konkan railways.pdf

Upload: lakhwant-singh

Post on 21-Feb-2018

228 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/24/2019 Konkan Railways.pdf

    1/18

    B060453CE

    1

    S524

  • 7/24/2019 Konkan Railways.pdf

    2/18

    on an

    ra ways

    was

    constructe

    on

    t

    s

    thebiggestprojectundertakenbytheIndian.

    Ithas

    aroute

    length

    of

    762km

    in

    broad

    gauge ravers ng3s a esv z arna a a, oaandMaharashtrawith59stations.

    2

  • 7/24/2019 Konkan Railways.pdf

    3/18

    e

    on an

    s

    a

    coasta

    str p

    o

    an

    oun e

    bytheSahyadrihillsontheeastandArabian.

    breathes

    side

    by

    side

    with

    economic

    growth;

    ,forestcover,andalandscapefringedwith

    .

    3

  • 7/24/2019 Konkan Railways.pdf

    4/18

    erou e sas ng e ne rac ,an sno e ec r e ye .

    Ithas

    been

    designed

    for

    high

    speed

    traffic

    (160

    km/h).

    It

    isopentogoodsandpassengertraffic.Theroute,which

    runsparalleltotheArabianseacoastline,offerssomeof

    the

    most

    spectacular

    views

    of

    any

    Indian

    rail

    journey.The

    atmanyplaces.TheNH17alsorunsbetweenMumbai

    andMangaluru.

    AlthoughKR

    is

    currently

    single

    line,

    KR

    and

    South

    WesternRailwaylinesrunparallelfromMajordato

    Mad aon makin thatsectionadoubleline.

    4

  • 7/24/2019 Konkan Railways.pdf

    5/18

    5

  • 7/24/2019 Konkan Railways.pdf

    6/18

    Loosesoilandnon

    1500riversto

    un orm

    strataExtremely

    MAJORBoringofthe

    westernSeismic

    ghats

    6

  • 7/24/2019 Konkan Railways.pdf

    7/18

    .

    Length

    762km

    Rulinggradient 150(compensated|)

    Number ofstations 59

    Numberofmajorbridges 179(withtotallinearwaterwayof21.50

    Kms .)

    Numberofminorbridges 1819(linearwaterwayof5.73Kms .)

    Numberof tunnels 92(totallength83.60Kms.)

    Lon esttunnel 6. Km. Karbude tunnel

    Longestbridge 2065.8m.(Sharavati riverbridge)

    Tallestviaduct 64metersinheight(Panval viaduct)

    7

  • 7/24/2019 Konkan Railways.pdf

    8/18

    a a a oo s10to12 eeta ovet egroundinjune1994.

    Inju y1997anentiremountainsi eco apse

    at

    Ukshi. Justmonthsbeforethecompletionofthe

    pernamtunnelamajor collapsetookplace.

    8

  • 7/24/2019 Konkan Railways.pdf

    9/18

    Landhadtobe

    acqu re rom

    42000different

    landowners.

    Specialcarehad

    tobe

    taken

    while

    providing

    centrifugaland

    jetfan

    ventilation

    9

  • 7/24/2019 Konkan Railways.pdf

    10/18

    Embankmentsof

    the

    depth

    of

    25m

    hadtobemade.

    Cuttingsofan

    average

    depth

    of

    made.

    10

  • 7/24/2019 Konkan Railways.pdf

    11/18

    TheJune16accidentinvolving

    highlightsthe

    need

    for

    fool

    proofsafetymeasuresagainstlandsli sontheKonkanRailway,particularlyduringthemonsoon.

    warningsignalonthesectionofthetrackwheretheaccidentha ened.Itranthrou ha

    fivemetre

    cutting

    and

    was

    thoughttobenotpronetolandslips.

    11

  • 7/24/2019 Konkan Railways.pdf

    12/18

    warnan

    approaching

    train

    with

    flashing

    lights

    and

    hooter

    at

    arange

    of500m,sothatthedriverisenabledtoreduceimpactwithafallen.

    UsinghighlysensitiveElectronicPendulums havingminiradio

    transmitterslinked

    to

    aradio

    modem

    which

    in

    turn

    communicates

    ,

    predictivefailurewarningsothatsimultaneousfailureofcuttingand

    arrivaloftraindonottakeplace.

    andcoupledwithACDtechnologynetworkthroughwirelessconnectivity,isalsobeingdevelopedbyKRCLforrealtimereaction

    .

    12

  • 7/24/2019 Konkan Railways.pdf

    13/18

    :

    portal,to

    aheight

    of

    1.5

    m

    above

    rail

    level,

    and

    awidth

    of

    2.5

    m,

    sandbagsarestackedwithagapof100 150mmevery2metresto

    Berms :Tomakethetunnelapproachesmorestable,upto50 60

    metreslength

    of

    tunnel

    approach

    or

    until

    we

    reach

    aheight

    of

    the

    , ,

    platform)ofabout34metreswillbeprovidedincaseofsoilmixed

    withboulders.

    approachcuttingforthetunnelisinrock,thentunnelportalsandtheapproachcutsshouldbeprotectedwithaspecialsteelbouldernet.

    13

  • 7/24/2019 Konkan Railways.pdf

    14/18

    Alllateriterockcuttingswhich wererequiringblastingatthe

    timeofconstruction,willnowbetreatedaslateritesoiland1:1

    s opesw ermsw eprov e .

    Allrockcuttings,exceptthosealreadyprovidedwithrock

    specialsteelbouldernets

    Excepthard

    rock

    cuttings,

    in

    all

    other

    cuttings

    toe

    protection

    wall(atthebaseofthecutting)orpitching(puttinglayerof

    rocksalongtheslope)upto2metreheightwillbeprovided.

    14

  • 7/24/2019 Konkan Railways.pdf

    15/18

    ManyFirsts

    WhentherailwaywasopenedtothepubliconJan26,1998,ithad

    ForthefirsttimeinIndiafundsfortheprojectwereraisedwithouttouchingthegovernmentcoffers.TheauthorisedcapitalofRs.800croreswaspooledtogetherbytherailwaysandthestatesofKerala,Karnataka

    andGoa

    and

    Maharashtra.

    This

    was

    leveraged

    by

    means

    of

    public

    bonds

    to

    eex en o s.2250crores.

    Theprojectalsoemployedtheleastnumberofpeopleinitsmanagement:atitspeakamere2400,allin.

    Aninternational

    record

    in

    tunnel

    boring

    was

    set:

    the

    Natuvadi

    tunnel's

    204metrespermonthbeattheprevious187metres.

    Finall totheamazementofIndians the ro ectwascom letedinamere8years,whichisabarewinkofaneyeinIndia.

    15

  • 7/24/2019 Konkan Railways.pdf

    16/18

    CONCLUSION

    TodaytheKonkanRailway,wendsitsfastandsafeway

    throu hsceniccountr notdes oiltb the iecesof

    engineering

    created

    for

    it.

    In

    fact

    Konkan

    Railway

    is

    an

    Indian

    triumphinmanyareas:engineering,efficiency,innovation,

    , , , ,

    aestheticsandservice.A760kMrailpath,laidonfairlyflatrails

    overrivers

    and

    valleys

    and

    through

    mountains

    and

    gorges,

    it

    was esigne an ui t yIn ianengineersinarecor timeo

    eightyears!ItisafeatofcivilengineeringthattheBritishhad

    contemplatedacenturyagoandabandonedasbeingtoo

    formidable.

    16

  • 7/24/2019 Konkan Railways.pdf

    17/18

    17

  • 7/24/2019 Konkan Railways.pdf

    18/18

    18