kpc-014-prd-008_thermal and moisture curing of pc units procedure

Upload: marksantana

Post on 10-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    1/23

    I

    THERMAL AND

    DATE OF ISSUANCE

    PREVIOUS REVISION NO.&DATE OF ISS

    PREPARED BY

    NAME Mark Santana

    TITLE KPC-QA

    DATE 21/10/2010

    SIGNATURE

    SLEVEL 3DOCUMENTSSTATEMENT OF METHOD

    ATER CURING OF DRAIAND COVER SLABS

    MSCODE NO.:KPC-014-PRD-007

    REVISION :00

    : 21OCT 2010

    UANCE : N/A

    ISSUED TO

    Bechtel Overseas, Inc.

    N CHANNELS

    PROJECT /CLIENT

    aaden Aluminum Smelter

    Plant Project

    140

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    2/23

    T

    KPC Controlled Document Integrated

    1.0Title2.0Methodology

    2.1General Description2.2Equipment2.3Materials2.4Preparation2.5Work & Methodology

    3.0Quality Assurance3.1Contractual Requireme3.2Responsibility3.3Inspection & Testing

    4.0Safety & Health4.1Protective Safety Equip4.2Environmental Safety4.3MSDS4.4Risk Assessment

    5.0References6.0Figures7.0Attachments

    7.1Heater Specifications7.2Thermocouple Specific7.3Forms

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System

    TABLE OF CONTENTS

    nts

    ment

    Health Contractor Requirements

    ations

    Page 2 / 23

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    3/23

    T

    KPC Controlled Document Integrated

    1.0 TITLESteam and

    2.0 SCOPE OF WORK2.1 GENERAL DESC

    This docum

    for Maaden Alumi

    Overseas, Inc. is th

    for manufacture ancompliance with th

    Curing is de

    temperature in con

    (ACI 116R-90).

    KPC will app

    a. ThermalDB00-0Using R

    while th

    strippin

    b. Water Csupple

    area in t

    Applicable

    quoted and followe

    2.2 EQUIPMENT

    List of Equip

    A. For1.

    -

    --

    -

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System

    ater Curing of PC Units

    IPTION

    nt outlines the procedure for Thermal and

    um Smelter Plant Project in Jubail, Kingdom

    Main Contractor and Al Kifah Precast Com

    d delivery of required Precast Concrete Unitis procedure.

    fined as the maintenance of satisfactory moi

    crete during its early stages so that desired

    ly two-stage curing system as follows:

    Curing as described in Bechtel Specification

    01. Thermal Curing corresponds to Acceleradiant Heat and Moisture (PCI-MNL-116, Se

    e PC Units are in the mould inside the Facto

    , release and lifting strength of concrete at

    uring which is curing by moisture retention

    ental heat. This is done after the units are t

    he Stockyard.

    echtel Specifications and Industry Codes pe

    d.

    ment:

    hermal Curing

    eaters / Blower (see Sec. 7.0, Attachments)

    PC to use Heaters with the following specifi

    Brand : Dimplex Model No. CFH90

    Max. Temp. = 55CHeat Output = 9.0 kW

    Noise = 60 dB

    Page 3 / 23

    ater Curing of PC Units

    of Saudi Arabia. Bechtel

    any is the sub-contractor

    s and responsible for

    sture content and

    roperties may develop

    No. 25457-0000-3PS-

    ted Curing of Concrete. 4.21.3). This is done

    y to achieve the required

    n earlier time.

    ithout the use

    ansferred to designated

    taining to the subject are

    ations:

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    4/23

    T

    KPC Controlled Document Integrated

    -

    -

    -

    2.3.4.5.6.7.

    B. For1.2.

    2.3 MATERIALSNo mate

    2.4 PREPARATIONPrior app

    achieved the req

    3PS-DB01-0001

    Time, which sho

    Concrete Compr

    2.5 WORK METHOA. Acceler

    Curing):

    1. Afteare

    unif

    2. Rubway

    the

    burl

    dist

    3. Cubpare

    4. Mon

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System

    Airflow = 900 m3/h

    Throw = 10m

    Temperature Control with Built-In Thermosased on settings

    lectronic Surface Thermocouples, with Pins

    ttachments)

    adiator, Fan (for Air Circulation)

    ollowcore Bed Water Heating Pipes (Option

    hermometer

    ubberized Tarpaulin

    xpanded Polystyrene

    ater Curing

    essian Cloth / Burlaps

    pproved Water Source

    ials required.

    lication of heat for thermal curing, ensure th

    uired initial setting time as per Bechtel Spec

    Furnishing & Delivering Ready Mix Concret

    uld not be in any case less than 1 hour and a

    essive Strength achieved 3.4 MPa (500 psi).

    OLOGY

    ted Curing of Concrete using Radiant Heat a

    ensuring that the concrete has achieved th

    laced and arranged in such a way that all ar

    rmly (see Section 6.0, Fig. 1 & 2).

    erized Tarpaulin and Expanded Polystyrene

    that the units are thoroughly covered and m

    ontraption. Moisture is maintained using a

    p/hessian cloth. Double the thickness at co

    nce of 300mm.

    Samples for Compressive Tests should be c

    nt concrete.itor the interior and surface temperature of

    Page 4 / 23

    at, Automatic Adjustment

    (see Sec. 7.0,

    al)

    at the concrete had

    ification No. 25457-0000-

    Sec. 3.3 Initial Setting

    s determined by the time

    nd Moisture (Thermal

    e initial set, the heaters

    eas will be heated

    to be installed in such a

    inimal heat escapes from

    over of moist

    ners and edges for a

    ured the same way as the

    the unit using embedded

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    5/23

    T

    KPC Controlled Document Integrated

    ther

    leas

    inteinst

    instr

    the

    redu

    5. Mea6. Tem

    a.b.

    c

    c.t

    d.

    e.s

    t

    f.c

    t

    c

    g.t

    t

    h.r

    (

    7. Thewat

    B. Water C

    1. AppWat

    2. Thormini

    3. Dou

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System

    ocouples tied to a continuous logging and

    2 thermocouples (one as spare) in the locat

    nal temperature is expected (generally thell thermocouples on each exposed face of t

    uments at mid-point of the cover zone. As e

    ehavior of the mix, the total number of sur

    ced to two.

    sure ambient air temperature using thermo

    perature Control (see Section 6.0, Fig. 3)

    re-Heat Temperature should be set at Ambi

    hour (+0.33C/min).

    cquire Temperature Readings every 30 min

    losely monitor the differential temperature.

    nit should have a temperature difference o

    aintain the rate of adding 20C per hour un

    he maximum allowable temperature at 65

    djust the setting of heaters as necessary. A

    er actual condition. Localized Hot Areas s

    eating Pipes may be used to adjust the hea

    ecessary

    aintain the temperature at 65C and monit

    ntil the required stripping and lifting streng

    trength is equal to 60% of the design concre

    he Materials Engineer.

    llowable cooling rate is at -28C per hour (-

    ontinue until the concrete temperature is n

    he ambient temperature outside the enclos

    racking.

    emove insulation in stages in such a way th

    emperature differential is not exceeded (20

    emperature is within 10C of Ambient Temp

    ubsequent monitoring of heating of precast

    educed to every 3 hours (for Pre- and Heati

    for Cooling Cycle) upon a clear demonstrati

    nd other damage were incurred during first

    moulds are stripped and moved to designat

    r curing.

    uring

    oved units are transferred to designated ar

    r Curing.

    oughly cover individual units with pre-satur

    mum of 2 layer hessian cloth.le layer polythene sheet is not required if t

    Page 5 / 23

    recording system. Install at

    ion where the maximum

    ass center). Initially,e element. Install these

    perience is gained as to

    ace thermocouples may be

    eters.

    ent Temperature +20C for

    tes at this stage, and

    No two portions of the

    more than 20C.

    til the concrete reaches

    .

    d or remove heaters as

    ould be avoided. Bed

    ing uniformity as

    or every 1 hr if first time

    h is achieved. Lifting

    te strength as directed by

    .50C/min). Cooling must

    more than 22C above

    re to prevent surface

    t the maximum allowable

    C), and until the surface

    erature.

    concrete units may be

    g Cycle) and every 6 hours

    n that no thermal cracks

    3 batches of units.

    d area in Stockyard for

    a in the Stockyard for

    ted hessian cloth. Use

    e units are thermal-cured.

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    6/23

    T

    KPC Controlled Document Integrated

    4. Watconc

    5.

    Watthor

    the

    6. No c7. Wat8. Insp

    dryi

    9. If dr

    3.0

    QUALITY ASSURAN3.1 CONTRACTUAL

    1. Acce000

    Spec

    014-

    2. Becrepo

    whil

    3.2 RESPONSIBILIT

    The foll

    Procedure:

    1. Ther2. Wat

    Stoc

    3.

    InspSup

    4. DocSant

    5. InspEngi

    3.3 INSPECTION &1. Freq

    inte

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System

    r used for curing must be the same water u

    rete.

    r is manually sprinkled until the hessian clooughly wet. Water curing will be considered

    oncrete surface is damp to touch.

    uring compound should be used.

    r curing should be for seven (7) consecutiv

    ct curing minimum twice at daytime and on

    g. Replenish water as required.

    ing is discovered, re-wet and increase the i

    E

    REQUIREMENTS

    ptance criterion will be based on Bechtel Sp

    -3PS-DB00-0001 Concrete Work and othe

    ifications and Inspection and Test Plan Po

    ITP-011.1.

    tel Resident Engineer or his representative

    rt on daily basis. The Bechtel Resident Engin

    the inspection is being conducted.

    wing personnel are responsible for the con

    mal Curing: Ramesh Lama Production Engi

    r Curing: Ferdinand Gurion / Eduardo Sison

    kyard

    ction: Alfred Comendador QC Engineer, Frvisor, Alfred Carpio QC Supervisor

    ment Control and Review: Alfred Comenda

    ana IMS-MR

    ction and Document Review: Vinod Kannat

    eer

    ESTING

    uency

    Frequency of measurement within the un

    vals specified in the Work Methodology.

    Page 6 / 23

    sed for the production of

    h and the precast unit issatisfactory if at any time

    days.

    ce at night for signs of

    spection frequency.

    ecification No. 25457-

    r relevant Bechtel

    t-Pour Inspection (KPC-

    ust be given a copy of

    eer may also be present

    uct of this Operational

    neer

    Production Engineer,

    eddie Toledana QC

    or QC Engineer, Mark

    - Bechtel Resident QC

    it must cover all units at

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    7/23

    T

    KPC Controlled Document Integrated

    2. Equiuse:

    a.b.

    usin

    3. RecPoin

    Co

    The

    W

    Cal

    Re

    Con

    to B

    repr

    4.0 HEALTH & SAFETY4.1 PROTECTIVE &

    The followi

    personnel conducti

    1. Hard

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System

    pment

    All measuring equipment must be thorou

    hermocouple must be calibrated by duly-

    gency.

    hermometers - must be calibrated by duly-

    gency.

    Heat/Blowers need not to be calibrated,

    above mentioned instruments.

    rds

    The following Forms must be used on eac

    ts:

    Quality

    trol Point

    Form Form Code

    No.

    Prep

    rmal Curing

    Post-Pour

    Inspection

    Report

    KPC-014-F-

    QAC-034Eac

    ter Curing

    Post-Pour

    Inspection

    Report

    KPC-014-F-

    QAC-034Eac

    ibration of

    easuring

    Devices

    Calibration

    of

    Equipment

    KPC-014-F-

    QAC-026

    Upd

    re

    porting of

    Non-

    formance /

    CAPA

    NC and

    CAPA Log

    Sheet

    KPC-014-F-

    QAC-032

    Eac

    Con

    Records shall be kept in KPC QC Departm

    chtel Resident Engineer duly noted by KPC

    sentative.

    KPC QA/QC Department copy is kept for

    SAFETY EQUIPMENT

    g are the list of Personal Protective Equipm

    ng this activity:

    Hat

    Page 7 / 23

    ghly inspected prior to

    pproved calibration

    pproved calibration

    ut performance measured

    h specified Quality Control

    aration ITP Reference

    Code

    h Unit

    Post-Pour

    Inspection (KPC-

    014-ITP-012.1)

    h Unit

    Post-Pour

    Inspection (KPC-

    014-ITP-012.1)

    ated as

    uired

    Calibration of

    Equipment (KPC-

    014-ITP-014.1)

    h Non-

    ormity

    Quality

    Management

    System (KPC-014-

    ITP-000.1)

    ent and copies distributed

    C Engineer or his

    inimum of two (2) years.

    nt to be used by

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    8/23

    T

    KPC Controlled Document Integrated

    2. Safe3. Cott

    4.2 ENVIRONMENPersonal Pr

    4.3 MSDS (MANUFNot Applica

    4.4 RISK ASSESSME

    Not Applica

    5.0 REFERENCESBechtel Specificati

    Revision 00

    ACI 116 R-90 Cem

    American C

    PO Box 909

    Manual for Qualit

    Products, 3rd

    Editio

    Precast/Pre

    175 West Ja

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System

    ty Shoes

    on Gloves

    AL SAFETY & HEALTH SUB-CONTRACTOR R

    tective Equipment

    CTURER SAFETY DATA SHEET)

    le

    NT

    le

    n No. 25457-0000-3PS-DB00-0001 Concret

    , 07 May 2010

    nt and Concrete Terminology

    ncrete Institute (ACI)

    , Farmington Hills, MI 48333-9094

    y Control for Plants and Production of Stru

    n PCI Manual MNL-116,

    stressed Concrete Institute (PCI)

    ckson Blvd., Chicago, Illinois 60604

    Page 8 / 23

    QUIREMENTS

    e Work

    tural Precast Concrete

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    9/23

    T

    KPC Controlled Document Integrated

    6.0 FIGURES

    Fig. 1: Heater and Mould Assembl

    For Drain Channels (may be modi

    as per actual conditions). Note th

    movement of air through direct

    heater blower throw (10m) and

    subsequent heat movement throu

    convection.

    HEATED AIR

    MOVEMENT

    THROUGHCONVECTION

    (SAME AS ON

    UPPER PORTION)

    STEEL SHEET (TO

    AVOID DIRECT

    HEAT THROW

    COLLISION BUT

    TRANSFER

    RADIANT HEAT)

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System

    ied

    gh

    HEATER

    HEATER

    DIREC

    THRO

    Page 9 / 23

    T HEAT

    W

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    10/23

    T

    KPC Controlled Document Integrated

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    Fig. 2: Heater and Mould Asse

    heating a

    Fig. 3: Thermal Curing Tempe

    illustrative purposes only; ac

    Pre-Heat @

    +27C/hr

    C

    TIME Variable:

    Ambient - Peak

    Temp.

    Time

    HEATER

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System

    mbly for Cover Slabs. Bed Heating Pipes are

    nd temperature controlled at the Boiler Roo

    rature and Concrete Compressive Strength

    tual conditions may vary but must not exceedocument)

    Sustained

    Heating

    Cooling

    @ -28C/hrWater

    Thermal Curing Stage

    TIME Variable:

    60% Conc.

    Strength

    TIME Variable:

    Peak - Ambient

    Temp.

    Page 10 / 23

    Concrete Strength

    Curing Temperature

    sed to ensure uniform

    m.

    elationship (Note: for

    d the limits set in this

    Initial Setting Time

    Initial Ambient Temp.

    Peak Temp. @ 65C

    Conc. Lifting Strength

    Curing Stage (7 Days min.)

    ater Curing Stage

    DIRECT HEAT

    THROW

    BED HEATING

    PIPES

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    11/23

    T

    KPC Controlled Document Integrated

    7.0 ATTACHMENTS7.1 HEAT BLOWERS

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System Page 11 / 23

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    12/23

    T

    KPC Controlled Document Integrated

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System Page 12 / 23

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    13/23

    T

    KPC Controlled Document Integrated

    7.2 SURFACE THERMOCOUPLE

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System Page 13 / 23

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    14/23

    T

    KPC Controlled Document Integrated

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System Page 14 / 23

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    15/23

    T

    KPC Controlled Document Integrated

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System Page 15 / 23

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    16/23

    T

    KPC Controlled Document Integrated

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System Page 16 / 23

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    17/23

    T

    KPC Controlled Document Integrated

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System Page 17 / 23

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    18/23

    T

    KPC Controlled Document Integrated

    8.0 FORMS8.1 CONCRETE POUR C8.2 POST-POUR INSPE

    8.3 CALIBRATION OF E

    8.4 NC AND CAPA LOG

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System

    ARDTION REPORT

    UIPMENT

    SHEET

    Page 18 / 23

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    19/23

    T

    KPC Controlled Document Integrated

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System Page 19 / 23

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    20/23

    T

    KPC Controlled Document Integrated

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System Page 20 / 23

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    21/23

    T

    KPC Controlled Document Integrated

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System Page 21 / 23

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    22/23

    T

    KPC Controlled Document Integrated

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    Management System Page 22 / 23

  • 8/8/2019 KPC-014-PRD-008_Thermal and Moisture Curing of PC Units Procedure

    23/23

    T

    ll d d

    ERMAL AND WATER CURING OF DRAINCHANNELS AND COVER SLABS

    METHOD STATEMENT

    P 23 / 23