Kosan Crisplant – Small Scale LNG Bunkering
Anders BjörnProject Director13-06-2017
![Page 2: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/2.jpg)
2
65 years in the Gas Business
We are ”GAS PEOPLE”LPG, LNG, Industrial Gas
![Page 3: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/3.jpg)
3
Worldwide References
• More than 3,500 plants/larger installations supplied since 1951
• Clients in more than 130 countries
![Page 4: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/4.jpg)
4
Project Areas - know-how & know-why
Systems and turnkey After-sales, and facility management
A one-stop shop for gas equipment
![Page 5: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/5.jpg)
5
Around 750 employees plus freelancers/partners worldwide
12 (+90) 30 120 12+16 93 335 8
2 22 5 26 10 85 23
42(+135)
![Page 6: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/6.jpg)
6
LNG Bunkering
![Page 7: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/7.jpg)
7
Methods of LNG Bunkering
Source: ABS, USA
![Page 8: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/8.jpg)
8
Source: SSPA, Sweden
Advantages & Disadvantages
![Page 9: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/9.jpg)
9
Source: SSPA, Sweden
The 4th Option
![Page 10: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/10.jpg)
10
The ”Samsø” Project
![Page 11: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/11.jpg)
11
The Samsoe Project
![Page 12: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/12.jpg)
12
Prinsesse Isabella
![Page 13: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/13.jpg)
13
Tender for the Bunkering facility
► No permanent tank on quay-side
► Maximum bunkering time <15 min
► No permanent staff on shore
► Entire facility has to be moved to Samsoe in less than 5 year
► Green Profil = No Emission
► Turnkey
![Page 14: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/14.jpg)
14
GATE Terminal
Source of the LNG
Port of Hou
![Page 15: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/15.jpg)
15
Logistic Supply Chain
![Page 16: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/16.jpg)
16
LNG Bunkering Unit
![Page 17: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/17.jpg)
17
Operation
![Page 18: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/18.jpg)
18
Zero Emission
• As the ferry leaves the remaining liquid in the lines will be vaporized and displaced to the road tanker through the vapour line due to thermal expansion and lower pressure in the road tanker
• Econimizers will lead the gas around the saftey valves just a bar below the limited before the valve opens.
• The Global warming from Methane has been estimated to be 25 times greater than CO2Danish Patent No. PR 178151
![Page 19: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/19.jpg)
19
Bunkering from Multi Trailers
![Page 20: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/20.jpg)
20
Dual Trailers
2-4 Tank Trailers
Serial or Parallel Connections
Flow rates from 40-240 m3/h
![Page 21: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/21.jpg)
21
Multi Trailers
4 Tank Trailers
Serial or Parallel Connections
2 Pumps each with 60 m3/h
Flow rates 120 m3/h
![Page 22: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/22.jpg)
22
Bunkering from Movable Multi Trailers
![Page 23: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/23.jpg)
23
Movable Multi Trailers (Movable MTTS)
40 - 240 m3/h bunkering flow
Optionally equipped with PBU for fast bunkering
Up to six trailers connected simultaneously
![Page 24: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/24.jpg)
24
Movable Multi Trailers (Movable MTTS)
![Page 25: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/25.jpg)
25
Bunkering with Intermediate storage tanks
![Page 26: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/26.jpg)
26
Intermediate tank on quay
2 x 300 m3 tanks
Pump unit
2 x 65 m3/h pumps
Flow rates from 40-130 m3/h
One truck loading point
![Page 27: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/27.jpg)
27
Bunkering with Intermediate storage tanks + Multi trailers
![Page 28: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/28.jpg)
28
Stationary storage tank with Multi Trailer
40 - 320 m3/h bunkering flow
5-450 m3 per bunker operation
Optionally equipped with PBU for fast bunkering
Ideal to achieve high flow and maximum flexibility
Possible to increase capacity and flow rate in phases
![Page 29: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/29.jpg)
29
Flow
Total volume m3
40 m3/h 120 m3/h 160 m3/h 240 m3/h80 m3/h
40 m3
60 m3
80 m3
120 m3
160 m3
240 m3
500 m3
400 m3
300 m3
LNG Bunkering Solutions Overview
![Page 30: Kosan Crisplant – Small Scale LNG · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017](https://reader030.vdocuments.us/reader030/viewer/2022021510/5aae20af7f8b9a5d0a8bbfc9/html5/thumbnails/30.jpg)
30
Advantages
► Less fixed assets
►Bunker fast and safe – 200-250 m3/hour
►High volumes of LNG
►No methane emission
►Very low operational costs – no fixed staff