korea hydro & nuclear power company seulki kim
DESCRIPTION
Self-disposition of styrofoam by using ISOCS. 2013. 08. Korea Hydro & Nuclear Power Company Seulki Kim. 0 1. 0 2. 0 3. 0 4. Contents. Summary. Problem & Solution. Performance. Conclusion. Summary. Summary. 0 1. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/1.jpg)
Korea Hydro & Nuclear Power Company
Seulki Kim
2013. 08
![Page 2: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/2.jpg)
ContentsContentsContentsContents
0101
0202
0303
0404
SummaryProblem & SolutionPerformanceConclusion
![Page 3: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/3.jpg)
Summary
![Page 4: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/4.jpg)
New fuel box cushioning waste (styrofoam, 480m3) has been stored in the storage for absence of self-disposition method since 1998.
No recycle and lack of storage space
0101 Summary
![Page 5: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/5.jpg)
Problem& Solution
![Page 6: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/6.jpg)
They were not contaminated, but it was very difficult to prove that they satisfied the self-disposition requirements.
Representative sample : 1kg(1L) per 200kg(200L)
→ Regulatory agency’s guideline Styrofoam 480m3 → It is necessary to analyze
representative sample of 2,400.
0202 Problem & Solution
![Page 7: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/7.jpg)
0202 Problem & Solution
RadioactiveNuclide
RadioactiveConcentration*
(Bq/g)MDA (Bq/g)**
Co-60 0.1 0.01
Cs-137 0.1 0.01
U-235*** 1 0.1
Regulation guideline
* IAEA Safety Series RS-G-1.7 Table 2 ** MDA : Minimum detectable activity *** U-235 : Natural radioactive nuclide
![Page 8: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/8.jpg)
Styrofoam : Low density material
→ It is difficult to meet the MDA guideline Actual analysing data
To satisfy the MDA guideline, we had to analyze more than 100,000 seconds for one sample.
0202 Problem & Solution
Co-60 MDA(Bq/g)
Cs-137 MDA(Bq/g)
Sample 1L(13g)
1.06E-01 1.51E-01
![Page 9: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/9.jpg)
In common sampling method for gamma analysis,2,400 samples x 100,000 seconds = 2,778 days
= 7.6 years
0202 Problem & Solution
In order to reduce total counting time,
we introduced the ISOCS.
![Page 10: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/10.jpg)
ISOCS : In-Situ Object Counting System
→ Portable HPGe Gamma SpectrometerGe detector, Collimators, portable MCA, laptop PCVarious sized and shaped objestsRegardless of place
0202 Problem & Solution
![Page 11: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/11.jpg)
ISOCS specificationManufacturing company : CanberraDetector model : BE5030Material : P-type HPGeUseful energy range : 3keV ~ 3MeVRelative efficiency ≥ 50%Resolution ≤ 0.75keV@122keV, [email protected]
0202 Problem & Solution
![Page 12: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/12.jpg)
Performance
![Page 13: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/13.jpg)
We derived the efficient amount of styrofoam and geometry to meet the MDA guideline.8 bundles of styrofoam (2m x 2.2m x 2.5m)The distance between styrofoam and detector : 50cm
0303 Performance
![Page 14: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/14.jpg)
Measuring period : ’12.10.11 ~ ’12.10.24 Counting time : 4,500 seconds Measuring efficiency : The use of modeling
program in system (Geometry composer) The MDA of main radionuclide
The result satisfied MDA guideline !
0303 Performance
Co-60 Cs-137 U-235
MaximumValue(Bq/g)
8.866E-03 7.807E-03 9.541E-03
![Page 15: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/15.jpg)
0303 Performance
![Page 16: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/16.jpg)
In common sampling method for gamma analysis,2,400 samples x 100,000 seconds = 2,778 days
By using ISOCS,44 SET* x 4,500 seconds = 198,000 seconds
* 1 SET : 8 bundles of styrofoam
0303 Performance
1/1200
![Page 17: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/17.jpg)
Reliability review of measurement of radioactivity by using ISOCSThe experiment to measure the reference source
0303 Performance
Radionuclide
Energy(keV)
Certified Value(Bq/g
)
Measuring value(Bq/g
)Error(%)
Am-241 59.54 9,919 8,980 -9.5
Cd-109 88.03 32,067 29,660 -7.5
Co-57 122.06 1,143 1,110 -2.9
Cs-137 661.66 1,910 1,893 -0.9
Co-601173.231332.49
2,923 2,976 +1.8
![Page 18: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/18.jpg)
The measuring data about 4 faces of styrofoam
0303 Performance
MDA(Bq/g) Co-60 Cs-137 U-235
Face #1 7.705E-03 7.379E-03 9.316E-03
Face #2 7.671E-03 7.323E-03 9.155E-03
Face #3 7.937E-03 7.310E-03 9.328E-03
Face #4 8.042E-03 7.313E-03 9.061E-03
Average 7.839E-03 7.331E-03 9.215E-03
![Page 19: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/19.jpg)
The result of radiation dose evaluation
0303 Performance
Individual Dose(uSv/yr)
Collective Dose(man-Sv/yr)
Result
Evaluationcriteia
Evaluationresult
Evaluationcriteia
Evaluationresult Satis-
faction10 3.69E-01 1 1.35E-05
![Page 20: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/20.jpg)
0303 Performance
![Page 21: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/21.jpg)
0303 Performance
![Page 22: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/22.jpg)
Conclusion
![Page 23: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/23.jpg)
In case of radioactivity measurement of low-density material such as styrofoam,
0404 Conclusion
![Page 24: Korea Hydro & Nuclear Power Company Seulki Kim](https://reader036.vdocuments.us/reader036/viewer/2022062410/56815acf550346895dc8a196/html5/thumbnails/24.jpg)
Thank youfor
listening !