  • 8/10/2019 KPC_Productivity Improvement 2014

    1/37

    Integrated Improvement Initiatives and

    Strategic decisions during the challenging

    situation of low coal prices

    Presented by : Gede Ngurah Ambara*Mgr Business Performance ImprovementKPC

    Novotel Hotel Balikpapan, Indonesia

    2-3 September 2014

    *e-mail : [email protected] : +62 (549) 52 1501

    Kalimantan Coal Market

    Overview of PT Kaltim Prima Coal Operation Challenging time : main driving factors for changes Stretching work-load (production) to reduce cost Improving Overall Effectiveness of Equipment Improve operators and mechanic discipline Sustainability of improvement initiatives Future Challenge of continuous improvement

    The Outline Summary

    mailto:[email protected]:[email protected]
  • 8/10/2019 KPC_Productivity Improvement 2014

    2/37

    PT KaltimPrimaCoalVision

    Indonesias leading coal producer for global needs

    delivering optimum values to all stakeholders

    Missions

    Fostering a culture that considers health, safety

    and environment in everything we do, maintaining

    good corporate governance and promoting good

    corporate citizenship, providing an environment

    for learning to achieve excellence and improvelivelihood, Optimizing value for all stakeholders,

    and carrying out best practice in management

    and operations to deliver consistent high quality

    product and performance

  • 8/10/2019 KPC_Productivity Improvement 2014

    3/37

    Location and Project Summary

  • 8/10/2019 KPC_Productivity Improvement 2014

    4/37

    Sangatta Coal Deposit

    Sangatta coal deposit occurrs in Balikpapan formation, withi

    Kutai Basin during Miocene age : located 20 km from the coast

    uncontaminated organic deposits with low ash and sulphur. The

    deposit was subjected by a geological intrusion called Pinang

    Dome. These pressures and temperature elevated the coal t

    higher rank than its age would normally suggest.

    Coal occurs in nine principal seams to the west of the Pinang Dome with thicknesses vary from

    0.5 to 15 meters, with most in the range 2.4 to 6.5 meters. Seam dips normally varies between

    3 and 20. The overburden consist of incompetent mudstones, siltstones and sandstones.

  • 8/10/2019 KPC_Productivity Improvement 2014

    5/37

    Exploration , Drilling & Geotechnical Monitoring

  • 8/10/2019 KPC_Productivity Improvement 2014

    6/37

    Soil Handling, Drill Blast, OB Removal & Coal Mining

  • 8/10/2019 KPC_Productivity Improvement 2014

    7/37

    KPC Fleets and Production

    Mobile-Heavy Equipment are 974 machines. KPC Daily production:

    Explosives usage : 487 tonnes AN , Fuel consumption : 1,200,000 litres ,

    Overburden removal : 1,450,000 bcm , Coal mined : 135,000 tonnes

    Trucks Units CapacityLiebherr T282 31 360 tonnes

    Hitachi EH 4500/5000 129 282 tonnes

    Caterpillar 789 94 185 tonnes

    Caterpillar 785 55 135 tonnes

    Komatsu HD785 52 100 tonnes

    Caterpillar 777 14 80 tonnes

    Shovels Units Capacity

    Liebherr R9800 3 45 m3

    Liebherr 996 18 32 to 33 m3

    Hitachi EX3600 11 23 to 24 m3

    Hitachi EX 3500 6 22 m3

    Hitachi EX 2500 4 15 16 m3

    Liebherr 984C 4 5 8 m3

  • 8/10/2019 KPC_Productivity Improvement 2014

    8/37

    CPP Stockpiles

    8 stock piles (Prima.Pinang & Melawan Brand)Total capacity > 300 kt

  • 8/10/2019 KPC_Productivity Improvement 2014

    9/37

    13 Km Dual OLC with speed 8.68 m/scapacity Max 9,000 tonnes per hour

    Overland Conveyor

  • 8/10/2019 KPC_Productivity Improvement 2014

    10/37

    Coal Transport & Loading Facilities (Sangatta)

    KPC has complete facilities to provide full coal mining and transportation solutions

    Coal Transportationto Loading Port

    13 km Overland Conveyor

    Average capacity : 4,200 tph Coal delivered in approximately

    25 minutes

    Port Stockpile

    Total Stockpile capacity of 2.5 Mt

    Stacker capacity of 4,200 tph

    Reclaim capacity of 7,500

    9,000 tph

    Ship Loading

    Private International Port

    2 km Jetty 17.2 m draft deep water berth at low tide

    Load vessels up to 220,000 dwt.

    Loading rate of 7,500 tph with one (1) legand up to 9,000 tph for 2 ship loading

  • 8/10/2019 KPC_Productivity Improvement 2014

    11/37

    111

    Port Stockpile

    7,500 tph for 1 Ship Loader

    9,000 tph for 2 Ship Loaders

    The facility can handle cape SizeShip (vessel) up to 200 kt with

    approx 20-25 hours

  • 8/10/2019 KPC_Productivity Improvement 2014

    12/37

    11

    Coal Trans-shipment Facilities

    Tanjung Bara Barge Loading

    New 1000 tph facility commissioned

    Barges loaded to vessel at Tanjung Baraanchorage

    1 km sailing distance from barge to vessel

    Lubuk Tutung Barge Loading

    2000 tph facility (1000 tph ROM crushing)

    Barges loaded to vessel at Lubuk Tutung

    anchorage or at FTS

    Floating Transfer Station (FTS)

    1000 tph floating loading facility

    Load up to Capesize vessels

    Stationed at Lubuk Tutung (Bengalon)

    1

  • 8/10/2019 KPC_Productivity Improvement 2014

    13/37

    1

    Challenging time : main driving factors for changes

    Recent Years and Current Situation

    KPC has been smoothly moved from 8 to 12 hours/shift roster toward end of year 2012. By doing this KPChas hindered the requirement to get additional man-power requirement of more than 800 operators.Meanwhile the expansion project continues, KPC and the other coal mined companies has been heavilyimpacted by continual decrease of coal price which due to prolonged economic crisis hit Europe, andslowing down of China and India economic which limits their coal import demand, and Excess coal supplyfrom North America. During one year by the end of year 2013, KPC Coal Average Selling Price has droppedmore than 12 USD.

    The uncertainty of when the coal price will back to normal continues even until nowdays, with main workforce of 5000 employees, and in total of 23,000 including contractors, KPC faced dilemmatic situation,rather than doing rationalization of employees, KPC has started to implement several strategic decisionssome of the main ones are :

    Substantially reduce the production by standing down 10 big diggers and more than hundreds of trucks. Started a new project of Improvement synergizing two main divisions : mining operation division (MOD)

    and Mining Support Division (MSD) to focus on increasing the overall effectiveness of equipment (OEE) Deliberately sending the excess operators to a semi-military training to improve their discipline, moral

    and work attitudes Develop additional work forces to focus on sustaining improvement initiatives at MOD and MSD.

  • 8/10/2019 KPC_Productivity Improvement 2014

    14/37

    1

    Reduce Production: parking up some of the main equipment

    Deliberately Parked-up equipment (reducing work-load)

    Year 2012 has been the peak of overburden removal production of KPC Pits, after that KPC has deliberatelyreduce the overburden production by means of parking-up about 10 big diggers and hundred of trucks.

    But in the same time the coal mined has been increasing, by means of reducing the strip ratio. The overallstrip ratio (SR) in year 2012 was 11.7, subsequently reducing to 9.8 by the end of year 2014. Theoverburden cost removal constitute about 80% of total mining cost, by doing this strategy, KPC has beensignificantly lowering the unit cost of production ($/tonnes).

    This parking up strategy has been subsequently implemented since early days of year 2013 and continuesuntil current time. To support the smoothness of this strategy, KPC management are ensuring that :A specific guide-lines/procedures of Park-up are being closely implemented and monitoredProcedure to re-activate any machine to be followed up carefullyA Roster/schedule of parking-up the machines is updated regularly to suit to recent/current dynamicsituation of coal mining activities, i.e : a significant change on overburden cycle-time which affect toincreasing number of waiting on trucks or trucks queue times.Integrate the park-up and re-activate the fleet with other procedures which may be impacted to, forinstances the SOP of Match Factor which relate to Fuel Efficiency project

  • 8/10/2019 KPC_Productivity Improvement 2014

    15/37

    1

    Reduce Production: parking up some of the main equipment

  • 8/10/2019 KPC_Productivity Improvement 2014

    16/37

    1

    Liebherr T282360 T = 32 Units

    New Project : Improving Overall Effectiveness of Equipment (OEE)

    Improving Overall Effectiveness of Equipment (OEE)

    Through careful study, and benchmarking to similar companies, initiated on early year 2012 and with the

    help with external consultant, it was found that KPC assets have not yet sweated , the overall effectivenessof equipment which were overall availability, usage and utilization were still relatively low compared toworld best practice. Further study also revealed that within digger-truck systems, the diggers capacitieswere in excess, while the trucks performances were the bottle-neck which needed to be enhanced .

    Since mid of year 2012, a new project called Membara Project was established. This project aimed atimproving overall effectiveness of equipment (OEE) particularly it was first focusing on improving the OEEof overburden trucks. During first pass off Membara Project, the improvement initiatives to improve the

    OEE were focused at two main division i.e. : Mining Operation Division (MOD) which has work force over3000 personnel, and Mining Support Division which maintain the mining fleet which supported by about1100 personnel. In MOD, Membara Project was focusing at improving OB trucks utilization on the biggestpit at that time, i.e. : Pit Bintang, while at MSD the focus was how to improve the physical availability of OBtrucks. At the end of year 2012, in MSD, after completing the project on OB trucks, the initiatives were thenrolled out to Improving Big Diggers and Support Equipment (dozer, grader) availability.

    The first pass of Membara Project completed on mid of 2013, which then continued to 2ndpass which focus

    on Cycle Time Project and Improvement on Drill and Blast.

    The challenge for Membara Projects which are typical for other improvement initiatives is how to make allimprovement initiatives sustained not only during project but keep continues in the future until the life ofmine.

  • 8/10/2019 KPC_Productivity Improvement 2014

    17/37

    1

    Liebherr T282360 T = 32 Units

    Frame-work of Membara Project

    Mindsetsand

    capabilities(MC)

    Managementinfrastructure

    (MI)

    Managementinfrastructure maturity

    "The formal structures, processes and systems

    through which human and organizational

    resources are managed and optimized to

    achieve shared goals"

    Performance management Organization design Continuous improvement infrastructure

    Effective review mechanisms

    Technical systems maturity

    "The most efficient way

    physical assets andresources are configured and

    optimized to create value

    and minimize losses"

    OEE improvement Reducing lost time of

    un-critical activities

    Improving PhysicalAvailability (PA) of

    trucks

    Fleet dispatch Truck cycle time

    management

    Maintenance planningand execution

    Mindsets and capabilitiesmaturity

    "The way people think, feel and conduct themselves in the

    workplace, both individually and collectively

    Management training Frontline engagement Effective feedback

    Membara framework focuses onimplementing new initiatives andensuring their sustainability, toachieve its goal

    Notes: Impr oving OEE in

    previous term is relat ively

    s imi lar to improv ing overal l

    uti l i zation of the equipm ent, i.e.

    Util ization (KPC) = PA x Usage

    Th G l f OEE I t

  • 8/10/2019 KPC_Productivity Improvement 2014

    18/37

    1

    Liebherr T282360 T = 32 Units

    The Goal of OEE Improvement

    A goal of attaining 63% OEEwith a stretch plan of 69%

    OEE

    All ops delays

    System delays

    Noncriticaldelays

    Critical delays

    Availabletime

    BM2

    PM1

    Total

    85

    65

    Current OEE Potential future

    89

    71

    Availability

    Utilization

    57 63

    Availability%

    Utilization%

    OEE%

    Improvements

    Improve availabilityfrom 85% to 89%

    Improve MTTR Improve MTBF

    Defectelimination

    Bettercomunicationwith MOD

    Improve utilizationfrom 65% to 71%

    Improved shiftchange

    Reduce nooperator

    Reduce mealand pray delays Reduce time for

    recovery afterrains

    Improve haulroads

    Improved availability

    and efficiency resulting in

    Improved OEE of 63%(stretch target 69%)

    MC

    MI

    M b P j t i t t MOD MSD

  • 8/10/2019 KPC_Productivity Improvement 2014

    19/37

    1

    Liebherr T282360 T = 32 Units

    Membara Project improvement process at MOD-MSD

    Involving many line teams

    and create official SOP

    documents; these can

    change after better insight

    from implementation

    Intensive Field Observationand involving line teams in

    refining concept of initiatives

    and lock changes by

    creating official SOPs and

    Change Managementdocuments

    Also involving all neccesarystake holders : MOD-MSDstaff, Dispatch, Contractors,and OEMs

    Multiple iterations on the SOPdocument were conductedwith all stakeholders to

    ensure buy-in

    Improving OB Truck OEE : the Initiatives development

  • 8/10/2019 KPC_Productivity Improvement 2014

    20/37

    1

    Improving OB Truck OEE : the Initiatives development

    After multiple idea

    generation session in

    MSD, MOD and dispatch

    a KPC Membara

    operating model evolved

    and new initiatives weredefined

    Category

    Manag-ement

    Infrastruct

    ure

    Robust performance management system introduced that includes appropriate incentive systems andperformance dialogues

    Refined organization structure that is aligned towards goal of the organization

    Setup a Membara PMO team that will drive continuous improvement at KPC

    Mindset &capabilities

    Frontline engagement program to create awareness and generate momentum

    Capability building curriculum targeted for Membara change managers and initiative champions

    Specific technical training programs for operators, supervisors and mechanics

    Reduced repair diagnostics time: Clear SOP on truck repair for operators Introduce new diagnosticians team Contractor management

    Reduced repair preparation time: Portable in-car toolbox Mini ware-houses in pits In-pit hose fabricator

    Reduced repair complete confirmation time

    Reduced repair time: SMED for priority ideas

    Defect elimination initiatives

    New equipment strategy

    Reduced repair response time: Staggered shifts for MSD

    Improved workmanship

    Technicalsystems

    Improved hauling: Improved road maintenance Improved road construction and design

    Improved loading: Refined loading SOPs and methods Defining optimal loading factors Matching shovel to truck body sizes

    Improved dumping practices: Refine dumping SOPs

    Improved shift change practices Newly defined shift change process and SOP

    Reduction in time for meal and pray

    Improved recovery from stops practices

    Optimal interfaces between departments: MOD - MSD

    Improve dispatch process and equipmentconfiguration

    Improve end to end mine planning andexecution process

    Make long term strategic mine planassumptions robust

    Planning and dispatch (Mineplanning and Mine optimiza-tion)

    Equipment availability (MSD- Haul trucks) Equipment utilization (MOD)A CB

    Improving Utilization of MOD OB trucks

  • 8/10/2019 KPC_Productivity Improvement 2014

    21/37

    2

    Liebherr T282360 T = 32 Units

    Improving Utilization of MOD OB trucks

    Part of OB Trucks OEE Improvement at Mining Operation Division Areas is how to improve the utilizationof these Trucks. During Membara Projects and continues to recent time and to be sustained in the future,

    there are 4 main areas focus of improving the utilization, that are :1.Shift Change process2.Meal and Pray Delay3.Wet Road Delays (Quick Start-up /Recovery after Rain : QSuar)4.No Operator Delay5.Improving Hauling (to reduce cycle time)These four main improvement initiatives at Mining Operation Division within Membara Project are knownas Ready MOD Project

    Meal Pray

    Shift Change

    No Operator

    Recovery from rain

    Improve Hauling

    Improving Shift Change Process

  • 8/10/2019 KPC_Productivity Improvement 2014

    22/37

    2

    Improving Shift Change Process

    ImpactSolutionSituation

    Baseline

    Mar 2013

    High shift change delaypre-implementation due

    to: Operators take longtime in muster area

    Operators take longto handover at shiftchange area

    4.2

    J

    11.9

    HT

    17.4

    BIG

    6.9

    1. Minimize operator time in muster area Operators spend minimal time in

    muster area due to fingerprinting andupfront unit assignment

    2. Clear truck assignment

    Unit status and operator assignmentupdated before start of shift anddisplayed in muster area

    3. Increase supervisor control in musterarea and shift change area

    Supervisors are assigned to monitormuster area and shift change area

    Clear responsibility to ensure operatorsget into trucks quickly

    4. Hot handovers

    Hot handover procedure implementedfor safe and efficient hand-over oftrucks from one operator to the next

    initiatives implemented across all 3 pits Time lost reduced by 50% - 80%, equals to

    0.25% to 1% of OEE

    4.64.2

    JHT

    2.5

    BIG

    3.4

    Initiatives Prioritization matrix

    f Schedule PPE distribution

    h Set up board to display truck location andoperator assignment in the muster area

    i clear guidelines & target time for equip. handover

    c Install siren in the muster area for efficiently

    b Re-inforce supervisor authority

    j Assign supervisor during shift change

    a Remove benches from the muster area

    d Effective safety briefing in manhaul/ muster area

    e Develop & follow stdard format for safety briefing

    g Clear assignment of transport for each panel

    k Build shift change bays to accommodate trucks

    l Build additional shift change area close to panels

    m Road patrol to ensure trucks not slow down

    Im-

    pact

    Ease of implementation

    a

    d

    e

    b ch

    i j

    f

    m

    g

    kl

  • 8/10/2019 KPC_Productivity Improvement 2014

    23/37

    2

    Liebherr T282360 T = 32 Units

    Shift Change : Remove Benches& Reinforce Supervisors Authority

    Muster area processes

    Benches in the muster area have been removedso that the operators moved quickly Supervisor uniform and equipment reflects theauthority and role he should have

    Yellow PPE and different colored safety helmetmark the supervisor as different and gives himadditional authority responsibility (e.g., army rank)

    Communication device is a must in order to beable to provide real time answers to problems

    Light lamp allows supervisor to direct vehiclesinto the shift change area during the night

    PPE distribution is scheduled once a fortnight orevery week in order to prevent inefficient process

    Efficient attendance recording using fingerprint(applies only in selected pits)

    Removing benches and reinforcing supervisors authority help expediting process in muster area

    Improving Meal Pray Process

  • 8/10/2019 KPC_Productivity Improvement 2014

    24/37

    2

    Liebherr T282360 T = 32 Units

    Improving Meal Pray Process

    Impact

    33.3

    PitJHT

    46.2

    35.9

    10.3

    BIGPitJ

    37.3

    26.2

    11.0

    HT

    22.9

    14.4

    8.5

    BIG

    27.1

    17.7

    9.4

    1. Staggered Meal and Praybreaks

    Optimal schedule withstaggered breaks with eachback-up operator covering

    more trucks than previously

    2. Shadow crew enforcement

    Shadow crew is enforcedworking according to shift

    and new working hours from6 to 6 to improve shift change

    3. Back-up allocation and

    visibility

    Operators from breakdownunits utilized as back-ups and

    allocated optimally

    4. Revised roles and responsi-bilities

    Specially created pondoksupervisors manage back-up

    process in the pondoksupported by dispatch

    5. Hot handovers

    Hot handover procedureimplemented for safe and

    efficient handover of trucksfrom one operator to the next

    SolutionSituation

    Apr-Jun1 Sep- Feb2

    High meal pray delayobserved pre-

    implementation due tounregulated break time and

    poor back-up allocation

    33.3

    14.2

    PitJ4

    8.7

    5.5

    HT3

    13.9

    8.8

    5.1

    BIG

    13.7

    7.9

    5.8

    Apr 2013

    Pray

    Meal

    Meal Pray Initiative wasimplemented across all 3pits in MarApr 2013

    Good impact from theinitiative has been seenwith the delay reduced tobelow budget figures inall 3 pits

    H:\Personal\Harold Ong\Indonesia\PGN\IPO\Legal DD Presentation.ppt - May 20 2003 - 23:24 /2

    Staggered Meal pray using a floating back up system

  • 8/10/2019 KPC_Productivity Improvement 2014

    25/37

    22

    Staggered Meal pray using a floating back-up system

    Key design decisions in staggering meal and pray breaks

    Principles Benefits

    5-6 configuration canmeet the constraint on

    spread of break variation possible to implement

    this configuration for alltrucks at a 3.72 manningratio

    Details of implementation

    1 back-up operatordeployed for every 5

    trucks for maximumcoverage at availablemanning ratio withinacceptable break window

    3Break

    schedule

    Saving in time lost due topray delay. Forexample,in the day shift,in addition to meal, the 2breaks cover Dzuhur andAshar prayers

    Cycle time loss due toadditional travel topondok are reduced

    Optimal schedule withstaggered breaks areimplemented

    2 x 30 mins duringday shift

    1 x 1 hr during thenight shift

    Savingcycle time due toreduction in handovers

    Equal working hours forall operators

    All operators man oneequipment after the otheras back-ups instead of

    using designated back-up operators

    Floatingback-up

    system

    2

    5:6

    configura-tion

    1

    New pondok supervisor roles have beencreated to provide additional manpowerfor managing Meal pray process

    H:\Personal\Harold Ong\Indonesia\PGN\IPO\Legal DD Presentation.ppt - May 20 2003 - 23:24 /2

    Staggered Meal pray (continue)

  • 8/10/2019 KPC_Productivity Improvement 2014

    26/37

    22

    Advantages of fixed back-up system

    Advantages of floating back-up systemProblem of operatorsrefusing to man trucks inpoor condition can be

    avoided

    Complexity of kimpermanagement can be

    reduced by designating

    mutli-kimpered operatorsas back-up

    Easy to implement as itsclose to current practice

    Feeling of equipmentownership by primaryoperators, potentiallyreducing maintenance

    issues

    Elimination of cycle timeloss due to back-ups

    returning after each breakslot to pondok (~ 5

    mins/truck)

    Potential opportunity ofidentifying operators whodont maintain trucks in

    good condition as theycan be reported by others

    Staggered Meal pray (continue)

    Due to the saving incycle time, floatingsystem for back-upsis preferred over thefixed system

    Meal Pray Delay : min/avail.unit/shift

    Improving Physical Availability component initiatives

  • 8/10/2019 KPC_Productivity Improvement 2014

    27/37

    2

    Liebherr T282360 T = 32 Units

    Improving Physical Availability component initiatives

    Diagnostics time

    Repair time

    Confirmationtime

    Response time

    Preparation time

    Planningimprovements

    Opportunitymaintenance

    Equipmentstrategy

    IncreaseMTBF

    IncreasePhysical

    Availabilityof Trucks

    ReduceMTTR

    Focus area Components

    Defectelimination

    1

    2

    1a

    1b

    1c

    1d

    1e

    2a

    2b

    2c

    2d

    9 areas of focus forImproving Physical

    Availability of OBTrucks

    We can break down

    Physical Availabilityinto 9 components

    To ensurecomprehensiveness,we should generateinitiatives around allthese components

    PA = 1(MTTR/MTBF)

    Reduce Response Time (Improve MTTR of OB Trucks)

  • 8/10/2019 KPC_Productivity Improvement 2014

    28/37

    2

    Liebherr T282360 T = 32 Units

    Reduce Response Time (Improve MTTR of OB Trucks)

    Ideas implemented to reduce staff

    unproductivity during shiftchangeover

    After, we have reduced this unproductivetime by up to 25%

    New shift change processBefore, mechanics dont work for a

    full 65 minutes after shift change

    Total 65

    Prayer 24

    PPE preparation 5

    Other discussions 6

    Discussion andjob distribution

    7

    Daily PA update 2

    Fatigue Control 2

    Safety talk 5

    Travel time fromworkshop 14

    44

    5

    Total

    Discussion andjob distribution

    2PPE preparation

    Daily PA update 2

    Fatigue Control 2

    Safety Talk 4

    Prayer 15

    Travel time fromworkshop

    14

    Al l d iscussions done outdoors,

    reducing unn ecessary activi t ies

    (remo val of s hoes, irrelevant

    d iscussions)

    21 mins reduction inmechanics

    unproductivity

    Staggered

    praying from

    the start

    Improve Shift Change and no labor-mechanic available

  • 8/10/2019 KPC_Productivity Improvement 2014

    29/37

    2

    Liebherr T282360 T = 32 Units

    p o e S t C a ge a d o abo ec a c a a ab e

    Prayer rooms set up at Maintenance Inpit Bases toreduce time needed to start-up during over shift period

    Up to 15minutes iswasted every

    beginning ofshift due topraying inbatches

    Small prayerrooms arebottleneckfor fasterstart-up time

    Prayer rooms are ready and in use

    Total of 2 prayer rooms areprepared: at In-Pit Maintenancebases

    New SOP for truck repair location has significantlyreduced no labour available category in our MTTR

    much easier now to

    superv ise my m echanics-Supervisor

    We have bet ter access

    to parts and supp ort

    equipment

    44

    66

    (AugSept)

    -33%

    Baseline(AprJune)

    No labour available Inpit

    Maintenance BintangNew SOP for truck

    repair location wasimplemented

    Truck operatorsnow know thatthey alwaysneed to go to pitbase except for:

    Engineproblems

    Brakeproblems

    Steeringproblems

    Safety belt

    Previously, truckoperators areunsure ifoperating thetruck will makecondition worse

    now we are easier

    finding the trucks

    Improve Repair Time (MTTR) : SMED analysis

  • 8/10/2019 KPC_Productivity Improvement 2014

    30/37

    2

    Liebherr T282360 T = 32 Units

    Improve Repair Time (MTTR) : SMED analysis

    Description

    Video-takingand baselining

    Duration

    1-3 days

    3-4 weeks total

    Video analysisand creation of

    newprocedures

    3-4 days

    Trial of newprocedures

    1-3 days

    Evaluation oftrial

    3-4 days

    Creating newservice sheetsand standard

    jobs

    2 days

    Video taking following each of the mechanics on duty Categorization of tasks and baselining total time

    required for the job

    Analysis of video based on externalization,parallelization, tweaking sequences, and removinginternal waste

    Identification of new tools and support equipmentsneeded

    Mechanics training for new processes Live trial of new processes on the ground (videotaped)

    Re-evaluation of trial, refinement of time taken based onsecond observation

    Re-evaluation of new tools and support equipmentsneeded

    Standardization of new processes and documentationin standard jobs and service sheets

    Improve Repair Time (MTTR) : SMED example Result

  • 8/10/2019 KPC_Productivity Improvement 2014

    31/37

    3

    Liebherr T282360 T = 32 Units

    p p ( ) pIdeas and new toolsCAT 789 250 hours service

    Impact 1/2

    Compressor Trolley

    Oil filter with bottle samples

    Compartment

    2 ladders with air filter platform

    Stocks of nipples & hoses

    Double punch

    Operator chair

    20 m air hose

    Additional tools and facilities needed

    Inform operator beforehand, mechanic to drive to end of pitbase with operator waiting

    2

    Merge electrical, steering and AETA checks5

    Do both air filter replacement in parallel (2 ladders, 2mechanics)

    6

    Oil condition to be checked in parallel7

    Ideas

    Create inventory for top 10 defective parts10

    Mechanics to do light checks while parking to bay4

    Mechanics to do steering check while driving to bay8

    Create space in ladder to keep old air filter9

    Use slide hammer to increase oil flow11

    Prepare a trolley and keep it close to truck ready with filter oil13

    Put aside old air filter only after the truck has left12

    Trolley should contain empty bottles for engine oil sample14

    Just before parking we should lift the body up, inspect, andthen park instead of doing at the end

    3

    1 Ask technicians to handover truck at the entrance of pit base

    Process/sequenc-

    ingtweaks

    Paralleli-zation

    Better

    supporttools

    Externali-zation

    Air fi l ter already

    placed on top of the

    customized ladder

    New container and

    better oi l draining

    too l

    The Result of Improvement of OB Trucks OEE

  • 8/10/2019 KPC_Productivity Improvement 2014

    32/37

    3

    Liebherr T282360 T = 32 Units

    p

    The OEE of OB Trucks has been steadily improving from the base-line of about 55%, in current days it isnow more than 65%. Since the completed project of Membara Phase-2 (May-13), for about one year, anaccumulative total cost saving of about 48 million dollars has been generated coming from theimprovement of the OEE of Overburden Trucks at KPC

    Improve Operators & Mechanic Discipline through PKU

  • 8/10/2019 KPC_Productivity Improvement 2014

    33/37

    3

    Liebherr T282360 T = 32 Units

    p p p g

    Starting early month of year 2013 until the end of year, more than 2400 operators, mechanic and supervisorswere being sent to military training program called PKUprogram at the Army training center at Cilodong,West Java. This programs aims at improving their moral, discipline and team-work which induce to

    better effectiveness and efficiency of work. This Training program were subsequently scheduled into 8batches . On each batch, they were about 300 employees participated. The period of training was about 3weeks.

    KPC used the momentum/opportunity of overflowoperators during parking of many equipment bysubsequently sending the work forces to this militarytraining program

    Semi Military Training (PKU) Results

  • 8/10/2019 KPC_Productivity Improvement 2014

    34/37

    3

    Liebherr T282360 T = 32 Units

    y g ( )

    Untung Suhartanto : A Refueling Superintendent, used to smoke a lots (addicted toit), after PKU program he smoke no more, after he dicipline himself during 3 weeks

    military training at Cilodong

    Many operators testified that their discipline at works and team work has increased

    significantly after PKU program

    How to Sustaining KPU result ?

    1. A mandatory for each supervisor to conduct apel siaga of their subordinates(operators/mechanic) at the scheduled roster

    2. Conduct a survey feed back from the alumni of PKU

    3. Sport Competition among PKU alumni held regularly4. Conduct a Workshop for Supervisors regarding the PKU result and benefit5. Always endorsing at every occasion for all workforces to implement the 7 Values of the

    company : Excellence, Integrity, Transparency, Agility, Empowerment, Team Work & Care

    More operators and mechanic were eventually quitted to smoke, furthermore KPCmanagement has been endorsing and proclaiming that by early of year 2015, all KPCwork sites, not only in the office building but also outside at mining site, at workshop

    and the vicinity, on the work areas no body is allowed to smoke.

    Sustainability of Improvement : Develop new structure

  • 8/10/2019 KPC_Productivity Improvement 2014

    35/37

    3

    Liebherr T282360 T = 32 Units

    Sustainability is a classical issue facing by every improvement initiatives, in order to sustain the process and results

    of improvement initiatives, KPC executives deliberately has developed new structure on MOD and MSD which

    called Continuous Improvement (CI) Lead and CI-specialist. Structurally these CI-Lead and CI Specialist are

    reported to GM MOD and MSD, but horizontally they are on close coordination with existing Business PerformanceImprovement Division (BPID) which has been established since 2008.

    Additionally to strengthen the culture of improvement in the company, the COO of KPC since Q4 2013, has been

    given a strong direction that for any promotion from supervisor level to higher position (superintendent), beside that

    the candidate should be seconded first at Safety Division, he or she should also be seconded at BPID to be directly

    assigned to project improvement tasks within at least 6 months.

    Continuous Improvement (CI) Academy Projects

  • 8/10/2019 KPC_Productivity Improvement 2014

    36/37

    3

    Liebherr T282360 T = 32 Units

    BATCH-1 : Nov 2013 - May 2014

    CI Academy Divisi Asal Mentor-Co Mentor Project Task Potential Saving ( million dollars)

    1 Sumarjono MOD -MO Anwar-Ambara Queuing Project 0.2

    2 Iswanto MOD- HT Anwar-Deni Improve Shift Change (additonal load during s.change) Intangible

    3 Denastry MOD-BIG Anwar-Ambara Improve Payload T282 1.6

    4 M Yanuar Hidayat CPHD Ambara-U.Suhartanto Improve Payload EH4500 3.0

    5 Zulfikar S MOD-PitJ Anwar-Ambara Fuel Efficiency Project Part -4 3.6

    6 Bachtiar Hidayat MSD Chairal S- U.Suhartanto OB truck (planning isiatif, inpit hose fab.) + SMK Intangible

    7 Sahirul Alim MSD Ilham S-Marzel P.Excavator , support equipment, Defect Elimination of

    Cat789&EH4500 Intangible

    Total Projects 8.4

    BATCH-1 : August 2014 - Feb 2015

    CI Academy Divisi Asal Mentor Project Task

    1 Adi Setyo Utomo MSD Untung S Mews Performance Improvement

    2 Raymond Lasor Bosar Ritonga MSD Untung S WO Closure and Labor Costing

    3 Irwansyah MSD Untung S Land Cruisher PA Improvement

    4 Muhammad Kurniawan MOD Ramli Denas + Anwar Improve Productivity of R9800

    5 Hermanto MOD Deni apriadi + Anwar Improved produksi MS Rehab

    6 Galuh Boyo Munanto HSES Kris Pranoto+Ambara Water Quality Improvement

    7 Wahyu Wardana HSES Kris Pranoto+Ambara Rehabilitation Quality Improvement

    Future Challenges

  • 8/10/2019 KPC_Productivity Improvement 2014

    37/37

    3

    Liebherr T282360 T = 32 Units

    Will take time to achieve a real Culture of Continuous Improvement

    Long term goal ofcontinues improvement ishow to make improvement

    become day-to-day practice

    of doing business of everyindividual in the company

    END of Presentation