-Pin Ring 00674 23 12 Shear Screw 11677CMS 24 1 Bottom Sub 00673 25 1 Follower Spring 00787

Page 158: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

DB LDAC Anchor 5-1/2” x 2-7/8” (23-26#) Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: LKT-0042-TU - 2019 January

H O M E O F K L I N E T O O L S

6. ASSEMBLY DRAWING

Page 159: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

DB LDAC Anchor 5-1/2” x 2-7/8” (23-26#) Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: LKT-0042-TU - 2019 January

H O M E O F K L I N E T O O L S

7. DIMENSIONS

A 2.816 in 71.526 mm K 4.385 in 111.379 mm B 3.688 in 93.675 mm L 46.4 in 1,178.6 mm C 2.375 in 60.325 mm M 6.25 in 158.75 mm D 2.875 in 73.025 mm N 2.63 in 66.80 mm E 4.400 in 111.760 mm P 4.14 in 105.16 mm F 2.760 in 70.104 mm Q 2.66 in 67.56 mm G 4.400 in 111.760 mm R 3.50 in 88.90 mm H 4.400 in 111.760 mm S 1.75 in 44.45 mm J 4.400 in 111.760 mm

Page 160: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Heavy Duty Lock Down Anchor/Catcher 5-1/2” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5525.2 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION

General Specifications Casing Tool

SIZE WEIGHT OD ID CONNECTIONS PART NUMBER

5-1/2” 14-20 4.63”

2.38” 2-7/8 EU8Rd 402-5525-XXXX 20-23 4.50”

Features

• Adjustable Secondary Shear Release Options

• No Torque Slip • Carbide or Wickered Slips available

Tool Assembly Part Numbers DESCRIPTION PART NUMBER

5-1/2 x 2-7/8 HD LDAC, 14-20#, RH set RH release, carbide 402-5525-0006 5-1/2 x 2-7/8 HD LDAC, 20-23#, RH set RH release, carbide 402-5525-0008

Page 161: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Heavy Duty Lock Down Anchor/Catcher 5-1/2” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5525.2 - 2019 January

H O M E O F K L I N E T O O L S

1. SPECIFICATIONS

Attribute Value

Maximum OD1 4.500 in 114.3 mm Minimum ID 2.360 in 59.9 mm

Overall Length 36.438 in 925.5 mm Approximate Weight 62 lb. 28.12 kg

External Working Pressure 10,000 psi 68,948 KPa Internal Working Pressure 10,000 psi 68,948 KPa

Max Working Temperature2 250 °F 121 °C Min Working Temperature 70 °F 21 °C

Tensile Rating 199,300 lbf 88,653 daN Max Number of Shear Screws 12

Max Safety Shear 62,976 – 71,148 lbf 28,008 – 31,584 daN Safety Shear Per Screw 5,248 – 5,929 lbf 2,334 – 2,632 daN

NACE Service Available Upon Request (1) Base tool OD. Look at casing weight chart for gage OD. (2) Higher temperatures can be achieved with different elastomers.

CASING WEIGHT RANGE (OD) 14-20# (4.625 in) 20-23# (4.500 in) MAX CASING ID 5.021 in 127.53 mm 4.970 in 126.24 mm MIN CASING ID 4.696 in 119.28 mm 4.578 in 116.28 mm

2. OPERATING INSTRUCTIONS

NOTE: Ensure all connections are correctly tightened. 2.1 Run to desired setting depth. 2.2 Pick up weight of tubing plus 1,000-3,000 lbs. 2.3 Apply right hand rotation and set down tubing string to set lower slips. 2.4 Pick up weight of tubing plus 5,000-10,000 lbs to set upper slips. 2.5 Cycle once more by setting weight down and then picking up again to ensure slips are adequately set. 2.6 Apply desired tension and leave in place. 2.7 To remove the anchor, set down weight then apply right hand rotation. 2.8 Pick while maintaining the right-hand rotation to release anchor.

Page 162: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Heavy Duty Lock Down Anchor/Catcher 5-1/2” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5525.2 - 2019 January

H O M E O F K L I N E T O O L S

3. ASSEMBLY INSTRUCTIONS NOTE: Care should be taken during assembly to insure all threads are greased adequately. CAUTION: Take care when handling inner mandrel not to damage seal surface. 3.1 Install O-rings (18) into the top sub (1) and bottom sub (7). 3.2 Slide j-pin ring (11) onto bottom (7), then install desired number of shear screws (16) into j-pin ring (11)

and into counterbores in bottom (7). 3.3 Assemble 2 of the slips (9), releasing slip (8) and 6 slip springs (10) into upper slip housing (3). 3.4 Slide assembly onto the upper end of mandrel (2). 3.5 With top sub (1) in vise, slide follower spring (20) onto top end of mandrel (2) and then screw mandrel (2)

into top sub (1). 3.6 Assemble 3 of the slips (9) and remaining 6 slip springs (10) into upper windows of control body (6). If

using the no torque slip, substitute it for one of the regular slips. 3.7 Slide threaded end of lower slip sleeve (5) into bottom end of the control body (6) all the way to a stop,

supporting the slips (9). Align so that slips (9) are between windows on lower slip sleeve (5). 3.8 Install two set screws (19) into control body (6) to hold lower slip sleeve (5) in place. 3.9 Slide cone (4) onto bottom end of mandrel (2). 3.10 Slide control body assembly onto bottom end of mandrel (2). 3.11 Back of set screws (19) ½ turn and rotate so that slips (9) fall into windows. 3.12 Screw cone (4) onto lower slip sleeve (5) and tighten thread (use pin through holes in control body (6) and

lower slip sleeve (5). 3.13 Slide J-pin ring (11) onto bottom (7) and install desired number of shear screws (16). 3.14 Slide bottom sub (7) onto bottom end of mandrel (2). Then screw bottom (7) to mandrel (2). 3.15 Slide bottom guide (17) into lower end of control body (6). 3.16 Install the drag springs (12) onto control body (6) using the drag spring screws (13) & (14). 3.17 Install cap screws (15) through the control body (6) into the bottom guide (17). 3.18 Tighten set screws (19) back down in control body. Ensure that the contact the mandrel (2) and not the

lower slip sleeve (5). Screws to be only snug and not excessively tight.

CAUTION: Locktite is recommended for all screws in the control body.

4. DISASSEMBLY INSTRUCTIONS 4.1 Insert tool into vise at top sub (1). 4.2 Remove cap screws (13,14 & 15) and drag springs (12) from control body (6) then remove the bottom

guide (17). 4.3 While backing up on the upper end of the mandrel (2) unscrew bottom sub (7) and remove. 4.4 Unscrew cone (4) from lower slip sleeve (5), using pin through holes in control body (6) and lower slip

sleeve (5). 4.5 Slide off control body (6). Slips (9) and slip springs (10) will fall in at this time. 4.6 Slide off cone (4) and unscrew mandrel (2) from top sub (1). 4.7 Slide upper slip assembly off of mandrel (2). Remaining releasing slip (8), slips (9) and slip springs (10) will

fall in at this time.

Page 163: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Heavy Duty Lock Down Anchor/Catcher 5-1/2” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5525.2 - 2019 January

H O M E O F K L I N E T O O L S

5. 402-5525-0006 PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER

14-20# (4.625” OD) 1 1 Top 00726 2 1 Mandrel 00727 3 1 Upper Slip Housing 00729 4 1 Cone 00730 5 1 Lower Slip Sleeve 00731 6 1 Control Body 00733-K 7 1 Bottom Sub 00734 8 1 Releasing Slip 57KXR 9 5 Upper Slip (Carbide/Wickered) 57KXUC/57KXUW

10 12 Upper Slip Spring 00040 11 1 J-Pin Ring 59196 12 4 Hw Drag Spring W/Counterbores 45DR56C 13 4 5/16 – 24 Unf X ¼ Bhcs 11354F 14 4 5/16 – 24 Unf X .459 Bhcs 1135FF 15 2 5/16 – 24 Unf X 3/8 Bhcs 11356F 16 12 7/16 – 14 Unc X 7i/16 Socket Set Screw 11677CMS 17 1 Bottom Guide 59056 18 2 233-90 O-ring 19233 19 1 Follower Spring 00787

Page 164: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Heavy Duty Lock Down Anchor/Catcher 5-1/2” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5525.2 - 2019 January

H O M E O F K L I N E T O O L S

6. 402-5525-0008 PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER

20-23# (4.500” OD) 1 1 Top 00726 2 1 Mandrel 00799 3 1 Upper Slip Housing 00800 4 1 Cone 00802 5 1 Lower Slip Sleeve 00731 6 1 Control Body 00801-K 7 1 Bottom Sub 00734 8 1 Releasing Slip 57KXR 9 5 Upper Slip (Carbide/Wickered) 57KXUC/57KXUW

10 12 Upper Slip Spring 00040 11 1 J-Pin Ring 59196 12 4 Hw Drag Spring W/Counterbores 45DR56C 13 4 5/16 – 24 Unf X ¼ Bhcs 11354F 14 4 5/16 – 24 Unf X .459 Bhcs 1135FF 15 2 5/16 – 24 Unf X 3/8 Bhcs 11356F 16 12 7/16 – 14 Unc X 7i/16 Socket Set Screw 11677CMS 17 1 Bottom Guide 00537 18 2 233-90 O-ring 19233 19 1 Follower Spring 00787

Page 165: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Heavy Duty Lock Down Anchor/Catcher 5-1/2” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5525.2 - 2019 January

H O M E O F K L I N E T O O L S

7. ASSEMBLY DRAWING

Page 166: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Heavy Duty Lock Down Anchor/Catcher 5-1/2” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5525.2 - 2019 January

H O M E O F K L I N E T O O L S

8. DIMENSIONS

DIMENSION MEASUREMENT

14-20# 20-23# A 7.562 in 192.07 mm 7.437 in 188.90 mm B 2.488 in 63.20 mm 2.488 in 63.20 mm C 2.669 in 67.79 mm 2.794 in 70.97 mm D 3.500 in 88.90 mm 3.500 in 88.90 mm F 2.438 in 61.93 mm 2.438 in 61.93 mm G 36.438 in 925.53 mm 36.438 in 925.53 mm H 3.668 in 93.17 mm 3.668 in 93.17 mm J 3.090 in 78.49 mm 3.090 in 78.49 mm K 4.625 in 117.48 mm 4.500 in 114.30 mm L 3.100 in 78.74 mm 3.100 in 78.74 mm M 4.625 in 117.48 mm 4.500 in 114.30 mm N 4.625 in 117.48 mm 4.500 in 114.30 mm P 4.625 in 117.48 mm 4.500 in 114.30 mm

Page 167: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 5-1/2” x 2-7/8” (20-23#)

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5525.1 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Lock Down Anchor/Catcher is set and released with only right-hand rotation (one quarter turn right hand rotation at the tool to set or to release). Once set, the tubing string can be landed in tension to facilitate rod pumping operations, and vertical movement of the tubing string is eliminated. When the normal releasing method is not possible, an emergency release requires only straight pull. The amount of tension required is adjustable. With the optional no-torque slip installed, right hand rotation of the tubing string is prevented - although the rotation required to release the anchor is not affected. This allows the anchor to be used with progressive cavity pumps.

GENERAL SPECIFICATIONS Casing Tool

SIZE WEIGHT OD ID CONNECTIONS PART NUMBER 5-1/2” 20-23 4.50” 2.349” 2-7/8 EU8Rd 402-5525-XXXX

Features

• Adjustable Secondary Shear Release

Options • No Torque Slip • Carbide or Wickered Slips available

Page 168: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 5-1/2” x 2-7/8” (20-23#)

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5525.1 - 2019 January

H O M E O F K L I N E T O O L S

1. SPECIFICATIONS

ATTRIBUTE VALUE Maximum OD1 4.505 in 114.4 mm Minimum ID 2.349 in 59.00 mm

Overall Length 37.06 in 941.32 mm Approximate Weight 58 lb. 26.31 kg

Max Casing ID 4.895 in 124.33 mm Min Casing ID 4.630 in 117.60 mm

External Working Pressure 5,500 psi 37,921 KPa Internal Working Pressure 7,000 psi 48,263 KPa

Max Working Temperature2 250 °F 121 °C Min Working Temperature 70 °F 21 °C

Tensile Rating 48,700 lbf 22,241 daN Compression Rating 100,000 lbf 44,482 daN

Max Slip Expansion (Upper) 5.229 in 132.8 mm Min Slip Expansion (Lower) 5.229 in 127.0 mm

Max Number of Shear Screws 7 Max Safety Shear 36,736 – 41,430 lbf 16,341 – 18,429 daN

Safety Shear Per Screw 5,248 – 5,929 lbf 2,334 – 2,632 daN NACE Service No

(1) Base tool OD. Look at casing weight chart for gage OD. (2) Higher temperatures can be achieved with different elastomers.

2. OPERATING INSTRUCTIONS

NOTE: Ensure all connections are correctly tightened. 2.1 Run to desired setting depth. 2.2 Pick up weight of tubing plus 1,000-3,000 lbs. 2.3 Apply right hand rotation and set down tubing string to set lower slips. 2.4 Pick up weight of tubing plus 5,000-10,000 lbs to set upper slips. 2.5 Cycle once more by setting weight down and then picking up again to ensure slips are adequately set. 2.6 Apply desired tension and leave in place. 2.7 To remove the anchor, set down weight then apply right hand rotation. 2.8 Pick up while maintaining the right-hand rotation to release anchor.

Page 169: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 5-1/2” x 2-7/8” (20-23#)

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5525.1 - 2019 January

H O M E O F K L I N E T O O L S

3. ASSEMBLY INSTRUCTIONS NOTE: Care should be taken during assembly to insure all threads are greased adequately. 3.1 Install O-rings (2) into the top sub (1) and bottom sub (19). 3.2 Assemble 2 of the slips (8), 1 releasing slip (6), and 6 slip springs (9) into upper slip housing (5). 3.3 Screw assembly onto the upper slip sleeve (4), then slide onto the upper end of mandrel (3). 3.4 With top sub (1) in vise, screw mandrel (3) into it. 3.5 Assemble 3 of the slips (8) and remaining 6 slip springs (9) into upper windows of control body (10). If

using the no torque slip, substitute it for one of the regular slips. 3.6 Slide threaded end of lower slip sleeve (11) into bottom end of the control body (10) all the way to a stop,

supporting the slips (8). 3.7 Screw cone (7) onto lower slip sleeve (11) and tighten thread (use pin through holes in control body (10)

and lower slip sleeve (11). 3.8 Slide J-pin ring (12) onto bottom sub (19) and install desired number of shear screws (13). 3.9 Slide control body assembly onto bottom end of mandrel (3), followed by bottom sub (19). Then screw

bottom (19) to mandrel (3). 3.10 Slide bottom guide (18) into lower end of control body (10). 3.11 Install the drag springs (14) onto control body (10) using the drag spring screws (15) & (16). 3.12 Install cap screws (17) through the control body (10) into the bottom guide (18).

CAUTION: Loctite is recommended for all screws in the control body.

4. DISASSEMBLY INSTRUCTIONS 4.1 Insert tool into vise at top sub (1). 4.2 Remove cap screws (17) & (16) from control body (10) then remove the bottom guide

(18).

Caution: Do Not Wrench immediately below Top Sub (See 7. Assembly Drawing)

4.3 While backing up on the upper end of the mandrel (3) unscrew bottom sub (19) and remove.

4.4 Unscrew cone (7) from lower slip sleeve (11), using pin through holes in control body (10) and lower slip sleeve (11).

4.5 Slide off control body (10). Slips (8) and slip springs (9) will fall in at this time. 4.6 Drag springs (14) may be removed at this time by removing the cap screws (15). 4.7 Slide off cone (7) and unscrew mandrel (3) from top sub (1). 4.8 Slide upper slip assembly off mandrel (3). 4.9 Disassemble upper slip assembly by unscrewing upper slip sleeve (4) from upper slip

housing (5). Remaining releasing slip (6), slips (8) and slip springs (9) will fall in at this time.

Page 170: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 5-1/2” x 2-7/8” (20-23#)

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5525.1 - 2019 January

H O M E O F K L I N E T O O L S

5. 402-5525-XXXX PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER

20-23# (4.500” OD) 1 1 Top Sub 00580 2 2 O-ring 19230 3 1 Mandrel 00581 4 1 Upper Slip Sleeve 00582 5 1 Upper Slip Housing 00583 6 1 Releasing Slip 57KXR 7 1 Cone 59065 8 5 Upper Slip (Carbide/Wickered) 57KXUC/57KXUW 9 12 Slip Spring 00040 10 1 Control Body 00585-K2 11 1 Lower Slip Sleeve 00584 12 1 J-Pin Ring 59196 13 8 Shear Screw 11677CMS 14 4 Drag Spring 45DR56C 15 4 5/16”-18 Unf X .459” BHCS 1135FF 16 4 5/16”-18 Unf X 3/8” BHCS 11356F 17 2 5/16”-18 Unf X ¼” BHCSs 11354F 18 1 Bottom Guide 00537 19 1 Bottom Sub 00587

Page 171: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 5-1/2” X 2-7/8” (20-23#) Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5525.1 - 2019 January

H O M E O F K L I N E T O O L S

6. 402-5525-XXXX ASSEMBLY DRAWING

Slide Upper Slip Housing up to Top Sub then Wrench as close to

shoulder as possible to Disassemble

Do Not Wrench Here

Page 172: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 5-1/2” X 2-7/8” (20-23#) Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-5525.1 - 2019 January

H O M E O F K L I N E T O O L S

7. 402-4520-XXXX DIMENSIONAL REFERENCES

DIMENSION MEASUREMENT A 7.375 in. 187.33 mm B 8.125 in. 206.38 mm C 13.688 in. 347.68 mm D 18.500 in. 469.90 mm E 33.563 in. 852.50 mm F 37.063 in. 941.56 mm G 3.731 in. 94.77 mm H 2.625 in. 66.68 mm J 4.500 in. 114.30 mm K 4.500 in. 114.30 mm L 4.500 in. 114.30 mm M 3.094 in. 78.59 mm

Page 173: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 7” X 2-7/8" Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-7025 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Lockdown Anchor/Catcher is set and released with only right-hand rotation (one-quarter turn right hand rotation at the tool to set or to release). Once set, the tubing string can be landed in tension to facilitate rod pumping operations, and vertical movement of the tubing string is eliminated. When the normal releasing method is not possible, an emergency release requires only straight pull. The amount of tension required is adjustable.

GENERAL SPECIFICATIONS Casing Tool

SIZE WEIGHT OD ID CONNECTIONS PART NUMBER

7” 17-26#

5.812” 2.441” 2-7/8 EU8Rd 402-7025-XXXX 26-35#

Features

• Heavy Duty design • Drag blocks rather than drag springs • Adjustable tension shear release

Options • Carbide or Wickered Slips available

Page 174: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 7” X 2-7/8" Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-7025 - 2019 January

H O M E O F K L I N E T O O L S

1. SPECIFICATIONS

ATTRIBUTE VALUE Maximum OD 5.827 in 146.4 mm Minimum ID 2.426 in 61.6 mm

Overall Length 51.000 in 1,295.4 mm Max Casing ID 6.629 in 168.4 mm Min Casing ID 5.892 in 149.7 mm

External Working Pressure 10,000 psi 68,947 kPa Internal Working Pressure 10,000 psi 68,947 kPa Max Working Temperature 350 °F 176 °C Min Working Temperature 32 °F 0 °C

Tensile Rating 116,000 lbs 516 kN Max Number of Shear Screws 12

Max Safety Shear 62,976 – 71,028 lbs 372 – 421 kN Safety Shear Per Screw 5,248 – 5,919 lbs 23 – 26 kN

NACE Service No

2. OPERATING INSTRUCTIONS NOTE: Ensure all connections are correctly tightened. 2.1 Run to desired setting depth. 2.2 Pick up weight of tubing plus 1,000-3,000 lbs. 2.3 Apply right hand rotation and set down tubing string to set lower slips. 2.4 Pick up weight of tubing plus 5,000-10,000 lbs to set upper slips. 2.5 Cycle once more by setting weight down and then picking up again to ensure slips are adequately set. 2.6 Apply desired tension and leave in place. 2.7 To remove the anchor, set down weight then apply right hand rotation. 2.8 Pick up while maintaining the right-hand rotation to release anchor. 2.9 If tool fails to release the secondary method is actuated by setting down weight, then pulling tension to

break shear pins. Continue pulling until tool releases.

3. ASSEMBLY INSTRUCTIONS NOTE: Care should be taken during assembly to ensure all threads are greased adequately. CAUTION: Take care when handling inner mandrel not to damage seal surface. 3.1 Vise onto mandrel (1) and slide cone (10) onto bottom of mandrel.

Page 175: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 7” X 2-7/8" Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-7025 - 2019 January

H O M E O F K L I N E T O O L S

3.2 As a subassembly: a. Install lower slips springs (13) and lower slips (12) into control body (14) and hold in place using

spring clips. b. Install drag block springs (15) and drag blocks (16) into control body and hold in place using

spring clips. c. Slide lower slip sleeve (11) through ID of control body. d. Slide subassembly onto bottom of mandrel and thread slip sleeve and cone together. Remove

spring clips. 3.3 Slide subassembly up far enough to expose Spirolox ring groove and slide Spirolox ring (18) just above

groove until after next step. 3.4 Install stop ring (19) and retaining ring (20), then slide Spirolox ring into groove. 3.5 Install j-body (17) onto bottom of lower mandrel and thread to bottom of control body. NOTE: THIS IS A

LEFT-HAND THREAD; NOTE: DRAG BLOCKS WILL HAVE TO BE CONSTRAINED IN ORDER FOR J-BODY TO FULL MAKE UP TO CONTROL BODY. Install set screws (4).

3.6 Slide control body/j-body up far enough on mandrel to expose counterbores in mandrel. Install j-pin ring (21) and shear screws (22).

3.7 Slide control body/j-body back down mandrel, fitting j-pins into j-slot running position (top of j-slot). 3.8 Remove tool from vise and re-position the lower mandrel in vise, just above bottom pin connection. 3.9 Install upper slip springs (7) and upper slips (8) into upper slip housing (6). Hold in place with spring clips. 3.10 Compress snap ring (3) and slide into upper slip housing until it expands in groove. 3.11 Aligning gap in snap ring with window in upper slip housing, use opening pliers to spread open snap ring

so that upper slip housing can slide over top of mandrel. 3.12 Once slip housing is the mandrel groove, release snap ring and install set screws (4). Ensure that slip

housing is free to move on mandrel after tightening set screws. 3.13 Install follower spring (5) onto top of mandrel. 3.14 Install snap ring (3) into spring retainer (2). Aligning gap in snap ring with window in spring retainer, use

opening pliers to spread open snap ring so that spring retainer can slide over top of mandrel. 3.15 Once spring retainer is in the mandrel groove, release snap ring and install set screws (4). It is ok to

tighten set screws until snap ring is tight against mandrel as this piece is not intended to move.

4. DISASSEMBLY INSTRUCTIONS 4.1 Insert tool into vise at bottom of mandrel (1) just above pin connection. 4.2 Remove set screws (4) from spring retainer (2). 4.3 Through window of spring retainer, use opening pliers to expand snap ring (3) and slide spring retainer

off top of mandrel. 4.4 Remove follower spring (5). 4.5 Remove set screws (4) from upper slip housing (6). 4.6 Through window of upper slip housing, use opening pliers to expand snap ring (3) and slide slip housing

off top of mandrel. 4.7 Unscrew cone (10) from lower slip sleeve (11) and slide off top of mandrel. 4.8 Remove tool from vise and re-position the top sub into vise. 4.9 Slide control body/j-body up mandrel far enough to expose j-pin shear screws. Remove shear screws (22)

and j-pin ring (21). Slide off bottom of mandrel.

Page 176: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 7” X 2-7/8" Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-7025 - 2019 January

H O M E O F K L I N E T O O L S

4.10 Remove set screws (4) and unscrew j-body (17) from control body. NOTE: THIS IS A LEFT-HAND CONNECTION. NOTE: CONSTRAIN DRAG BLOCKS WHEN REMOVING J-BODY AS THEY ARE SPRING-LOADED.

4.11 Slide control body up enough so that Spirolox ring (18) can be slid out of groove and moved up. After sliding Spirolox ring up, slide stop ring (19) up to expose retaining ring (20). Remove retaining ring, stop ring, and Spirolox ring.

4.12 Remove control body (14) and lower slip sleeve (11) from bottom of mandrel. Slide slip sleeve out of bottom of control body.

4.13 Slide cone (10) off bottom of mandrel.

Page 177: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 7” X 2-7/8" Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-7025 - 2019 January

H O M E O F K L I N E T O O L S

5. 402-7025-000X PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER 17-26# 26-35#

1 1 Mandrel 00828 2 1 Spring Retainer 00855 3 2 Snap Ring 00834 4 9 Set Screw 11166C 5 1 Follower Spring 00856 6 1 Upper Slip Housing 00827 7 6 Upper Slip Spring 00214 8 1 Releasing Slip 73KXR 9 2 Upper Slip 73KXUC (Carbide) or 73KXUW (Wicker)

10 1 Cone 00829 11 1 Lower Slip Sleeve 00830 12 3 Lower Slip 73KXLC (Carbide) or 73KXLW (Wicker) 13 3 Lower Slip Spring 00213 14 1 Control Body 00831 15 18 Drag Block Spring 50110 16 3 Drag Block 50700 50560 17 1 J-Body 00832 18 1 Spirolox Ring WSM-368 19 1 Stop Ring 00835 20 1 Retaining Ring 00836 21 1 J-Pin Ring 00833 22 12 Shear Screw 11678CMS 23 5 Button Head Set Screw 11358C

Page 178: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 7” X 2-7/8"

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-7025 - 2019 January

H O M E O F K L I N E T O O L S

6. 402-7025-XXXX ASSEMBLY DRAWING

Page 179: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 7” X 2-7/8"

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-7025 - 2019 January

H O M E O F K L I N E T O O L S

7. 402-7025-XXXX DIMENSIONAL REFERENCES

DIMENSION MEASUREMENT A 3.687 in. 93.65 mm B 5.750 in. 146.05 mm C 3.687 in. 93.65 mm D 5.550 in. 140.97 mm E 5.812 in. 147.62 mm F 5.625 in. 142.88 mm G 2.441 in. 62.00 mm H 51.000 in. 1,295.4 mm I 4.625 in. 117.48 mm J 3.125 in. 79.38 mm K 4.000 in. 101.6 mm

Page 180: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 7” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-7025 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Lockdown Anchor/Catcher is set and released with only right-hand rotation (one-quarter turn right hand rotation at the tool to set or to release). Once set, the tubing string can be landed in tension to facilitate rod pumping operations, and vertical movement of the tubing string is eliminated. When the normal releasing method is not possible, an emergency release requires only straight pull. The amount of tension required is adjustable. With the optional no-torque slip installed, right hand rotation of the tubing string is prevented – although the rotation required to release the anchor is not affected. This allows the ancho to be used with progressive cavity pumps.

GENERAL SPECIFICATIONS Casing Tool

SIZE WEIGHT OD ID CONNECTIONS PART NUMBER

7” 20-29# 5.969”

2.375” 2-7/8 EU8Rd 402-7025-XXXX 26-35# 5.844”

Features

• Adjustable Secondary Shear Release

Options • No Torque Slip • Carbide or Wickered Slips available

Page 181: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 7” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-7025 - 2019 January

H O M E O F K L I N E T O O L S

1. SPECIFICATIONS

ATTRIBUTE VALUE Maximum OD1 5.849 in 148.6 mm Minimum ID 2.360 in 59.9 mm

Overall Length 43.125 in 1,095.4 mm Approximate Weight 147 lb. 66.7 kg

Max Casing ID 6.552 in 166.4 mm Min Casing ID 5.892 in 149.7 mm

External Working Pressure 11,170 psi 77,0014 kPa Internal Working Pressure 10,570 psi 72,878 kPa

Max Working Temperature2 250 °F 121 °C Min Working Temperature 70 °F 21 °C

Tensile Rating 145,000 lbf 645 kN Max Number of Shear Screws 12

Max Safety Shear 62,976 – 71,028 lbf 280 – 316 kN Safety Shear Per Screw 5,248 – 5,929 lbf 23 – 26 kN

NACE Service No (1) Base tool OD. Look at casing weight chart for gage OD. (2) Higher temperatures can be achieved with different elastomers.

2. OPERATING INSTRUCTIONS

NOTE: Ensure all connections are correctly tightened. 2.1 Run to desired setting depth. 2.2 Pick up weight of tubing plus 1,000-3,000 lbs. 2.3 Apply right hand rotation and set down tubing string to set lower slips. 2.4 Pick up weight of tubing plus 5,000-10,000 lbs to set upper slips. 2.5 Cycle once more by setting weight down and then picking up again to ensure slips are adequately set. 2.6 Apply desired tension and leave in place. 2.7 To remove the anchor, set down weight then apply right hand rotation. 2.8 Pick up while maintaining the right-hand rotation to release anchor.

Page 182: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 7” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-7025 - 2019 January

H O M E O F K L I N E T O O L S

3. ASSEMBLY INSTRUCTIONS NOTE: Care should be taken during assembly to insure all threads are greased adequately. NOTE: When equipped, Control line slots in Slip Housing, Cone, and Control Body must be lined up together. CAUTION: Take care when handling inner mandrel not to damage seal surface. 3.1 Install top gauge (3) onto top sub (1). 3.2 Install O-rings (2) into the top sub (1) and bottom sub (19). 3.3 Assemble 2 of the slips (9), 1 releasing slip (8), and 6 slip springs (7) into upper slip housing (6). 3.4 Screw assembly onto the upper slip sleeve (5) and then slide onto the upper end of mandrel (4). 3.5 With top sub (1) in vise, screw mandrel (4) into it. 3.6 Assemble 3 of the slips (9) and remaining 6 slip springs (7) into upper windows of control body (11). If

using the no torque slip, substitute it for one of the regular slips (9). 3.7 Slide threaded end of lower slip sleeve (12) into bottom end of the control body (11) all the way to a stop,

supporting the slips (9). 3.8 Screw cone (10) onto lower slip sleeve (12) and tighten thread (use pin through holes in control body (11)

and lower slip sleeve (12). 3.9 Slide J-pin ring (14) onto bottom sub (19) and install desired number of shear screws (13). 3.10 Slide control body assembly onto bottom end of mandrel (4), followed by bottom sub (19). Then screw

bottom (19) to mandrel (4). 3.11 Slide bottom guide (18) into lower end of control body (11). 3.12 Install the drag springs (15) onto control body (11) using the drag spring screws (16). 3.13 Install cap screws (17) through the control body (11) into the bottom guide (18).

CAUTION: Loctite is recommended for all screws in the control body.

4. DISASSEMBLY INSTRUCTIONS 4.1 Insert tool into vise at top sub (1). 4.2 Remove cap screws (17) from control body (11) then remove the bottom guide (18). Caution: Do Not Wrench immediately below Top Sub (See 7. Assembly Drawing) 4.3 While backing up on the upper end of the mandrel (4) unscrew bottom sub (19) and remove. 4.4 Unscrew cone (10) from lower slip sleeve (12), using pin through holes in control body (11) and lower slip

sleeve (12). 4.5 Slide off control body (11). Slips (9) and slip springs (7) will fall in at this time. 4.6 Drag springs (15) may be removed at this time by removing the cap screws (16). 4.7 Slide off cone (10) and unscrew mandrel (4) from top sub (1). 4.8 Slide upper slip assembly off mandrel (4). 4.9 Disassemble upper slip assembly by unscrewing upper slip sleeve (5) from upper slip housing (6).

Remaining releasing slip (8), slips (9) and slip springs (7) will fall in at this time.

Page 183: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 7” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-7025 - 2019 January

H O M E O F K L I N E T O O L S

5. 402-7025-XXXX PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER 20-29# (5.969” OD) 26-35# (5.844”)

1 1 Top Sub 00698 2 2 O-ring 19236 3 1 Top Gauge N/A N/A 4 1 Mandrel 00750 5 1 Upper Slip Sleeve 59135 6 1 Upper Slip Housing 00822 7 6 Slip Spring 00214 8 1 Releasing Slip 73KXR 9 5 Slip (Carbide/Wickered) 73KXUC/73KXUW

10 1 Cone 00823 00820 11 1 Control Body 00824 12 1 Lower Slip Sleeve 59145 13 12 7/16”-Nc X ½” Steel Screw 11678CMS 14 1 J-Pin Ring 59191 15 4 Drag Spring 45DR56 16 6 5/16”-Nf X ½” Cap Screw 11358F 17 4 5/16”-Nf X ¾” Cap Screw 1135AF 18 1 Bottom Guide 00825 00819 19 1 Bottom Sub 00751

Page 184: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 7” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-7025 - 2019 January

H O M E O F K L I N E T O O L S

6. 402-7025-XXXX ASSEMBLY DRAWING

Do Not Wrench Here Slide Upper Slip Housing up to Top Sub then Wrench as close to

shoulder as possible to Disassemble

Page 185: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 7” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-7025 - 2019 January

H O M E O F K L I N E T O O L S

7. 402-4520-XXXX DIMENSIONAL REFERENCES

Page 186: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Lock Down Anchor/Catcher 7” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU-402-7025 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSION MEASUREMENT 20-29# 26-35#

A 8.375 in. 212.73 mm 8.375 in. 212.73 mm B 9.125 in. 231.78 mm 9.125 in. 231.78 mm C 15.313 in. 388.95 mm 15.313 in. 388.95 mm D 22.063 in. 560.40 mm 22.063 in. 560.40 mm E 38.938 in. 989.03 mm 38.938 in. 989.03 mm F 43.125 in. 1,095.38 mm 43.125 in. 1,095.38 mm G 5.969 in. 151.61 mm 4.500 in. 114.30 mm H 3.438 in. 87.33 mm 3.438 in. 87.33 mm J 5.750 in. 146.05 mm 5.750 in. 146.05 mm K 5.750 in. 146.05 mm 5.750 in. 146.05 mm L 5.969 in. 151.61 mm 5.844 in. 148.44 mm M 3.750 in. 95.25 mm 3.750 in. 95.25 mm

Page 187: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

EU8RD Lock Down Tubing Anchor 5-1/2” X 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4008 - 2019 January

H O M E O F K L I N E T O O L S

Description This Tubing Anchor/Catcher is set and released with only right-hand rotation: one quarter turn right hand rotation at the tool to set or to release. Once set, the tubing string can be landed in tension to facilitate rod pumping operations, and vertical movement of the tubing string is eliminated. When the normal releasing method is not possible, an emergency release requires only straight pull. The amount of tension required is adjustable. With the optional no-torque slip installed, right hand rotation of the tubing string is prevented - although the rotation required to release the anchor is not affected. This allows the anchor to be used with progressive cavity pumps.

Page 188: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

EU8RD Lock Down Tubing Anchor 5-1/2” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4008 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONS (IN.)

A B C D E F * G H * J K 3.69 2.75 3.38" 4.625 5.00 2.38 0.75 8.12 3.00 37.06

* IN POSITION SHOWN

SPECIFICATIONS CASING WEIGHT MAX.O.D. MIN.I.D. CONNECTIONS 5-1/2" 13-20# 4.625" 2.38" 2-7/8" EU8Rd

Torque rating: 3,500 ft. Lbs. Shear release: 57,500 lbs. Max. (4750 lb./screw)

PART LIST

KEY # QTY. P/N PART KEY # QTY. P/N PART 1 1 58985 Top Sub 9 1 59085 Lower Slip Sleeve 2 1 00699*** Mandrel 10 1 59025-K** Control Body 3 1 59075 Upper Slip Sleeve 11 1 59196 J-Pin Ring 4 1 59015** Upper Slip Body 12 12 11677CMS Shear Screws 5 12 00040 Slip Spring 13 4**** 45DR56 Drag Spring 6 5 57KXU * Slip 14 4 11355F Short Drag Spring Screw 7 1 57KXR Releasing Slip 15a 2 11356F Long Drag Spring Screw

Not Shown 1 60385 Torque Slip (Opt.) 15b 4 11358F Long Drag Spring Screw 8 1 59065** Cone 16 1 59056** Control Body Cap

* Add W for wickered, C for carbide 17 1 58995 Bottom ** For control line bypass tools, see chart below 18 2 19231 O-ring ***For 120ksi M.Y. mandrel, use P/N 00908 **** Optional 8 drag springs available

Control Line Bypass Parts

KEY # QTY. P/N PART 4 1 59017 Upper Slip Body 8 1 59067 Cone 10 1 59007 Control Body 16 1 59057 Control Body Cap

1. ASSEMBLY

1.1 Slide j-pin ring (11) onto bottom (17), then install desired number of shear screws (12) into j-pin ring and into counterbores in bottom.

1.2 Assemble 2 of the slips (6), releasing slip (7) and 6 of the slip springs (5) into upper slip body (4). 1.3 Screw this assembly onto upper slip sleeve (3), then slide onto upper end of mandrel (2). 1.4 With top sub (1) in vise, screw mandrel into it.

Page 189: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

EU8RD Lock Down Tubing Anchor 5-1/2” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4008 - 2019 January

H O M E O F K L I N E T O O L S

1.5 Assemble 3 of the slips and remaining 6 of the slip springs into upper windows of control body (10). If using the torque slip, substitute it for one the regular slips.

1.6 Slide threaded end of lower slip sleeve (9) into bottom end of control body all the way to a stop, supporting the slips.

1.7 Screw cone (8) onto lower slip sleeve and tighten thread (use pin through holes in control body and lower slip sleeve).

1.8 Slide this assembly onto mandrel, followed by bottom (j-pins will enter j-slots in control body). Then screw bottom to mandrel

1.9 Slide control body cap (16) into lower end of control body. 1.10 Install the 8 drag springs (13) onto control body, using the short and long drag spring screws (14 & 15).

The long screws will also retain the control body cap.

Caution: if running the anchor below 5,000 ft deep, be sure to use Loctite on the threads of the screws, to avoid them from vibrating loose.

2. DISASSEMBLY

2.1 With top sub (1) in vise, and backing up on upper end of mandrel, unscrew bottom (17) and remove. 2.2 Unscrew cone (8) from lower slip sleeve (9), using pin through holes in control body (10) and lower slip

sleeve. Then slide off control body. Slips (6) and slip springs (5) will fall in at this time. Drag springs (13) may be removed at this time by removing screws (14 & 15).

2.3 Slide off cone, unscrew mandrel from top sub, and slide upper slip assembly off mandrel. 2.4 Disassemble upper slip assembly by unscrewing upper slip sleeve (3) from upper slip body (4). Remaining

slips and springs will fall in at this time.

3. SETTING INSTRUCTIONS 3.1 Run to setting depth then pick up, hold right hand torque and sit down to set the slips and lock the

anchor in the set position. Remove torque from the tubing then pick up to test the set of the anchor. Pull tension and set down several times to lock in a tight set.

4. OPERATING INSTRUCTIONS 4.1 After setting, continue to hold tension to keep the tubing string straight, protecting it from undue wear

when running a rod pump. If using a progressive cavity pump, run one torque slip on the lower end, replacing one of the lower slips. This will prevent the tubing string rotating to the right (although it will not affect release of the anchor).

5. RELEASING INSTRUCTIONS

5.1 METHOD 1: Release tension and slack off tubing weight. Hold right hand torque and pick up. It may be

necessary to pull up to 15,000 lbs. To release the upper slips, however this will not affect the shear screws. The slips will retract to the run-in position and the anchor can be pulled from the well or relocated.

Page 190: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

EU8RD Lock Down Tubing Anchor 5-1/2” X 2-7/8”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4008 - 2019 January

H O M E O F K L I N E T O O L S

5.2 METHOD 2: To release without rotation, or if the anchor cannot be unlocked, simply pull tension to shear the safety release shear screws. With this method the anchor cannot be relocated until it has been retrieved from well and re-dressed.

Page 191: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

EU8RD Lock Down Tubing Anchor 7” X 3-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4023 - 2019 January

H O M E O F K L I N E T O O L S

SPECIFICATIONS CASING WEIGHT MAX.O.D. MIN.I.D. CONNECTIONS

7" 20-29# 5.969" 2.38" 3-1/2" EU8RD torque rating: 3,500 ft. lbs. shear release: 57,500 lbs. max. (4750 lb./screw)

DESCRIPTION This Tubing Anchor/Catcher is set and released with only right-hand rotation: 1/4 right hand rotation at the tool to set or to release. Once set, the tubing string can be landed in tension to facilitate rod pumping operations, and vertical movement of the tubing string is eliminated. When the normal releasing method is not possible, an emergency release requires only straight pull. The amount of tension required is adjustable. With the optional no-torque slip installed, right hand rotation of the tubing string is prevented - although the rotation required to release the anchor is not affected. This allows the anchor to be used with progressive cavity pumps.

Page 192: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

EU8RD Lock Down Tubing Anchor 7” X 3-1/2”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4023 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONS (IN.)

A B C D E F G H 4.50 3.438 5.969 5.375 3.75 9.12 3.00 43.12"

PART LIST

KEY # QTY. P/N PART KEY # QTY. P/N PART 1 1 00696 Top Sub 9 1 59145 Lower Slip Sleeve 2 1 59105 Mandrel 10 1 00824 Control Body 3 1 59135 Upper Slip Sleeve 11 1 59191 J-Pin Ring 4 1 00822 Upper Slip Body 12 12 11678CMS Shear Screws 5 12 00214 Slip Spring 13 4 45DR56 Drag Spring 6 5 73KXU * Slip 14 4 1135AF Short Drag Spring Screw 7 1 73KXR Releasing Slip 15 6 11358F Long Drag Spring Screw

not shown 1 73KXNT Torque Slip (Opt.) 16 1 00825 Bottom Guide 8 1 00823 Cone 17 1 71681 Bottom

* Add W for wickered, C for carbide 18 2 19236 O-ring 1. ASSEMBLY

1.1. Slide j-pin ring (11) onto bottom (17), then install desired number of shear screws (12) into j-pin ring and

into counterbores in bottom. 1.2. Assemble 2 of the slips (6), releasing slip (7) and 6 of the slip springs (5) into upper slip body (4). 1.3. Screw this assembly onto upper slip sleeve (3), then slide onto upper end of mandrel (2). 1.4. With top sub (1) in vise, screw mandrel into it. 1.5. Assemble 3 of the slips and remaining 6 of the slip springs into upper windows of control body (10). If

using the torque slip, substitute it for one the regular slips. 1.6. Slide threaded end of lower slip sleeve (9) into bottom end of control body all the way to a stop,

supporting the slips. 1.7. Screw cone (8) onto lower slip sleeve and tighten thread (use pin through holes in control body and lower

slip sleeve). 1.8. Slide this assembly onto mandrel, followed by bottom (j-pins will enter j-slots in control body). Then

screw bottom to mandrel 1.9. Slide bottom guide (16) into lower end of control body. 1.10. Install the 4 drag springs (13) onto control body, using the short and long drag spring screws (14 & 15).

The long screws will also retain the bottom guide.

CAUTION: If running the anchor below 5,000 ft deep, be sure to use Loctite on the threads of the screws, to avoid them from vibrating loose. 1.11. Tighten all screws and other threads. Anchor is now ready to run.

Page 193: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

EU8RD Lock Down Tubing Anchor 7” X 3-1/2”

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4023 - 2019 January

H O M E O F K L I N E T O O L S

2. DISASSEMBLY

2.1. With top sub (1) in vise, and backing up on upper end of mandrel, unscrew bottom (17) and remove. 2.2. Unscrew cone (8) from lower slip sleeve (9), using pin through holes in control body (10) and lower slip

sleeve. Then slide off control body. Slips (6) and slip springs (5) will fall in at this time. Drag springs (13) may be removed at this time by removing screws (14 & 15).

2.3. Slide off cone, unscrew mandrel from top sub, and slide upper slip assembly off mandrel. 2.4. Disassemble upper slip assembly by unscrewing upper slip sleeve (3) from upper slip body (4). Remaining

slips and springs will fall in at this time.

3. SETTING INSTRUCTIONS

3.1. Run to setting depth then pick up, hold right hand torque and sit down to set the slips and lock the anchor in the set position.

3.2. Remove torque from the tubing then pick up to test the set of the anchor. 3.3. Pull tension and set down several times to lock in a tight set.

4. OPERATING INSTRUCTIONS

4.1. After setting, continue to hold tension to keep the tubing string straight, protecting it from undue wear

when running a rod pump. If using a progressive cavity pump, run one torque slip on the lower end, replacing one of the lower slips. This will prevent the tubing string rotating to the right (although it will not affect release of the anchor).

5. RELEASING INSTRUCTIONS

5.1. METHOD 1: release tension and slack off tubing weight. Hold right hand torque and pick up. It may be necessary to pull up to 20,000 lbs. To release the upper slips, however this will not affect the shear screws. The slips will retract to the run-in position and the anchor can be pulled from the well or relocated.

5.2. METHOD 2: to release without rotation, or if the anchor cannot be unlocked, simply pull tension to shear the safety release shear screws. With this method the anchor cannot be relocated until it has been retrieved from well and re-dressed.

Page 194: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Tubing Anchor/Catcher 4-1/2” X 2-3/8” DP

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: LKT-0167-TU - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION The Kline Tubing Anchor/Catcher is a time-tested design that has proven to be rugged and reliable. It can anchor tubing in either tension or compression. The LKT Tubing Anchor/Catcher is fully retrievable or resettable and includes a safety shear release feature that can be adjusted quickly in the field. The LKT Tubing Anchor/Catcher employs drag blocks rather than drag springs for maximum drag reliability. The LKT Tubing Anchor/Catcher requires left hand rotation to set the tool. It is released with right hand rotation.

GENERAL SPECIFICATIONS Casing Tool

SIZE WEIGHT OD ID CONNECTIONS

4 ½” 15.1-16.6 LB/FT 3.50” 1.94” 2 3/8” EUE

8RD Box X Pin

CONFIGURATIONS PART NUMBER SLIP TYPE

41-4520-1 Wickered 41-4520-2 Carbide

Features

• Rugged design • Drag blocks rather than drag springs • Fully enclosed large cross-section slips • Adjustable tension shear release

PERFORMANCE SPECIFICATIONS Burst Rating 10,000 PSI

Collapse Rating 9,200 PSI Tensile Rating 80,000 LB

Safety Shear (Max) 39,800 LB

Page 195: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Tubing Anchor/Catcher 4-1/2” X 2-3/8” DP

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: LKT-0167-TU - 2019 January

H O M E O F K L I N E T O O L S

1. OPERATING INSTRUCTIONS NOTE: Ensure all connections are correctly tightened.

1.1 SETTING:

a. Run to desired setting depth. b. Rotate several turns to the left to set the slips. Pick up and sit down several times while turning

to the left to insure a tight set.

1.2 RELEASING: a. Slack off to place tubing in neutral. b. Rotate to the right until slips have retracted to the run-in position. This should take fewer than

but no more than 6-7 turns. c. The tubing string can be pulled from the well, or the anchor relocated. d. If the anchor is stuck, pick up and sit down several times while turning to the right to free up

the parts.

1.3 SHEAR RELEASE: a. Should this still fail to free anchor, pull tension to break shear pins. This will unload the lower

cone and pick up slips from above. The anchor can now be pulled from the well but cannot be set again until redressed.

2. ASSEMBLY INSTRUCTIONS NOTE: Care should be taken during assembly to insure all threads are greased adequately. CAUTION: Do not wrench drag block retainer (3) tight with upper cone (11) against stop screw (9). 2.1 Insert top sub (1) into vise. 2.2 Slide drag block sleeve (7) and drag block retainer (3) onto upper end of the mandrel (2). 2.3 Screw upper end of mandrel (2) into lower end of the top sub (1). 2.4 Insert upper cone (11) into control body (6) and install 1/8 x 0.312 LG pipe plugs (10) through slot on

control body (6) into upper cone (11).

Ensure that long slot is aligned with tapped hole on upper end of upper cone (11).

2.5 Assembly slip springs (13) to slips (12) with the #10-24 x ¼” button head cap screws (14). 2.6 Insert slip assemblies into the slip windows in the control body (6). 2.7 Slide control body assembly over mandrel (2) and drag block sleeve (7). 2.8 Thread upper cone (11) onto center thread of mandrel (2) until it bottoms on thread stop, then install

#10-24x5/16 set screw (9) into upper cone. 2.9 Install 5/16-18 UNC x 3/8 socket cap screws (8) into control body (6) to secure drag block sleeve (7). 2.10 Install drag block springs (5) and drag blocks (4) into control body (6) and then thread drag block retainer

(3) onto upper end of control body (6).

Page 196: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Tubing Anchor/Catcher 4-1/2” X 2-3/8” DP

Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: LKT-0167-TU - 2019 January

H O M E O F K L I N E T O O L S

4 drag block springs per drag block recommended.

2.11 Slide lower cone (15) and shear pin ring (17) onto lower end of mandrel (2) and install desired number of shear pins (16). 3,980 lb. per shear pin.

2.12 Thread bottom (19) onto lower end of mandrel (2). 2.13 Thread shear pin cap (18) onto lower cone (15). 2.14 Tighten both upper and lower mandrel connections.

Before tightening, be sure to support the bottom with a vise stand, or similar.

3. DISASSEMBLY INSTRUCTIONS

3.1 Insert tool into vise at top sub (1). 3.2 Remove bottom (19) from mandrel (2).

Before breaking thread, be sure to support the bottom with a vise stand, or similar. It may be necessary to back up on mandrel (2).

3.3 Remove shear pin cap (18) and shear pins (16). 3.4 Remove shear pin ring (17) and lower cone (15). 3.5 Remove #10-24x5/16 set screw (9) from upper cone and #10-24x1/4 button head cap screws (14) from

control body (6). 3.6 Remove control body assembly with left hand rotation till upper cone (11) has cleared center thread on

mandrel (2), then slide assembly completely off mandrel. 3.7 Remove 1/8x0.312 pipe plugs (10) from upper cone (11). 3.8 Remove drag block retainer (3), drag blocks (4) and drag block springs (5) from the control body.

CAUTION: when you remove the drag block retainer (3) the drag blocks (4) and drag block springs (5) will pop out violently. Support them with a pipe strap or a bolt ring assembly tool. Remove mandrel (2) from top sub (1).

Page 197: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Tubing Anchor/Catcher 4-1/2” X 2-3/8” DP Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: LKT-0167-TU - 2019 January

H O M E O F K L I N E T O O L S

4. PARTS LIST

ITEM QTY Description P/N 41-4520-1

P/N 41-4520-2

1 1 Top 1E2E1 2 1 Mandrel 59410 3 1 Drag Block Retainer 59430 4 3 Drag Block 50450 5 12 Drag Block Spring 50100 6 1 Control Body 59390-K 7 1 Drag Block Sleeve 59350 8 1 #10-24 X ¼” Button Head Cap Screw 11356C 9 1 #10-24 X 5/16” Set Screw 11235C 10 3 1/8” X 0.312” Pipe Plug 11156N 11 1 Upper Cone 59440 12 3 Slip 60520 60521 13 3 Slip Spring 50725 14 3 #10-24 X ¼” Button Head Cap Screw 11334C 15 1 Lower Cone 59370 16 10 Shear Pin (4,000 Lb) 72864 17 1 Shear Pin Ring 59420 18 1 Shear Pin Cap 59380 19 1 Bottom 59360

Page 198: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Tubing Anchor/Catcher 4-1/2” X 2-3/8” DP Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: LKT-0167-TU - 2019 January

H O M E O F K L I N E T O O L S

5. ASSEMBLY DRAWING

DIMENSIONS A 3.12” B 2.38” C 3.50” D 5.00” E 10.81” F 4.12” G 28.80”

SHEAR PIN RATING

Per Pin (Lb) 3,980 Maximum Shear Rating (Lb) 39,800

Page 199: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Tubing Anchor/Catcher 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4001 - 2019 January

H O M E O F K L I N E T O O L S

The Kline Tubing Anchor/Catcher is a rugged tool that employs drag blocks (rather than drag springs) and fully enclosed large cross-section slips for maximum safety. It has a tension shear release that is easily adjustable in the field.

PART LIST KEY # QTY PART # NAME KEY# QTY PART # NAME 1 1 58740 Mandrel 10 3 60270 Slip 3 1 58780 Drag Block Retainer 11 3 51795 Slip Spring 4 3 50353 Drag Block (Carbide) 12 3 11334C Slip Spring Screw 5 9 50120 Drag Block Spring (Leaf) 13 1 58800 Lower Cone 6 1 58770-K Control Body 14 10 72861 Shear Pin 7 1 11235C Thread Stop Screw 15 1 58820 Shear Pin Ring 8 3 11156N Torque Screw (Plug) 16 1 58810 Shear Pin Cover 9 1 58790 Upper Cone 17 1 58750 Bottom

Page 200: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Tubing Anchor/Catcher 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4001 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONS

A C D E F G 2.25” 2.25” 3.94” 8.12” 3.38” 24.40”

SPECIFICATIONS

CASING WEIGHT MAX OD MIN OD CONNECTIONS 2-7/8” 6.4 – 6.5# 2.25” 1.00” 1.900” NU10RD

1. OPERATING INSTRUCTIONS

1.1. Run to setting depth and rotate several turns to the left to set the slips. Pick up and sit down several

times while turning to the left to insure a tight set. 1.2. To release, rotate to the right with tubing in neutral. The slips will retract to the run-in position and the

tubing string can be pulled from the well, or the anchor relocated. 1.3. If the anchor is stuck, pick up and sit down several times while turning to the right to free up parts.

Should this still fail to free anchor, pull tension to break shear pins. This will unload the lower cone and pick up slips from above.

1.4. The anchor can now be pulled from the well but cannot be set again until redressed.

2. DISASSEMBLY

2.1. With top of mandrel in vise, unscrew bottom and slide off lower cone/bottom assembly. 2.2. Remove thread stop screw and unscrew upper cone from mandrel by rotating control body. 2.3. Slide assembly off mandrel (slips will now come free). 2.4. Remove torque screws and slide upper cone out of control body. 2.5. Unscrew lower cone from shear pin cover and remove shear pins to disassemble lower cone/bottom

assembly. 2.6. Unscrew drag block retainer from control body to disassemble drag blocks and springs.

3. ASSEMBLY

3.1. Assembly procedures are essentially the reverse of disassembly. Care should be taken during assembly to

insure all threads are greased adequately. Be sure to install thread stop screw through long slot in control body, but only after sliding upper cone into control body and screwing assembly, with slips installed, onto mandrel all the way to stop.

3.2. Before tightening, be sure to support the bottom with a vise stand, or similar. Do not wrench drag block retainer tight with upper cone against stop screw.

Page 201: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Tubing Anchor/Catcher 2-7/8” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4001 - 2019 January

H O M E O F K L I N E T O O L S

4. SHEAR PIN ADJUSTMENT

4.1. The tubing anchor is shipped with 10 ea. 1/4" dia. shear pins, each adding 1770 lbs. of shear force required to activate the emergency release.

4.2. To adjust the number of pins, unscrew the shear pin cover from lower cone and slide down, exposing the pins.

4.3. Remove pins as required and re-assemble.

Page 202: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Big Bore Tubing Anchor/Catcher 3-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4001 - 2019 January

H O M E O F K L I N E T O O L S

The Kline Tubing Anchor/Catcher is a rugged anchor that employs drag blocks (rather than drag springs) and fully enclosed large cross-section slips for maximum safety. It has a tension shear release that is easily adjustable in the field.

PART LIST KEY # QTY PART # NAME KEY# QTY PART # NAME

1 1 72580 TOP 10 1 72640 UPPER CONE 2 1 72560 MANDREL 11 3 44420 SLIP 3 1 72620 CONTROL BODY CAP 12 3 51790 SLIP SPRING 4 1 72610 DRAG BLOCK RETAINER 13 3 11334C SLIP SPRING SCREW 5 4 50353 DRAG BLOCK (CARBIDE) 14 1 44400 LOWER CONE 6 12 50120 DRAG BLOCK SPRING (LEAF) 15 9 72863 SHEAR PIN 7 1 72600-K CONTROL BODY 16 1 44390 SHEAR PIN RING 7a 1 72590 DRAG BLOCK SLEEVE 17 1 44410 SHEAR PIN COVER 7b 2 11334F CAP SCREW 18 1 72630 BOTTOM 8 1 11334C THREAD STOP SCREW 9 3 11156N TORQUE SCREW (PLUG)

Page 203: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Big Bore Tubing Anchor/Catcher 3-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4001 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONS

A B C D E F G 2.50” 1.95” 2.81” 4.68” 7.81” 3.50” 26.44”

SPECIFICATIONS

CASING WEIGHT MAX OD MIN OD CONNECTIONS 3-1/2” 7.7-9.3# 2.81” 1.62” 1.900” EU10RD

1. OPERATING INSTRUCTIONS

1.1. Run to setting depth and rotate several turns to the left to set the slips. Pick up and sit down several times

while turning to the left to insure a tight set. 1.2. To release, rotate to the right with tubing in neutral. The slips will retract to the run-in position and the tubing

string can be pulled from the well, or the anchor relocated. 1.3. If the anchor is stuck, pick up and sit down several times while turning to the right to free up parts. Should this

still fail to free anchor, pull tension to break shear pins. This will unload the lower cone and pick up slips from above.

1.4. The anchor can now be pulled from the well but cannot be set again until redressed.

2. DISASSEMBLY INSTRUCTIONS 2.1. With top in vise, unscrew bottom (it may be necessary to back up on mandrel) and slide off lower cone/bottom

assembly. Remove cap screw, control body cap, and drag block retainer from control body, allowing drag blocks and springs to also be removed. Remove thread stop screw and unscrew upper cone from mandrel by rotating control body. Slide assembly off mandrel (slips will now come free). Remove torque screws and slide upper cone out of control body. Unscrew lower cone from shear pin cover and remove shear pins to disassemble lower cone/bottom assembly. Unscrew drag block retainer from control body to disassemble drag blocks and springs. It is not necessary to remove top from mandrel.

3. ASSEMBLY INSTRUCTIONS

3.1. Assembly procedures are essentially the reverse of disassembly. Care should be taken during assembly to

insure all threads are greased adequately. Be sure to install thread stop screw through long slot in control body, but only after sliding upper cone into control body and screwing assembly, with slips installed, onto mandrel all the way to stop. Drag blocks must be installed after this point, first sliding drag block sleeve into control body and retaining it with cap screw. Before tightening, be sure to support the bottom with a vise stand, or similar. Do not wrench control body cap tight with upper cone against stop screw.

4. SHEAR PIN ADJUSTMENT

4.1. The tubing anchor is shipped with 9 ea. 5/16" dia. shear pins, each adding 2760 lbs. of shear force required to

activate the emergency release. To adjust the number of pins, unscrew the shear pin cover from lower cone and slide down, exposing the pins. Remove pins as required and re-assemble.

Page 204: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Big Bore Tubing Anchor/Catcher 4” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4003 - 2019 January

H O M E O F K L I N E T O O L S

The Kline Tubing Anchor/Catcher is a rugged anchor that employs drag blocks (rather than drag springs) and fully enclosed large cross-section slips for maximum safety. It has a tension shear release that is easily adjustable in the field.

PARTS LIST KEY # QTY PART # NAME KEY# QTY PART # NAME 1 1 1E2E1 TOP 10 1 72670 UPPER CONE 2 1 72690 MANDREL 11 3 60520 (40TAC) SLIP 3 1 72760 CONTROL BODY CAP 12 3 50725 SLIP SPRING 4 1 72740 DRAG BLOCK RETAINER 13 3 11334C SLIP SPRING SCREW 5 4 50353(11-11.6#)/50363(9.5#) DRAG BLOCK (CARBIDE) 14 1 72700 LOWER CONE 6 12 50120 DRAG BLOCK SPRING (LEAF) 15 12 72862 SHEAR PIN 7 1 72750-K CONTROL BODY 16 1 72730 SHEAR PIN RING 8 1 11234C THREAD STOP SCREW 17 1 72710 SHEAR PIN COVER 9 3 11156N 1/8” X 0.312” LG PIPE PLUG 18 1 72680 BOTTOM

Page 205: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Big Bore Tubing Anchor/Catcher 4” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4003 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONS

A B C D E F G 3.06” 2.45” 3.25” 5.00” 8.44” 4.12” 26.00”

SPECIFICATIONS

CASING WEIGHT MAX OD MIN OD CONNECTIONS 4” 9.5-11.6# 3.28” 1.94” 2-3/8” EU8RD

1. OPERATING INSTRUCTIONS

1.1. Run to setting depth and rotate several turns to the left to set the slips. Pick up and sit down several times

while turning to the left to insure a tight set. 1.2. To release, rotate to the right with tubing in neutral. The slips will retract to the run-in position and the tubing

string can be pulled from the well, or the anchor relocated. 1.3. If the anchor is stuck, pick up and sit down several times while turning to the right to free up parts. Should this

still fail to free anchor, pull tension to break shear pins. This will unload the lower cone and pick up slips from above.

1.4. The anchor can now be pulled from the well but cannot be set again until redressed.

2. DISASSEMBLY INSTRUCTIONS 2.1. With top in vise, unscrew bottom (it may be necessary to back up on mandrel) and slide off lower cone/bottom

assembly. Remove thread stop screw and unscrew upper cone from mandrel by rotating control body. 2.2. Slide assembly off mandrel (slips will now come free). 2.3. Remove torque screws and slide upper cone out of control body. 2.4. Unscrew lower cone from shear pin cover and remove shear pins to disassemble lower cone/bottom assembly. 2.5. Unscrew drag block retainer from control body to disassemble drag blocks and springs. It is not necessary to

remove top from mandrel.

3. ASSEMBLY INSTRUCTIONS 3.1. Assembly procedures are essentially the reverse of disassembly. Care should be taken during assembly to

insure all threads are greased adequately. 3.2. Be sure to install thread stop screw through long slot in control body, but only after sliding upper cone into

control body and screwing assembly, with slips installed, onto mandrel all the way to stop. 3.3. Before tightening, be sure to support the bottom with a vise stand, or similar. 3.4. Do not wrench control body nut tight with upper cone against stop screw.

Page 206: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Big Bore Tubing Anchor/Catcher 4” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4003 - 2019 January

H O M E O F K L I N E T O O L S

4. SHEAR PIN ADJUSTMENT

4.1. The tubing anchor is shipped with 12ea. 5/16" dia. shear pins, each adding 2760 lbs. of shear force required to

activate the emergency release. 4.2. To adjust the number of pins, unscrew the shear pin cover from lower cone and slide down, exposing the pins. 4.3. Remove pins as required and re-assemble.

Page 207: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Big Bore Tubing Anchor/Catcher 4-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4004 - 2019 January

H O M E O F K L I N E T O O L S

PART LIST KEY # QTY PART # NAME KEY# QTY PART # NAME

1 1 90350 TOP 10 1 90320 UPPER CONE 2 1 90270 MANDREL 11 3 60520 SLIP 3 1 90300 CONTROL BODY CAP 12 3 50725 SLIP SPRING 5 3 50440 DRAG BLOCK (CARBIDE) 13 3 11334C SLIP SPRING SCREW 6 12 50100 DRAG BLOCK SPRING (LEAF) 14 1 90260 LOWER CONE 7 1 90292-K CONTROL BODY 15 12 72864 SHEAR PIN 7a 1 90280 DRAG BLOCK SLEEVE 16 1 90340 SHEAR PIN RING 7b 1 11356C CAP SCREW 17 1 90330 SHEAR PIN CAP 8 1 11235C THREAD STOP SCREW 18 1 90310 BOTTOM 9 3 11156N TORQUE SCREW (PLUG)

Page 208: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Big Bore Tubing Anchor/Catcher 4-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4004 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONS

A B C D E F G 3.69” 2.75” 3.84” 5.50” 10.81” 4.12” 29.50”

SPECIFICATIONS

CASING WEIGHT MAX OD MIN OD CONNECTIONS 4-1/2” 9.5-11.6# 3.84” 2.38” 2-7/8” EU8RD

1. OPERATING INSTRUCTIONS

1.1. Run to setting depth and rotate several turns to the left to set the slips. 1.2. Pick up and sit down several times while turning to the left to insure a tight set. 1.3. To release, rotate to the right with tubing in neutral. The slips will retract to the run-in position and the

tubing string can be pulled from the well, or the anchor relocated. 1.4. If the anchor is stuck, pick up and sit down several times while turning to the right to free up parts.

Should this still fail to free anchor, pull tension to break shear pins. This will unload the lower cone and pick up slips from above.

1.5. The anchor can now be pulled from the well but cannot be set again until redressed.

2. DISASSEMBLY INSTRUCTIONS

2.1. With top in vise, unscrew bottom (it may be necessary to back up on mandrel) and slide off lower cone/bottom assembly.

2.2. Remove cap screw and control body cap from control body, allowing drag blocks and springs to also be removed.

2.3. Remove thread stop screw and unscrew upper cone from mandrel by rotating control body (drag block sleeve will remain on mandrel).

2.4. Slide assembly off mandrel (slips will now come free). 2.5. Remove torque screws and slide upper cone out of control body. 2.6. Unscrew lower cone from shear pin cap and remove shear pins to disassemble lower cone/bottom

assembly. 2.7. Unscrew top sub from mandrel and slide off drag block sleeve.

3. ASSEMBLY INSTRUCTIONS

3.1. Assembly procedures are essentially the reverse of disassembly. Care should be taken during assembly to

insure all threads are greased adequately. 3.2. Be sure to install thread stop screw through long slot in control body, but only after sliding upper cone

into control body and screwing assembly, with slips installed, onto mandrel all the way to stop. 3.3. Drag blocks must be installed after this point, first sliding drag block sleeve into control body and

retaining it with cap screw. 3.4. Before tightening, be sure to support the bottom with a vise stand, or similar. Do not wrench control

body nut tight with upper cone against stop screw.

Page 209: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Big Bore Tubing Anchor/Catcher 4-1/2” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4004 - 2019 January

H O M E O F K L I N E T O O L S

4. SHEAR PIN ADJUSTMENT

4.1. The tubing anchor is shipped with 12ea. 3/8" dia. shear pins, each adding 4000 lbs. of shear force required

to activate the emergency release. 4.2. To adjust the number of pins, unscrew the shear pin cap from lower cone and slide down, exposing the

pins. 4.3. Remove pins as required and re-assemble.

Page 210: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Big Bore Tubing Anchor/Catcher 5” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4006 - 2019 January

H O M E O F K L I N E T O O L S

The Kline Tubing Anchor/Catcher is a rugged anchor that employs drag blocks (rather than drag springs) and fully enclosed large cross-section slips for maximum safety. It has a tension shear release that is easily adjustable in the field.

PART LIST KEY # QTY PART # NAME KEY# QTY PART # NAME

1 1 90350 TOP 9 3 11156N TORQUE SCREW (PLUG) 2 1 90270 MANDREL 10 1 90320 UPPER CONE 3 1 90301 CONTROL BODY CAP 11 3 50TAC SLIP 5 3 50560(11.5-15#) DRAG BLOCK (CARBIDE) 12 3 50725 SLIP SPRING 5 3 50550(15-18#) DRAG BLOCK (CARBIDE) 13 3 11334C SLIP SPRING SCREW 6 12 50100 DRAG BLOCK SPRING (LEAF) 14 1 90260 LOWER CONE 7 1 90292-K CONTROL BODY 15 12 72864 SHEAR PIN 7a 1 90280 DRAG BLOCK SLEEVE 16 1 90340 SHEAR PIN RING 7b 1 11356C CAP SCREW 17 1 90331 SHEAR PIN CAP 8 1 11235C THREAD STOP SCREW 18 1 90310 BOTTOM

Page 211: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Big Bore Tubing Anchor/Catcher 5” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4006 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONS

A B C D E F G 3.69” 4.12” 3.84” 5.50” 10.81” 4.12” 29.50”

SPECIFICATIONS

CASING WEIGHT MAX OD MIN OD CONNECTIONS 5” 11.5-18# 4.12” 2.38” 2-7/8” EU8RD

1. OPERATING INSTRUCTIONS

1.1. Run to setting depth and rotate several turns to the left to set the slips. Pick up and sit down several

times while turning to the left to insure a tight set. 1.2. To release, rotate to the right with tubing in neutral. The slips will retract to the run-in position and the

tubing string can be pulled from the well, or the anchor relocated. 1.3. If the anchor is stuck, pick up and sit down several times while turning to the right to free up parts.

Should this still fail to free anchor, pull tension to break shear pins. This will unload the lower cone and pick up slips from above.

1.4. The anchor can now be pulled from the well but cannot be set again until redressed.

2. DISASSEMBLY INSTRUCTIONS

2.1. With top in vise, unscrew bottom (it may be necessary to back up on mandrel) and slide off lower cone/bottom assembly.

2.2. Remove cap screw and control body cap from control body, allowing drag blocks and springs to also be removed.

2.3. Remove thread stop screw and unscrew upper cone from mandrel by rotating control body (drag block sleeve will remain on mandrel).

2.4. Slide assembly off mandrel (slips will now come free). 2.5. Remove torque screws and slide upper cone out of control body. 2.6. Unscrew lower cone from shear pin cap and remove shear pins to disassemble lower cone/bottom

assembly. 2.7. Unscrew top sub from mandrel and slide off drag block sleeve.

3. ASSEMBLY INSTRUCTIONS

3.1. Assembly procedures are essentially the reverse of disassembly. Care should be taken during assembly to insure all threads are greased adequately.

3.2. Be sure to install thread stop screw through long slot in control body, but only after sliding upper cone into control body and screwing assembly, with slips installed, onto mandrel all the way to stop.

3.3. Drag blocks must be installed after this point, first sliding drag block sleeve into control body and retaining it with cap screw.

3.4. Before tightening, be sure to support the bottom with a vise stand, or similar. 3.5. Do not wrench control body cap tight with upper cone against stop screw.

Page 212: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Big Bore Tubing Anchor/Catcher 5” Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4006 - 2019 January

H O M E O F K L I N E T O O L S

4. SHEAR PIN ADJUSTMENT

4.1. The tubing anchor is shipped with 12ea. 3/8" dia. shear pins, each adding 4000 lbs. of shear force required

to activate the emergency release. 4.2. To adjust the number of pins, unscrew the shear pin cap from lower cone and slide down, exposing the

pins. 4.3. Remove pins as required and re-assemble.

Page 213: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Dual String Anchor Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4020 - 2019 January

H O M E O F K L I N E T O O L S

CASING SIZE CASING WEIGHT ANCHOR O.D. SHORT STRING

LATCH THREAD LONG STRING CONNECTION

MAX. PULL ON SHORT STRING

4-1/2" 9.5-11.6# 3.812" 1.900" NU10Rd 1.315" NU10Rd 26,000 lb. 5-1/2" 13-23# 4.500" 1.900" EU10Rd 1.900" EU 10Rd 26,000 lb.

7" 17-29# 5.970" 2-3/8" EU8Rd 2-3/8" EU8Rd 44,000 Lb. 7" 17-29# 5.990" 1.900" EU10Rd 2-7/8" EU8Rd 26,000 lb.

Other connections and larger sizes available

Page 214: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Dual String Anchor Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4021 - 2019 January

H O M E O F K L I N E T O O L S

DESCRIPTION Kline’s dual string anchor provides a means of anchoring the second, or short, tubing string in a dual completion. It consists of two parts: an anchor body with long string connection threads on one side, top and bottom, and a short string receptacle with J-lugs on the opposite side. A short string latch with J-slots on the bottom and short string connection threads on the top. OPERATION The anchor is run above a production packer. After the packer is set, the anchor is contacted, the latch will automatically locate and latch in the hole with J-lugs. The short string can then be landed in tension, compression, or neutral, as appropriate. To release the short string, set weight, then raise the string while rotating to the right.

Page 215: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

Dual String Anchor Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4021 - 2019 January

H O M E O F K L I N E T O O L S

PART NUMBERS SIZE ANCHOR BODY SHORT STRING LATCH

5-1/2" DSA55X1.9X1.9 DSA55X1.9X1.9LATCH 7" DSA7X2X2 DSA7X2X2LATCH

DIMENSIONS

SIZE A B

5-1/2" 8.12" 6.75"

7" 9.88" 8.75"

MAXIMUM TENSION ON SHORT STRING SIZE CASING WEIGHT

5-1/2" 26,000 LB. 7" 44,000 LB.

Page 216: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

1.900” Downhole Swivel Joint Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU3002 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONAL SPECIFICATIONS TUBING MINIMUM CASING SIZE MAXIMUM OD MINIMUM ID CONNECTIONS 1.900” 4.000” 3.250” 1.500” 1.900” EU10RD

The Downhole Swivel Joint allows rotation of the tubing string even when the section below is stuck. Thrust bearings are incorporated in the joint to reduce friction when the tubing is in tension or compression during rotation. This Swivel Joint is often used below a Kline Tubing Anchor/Catcher when the tailpipe will be in mud, to facilitate the rotation required to set the anchor.

PART NUMBERS KEY # QTY PART # NAME KEY

# QTY PART # NAME

1 1 27290 TOP 5 1 27310 CAP 2 1 27320 UPPER THRUST BEARING 6 2 11144C SET SCREW 3 1 17332 O-RING 7 1 17330 O-RING 4 1 27321 LOWER THRUST BEARING 8 1 27300 BOTTOM

DIMENSIONS

A B C 2.62" 2.00" 9.44"

TECHNICAL SPECIFICATIONS

PRESSURE RATING 9000 PSI MINIMUM TENSILE STRENGTH 49,000 LB.

Page 217: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

2-3/8” Downhole Swivel Joint Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU3003 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONAL SPECIFICATIONS TUBING MINIMUM CASING SIZE MAXIMUM OD MINIMUM ID CONNECTIONS 2-3/8" 4-1/2" 3.750" 2.00" 2-3/8" EU8RD

The Downhole Swivel Joint allows rotation of the tubing string even when the section below is stuck. Thrust bearings are incorporated in the joint to reduce friction when the tubing is in tension or compression during rotation. This Swivel Joint is often used below a Kline Tubing Anchor/Catcher when the tailpipe will be in mud, to facilitate the rotation required to set the anchor.

PART NUMBERS KEY # QTY PART # NAME KEY

# QTY PART # NAME

1 1 67260 TOP 5 1 67270 CAP 2 1 67250 UPPER THRUST BEARING 6 2 11144C SET SCREW 3 1 19336 O-RING 7 1 19334 O-RING 4 1 67251 LOWER THRUST BEARING 8 1 67280 BOTTOM

DIMENSIONS

A B C 3.12" 2.38" 12.00"

TECHNICAL SPECIFICATIONS

PRESSURE RATING 7500 PSI MINIMUM TENSILE STRENGTH 71.000 LB.

Page 218: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

2-7/8” Downhole Swivel Joint Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU3004 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONAL SPECIFICATIONS TUBING MINIMUM CASING SIZE MAXIMUM OD MINIMUM ID CONNECTIONS 2-7/8” 5.500” 4.500” 2.500” 2-7/8” EU8RD

The Downhole Swivel Joint allows rotation of the tubing string even when the section below is stuck. Thrust bearings are incorporated in the joint to reduce friction when the tubing is in tension or compression during rotation. This Swivel Joint is often used below a Kline Tubing Anchor/Catcher when the tailpipe will be in mud, to facilitate the rotation required to set the anchor.

PART NUMBERS KEY # QTY PART # NAME KEY # QTY PART # NAME

1 1 67210 TOP 6 1 67201 LOWER THRUST BEARING 2 1 19343 O-RING 7 1 67240 LOWER CAP 3 1 67230 UPPER CAP 8 2 11144C SET SCREW 4 1 67200 UPPER THRUST BEARING 9 1 19338 O-RING 5 1 19342 O-RING 10 1 67220 BOTTOM

DIMENSIONS

A B C 3.69" 1.88" 12.31"

TECHNICAL SPECIFICATIONS

PRESSURE RATING 6000 PSI MAXIMUM TENSILE STRENGTH 99,000 LB.

Page 219: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

2-3/8" Downhole Shutoff Valve Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4009 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONAL SPECIFICATIONS CASING SIZE MAXIMUM O.D. MINIMUM I.D. CONNECTIONS 4-1/2" & UP 3.844" 1.800" 2-3/8" EU8RD

DESCRIPTION This Downhole Shutoff Valve will hold pressure in the tubing string from above or from below the valve. It is operated by tubing rotation and is closed or opened with ¼ turn of the tubing at the tool. While its bore is not full opening, it is enough for most uses, and is smooth, to avoid turbulence. All parts are made from corrosion resistant alloys, and the ball is made of Inconel, making it impervious to caustic fluids. However, application of valve in a frac string or exposure to sand may cause erosion and damage to ball and seals. The valve is compatible with the Kline KS1XW and most other lock-setting packers that allow the tubing to be left in tension, compression, or in neutral. The seal system incorporates elastomers for lower pressures and metal to metal for high pressure. This valve is suitable for both H2S and CO2 service and is rated to 3000F.

Page 220: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

2-3/8" Downhole Shutoff Valve Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4009 - 2019 January

H O M E O F K L I N E T O O L S

PART NUMBERS

KEY # QTY PART NUMBER PART NAME KEY # QTY PART

NUMBER PART NAME 1 1 72020 TOP 9 1 72000 BALL 2 6 MAX 11255-01 WAVE SPRING 10 2 71993 BALL PIN 3 4 MAX 71990 INNER SPACER 11 4 11144C SET SCREW 4 2 19226 O-RING 12 1 19232 O-RING 5 2 72060 SEAL BODY 13 2 71992 TORQUE PIN 6 2 609-23-522 SEAL 14 2 71991 OUTER SPACER 7 2 72070 SEAL RETAINER 15 1 72030 CAP 8 1 72040 ROTATION KEY 16 1 72010 BOTTOM

8A 1 72045 BLANK KEY (NOT SHOWN)

DIMENSIONS (IN.) A B C D

3.50 3.84 3.88 19.63

TECHNICAL SPECIFICATIONS

MAXIMUM WORKING PRESSURE

MAXIMUM DIFFERENTIAL PRESSURE WHEN OPENING

MAXIMUM TENSION LOAD

MAXIMUM TENSION OR COMPRESSION WHEN OPENING OR

CLOSING

6,000 PSI 3,000 PSI 105,000 LB 10,000 LB ASSEMBLY PROCEDURES Note: Use plenty of grease during assembly of this valve.

1. Install the 3 O-rings (4 & 12) onto seal bodies (5) and the bottom (16). Slide seal retainers (7) over seals (6) and press seals over serrations on seal bodies to stop.

2. Install wave springs (2), inner spacers (3) and seal bodies into top (1) and bottom. Use 3 wave springs and 2 inner spacers on each end, alternating springs and spacers.

Note: If the valve cannot be assembled properly, or if, after assembling, the valve leaks when it’s closed, and water is poured into one end, the number of wave springs and inner spacers may be adjusted as necessary, until both stations are rectified.

3. Install 2 outer spacers (14) and clamp bottom in vise. Install rotation key (8) & blank key (8a) onto ball (9), then slide ball into top end of bottom and install ball pins (10).

4. Rotate ball until the rotation key is pointing straight out from the bottom (half open position). 5. Slide top over ball and bottom, then push inward, compressing wave springs, until the torque pins (13) can be

installed.

Page 221: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

2-3/8" Downhole Shutoff Valve Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4009 - 2019 January

H O M E O F K L I N E T O O L S

6. With top in vise, slide cap (15) over bottom and screw to top hand tight. Open and close the valve several times to insure proper operation. Insure valve closes with desired rotation and make any adjustments to number of wave springs and inner spacers considered necessary.

7. Install the 4 set screws (11). DISASSEMBLY PROCEDURES

1. Place top (1) in vise. Remove the 4 set screws (11) and unscrew the cap (15). 2. Remove the torque pins (13) and slide bottom (16) out of top. 3. Remove ball pins (10) and slide ball (9) out of bottom. 4. Slide seal bodies (5) out of top and bottom, then remove wave springs (2) and inner spacers (3).

Page 222: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

2-7/8" Downhole Shutoff Valve Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4010 - 2019 January

H O M E O F K L I N E T O O L S

DIMENSIONAL SPECIFICATIONS CASING SIZE MAXIMUM O.D. MINIMUM I.D. CONNECTIONS 5-1/2" & UP 4.500 2.360 2-3/8" EU8RD

DESCRIPTION This Downhole Shutoff Valve will hold pressure in the tubing string from above or from below the valve. It is operated by tubing rotation and is closed or opened with 1/2 turn of the tubing at the tool. While its bore is not full opening, it is enough for most uses, and is smooth, to avoid turbulence. All parts are made from corrosion resistant alloys, and the ball is made of Inconel, making it impervious to caustic fluids. However, application of valve in a frac string or exposure to sand may cause erosion and damage to ball and seals. The valve is compatible with the Kline KS1XW and most other lock-setting packers that allow the tubing to be left in tension, compression, or in neutral. With the shutoff valve closed, the packer and valve are converted into a temporary bridge plug. The seal system incorporates elastomers for lower pressures and metal to metal for high pressure. This valve is suitable for both H2S and C02 service and is rated to 3000F.

Page 223: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

2-7/8" Downhole Shutoff Valve Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4010 - 2019 January

H O M E O F K L I N E T O O L S

PART NUMBERS

KEY # QTY PART NUMBER PART NAME KEY # QTY PART NUMBER PART NAME 1 1 72100 TOP 8 2 71993 BALL PIN 2 6 MAX 11255-02 WAVE SPRING 9 4 11144C SET SCREW 3 4 MAX 72080 INNER SPACER 10 1 19236 O-RING 4 2 19231 O-RING 11 2 71992 TORQUE PIN 5 2 601-28-523 SEAL BODY 12 2 72081 OUTER SPACER 6 1 72040 ROTATION KEY 13 1 72120 CAP

6A 1 72045 BLANK KEY (NOT SHOWN) 14 1 72135 BOTTOM 7 1 72110 BALL

DIMENSIONS (IN.)

A B C D 4.00 4.50 3.88 19.31

TECHNICAL SPECIFICATIONS

MAXIMUM WORKING PRESSURE

MAXIMUM DIFFERENTIAL PRESSURE WHEN OPENING

MAXIMUM TENSION LOAD

MAXIMUM TENSION OR COMPRESSION WHEN OPENING OR

CLOSING

6,000 PSI 3,000 PSI 105,000 LB 10,000 LB ASSEMBLY PROCEDURES Note: Use plenty of grease during assembly of this valve.

1. Install the 3 O-rings (4 & 10) onto seal bodies (5) and the bottom (14). 2. Install wave springs (2), inner spacers (3) and seal bodies into top (1) and bottom. Use 3 wave springs and 2 inner

spacers on each end, alternating springs and spacers. Note: If the valve cannot be assembled properly, or if, after assembling, the valve leaks when it’s closed, and water is poured into one end, the number of wave springs and inner spacers may be adjusted as necessary, until both stations are rectified.

3. Install outer spacers (12) and clamp bottom in vise. Install rotation key (6) and blank key (6a) onto ball (7), then slide ball into top end of the bottom and install ball pins (8).

Note: Push ball into the bottom, compressing wave springs, to allow ball pins to be inserted into the holes in the keys. The positions of rotation key and blank key determine whether the ball closes with left hand rotation and opens with right hand (normal) or in the opposite directions (optional).

4. Rotate ball until the rotation key is pointing straight out from the bottom (half open position). 5. Slide top over ball and bottom, then push inward, compressing wave springs, until the torque pins (11) can be

installed.

Page 224: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

2-7/8" Downhole Shutoff Valve Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: TU4010 - 2019 January

H O M E O F K L I N E T O O L S

6. With top in vise, slide cap (13) over bottom and screw to top hand tight. Open and close the valve several times to insure proper operation. Insure valve closes with desired rotation and make any adjustments to number of wave springs and inner spacers considered necessary.

7. Install the 4 set screws (9).

DISASSEMBLY PROCEDURES

1. Place top (1) in vise. Remove the 4 set screws (9) and unscrew the cap (13). 2. Remove the torque pins (11) and slide bottom (14) out of top. 3. Remove ball pins (8) and slide ball (7) out of bottom. 4. Slide seal bodies (5) out of top and bottom, then remove wave springs (2) and inner spacers (3).

Note: Application of valve in a frac string or exposure to sand may cause erosion and damage to ball and seals.

Page 225: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KT-2 On/Off Tool – Version 1 Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: 604-00XX-TU – Revision H - 2019 January

H O M E O F K L I N E T O O L S

1. DESCRIPTION The Kline KT-2 On/Off Tool is designed to be run with the KS1-XW Packer to allow the removal of the tubing string without affecting the packer. The bonded seal in the on/off tool allows isolation at the packer.

GENERAL SPECIFICATIONS CASING TOOL

Size Weight OD ID Connections Part Number 4-1/2” 9.5-13.5 LB/FT 3.750”

2.00” 2-3/8” EUE 8RD Box Up 604-0020-0001 5-1/2” 14-23 LB/FT 4.438” 4-1/2” 9.5-13.5 LB/FT 3.750”

2.00” 2-3/8” EUE 8RD Box Up 604-0020-0004* 5-1/2” 14-23 LB/FT 4.438” 5-1/2” 14-23 LB/FT 4.500”

2.50” 2-7/8” EUE 8RD Box Up 604-0025-0001

7” 17-38 LB/FT 5.750” 7” 17-38 LB/FT 5.750” 604-0025-0002

*Nickel Coated

Features

• Rugged bonded seal allows multiple connections • Stingers available with or without profiles • May be shear pinned for secure running using shear screws (1168DC)

2. OPERATING INSTRUCTIONS NOTE: Ensure all connections are correctly tightened.

2.1 Run to desired setting depth. 2.2 Apply left hand rotation and pull up on tubing string to remove tubing string with KT-2

On/Off tool from hole while leaving packer in place.

3. ASSEMBLY INSTRUCTIONS NOTE: Care should be taken during assembly to insure all threads are greased adequately. CAUTION: Take care when handling stingers not to damage seal surface on upper end.

3.1 Insert top sub (1) into vise. 3.2 Install O-rings (7) into bonded seals (8). 3.3 Place bonded seals (8) into the bottom end of top sub. 3.4 Slide appropriate casing sleeve (3) or (4) over the top of the j-body assembly (2). 3.5 Install set screws (5) to retain j-body assembly (2) to the top sub (1).

4. DISASSEMBLY INSTRUCTIONS

Stinger Sold Separately

Page 226: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KT-2 On/Off Tool – Version 1 Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: 604-00XX-TU – Revision H - 2019 January

H O M E O F K L I N E T O O L S

4.1 Insert tool into vise at top sub (1). 4.2 Remove set screws (5) from assembly. 4.3 Remove j-body assembly (2) from the top sub (1). 4.4 Remove bonded seals (8) from top sub (1).

5. 604-0020-0001 PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER 1 1 TOP SUB 00201 2 1 J-BODY ASSEMBLY 00202-K 3 1 55 CASING SLEEVE 00356 4 1 45 CASING SLEEVE 00355 5 3 ¼” – 20 NC X ¼” SOCKET SET SCREW 11144C 6 2 232 O-RING 19149 7 2 BONDED SEAL 600-55-520

Page 227: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KT-2 On/Off Tool – Version 1 Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: 604-00XX-TU – Revision H - 2019 January

H O M E O F K L I N E T O O L S

6. 604-0020-0004 PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER 1 1 TOP SUB 00201N 2 1 J-BODY ASSEMBLY 00202-KN 3 1 55 CASING SLEEVE 00356N 4 1 45 CASING SLEEVE 00355N 5 3 ¼” – 20 NC X ¼” SOCKET SET SCREW 11144C 6 2 232 O-RING 19149 7 2 BONDED SEAL 600-55-520

Page 228: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KT-2 On/Off Tool – Version 1 Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: 604-00XX-TU – Revision H - 2019 January

H O M E O F K L I N E T O O L S

7. 604-0025-0001 PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER 1 1 TOP SUB 00155 2 1 J-BODY ASSEMBLY 00152-K 3 1 70 CASING SLEEVE 00358 4 1 55 CASING SLEEVE 00357 5 3 ¼” – 20 NC X 3/8” SOCKET SET SCREW 11146C 6 2 153 O-RING 19153 7 2 BONDED SEAL 600-70-520

Page 229: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KT-2 On/Off Tool – Version 1 Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: 604-00XX-TU – Revision H - 2019 January

H O M E O F K L I N E T O O L S

8. 604-0025-0002 PARTS LIST

ITEM QTY DESCRIPTION PART NUMBER 1 1 TOP SUB 00393 2 1 J-BODY ASSEMBLY 00152-K 3 1 70 CASING SLEEVE 00358 4 NA NA NA 5 3 ¼” – 20 NC X 3/8” SOCKET SET SCREW 11146C 6 2 153 O-RING 19153 7 2 BONDED SEAL 600-70-520

Page 230: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KT-2 On/Off Tool – Version 2 Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: 604-XXX-TU – Revision D - 2019 January

H O M E O F K L I N E T O O L S

1. DESCRIPTION

The Kline KT-2 On/Off Tool is designed to be run with the KS1-XW Packer to allow the removal of the tubing string without affecting the packer. The bonded seal in the on/off tool allows isolation at the packer.

GENERAL SPECIFICATIONS Casing Tool

Size Weight OD ID Connections Part Number

4-1/2” 9.5-13.5 LB/FT 3.750”

2.00” 2-3/8” EUE 8RD Box Up

604-4520-0001 604-4520-0003*

15.1 LB/FT 3.625” 604-4520-0004 5-1/2” 14-23 LB/FT 4.438” 604-5520-0001

5-1/2” 14-23 LB/FT 4.500”

2.50” 2-7/8” EUE 8RD Box Up

604-5525-0001* 23-26 LB/FT 4.400” 604-5525-0002

7” 17-32 LB/FT 5.875” 604-7025-0001 7” 17-32 LB/FT 5.875” 3.00” 3-1/2” EUEU 8RD Box Up 604-7035-0001

*NICKEL COATED Features

• Rugged bonded seal allows multiple connections • Stingers available with or without profiles • May be shear pinned for secure running using shear screws (1168DC) • The 4-1/2” KT-2 On/Off Tool has been internally tested to 80,000lbs and 3,000 ft-lbs to

establish minimum operating performance.

2. OPERATING INSTRUCTIONS NOTE: Ensure all connections are correctly tightened.

2.1 Run to desired setting depth. 2.2 Apply left hand rotation and pull up on tubing string to remove tubing string with KT-2

On/Off tool from hole while leaving packer in place.

3. ASSEMBLY INSTRUCTIONS NOTE: Care should be taken during assembly to insure all threads are greased adequately. CAUTION: Take care when handling stingers not to damage seal surface on upper end.

3.1 Insert top sub (1) into vise. 3.2 Install O-rings (4) into bonded seals (5). 3.3 Place bonded seals (5) into the bottom end of top sub with the bonded rubber end face

down. 3.4 Make up the j-body assembly (2) to the top sub.

Stinger Sold Separately

Page 231: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KT-2 On/Off Tool – Version 2 Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: 604-XXX-TU – Revision D - 2019 January

H O M E O F K L I N E T O O L S

3.5 Install set screws (3) to retain j-body assembly (2) to the top sub (1). 4. DISASSEMBLY INSTRUCTIONS

4.1 Insert tool into vise at top sub (1). 4.2 Remove set screws (3) from assembly. 4.3 Remove j-body assembly (2) from the top sub (1). 4.4 Remove bonded seals (5) from top sub (1).

5. ASSEMBLY DRAWING

6. BILL OF MATERIALS

(PN 604-4520-0001) 4-1/2” X 2-3/8” KT-2 ON/OFF TOOL, 9.5-13.5# ITEM NO DESCRIPTION PART NUMBER

1 TOP SUB 00201 2 J-BODY ASSEMBLY 00722-K 3 ¼” UNC X ¼” SOCKET SET SCREW 11144C 4 O-RING 19149 5 ON OFF SEAL 600-55-520

Page 232: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KT-2 On/Off Tool – Version 2 Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: 604-XXX-TU – Revision D - 2019 January

H O M E O F K L I N E T O O L S

(PN 604-4520-0003) 4-1/2” X 2-3/8” KT-2 ON/OFF TOOL, 9.5-13.5#, NICKEL COATED

ITEM NO DESCRIPTION PART NUMBER 1 TOP SUB 00201N 2 J-BODY ASSEMBLY 00722-KN 3 ¼” UNC X ¼” SOCKET SET SCREW 11144C 4 O-RING 19149 5 ON OFF SEAL 600-55-520

(PN 604-4520-0004) 4-1/2” X 2-3/8” KT-2 ON/OFF TOOL, 15.1#

ITEM NO DESCRIPTION PART NUMBER 1 TOP SUB 00867 2 J-BODY ASSEMBLY 00821-K 3 ¼” UNC X ¼” SOCKET SET SCREW 11144C 4 O-RING 19149 5 ON OFF SEAL 600-55-520

(PN 604-5520-0001) 5-1/2” X 2-3/8” KT-2 ON/OFF TOOL, 14-23#

ITEM NO DESCRIPTION PART NUMBER 1 TOP SUB 00201 2 J-BODY ASSEMBLY 00723-K 3 ¼” UNC X ¼” SOCKET SET SCREW 11144C 4 O-RING 19149 5 ON OFF SEAL 600-55-520

(PN 604-5525-0001) 5-1/2” X 2-7/8” KT-2 ON/OFF TOOL, 14-23#, NICKEL COATED

ITEM NO DESCRIPTION PART NUMBER 1 TOP SUB 00155N 2 J-BODY ASSEMBLY 00720-K 3 ¼” UNC X 3/8” SOCKET SET SCREW 11146C 4 O-RING 19153 5 ON OFF SEAL 600-70-520

(PN 604-5525-0002) 5-1/2” X 2-7/8” KT-2 ON/OFF TOOL, 23-26#

ITEM NO DESCRIPTION PART NUMBER 1 TOP SUB 00809 2 J-BODY ASSEMBLY 00810-K 3 ¼” UNC X 3/8” SOCKET SET SCREW 11146C 4 O-RING 19153 5 ON OFF SEAL 600-70-520

Page 233: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

Technical Data Sheet Product Line

KT-2 On/Off Tool – Version 2 Upper Completions

For more information Visit www.rubicon-oilfield.com or contact your local sales office Domestic and international patents and trademarks granted and/or applied for where applicable Kline Oilfield Equipment │Tulsa │Oklahoma │ +1 918 445 0588 Reference: 604-XXX-TU – Revision D - 2019 January

H O M E O F K L I N E T O O L S

(PN 604-7025-0002) 7” X 2-7/8” KT-2 ON/OFF TOOL, 17-32#

ITEM NO DESCRIPTION PART NUMBER 1 TOP SUB 00155 2 J-BODY ASSEMBLY 00721-K 3 ¼” UNC X 3/8” SOCKET SET SCREW 11146C 4 O-RING 19153 5 ON OFF SEAL 600-70-520

Page 234: KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions · 2019-04-07 · Technical Data Sheet Product Line KS1-XW Packer (7k) 4-1/2” X 2-3/8” Upper Completions For more information

HOME OF KLINE TOOLSwww.rubicon-oilfield.com/product/upper-completions/