knott county pedestrian bridge over ky …transportation.ky.gov/construction-procurement/project...

8
TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS INDEX OF SHEETS Sheet No. Description SPECIAL NOTES S1 Title Sheet General Notes Layout S2 SPECIAL PROVISIONS STANDARD DRAWINGS SPECIFICATIONS BGX-006-08 Stencils for Structures S ub s t r u c t u r e Superstructure BRIDGE TOTALS UNIT ITEM BID ESTIMATE OF QUANTITIES C.Y. LBS. R e i n f o r ce m e n t S t ee l C l a ss " A " C on c r e t e C.Y. S.Y. C o a ti ng M a s on r y PIER #1 BGX-012-02 Geotechnical Legend L.S. BID ITEM CODE 08100 08150 08001 02998 PLANS PREPARED BY: KY No. 12531 TITLE AND QUANTITIES S1 2012 AASHTO LRFD Bridge Design Specifications S3 L.S. L.F. L.F. S4 Foundation Layout S6 S5 1 CONSTRUCTI ON PROJ E CT NO. LETTI NG DATE 4 58 17 244 924 9405 1 S up e r s t r u c t u r e T r u ss B r i dg e of Pedestrian Bridges (2009) AASHTO LRFD Guide Specifications for the Design Signals (2008) Supports for Highway Signs, Luminaries, and Traffic AASHTO Standard Specifications for Structural Construction. 2012 Standard Specifications for Road and Bridge 1.7 7.0 16 49.5 1 24567ED STA. 12+01.81 PEDESTRIAN BRIDGE OVER KY 899 KNOTT COUNTY 54 i n c h C o mm on Dr ill e d S h a f t 48 i n c h R o c k Dr ill e d S h a f t 21777EN 20637ED L.F. L.F. 02614 T yp e A - 4 Ha nd r a il , L.F. 170 170 20745ED R o c k C o r i ng 20746ED C o mm on E x ca v a ti on S t r u c t u r e ABUTMENT #1 PIER #2 PIER #3 PIER #4 PIER #5 ABUTMENT #2 Bryan G. Stopper, P.E. 20 19 20 23 17 1107 8.0 15 872 6.7 12.7 11.7 3232 2782 1.7 244 1 23 46 42 19 RGX-030-06 Handrail Type A. A-1, A-2, A-3, A-4 SUPERSTRUCTURE IS INCIDENTAL TO TRUSS BRIDGE SUPERSTRUCTURE. NOTE: THE PORTION OF THE HANDRAIL TYPE A-2 ON THE TRUSS Abutments Piers 1, 2, 5 Sounding Layout Piers 3, 4 S7 Special Note 11C Drilled Shafts S8 6 147 18.5 23.0 8.0 8.0 41.5 16.0 40 42 S ound i ng s R o c k 1 1 PIER 3 & 4 REIN. STEEL CHANGED - DK 6-16-2016 23514EC C on c r e t e ) ( P r eca s t A cce ss S t a i r s 2 2 6-22-2017 Inserted the Bid Item Code. F I LE NAM E : DATE : DRAWING NO. SHEET NO. Commonwealth of Kentucky COUNTY ROUTE CROSSING PREPARED BY DETAILED BY: DESIGNED BY: DATE: CHECKED BY REVISION DATE S HEET L OC AT I ON: JULY 2015 G:\E ngr\HD1246. 04 \Bri dges \Cadd\001 - 27393 - S001 - Titl e Sheet. dgn dki rby 6/22 /2017 11 : 36: 43 AM KY 899 DEPARTMENT OF HIGHWAYS PEDESTRIAN OVERPASS ITEM NO. 12-8802.00 KNOTT 27393 DCK BGS BGS DCK Y K C U T N E K F O E T A T S D E S N E C I L R E E N I G N E L A N O I S S E F O R P 12531 BRYAN STOPPER HMB PROFESSIONAL ENGINEERS, INC. 23541EC

Upload: hoangthuan

Post on 19-Apr-2018

219 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: KNOTT COUNTY PEDESTRIAN BRIDGE OVER KY …transportation.ky.gov/Construction-Procurement/Project Related...TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS INDEX OF SHEETS ... dg e AASHTO

TR

AN

SP

OR

TA

TIO

N C

AB

INE

TD

EP

AR

TM

EN

T O

F H

IGH

WA

YS

IND

EX

OF

SH

EE

TS

Sh

eet

No

.D

escri

pti

on

SP

EC

IAL

NO

TE

S

S1

Title S

heet

Gen

eral N

otes

Layout

S2

SP

EC

IAL

PR

OV

ISIO

NS

ST

AN

DA

RD

DR

AW

ING

S

SP

EC

IFIC

AT

ION

S

BG

X-0

06

-0

8 S

ten

cil

s f

or S

tru

ctu

res

Substructure

Superstructure

BR

IDG

E T

OT

AL

S

UN

IT

ITE

M

BID

ES

TIM

AT

E O

F Q

UA

NT

IT

IE

S

C.Y

.L

BS

.Reinforcement

Steel

Class "A"

Concrete

C.Y

.S

.Y.Coating

Masonry

PIE

R #

1

BG

X-012-02 G

eote

chnic

al

Legend

L.S

.

BID

IT

EM

CO

DE

0

81

00

0

81

50

08

00

1 0

29

98

PL

AN

S P

RE

PA

RE

D B

Y:

KY

No

. 1

25

31

TIT

LE

AN

D Q

UA

NT

ITIE

S

S1

20

12

AA

SH

TO

LR

FD

Brid

ge D

esig

n S

pecif

icati

on

s

S3

L.S

.L

.F.

L.F

.

S4

Fo

un

datio

n L

ay

ou

t

S6

S5

1

CONSTRUCTION PROJECT NO.LETTING DATE

4 58

17

244

92

4

94

05

1

Superstructure

Truss Bridge

of P

edestrian B

ridges (2009)

AA

SH

TO

LR

FD

Gu

id

e S

pecificatio

ns f

or t

he D

esig

n

Signals (

2008)

Supports f

or H

ighw

ay S

igns, L

um

inaries, and T

raffic

AA

SH

TO

Standard S

pecifications f

or S

tructural

Co

nstru

ctio

n.

2012 S

tandard S

pecifications f

or R

oad a

nd B

ridge

1.7

7.0

16

49

.51

24

56

7E

D

ST

A. 12+

01.8

1

PE

DE

ST

RIA

N B

RID

GE

OV

ER

KY

899

KN

OT

T C

OU

NT

Y

54 inch

Common

Drilled Shaft

48 inch

Rock

Drilled Shaft

2

17

77

EN

20

63

7E

D

L.F

.L

.F.

02

61

4 Type A-4

Handrail, L.F

.

17

0

17

0

20

74

5E

D

Rock Coring

20

74

6E

D

Common

Excavation

Structure

AB

UT

ME

NT

#1

PIE

R #

2

PIE

R #

3

PIE

R #

4

PIE

R #

5

AB

UT

ME

NT

#2

Bry

an

G.

Sto

pp

er,

P.E

.

20

19

20

23

17

11

07

8.0

15

872

6.7

12

.7

11.7

3232

2782

1.7

24

4

1

23

46

42

19

RG

X-0

30

-0

6 H

an

drail

Ty

pe A

. A

-1

, A

-2

, A

-3

, A

-4

SU

PE

RS

TR

UC

TU

RE

IS

IN

CID

EN

TA

L T

O T

RU

SS

BR

IDG

E S

UP

ER

ST

RU

CT

UR

E.

NO

TE

: T

HE

PO

RT

ION

OF

TH

E H

AN

DR

AIL

TY

PE

A-2

ON

TH

E T

RU

SS

Ab

utm

en

ts

Piers 1

, 2

, 5

Sounding L

ayout

Piers 3, 4

S7

Sp

ecial N

ote 1

1C

Drilled

Sh

afts

S8

6

14

7

18

.5

23

.0

8.0

8.0

41

.516.0

40

42

Soundings

Rock

1

1P

IE

R 3

& 4

RE

IN

. S

TE

EL

CH

AN

GE

D -

DK

6-1

6-2

01

6

2

35

14

EC

Concrete)

(Precast

Access Stairs

2

26-22-2017

Inserted the B

id Item

C

ode.

FILE NAME:

DATE:

DR

AW

ING

NO

.

SH

EE

T N

O.

Co

mm

on

wea

lth

of

Ken

tuck

y

CO

UN

TY

RO

UT

EC

RO

SS

ING

PR

EP

AR

ED

BY

DE

TA

IL

ED

BY

:

DE

SIG

NE

D B

Y:

DA

TE

:C

HE

CK

ED

BY

RE

VIS

IO

ND

AT

E

SHEET LOCATION:

JU

LY

20

15

G:\Engr\HD1246.04\Bridges\Cadd\001-27393-S001-Title Sheet.dgndkirby

6/22/201711:36:43 AM

KY

899

DE

PA

RT

ME

NT

OF

HIG

HW

AY

S

PE

DE

ST

RIA

N O

VE

RP

AS

S

ITE

M N

O.

12

-88

02

.00

KN

OT

T

27

39

3

DC

K

BG

S

BG

S

DC

K

YK

CU

TN

EK

FO

ET

ATS

DE

SN

ECI

L

RE

E

NI

GN

E

LA

NOI

SS

EF

ORP

12531

BR

YA

N S

TO

PP

ER

HM

B P

RO

FE

SS

ION

AL

EN

GIN

EE

RS

, IN

C.

2354

1EC

dkirby
Signature
Page 2: KNOTT COUNTY PEDESTRIAN BRIDGE OVER KY …transportation.ky.gov/Construction-Procurement/Project Related...TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS INDEX OF SHEETS ... dg e AASHTO

SP

EC

IFIC

AT

ION

S

MA

TE

RIA

LS

DE

SIG

N S

PE

CIF

ICA

TIO

NS

F

’c

F

’c

CO

NC

RE

TE

OF

TH

E S

UB

ST

RU

CT

UR

E A

BO

VE

TH

E B

RID

GE

SE

AT

S. C

LA

SS

"A

" C

ON

CR

ET

E I

S T

O B

E U

SE

D I

N T

HE

SU

BS

TR

UC

TU

RE

BE

LO

W T

HE

BR

IDG

E S

EA

TS

, E

XC

EP

T A

S N

OT

ED

.

BE

VE

LE

D E

DG

ES

DIM

EN

SIO

NS

CO

NS

TR

UC

TIO

N I

DE

NT

IFIC

AT

ION

TH

E N

AM

ES

OF

TH

E P

RIM

E C

ON

TR

AC

TO

R A

ND

TH

E S

UB

CO

NT

RA

CT

OR

SH

AL

L B

E I

MP

RIN

TE

D I

N T

HE

SH

AL

L F

UR

NIS

H A

LL

PL

AN

S, E

QU

IPM

EN

T A

ND

LA

BO

R N

EC

ES

SA

RY

TO

DO

TH

E W

OR

K F

OR

WH

ICH

NO

DIR

EC

T P

AY

ME

NT

WIL

L B

E M

AD

E.

ST

UD

SH

EA

R C

ON

NE

CT

OR

S,

UN

S G

10

15

HIG

H S

TR

EN

GT

H B

OL

TS

, N

UT

S, A

ND

WA

SH

ER

S

SH

EE

T L

EA

D A

ND

PIG

LE

AD

AL

L F

LA

NG

E A

ND

WE

B M

AT

ER

IAL

, IN

CL

UD

ING

SP

LIC

E P

LA

TE

S,

IN L

ON

GIT

UD

INA

L P

LA

TE

GIR

DE

RS

SH

AL

L

ME

ET

TH

E L

ON

GIT

UD

INA

L C

HA

RP

Y V

-NO

TC

H T

OU

GH

NE

SS

TE

ST

AP

PL

ICA

BL

E T

O Z

ON

E 2

IN

AC

CO

RD

AN

CE

WIT

H T

HE

FO

LL

OW

ING

:

MA

TE

RIA

L

MA

TE

RIA

L S

PE

CIF

ICA

TIO

NS

B29-79

M

-164M

T

YP

E 3

M

-1

69

F

y

F

y

F

y

HIG

H S

TR

EN

GT

H B

OL

T C

ON

NE

CT

ION

S

PR

OH

IBIT

ED

FIE

LD

WE

LD

ING

EX

CE

PT

AS

SH

OW

N O

N T

HE

PL

AN

S,

NO

WE

LD

ING

OF

AN

Y N

AT

UR

E S

HA

LL

BE

PE

RF

OR

ME

D O

N T

HE

LO

AD

WE

LD

ING

SP

EC

IFIC

AT

ION

S

WE

LD

ING

PR

OC

ED

UR

E

DE

SIG

N L

OA

D A

ND

ME

TH

OD

=

3.5

KS

I F

OR

CL

AS

S "

A" R

EIN

FO

RC

ED

CO

NC

RE

TE

= 4.0

KS

I F

OR

CL

AS

S "

AA

" R

EIN

FO

RC

ED

CO

NC

RE

TE

=

60

KS

I F

OR

ST

EE

L R

EIN

FO

RC

EM

EN

T

AS

TM

OR

AA

SH

TO

SP

EC

IFIC

AT

ION

S A

S D

ES

IGN

AT

ED

BE

LO

W S

HA

LL

GO

VE

RN

TH

E M

AT

ER

IAL

S F

UR

NIS

HE

D.

ST

RU

CT

UR

AL

ST

EE

L

(GR

AD

E 3

6)

HIG

H S

TR

EN

GT

H L

OW

AL

LO

Y S

TR

UC

TU

RA

L S

TE

EL

(G

RA

DE

50W

)

= 36 K

SI F

OR

DR

AIN

S &

AR

MO

RE

D E

DG

ES

A.S

.T.M

. A

AS

HT

O

M

-270M

G

RA

DE

36

M

-2

70

M G

RA

DE

50

W

25

FT

-L

BF

AT

40

DE

G.

F.

25

FT

-L

BF

AT

40

DE

G.

F.

30

FT

-L

BF

AT

40

DE

G.

F.

SA

MP

LIN

G &

TE

ST

ING

PR

OC

ED

UR

ES

SH

AL

L B

E I

N A

CC

OR

DA

NC

E W

ITH

AA

SH

TO

T2

43

(C

.E.)

, U

TIL

IZIN

G (

H)

FR

EQ

UE

NC

Y T

ES

TIN

G. W

HE

N P

LA

TE

TH

ICK

NE

SS

EX

CE

ED

S 1

.5 I

N, F

RE

QU

EN

CY

OF

TE

ST

ING

SH

AL

L B

E (

P).

CL

AS

S "

AA

" C

ON

CR

ET

E I

S T

O B

E U

SE

D I

N T

HE

RO

AD

WA

Y S

LA

B,

BA

RR

IER

S,

AN

D I

N T

HE

PO

RT

ION

S

RE

INF

OR

CE

ME

NT

F

y

= 50 K

SI F

OR

PIL

IN

G

AL

L E

XP

OS

ED

ED

GE

S S

HA

LL

BE

BE

VE

LE

D 7

/8" U

NL

ES

S O

TH

ER

WIS

E N

OT

ED

.

DIM

EN

SIO

NS

AR

E F

OR

A N

OR

MA

L T

EM

PE

RA

TU

RE

OF

60 D

EG

RE

ES

FA

HR

EN

HE

IT. L

AY

OU

T D

IME

NS

ION

S

AR

E H

OR

IZO

NT

AL

DIM

EN

SIO

NS

.

CO

NC

RE

TE

WIT

H 1

IN

CH

LE

TT

ER

S A

T A

LO

CA

TIO

N D

ES

IGN

AT

ED

BY

TH

E E

NG

INE

ER

. T

HE

CO

NT

RA

CT

OR

CO

MP

LE

TIO

N O

F T

HE

ST

RU

CT

UR

E

LA

BO

R,

OR

AN

YT

HIN

G E

LS

E R

EQ

UIR

ED

TO

CO

MP

LE

TE

TH

E S

TR

UC

TU

RE

.

BA

CK

FIL

LIN

G,

RE

MO

VA

L O

F A

LL

OR

PA

RT

S O

F E

XIS

TIN

G S

TR

UC

TU

RE

S,

PH

AS

E C

ON

ST

RU

CT

ION

, IN

CID

EN

TA

L M

AT

ER

IAL

S,

MO

ST

AP

PR

OP

RIA

TE

TO

TH

E W

OR

K I

NV

OL

VE

D. T

HIS

MA

Y I

NC

LU

DE

CO

FF

ER

DA

MS

, S

HO

RIN

G, E

XC

AV

AT

ION

S,

MA

TE

RIA

L,

LA

BO

R O

R C

ON

ST

RU

CT

ION

OP

ER

AT

ION

S,

NO

T O

TH

ER

WIS

E S

PE

CIF

IED

, A

RE

TO

BE

IN

CL

UD

ED

IN

TH

E B

ID I

TE

M

TH

E C

ON

TR

AC

TO

R I

S R

EQ

UIR

ED

TO

CO

MP

LE

TE

TH

E S

TR

UC

TU

RE

IN

AC

CO

RD

AN

CE

WIT

H T

HE

PL

AN

S A

ND

SP

EC

IFIC

AT

ION

S.

DE

SIG

NA

TE

D B

Y S

UF

FIX

(S

) I

N B

IL

L O

F R

EIN

FO

RC

EM

EN

T.

DIM

EN

SIO

NS

SH

OW

N F

RO

M T

HE

FA

CE

OF

CO

NC

RE

TE

TO

BA

RS

AR

E T

O C

EN

TE

R O

F

BA

RS

UN

LE

SS

OT

HE

RW

IS

E S

HO

WN

. S

PA

CIN

G O

F B

AR

S I

S F

RO

M C

EN

TE

R T

O C

EN

TE

R

OF

BA

RS

. C

LE

AR

DIS

TA

NC

E T

O F

AC

E O

F C

ON

CR

ET

E I

S 2

", U

NL

ES

S O

TH

ER

WIS

E N

OT

ED

.

EP

OX

Y C

OA

T B

AR

S D

ES

IG

NA

TE

D B

Y S

UF

FIX

(E

) I

N A

CC

OR

DA

NC

E W

IT

H S

EC

TIO

N 8

11

.10

OF

TH

E S

TA

ND

AR

D S

PE

CIF

IC

AT

IO

NS

. U

SE

ST

IR

RU

P B

EN

D D

IA

ME

TE

RS

FO

R B

AR

S

CA

RR

YIN

G M

EM

BE

RS

OF

TH

E B

RID

GE

WIT

HO

UT

TH

E W

RIT

TE

N C

ON

SE

NT

OF

TH

E D

IRE

CT

OR

, D

IVIS

ION

OF

BR

IDG

E D

ES

IGN

, A

ND

TH

EN

ON

LY

IN

TH

E M

AN

NE

R A

ND

AT

TH

E L

OC

AT

ION

S D

ES

IGN

AT

ED

IN

TH

E

AU

TH

OR

IZA

TIO

N.

AL

L W

EL

DIN

G A

ND

WE

LD

ING

MA

TE

RIA

LS

EX

CE

PT

FO

R R

EIN

FO

RC

EM

EN

T, S

HA

LL

CO

NF

OR

M T

O "

JO

INT

SP

EC

IFIC

AT

ION

AN

SI/

AA

SH

TO

/AW

S D

1.5

-95 B

RID

GE

WE

LD

ING

CO

DE

". M

OD

IFIC

AT

ION

AN

D A

DD

ITIO

NS

AS

ST

AT

ED

ON

TH

E P

LA

NS

AN

D S

PE

CIA

L P

RO

VIS

ION

4(0

4),

CU

RR

EN

T E

DIT

ION

, S

HA

LL

SU

PE

RS

ED

E T

HE

JO

INT

SP

EC

IFIC

AT

ION

S.

QU

AL

IFIC

AT

ION

TE

ST

S O

F A

LL

WE

LD

ING

PR

OC

ED

UR

ES

SH

AL

L B

E C

OM

PL

ET

ED

BY

TH

E C

ON

TR

AC

TO

R A

ND

AP

PR

OV

ED

BY

TH

E E

NG

INE

ER

PR

IOR

TO

TH

E F

INA

L A

PP

RO

VA

L O

F T

HE

SH

OP

DR

AW

ING

S A

ND

WE

LD

ING

PR

OC

ED

UR

E A

ND

TH

E S

TA

RT

OF

TH

E F

AB

RIC

AT

ION

.

UN

LE

SS

OT

HE

RW

ISE

SP

EC

IFIE

D O

N T

HE

PL

AN

S, A

LL

BO

LT

ED

CO

NN

EC

TIO

NS

SH

AL

L B

E A

ST

M A

325 7

/8 I

NC

H

DIA

ME

TE

R H

IGH

ST

RE

NG

TH

BO

LT

S, N

UT

S, A

ND

WA

SH

ER

S. O

PE

N H

OL

ES

SH

AL

L B

E 1

5/1

6 I

N D

IAM

ET

ER

.

TY

PE

3 B

OL

TS

SU

ITA

BL

E F

OR

US

E W

ITH

WE

AT

HE

RIN

G S

TE

EL

SH

AL

L B

E U

SE

D A

S D

ES

CR

IBE

D I

N A

AS

HT

O

M 1

64. A

LL

HIG

H S

TR

EN

GT

H B

OL

TE

D F

IEL

D C

ON

NE

CT

ION

S A

RE

TO

BE

IN

ST

AL

LE

D U

SIN

G "

DIR

EC

T T

EN

SIO

N

IND

ICA

TO

RS

" (

DT

I’S

) IN

AC

CO

RD

AN

CE

WIT

H T

HE

ST

AN

DA

RD

SP

EC

IFIC

AT

ION

S A

ND

AS

TM

F9

59

. A

LL

DT

I’S

SH

AL

L B

E M

EC

HA

NIC

AL

LY

ZIN

C C

OA

TE

D W

ITH

BA

KE

D E

PO

XY

AP

PL

IED

OV

ER

TH

E Z

INC

CO

AT

ING

. I

NS

TA

LL

AT

ION

DE

TA

ILS

OF

TH

E D

TI’

S S

HA

LL

BE

SH

OW

N O

N T

HE

SH

OP

PL

AN

S.

DIS

CL

AIM

ER

AP

PR

OV

AL

WIL

L B

E C

ON

TIN

GE

NT

ON

TH

E S

AT

ISF

AC

TO

RY

CO

MP

LE

TIO

N O

F T

HE

PR

OJE

CT

.

IS N

OT

BO

UN

D B

Y A

CC

EP

TA

NC

E O

F A

NY

SU

BM

ISS

ION

S R

EQ

UIR

ED

. F

INA

L A

CC

EP

TA

NC

E O

R

WO

RK

PE

RF

OR

ME

D A

ND

AU

TH

OR

IZA

TIO

N F

OR

TH

E C

ON

TR

AC

TO

R T

O P

RO

CE

ED

. T

HE

DE

PA

RT

ME

NT

CO

NS

TIT

UT

E E

ND

OR

SE

ME

NT

OR

AP

PR

OV

AL

. T

HE

AC

CE

PT

AN

CE

IS

AC

KN

OW

LE

DG

EM

EN

T O

F T

HE

AC

CE

PT

AN

CE

OF

AN

Y C

ON

TR

AC

TO

R’S

SU

BM

ISS

ION

RE

QU

IRE

D O

N T

HIS

PR

OJE

CT

DO

ES

NO

T

GE

NE

RA

L N

OT

ES

S2

PR

EF

AB

RIC

AT

ED

BR

IDG

E

of the full dead load deflection plus 1%

of the full length of the bridge.

Th

e b

rid

ge s

hall h

av

e a

vertical c

am

ber d

im

en

sio

n a

t m

id

sp

an

eq

ual t

o 1

00

%

deliv

ery

.

material and w

orkm

anship defects for a period of ten years from

the date of

Th

e b

rid

ge m

an

ufactu

rer sh

all w

arran

t th

eir steel stru

ctu

re(s) to

b

e free o

f d

esig

n,

Ken

tu

ck

y an

d d

on

e in

acco

rd

an

ce w

ith

reco

gn

ized

en

gin

eerin

g p

ractices an

d p

rin

cip

les.

the direct supervision of a L

icensed P

rofessional E

ngineer in the S

tate of

Structural design of the bridge structure shall be perform

ed by or under

by a P

rofessional E

ngineer w

ho is licensed in the S

tate of K

entucky.

referen

ced

d

etails an

d sh

eet n

um

bers. A

ll d

raw

in

gs sh

all b

e sig

ned

an

d sealed

notes shall be clearly specified on the draw

ings. D

raw

ings shall have cross

mem

ber sizes, bridge reactions, anchor bolt spacing dim

ensions, and general

Th

ese sh

op

d

raw

in

gs sh

all sh

ow

all relative design inform

ation such as

Subm

it s

hop d

raw

ings i

n a

ccordance w

ith t

he K

DO

H S

tandard S

pecifications.

PR

EF

AB

RIC

AT

ED

BR

IDG

E -

OT

HE

R S

UB

MIT

TA

LS

by a P

rofessional E

ngineer w

ho is licensed in the S

tate of K

entucky.

by the bridge m

anufacturer. A

ll calculations shall be signed and sealed

Stru

ctu

ral calcu

latio

ns fo

r th

e b

rid

ge su

perstru

ctu

re sh

all b

e su

bm

itted

GR

AD

E 3

6 (

AR

MO

RE

D E

DG

E)

- U

P T

O 4

IN

TH

IC

KN

ES

S

GR

AD

E 5

0W

-

UP

TO

2 I

N T

HIC

KN

ES

S

GR

AD

E 5

0W

- O

VE

R 2

IN

TO

4 I

N T

HIC

KN

ES

S

AIS

C S

hop C

ertification.

In

sp

ectio

n an

d M

ain

ten

an

ce p

ro

ced

ures.

Warran

ty

in

fo

rm

atio

n.

Splicing and erection procedures.

standard qualification tests.

Weld

er c

ertificatio

ns i

n c

om

plian

ce w

ith

AW

S

RE

FE

RE

NC

ES

TO

TH

E S

PE

CIF

ICA

TIO

NS

AR

E T

O T

HE

CU

RR

EN

T E

DIT

ION

OF

TH

E

KE

NT

UC

KY

DE

PA

RT

ME

NT

OF

HIG

HW

AY

S S

TA

ND

AR

D S

PE

CIF

ICA

TIO

NS

FO

R R

OA

D

AN

D B

RID

GE

CO

NS

TR

UC

TIO

N I

NC

LU

DIN

G A

NY

CU

RR

EN

T S

UP

PL

EM

EN

TA

L S

PE

CIF

ICA

TIO

NS

.

AL

L R

EF

ER

EN

CE

S T

O T

HE

AA

SH

TO

SP

EC

IFIC

AT

ION

S A

RE

TO

TH

E C

UR

RE

NT

ED

ITIO

N

OF

TH

E A

AS

HT

O L

RF

D B

RID

GE

DE

SIG

N S

PE

CIF

ICA

TIO

NS

, W

ITH

IN

TE

RIM

S.

and reinforcem

ent shall be included in the lum

p sum

bid for T

russ B

ridge S

uperstructure.

Ep

ox

y co

ated

rein

fo

rcem

en

t sh

all b

e u

sed

in

th

e co

ncrete d

eck

. T

he co

ncrete d

eck

based

up

on

stru

ctu

ral a

nd

/o

r s

hip

pin

g r

eq

uirem

en

ts.

sh

all d

eterm

in

e t

he d

istan

ce f

ro

m t

he t

op

of t

he d

eck

to

th

e t

op

an

d b

otto

m t

ru

ss m

em

bers

(are p

laced

up

in

sid

e t

he t

ru

sses a

nd

attach

ed

to

th

e t

ru

ss v

erticals).

Th

e b

rid

ge m

an

ufactu

rer

faces. B

ridge s

hall b

e d

esigned u

tilizing a

n H

-S

ection c

onfiguration w

here t

he f

loor b

eam

s

vertical m

em

bers. Interior v

ertical m

em

bers m

ay b

e e

ither p

lum

b o

r p

erpendicular t

o t

he c

hord

Bridge s

hall b

e d

esigned a

s a

straight t

russ t

hat h

as o

ne d

iagonal p

er p

anel a

nd p

lum

b e

nd

on the sole plate.

tight only nuts to allow

m

ovem

ent under therm

al expansion or contraction in slotted holes

tig

hten

in

g th

e n

uts o

n th

e an

ch

or b

olts at that end. T

he opposite end w

ill have finger

stru

ctu

re sh

all b

e v

ulcan

ized

to

th

e b

earin

g p

ad

. O

ne en

d o

f th

e b

rid

ge w

ill b

e fix

ed

b

y fu

lly

Sp

ecificatio

ns. U

se G

as 9

5 p

si. T

he b

rid

ge b

earin

g so

le p

late w

hich

is b

olted

to

th

e b

rid

ge

sh

all b

e d

esig

ned

in

acco

rd

an

ce w

ith

Meth

od

B i

n t

he A

AS

HT

O L

RF

D B

ridge D

esign

with

steel sh

im

s if req

uired

p

laced

o

n th

e ab

utm

en

t o

r g

ro

ut p

ad

. T

he elasto

meric b

earin

g p

ad

s

Brid

ge b

earin

gs s

hall c

on

sist o

f a

steel (

GR

AD

E 5

0W

) s

ole p

late a

nd

an

elasto

meric b

earin

g p

ad

= 5

0 K

SI

FO

R S

TE

EL

GIR

DE

RS

& T

RU

SS

ME

MB

ER

S,

SE

CO

ND

AR

Y M

EM

BE

RS

. S

TIF

FN

ER

S &

SP

LIC

ES

SP

EC

IF

IC

AT

IO

NS

",

20

10

.

DE

SIG

N I

SS

UE

S N

OT

AD

DR

ES

SE

D I

N T

HE

GU

IDE

SP

EC

. R

EF

ER

TO

"A

AS

HT

O L

RF

D B

RID

GE

DE

SIG

N

ST

RU

CT

UR

AL

SU

PP

OR

TS

FO

R H

IGH

WA

Y S

IGN

S,

LU

MIN

AR

IES

, A

ND

TR

AF

FIC

SIG

NA

LS

",

20

08

.

WIN

D L

OA

D S

HA

LL

BE

AS

RE

FE

RE

NC

ED

IN

TH

E G

UID

E T

O "

AA

SH

TO

ST

AN

DA

RD

SP

EC

IFIC

AT

ION

S F

OR

IN T

HE

AA

SH

TO

"L

RF

D G

UID

E S

PE

CIF

ICA

TIO

NS

FO

R T

HE

DE

SIG

N O

F P

ED

ES

TR

IAN

BR

IDG

ES

" (

2009).

TH

IS B

RID

GE

SH

AL

L B

E D

ES

IGN

ED

FO

R A

90

PS

F P

ED

ES

TR

IAN

LO

AD

ING

WIT

HO

UT

IM

PA

CT

AS

DE

SC

RIB

ED

FO

R T

RU

SS

BR

IDG

E S

UP

ER

ST

RU

CT

UR

E.

INS

TA

LL

AN

CH

OR

BO

LT

S I

N A

CC

OR

DA

NC

E W

ITH

KY

TC

SP

EC

IFIC

AT

ION

S 6

07.0

3.1

7.

TH

E C

OS

T O

F D

RIL

LIN

G A

NC

HO

R B

OL

T H

OL

ES

, H

EA

TIN

G A

NC

HO

R B

OL

TS

, F

UR

NIS

HIN

G L

EA

D O

R G

RO

UT

AN

D F

ILL

ING

TH

E H

OL

ES

SH

AL

L B

E I

NC

IDE

NT

AL

TO

AN

D I

NC

LU

DE

D I

N T

HE

LU

MP

SU

M B

ID

PE

DE

ST

RIA

N R

AIL

pain

ted

g

lo

ss b

lack

.

under H

andrail T

ype A

-4. A

ll p

ortions o

f t

he r

ailing, both A

-2 a

nd A

-4, shall b

e

EN

GIN

EE

R. T

he p

ortio

n o

f th

e railin

g o

n th

e stairs is a sep

arate b

id

item

Superstructure. S

hop draw

ings shall be subm

itted for the approval of the

an

d ap

pu

rten

an

ces sh

all b

e in

clu

ded

in

th

e lu

mp

su

m b

id

fo

r T

ru

ss B

rid

ge

ped

estrian

rail, in

clu

din

g b

ut n

ot lim

ited

to

all steel rails, p

osts, fittin

gs, p

ain

tin

g,

lab

or, m

aterials, eq

uip

men

t, an

d fin

ish

in

g item

s n

ecessary

fo

r th

e p

lacem

en

t o

f

Standard D

raw

ing R

GX

-030-06 T

ype A

-2 o

n t

he t

russ s

uperstructure. A

ll

Work includes providing all pedestrian rails, com

plete, in accordance w

ith

sh

all b

e t

he r

esp

on

sib

ility

of t

he E

NG

IN

EE

R.

brack

et an

d/o

r fo

otin

gs), in

clu

din

g d

esig

n o

f an

ch

or b

olt em

bed

men

ts,

Engineering design of the bridge supporting foundations (abutm

ent, pier,

to

b

e tran

sferred

b

y th

e su

perstru

ctu

re to

th

e su

pp

ortin

g fo

un

datio

ns.

bolts. T

he anchor bolts shall be designed to resist all horizontal and uplift forces

The bridge m

anufacturer shall determ

ine the num

ber and diam

eter of all anchor

AN

CH

OR

BO

LT

S A

ND

HO

LE

S

PR

EC

AS

T S

TA

IRS

co

lor a

s d

esig

nate

d b

y A

LIC

E L

LO

YD

CO

LL

EG

E.

Co

nta

ct

Dir

ecto

r o

f P

hy

sic

al

Pla

nt

(6

06

)3

68

-6

13

0.

at e

very f

loor b

eam

location. A

ll s

teel m

em

bers s

hall b

e G

rade 5

0W

(w

eathering s

teel) a

nd p

ainted a

shape s

tringers (

w-shapes o

r c

hannels),

a m

inim

um

of o

ne s

tiffen

er s

hall b

e p

ro

vid

ed

in

each

strin

ger

and f

astenings a

re s

pecifically d

esigned t

o p

rovide a

dequate l

ateral s

upport t

o t

he t

op f

lange o

f o

pen

fab

ricated

fro

m s

tru

ctu

ral s

teel s

hap

es o

r s

qu

are a

nd

rectan

gu

lar s

tru

ctu

ral s

teel t

ub

in

g.

Un

less t

he f

lo

or

fro

m s

qu

are a

nd

/o

r r

ectan

gu

lar s

tru

ctu

ral s

teel t

ub

in

g.

Oth

er s

tru

ctu

ral m

em

bers a

nd

bracin

g s

hall b

e

All m

em

bers o

f t

he v

ertical t

russes (

top a

nd b

ottom

chords, verticals, and d

iagonals) s

hall b

e f

abricated

by a P

rofessional E

ngineer w

ho is licensed in the S

tate of K

entucky.

by the bridge m

anufacturer. A

ll calculations shall be signed and sealed

Structural calculations for the precast concrete stairs shall be subm

itted

sealed by a P

rofessional E

ngineer w

ho is licensed in the S

tate of K

entucky.

cross referenced details and sheet num

bers. A

ll draw

ings shall be signed and

general notes shall be clearly specified on the draw

ings. D

raw

ings shall have

mem

ber sizes, rein

fo

rcin

g, reactio

ns, an

ch

or b

olt sp

acin

g d

im

en

sio

ns, an

d

Th

ese sh

op

d

raw

in

gs sh

all sh

ow

all relative design inform

ation such as

Subm

it s

hop d

raw

ings i

n a

ccordance w

ith t

he K

DO

H S

tandard S

pecifications.

GE

OT

EC

HN

ICA

L I

NF

OR

MA

TIO

N

pro

ject (

S-0

72

-2

01

5).

By

referen

ce t

his r

ep

ort i

s p

art o

f t

he c

on

tract d

ocu

men

ts.

Additional n

otes a

nd i

nfo

rm

atio

n a

re c

on

tain

ed

in

th

e g

eo

tech

nical r

ep

ort f

or t

his

th

e u

nit p

rice b

id

fo

r P

recast C

on

crete S

tairs.

installation and furnishing of the bearings and connections are included in

co

nn

ectio

ns to

th

e su

bstru

ctu

re are to

b

e in

clu

ded

in

th

e su

bm

ittals. T

he

th

e stairs sh

all b

e ep

ox

y co

ated

.T

he d

esig

n, d

etailin

g o

f th

e b

earin

gs an

d

Tw

o 4

’ w

id

e u

nits o

r o

ne 8

’ w

id

e u

nit are accep

tab

le. R

ein

fo

rcin

g u

sed

in

TH

OS

E C

HA

NG

ES

TO

TH

E D

EP

AR

TM

EN

T T

HR

OU

GH

TH

E C

ON

TR

AC

TO

R.

IF A

NY

CH

AN

GE

S I

N T

HE

DE

SIG

N P

LA

NS

AR

E P

RO

PO

SE

D B

Y A

FA

BR

ICA

TO

R O

R S

UP

PL

IER

, S

UB

MIT

DE

SIG

NE

R F

OR

DIS

TR

IBU

TIO

N A

S S

HO

WN

ON

TH

E D

IVIS

ION

S W

EB

SIT

E.

DE

SIG

NE

R S

HA

LL

RE

QU

ES

T T

HE

FA

BR

ICA

TO

R T

O S

EN

D T

HE

RE

QU

IRE

D N

UM

BE

R O

F S

ET

S T

O T

HE

TO

TH

E F

AB

RIC

AT

OR

. I

F D

ES

IGN

ER

IS

SA

TIS

FIE

D T

HA

T T

HE

CO

NS

TR

UC

TIO

N C

AN

PR

OC

EE

D,

TH

E

TH

E D

ES

IGN

ER

SH

AL

L R

EV

IEW

TH

E S

UB

MIT

TA

L A

ND

SE

ND

A S

ET

WIT

H T

HE

IR C

OM

ME

NT

S B

AC

K

FR

AN

KF

OR

T, K

Y 4

0601

3 H

MB

CIR

CL

E

US

46

0 G

EO

RG

ET

OW

N R

OA

D

HM

B P

RO

FE

SS

ION

AL

EN

GIN

EE

RS

, IN

C.

AN

D S

PE

CIF

IC

AT

IO

NS

TO

:

FA

BR

ICA

TO

RS

SH

AL

L S

EN

D 3

SE

TS

OF

SH

OP

DR

AW

ING

S T

HA

T A

RE

RE

QU

IRE

D B

Y T

HE

PL

AN

S

SH

OP

DR

AW

ING

PR

OC

ED

UR

E

G

EN

ER

AL

NO

TE

S

FILE NAME:

DATE:

DR

AW

ING

NO

.

SH

EE

T N

O.

Co

mm

on

wea

lth

of

Ken

tuck

y

CO

UN

TY

RO

UT

EC

RO

SS

ING

PR

EP

AR

ED

BY

DE

TA

IL

ED

BY

:

DE

SIG

NE

D B

Y:

DA

TE

:C

HE

CK

ED

BY

RE

VIS

IO

ND

AT

E

SHEET LOCATION:

JU

LY

20

15

G:\Engr\HD1246.04\Bridges\Cadd\002-27393-S002-General Notes.dgndkirby

3/17/20169:46:21 AM

KY

899

DE

PA

RT

ME

NT

OF

HIG

HW

AY

S

PE

DE

ST

RIA

N O

VE

RP

AS

S

ITE

M N

O.

12

-88

02

.00

KN

OT

T

27

39

3

DC

K

BG

S

BG

S

DC

K

HM

B P

RO

FE

SS

ION

AL

EN

GIN

EE

RS

, IN

C.

Page 3: KNOTT COUNTY PEDESTRIAN BRIDGE OVER KY …transportation.ky.gov/Construction-Procurement/Project Related...TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS INDEX OF SHEETS ... dg e AASHTO

C.P

. 3

WV

12+00

EX R/W

(ASPHALT)

SIG

N

POST

POST

SIG

N

SAN

MH

GATE

STONE

1 STORY

3"

WATERLINE

2" GAS SERVICE LINE

SA

ME DITCH(P

UMP

&PRESSURE)

6"

WATERLINE 2 LINES

EX R/

W

980

990

970

980

970

960

960

960

PL

AN

EL

EV

AT

ION

3’-6"

! B

RID

GE

GR

AD

E

PR

OF

ILE

RA

ILIN

G

PE

DE

ST

RIA

N

SL

AB

CO

NC

RE

TE

FL

OO

RB

EA

M

TO

P C

HO

RD

TY

PIC

AL

SE

CT

ION

CO

LL

EG

E M

AIN

CA

MP

US

TO

AL

LIC

E L

LO

YD

GR

OU

ND

LIN

E

EX

IST

ING

VERT. CL.

17’-0" MIN.

-0.5

%

EL

EV

. 9

82

.93

EL

EV

. 9

75

.93

EL

EV

. 968.9

4

EL

EV

. 9

83

.50

EL

EV

. 977.0

8

EL

EV

. 970.0

8

EL

EV

. 963.0

8

ST

A. 11+

81.8

4

VE

RT

. C

LE

AR

.

PO

IN

T O

F M

IN

.

! B

RID

GE

N 6

3°4

5’ 2

4" E

11

2’-

0" T

RU

SS

SP

AN

7"

7"

11

3’-

2" O

UT

TO

OU

T T

RU

SS

BR

IDG

E

ST

A. 11+

45.8

1

! P

IE

R 3

ST

A. 1

2+

57

.81

! P

IE

R 4

ST

A. 11+

28.3

1

! P

IE

R 2

ST

A. 11+

13.2

3

! P

IE

R 1

ST

A.

11

+0

0.6

5

BE

GIN

ST

AIR

ST

A. 1

2+

72

.97

! P

IE

R 5

ST

A. 1

2+

85

.56

EN

D S

TA

IR

28’-3"

MIN. CL.

42’-0"

MIN. CL.

LANE

12’-0"

P.O

.T.

10

+5

0.0

0

11+00

POST

=

38°1

0’ 1

4"

P.I

. 11+

42.7

3

=

58

°28

’ 5

0"

P.I

. 10+

69.7

4

5’-0"

5’-0"

@ 1

1"=

10’-

1"

11

TR

EA

DS

@ 1

1"=

9’-

2"

10 T

RE

AD

S

@ 1

1"=

10’-

1"

11

TR

EA

DS

P.O

.T.

12

+9

5.0

0

@ 1

1"=

10’-

1"

11

TR

EA

DS

5’-0

"

@ 1

1"=

10’-

1"

11

TR

EA

DS

RO

CK

LIN

E

AP

PR

OX

IMA

TE

8’-0

"

BR

AC

E

DIA

GO

NA

L

(T

YP

.)

HA

ND

RA

IL

TY

PE

A-4

(T

YP

.)

FE

NC

E M

ES

H

CH

AIN

LIN

K

8’-0" CLEAR HEIGHT

(TYP.)

8’-

0"

S3

LA

YO

UT

FILE NAME:

DATE:

DR

AW

ING

NO

.

SH

EE

T N

O.

Co

mm

on

wea

lth

of

Ken

tuck

y

CO

UN

TY

RO

UT

EC

RO

SS

ING

PR

EP

AR

ED

BY

DE

TA

IL

ED

BY

:

DE

SIG

NE

D B

Y:

DA

TE

:C

HE

CK

ED

BY

RE

VIS

IO

ND

AT

E

SHEET LOCATION:

JU

LY

20

15

G:\Engr\HD1246.04\Bridges\Cadd\003-27393-S003-Layout.dgndkirby

3/17/20169:46:22 AM

KY

899

DE

PA

RT

ME

NT

OF

HIG

HW

AY

S

PE

DE

ST

RIA

N O

VE

RP

AS

S

ITE

M N

O.

12

-88

02

.00

KN

OT

T

27

39

3

DC

K

BG

S

BG

S

DC

K

97

0

98

0

99

0

10

00

960

12

+0

0

95

0

11+

00

13

+0

0

8’-

0" P

AT

HW

AY

11

2’-

0" T

HR

OU

GH

TR

US

S B

RID

GE

TO

PA

RK

ING

PIE

R 1

P

IE

R 2

PIE

R 3

P

IE

R 4

PIE

R 5

A

BU

T 2

A

BU

T 1

94

0

DA

TU

M9

40

HM

B P

RO

FE

SS

ION

AL

EN

GIN

EE

RS

, IN

C.

Page 4: KNOTT COUNTY PEDESTRIAN BRIDGE OVER KY …transportation.ky.gov/Construction-Procurement/Project Related...TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS INDEX OF SHEETS ... dg e AASHTO

C.P

. 3

N 6

3°4

5’ 2

4" E

ST

A.

11

+4

5.8

1

! P

IE

R 3

ST

A.

12

+5

7.8

1

! P

IE

R 4

ST

A.

11

+2

8.3

1

! P

IE

R 2

ST

A.

11

+1

3.2

3

! P

IE

R 1

ST

A.

11

+0

0.6

5

BE

GIN

ST

AIR

ST

A. 1

2+

72

.97

! P

IE

R 5

ST

A. 1

2+

85

.56

EN

D S

TA

IR

11+00

=

38

°10

’ 1

4"

P.I

. 11+

42.7

3

2’-0"

P.O

.T. 12+

95.0

0

FO

UN

DA

TIO

N L

AY

OU

T

!SU

RV

EY

! B

RID

GE

&

FO

UN

DA

TIO

N L

AY

OU

TAH

EA

D

12"

3’-0"

5’-0

"

5’-0

"

10’-

0"

A

B

C

7’-0"

3’-6"

4’-0

"

8’-0

"

4’-0

"

3’-6"

4’-0

"

4’-0

"

8’-0

"

12’-7"

15’-1"

7’-0"

3’-6"

3’-6"

14’-5"

DS

1

W/

48" O

RO

CK

SO

CK

ET

(T

YP

.)

54" O

DR

ILL

ED

SH

AF

T C

OM

MO

N

3’-1"

112’-0"

DS

2

4’-0"

8’-0"

4’-0"

3’-6" 7’-0"

3’-6"

15’-2"

5’-0"

10’-0"

5’-0"

12"

3’-0"

2’-0"

12’-7"

SP

RE

AD

FO

OT

ING

RE

CO

RD

PO

INT

FT

G. E

LE

V.

BO

TT

OM

FT

G. E

LE

VA

TIO

N

AS

-BU

ILT

A B C D E

96

0.4

5

95

6.3

7

95

6.3

7

964.2

2

96

6.3

1

TY

PIC

AL

DR

ILL

ED

SH

AF

T

DIA

.

4’-6"

6" P

ITC

H

#5 S

PIR

AL

(T

YP

.)

! D

RIL

LE

D S

HA

FT

3"

8’-0" ROCK SOCKET

17 #

11

CL

R.

6"

CL

R.

9"

6" P

ITC

H

#5 S

PIR

AL

(T

YP

.)

AA

BB

SE

E P

IE

R S

HE

ET

S

SP

IR

AL

BA

RS

,

*

4’-0

"

*

5’-4"6’-9"

SE

CT

IO

N A

-A

4’-6"

2’-3

"2

’-3

"

9" CLR.

SE

CT

IO

N B

-B

2’-0"

4’-0"

2’-0"

6" CLR.! P

IE

R

! C

OL

UM

N

! P

IE

R

! C

OL

UM

N1

7~

#1

1 S

HA

FT

BA

RS

17

~#

11

SH

AF

T B

AR

S S

PIR

AL

BA

R

TO

P &

BO

TT

OM

OF

SP

IR

AL

IN

CL

UD

E 1

� E

XT

RA

TU

RN

S A

T

6"

"L"

36

" D

IA

.

* N

OT

E:

TO

BE

CO

MP

LE

TE

D B

Y F

IEL

D C

ON

ST

RU

CT

ION

PE

RS

ON

NE

L

DR

ILL

ED

SH

AF

T R

EC

OR

D

SH

AF

T

DS

1

DS

2

SH

AF

T S

OL

ID R

OC

K *

LE

NG

TH

OF

DR

ILL

ED

SH

AF

T C

OM

MO

N *

LE

NG

TH

OF

DR

ILL

ED

HO

LE

EL

EV

. *

BO

TT

OM

OF

RO

CK

EL

EV

. *

TO

P O

F

EL

EV

AT

ION

TO

P

DR

IL

LE

D S

HA

FT

NO

TE

S

DR

ILL

ED

SH

AF

T C

ON

ST

RU

CT

ION

SH

AL

L B

E I

N A

CC

OR

DA

NC

E W

ITH

TH

E G

EO

TE

CH

NIC

AL

RE

PO

RT

AN

D T

HE

CU

RR

EN

T S

PE

CIA

L N

OT

E F

OR

DR

ILL

ED

SH

AF

TS

.

PE

RM

AN

EN

T C

AS

ING

IS

RE

QU

IRE

D I

N T

HE

OV

ER

BU

RD

EN

MA

TE

RIA

L A

ND

IS

TO

BE

CO

NS

IDE

RE

D

INC

IDE

NT

AL

TO

TH

E U

NIT

BID

PR

ICE

FO

R D

RIL

LE

D S

HA

FT

, C

OM

MO

N.

EX

PL

OR

AT

OR

Y D

RIL

LIN

G, R

EQ

UIR

ED

TO

FIN

AL

IZE

TH

E D

RIL

LE

D S

HA

FT

TIP

EL

EV

AT

ION

S, W

ILL

BE

PA

ID U

ND

ER

TH

E F

OL

LO

WIN

G B

ID I

TE

MS

.

IT

EM

Q

UA

N U

NIT

S.

RO

CK

SO

UN

DIN

G

RO

CK

CO

RIN

G4

0 L

F

95

8.5

0

96

2.0

0

PIE

R 3

PIE

R 4

LO

CA

TIO

N

7 k

sf A

T T

HE

ST

RE

NG

TH

LIM

IT

ST

AT

E.

TH

E A

LL

OW

AB

LE

BE

AR

ING

RE

SIS

TA

NC

E I

S

ST

RE

NG

TH

LIM

IT S

TA

TE

.

FA

CT

OR

ED

PR

ES

SU

RE

OF

2 k

sf A

T T

HE

FO

OT

ING

S A

RE

DE

SIG

NE

D F

OR

A M

AX

IMU

M

17 ~

#11 B

AR

S

EL

EV

. 9

62

.00

PIE

R 4

EL

EV

. 9

58

.50

PIE

R 3

TO

P O

F D

RIL

LE

D S

HA

FT

EL

EV

. 9

39

.00

PIE

R 4

EL

EV

. 9

40

.00

PIE

R 3

BO

T. O

F D

RIL

LE

D S

HA

FT

, C

OM

MO

N

EL

EV

. 9

31

.00

PIE

R 4

EL

EV

. 9

32

.00

PIE

R 3

BO

T. O

F R

OC

K S

OC

KE

T

17

~ #

11

BA

RS

,

CO

LU

MN

DO

WE

LS

S4

COMMON DRILLED SHAFT

DE

42 L

F

FILE NAME:

DATE:

DR

AW

ING

NO

.

SH

EE

T N

O.

Co

mm

on

wea

lth

of

Ken

tuck

y

CO

UN

TY

RO

UT

EC

RO

SS

ING

PR

EP

AR

ED

BY

DE

TA

IL

ED

BY

:

DE

SIG

NE

D B

Y:

DA

TE

:C

HE

CK

ED

BY

RE

VIS

IO

ND

AT

E

SHEET LOCATION:

JU

LY

20

15

G:\Engr\HD1246.04\Bridges\Cadd\004-27393-S004-Foundation Layout.dgndkirby

3/17/20169:46:22 AM

KY

899

DE

PA

RT

ME

NT

OF

HIG

HW

AY

S

PE

DE

ST

RIA

N O

VE

RP

AS

S

ITE

M N

O.

12

-88

02

.00

KN

OT

T

27

39

3

DC

K

BG

S

BG

S

DC

K

HM

B P

RO

FE

SS

ION

AL

EN

GIN

EE

RS

, IN

C.

Page 5: KNOTT COUNTY PEDESTRIAN BRIDGE OVER KY …transportation.ky.gov/Construction-Procurement/Project Related...TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS INDEX OF SHEETS ... dg e AASHTO

S5

PL

AN

OF

CA

P

EL

EV

AT

ION

S

EC

TIO

N A

-A

TY

PE

1

A

B

(T

YP

.)

6"

BA

R T

YP

ES

AB

UT

ME

NT

S

BA

RS

A1

1’-0"

1’-0"

3’-0"

5’-0"

10’-0"

AHEAD

AB

UT

1 S

HO

WN

, A

BU

T 2

SIM

ILA

R

ST

A. 11+

00.6

5

BE

GIN

ST

AIR

5’-0"

12"12"12"

ST

AIR

FA

BR

ICA

TO

R

BE

AR

ING

PA

D A

S P

ER

6"

BA

RS

A2

6"

10 B

AR

S A

3 @

12" =

9’-0"

2’-6"

12"1’-6"

6"

6"

TO

P &

BO

TT

OM

10

BA

RS

A1

@ 1

2" =

9’-0

"

CO

NS

T.

JT

.

RO

UG

HE

NE

D

1’-0"1’-6"

1’-0"

ST

AIR

FA

BR

ICA

TO

R

BE

AR

ING

PA

D A

S P

ER

3’-0"

3"

SH

OW

N T

OP

& B

OT

T.

4 B

AR

S A

2 S

PA

. A

S3

"

3" CL.

BA

RS

A3

SP

A. A

S S

HO

WN

4 B

AR

S A

21 1

BA

SE

D O

N T

HIS

DIM

EN

SIO

N.

PL

AN

S W

ILL

NE

ED

TO

BE

AD

JU

ST

ED

EL

EV

AT

ION

S S

HO

WN

IN

TH

ES

E

BE

FO

RE

CO

NS

TR

UC

TIO

N.

AL

L

WIT

H S

TA

IR M

AN

UF

AC

TU

RE

R

SH

AL

L C

ON

FIR

M D

IME

NS

ION

S

BE

AR

ING

PA

D. C

ON

TR

AC

TO

R

EL

EV

AT

IO

NS

BA

SE

D O

N �"

1

BIL

L O

F R

EIN

FO

RC

EM

EN

T

FT

INF

TF

TF

TF

TIN

ININ

IN

20

#5

12

#5

LE

NG

TH

LO

CA

TIO

NA

BC

DS

IZE

MA

RK

TY

PE

NO

.

#5

9

10

ST

R.

6882 6

10

82

1

A1

FO

OT

ING

A2

ST

R.

FO

OT

ING

& S

TE

M

A3

(S

)

FO

OT

ING

& S

TE

M

QU

AN

TIT

Y I

S F

OR

ON

E A

BU

TM

EN

T

EL

EV

. A

EL

EV

. B

EL

EV

. C

A B C

EL

EV

AT

ION

S

AB

UT

ME

NT

1A

BU

TM

EN

T 2

96

3.6

63

96

2.9

55

96

8.8

15

96

6.3

15

96

0.4

55

96

9.5

23

SID

EW

AL

K

FILE NAME:

DATE:

DR

AW

ING

NO

.

SH

EE

T N

O.

Co

mm

on

wea

lth

of

Ken

tuck

y

CO

UN

TY

RO

UT

EC

RO

SS

ING

PR

EP

AR

ED

BY

DE

TA

IL

ED

BY

:

DE

SIG

NE

D B

Y:

DA

TE

:C

HE

CK

ED

BY

RE

VIS

IO

ND

AT

E

SHEET LOCATION:

JU

LY

20

15

G:\Engr\HD1246.04\Bridges\Cadd\005-27393-S005-Abutments.dgndkirby

3/17/20169:46:23 AM

KY

899

DE

PA

RT

ME

NT

OF

HIG

HW

AY

S

PE

DE

ST

RIA

N O

VE

RP

AS

S

ITE

M N

O.

12

-88

02

.00

KN

OT

T

27

39

3

DC

K

BG

S

BG

S

DC

K

A A

HM

B P

RO

FE

SS

ION

AL

EN

GIN

EE

RS

, IN

C.

Page 6: KNOTT COUNTY PEDESTRIAN BRIDGE OVER KY …transportation.ky.gov/Construction-Procurement/Project Related...TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS INDEX OF SHEETS ... dg e AASHTO

S6

PL

AN

OF

CA

P

EL

EV

AT

ION

TY

PE

3

A

B

(T

YP

.)

6"

BA

R T

YP

ES

2’-0"

5’-0"

10’-0"

AHEAD

5’-0"

12"12"

ST

AIR

FA

BR

ICA

TO

R

BE

AR

ING

PA

D A

S P

ER

6"

BA

RS

P10

6"

2’-0"

4"

1

BIL

L O

F R

EIN

FO

RC

EM

EN

T

FT

INF

TF

TF

TF

TIN

ININ

IN

7#6

8

#5

LE

NG

TH

LO

CA

TIO

NA

BC

DS

IZE

MA

RK

TY

PE

#6

8

7822

9 7

P1

FO

OT

ING

P2

P3

(S

)

A B C

EL

EV

AT

ION

S

96

9.3

72

97

6.3

72

PIE

RS

1,

2,

& 5

! P

IE

R C

AP

PIE

R 5

ST

A. 12+

72.9

7

PIE

R 2

ST

A.

11

+2

8.3

1

PIE

R 1

ST

A.

11

+1

3.2

3

EN

D E

LE

VA

TIO

N

PL

AN

OF

FO

OT

IN

G

! S

UR

VE

Y

10

" =

3’-4

" (

TY

P.)

5 B

AR

S P

13 @

2’-0"

13’-0" PIER 1, 20’-0" PIER 2, 11’-0" PIER 5

7 B

AR

S P

6 @

12" =

6’-0" P

IE

R 5

16

BA

RS

P6

@ 1

2" =

15

’-0

" P

IE

R 2

9 B

AR

S P

6 @

12" =

8’-0" P

IE

R 1

BA

RS

P11

BA

RS

P12

7’-0" PIER 5

9’-0" PIER 1, 16’-0" PIER 2,

MIN. LAP

2’-7"

(T

YP

.)

2’-0"

BA

RS

P5

BA

RS

P4

BA

RS

P2

BA

RS

P3

BA

RS

P1

CL.

3"CL.

2"

EL

EV

. A

1E

LE

V. B

1E

LE

V. C

P9 P

IE

R 5

P8 P

IE

R 2

P7 P

IE

R 1

BA

RS

P6

RO

UG

HE

NE

D C

.J.

RO

UG

HE

NE

D C

.J.

97

5.2

22

PIE

R 1

PIE

R 2

PIE

R 5

97

0.0

89

77

.08

97

5.9

3

95

6.3

79

56

.37

96

4.2

2

7’-0"

3’-6"3’-6"

7 BARS P3 @ 12" = 6’-0" TOP

7 BARS P1 @ 12" = 6’-0" BOTT.6" 6"

8’-0"

4’-0"

4’-0"

8 B

AR

S P

4 @

12

" =

7’-0

" T

OP

8 B

AR

S P

2 @

12" =

7’-0" B

OT

T.

6"

6"

! P

IE

R C

AP

! S

UR

VE

Y

SP

A. A

S S

HO

WN

14

BA

RS

P5

AHEAD

SE

CT

ION

B-B

! P

IE

R C

AP

! C

OL

UM

N

(T

YP

.)

2" C

L.

2’-0"

3 E

Q.

SP

A.

2’-0"

4 EQ. SPA.

SP

A W

/ D

OW

EL

S P

5

P9 P

IE

R 5

P8

PIE

R 2

P7 P

IE

R 1

14

BA

RS

P6

B

C

A

D

B

C

B

C

A D

TY

PE

1

TY

PE

2

NO

.

PIE

R 1

NO

.

PIE

R 2

NO

.

PIE

R 5

17

77

21

00

67

8

FO

OT

ING

FO

OT

ING

FO

OT

ING

DO

WE

L

88

2

ST

R.

ST

R.

P4

P5

P6

P7

P8

P9

11

26

00

66

8

FO

OT

ING

#5

77

88

86

8

P10

14

14

14

#6

41

10

06

44

51

39

16

7#4

CO

LU

MN

CO

LU

MN

CO

LU

MN

CO

LU

MN

18

18

78

ST

R.

ST

R.

ST

R.

ST

R.

ST

R.

1 3

P11

P12

P13

14

14

14

-- -

- --

#6

#6

#6

10

6

17

6

86

98

98

10

8

78

5 4 5 10

5 4 5 10

5 4 5 10

#6

#6

#5

#4

88

10

06

98

18

18

@ E

Q. S

PA

.

5 B

AR

S P

12

SE

CT

ION

A-A

2’-0"

@ E

Q. S

PA

.

5 B

AR

S P

10

3 EQ. SPA.

EA

. F

A.

2 B

AR

S P

11

(T

YP

.)

2" C

L.

P1

3

FO

AM

BA

CK

ER

RO

D

SIL

ICO

NE

)

(US

E S

EL

F L

EV

EL

ING

�" S

IL

IC

ON

E J

OIN

T

2’-0"

DIM

EN

SIO

NS

.

TO

BE

AD

JU

ST

ED

BA

SE

D O

N T

HE

SE

SH

OW

N I

N T

HE

SE

PL

AN

S W

ILL

NE

ED

CO

NS

TR

UC

TIO

N.

AL

L E

LE

VA

TIO

NS

ST

AIR

MA

NU

FA

CT

UR

ER

BE

FO

RE

SH

AL

L C

ON

FIR

M D

IME

NS

ION

S W

ITH

AN

D �

" B

EA

RIN

G P

AD

. C

ON

TR

AC

TO

R

EL

EV

AT

ION

S B

AS

ED

ON

AN

8" S

LA

B

CA

P

CA

P

CA

P

CA

P

FILE NAME:

DATE:

DR

AW

ING

NO

.

SH

EE

T N

O.

Co

mm

on

wea

lth

of

Ken

tuck

y

CO

UN

TY

RO

UT

EC

RO

SS

ING

PR

EP

AR

ED

BY

DE

TA

IL

ED

BY

:

DE

SIG

NE

D B

Y:

DA

TE

:C

HE

CK

ED

BY

RE

VIS

IO

ND

AT

E

SHEET LOCATION:

JU

LY

20

15

G:\Engr\HD1246.04\Bridges\Cadd\006-27393-S006-Piers1_2_5.dgndkirby

3/17/20169:46:23 AM

KY

899

DE

PA

RT

ME

NT

OF

HIG

HW

AY

S

PE

DE

ST

RIA

N O

VE

RP

AS

S

ITE

M N

O.

12

-88

02

.00

KN

OT

T

27

39

3

DC

K

BG

S

BG

S

DC

K

A A

BB

HM

B P

RO

FE

SS

ION

AL

EN

GIN

EE

RS

, IN

C.

Page 7: KNOTT COUNTY PEDESTRIAN BRIDGE OVER KY …transportation.ky.gov/Construction-Procurement/Project Related...TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS INDEX OF SHEETS ... dg e AASHTO

S7

PL

AN

OF

CA

P

12’-0" AHEAD

6’-0"

3’-4"

1’-8"

! B

EA

RIN

G

1’-8"

CO

NS

T. JT

.

BE

AR

ING

PA

D

EL

AS

TO

ME

RIC

BO

LT

ED

TO

TR

US

S)

(VU

LC

AN

IZE

D T

O B

EA

RIN

G P

AD

,

ST

EE

L S

OL

E P

LA

TE

AN

D D

OU

BL

E N

UT

S

AN

CH

OR

BO

LT

S

BE

AR

ING

PA

D

EL

AS

TO

ME

RIC

BE

AR

ING

DE

TA

ILS

PL

AT

E O

N B

EN

T 2

(E

XP

AN

SIO

N).

ON

BE

NT

1 (

FIX

ED

). U

SE

SL

OT

TE

D H

OL

ES

IN

SO

LE

NO

TE

: U

SE

ST

AN

DA

RD

HO

LE

S I

N T

HE

SO

LE

PL

AT

E

FO

AM

BA

CK

ER

RO

D

JO

IN

T D

ET

AIL

S

SE

CT

ION

A-A

PIE

R 3

SH

OW

N,

PIE

R 4

SIM

IL

AR

! T

RU

SS

ME

MB

ER

S

! B

EA

RIN

G

2

1

1 2

A

B

(T

YP

.)

6"

3’-6"

BA

R T

YP

ES

6"

TO

"T

RU

SS

BR

IDG

E S

UP

ER

ST

RU

CT

UR

E"

NO

TE

: S

ILIC

ON

E J

OIN

T S

EA

L S

HA

LL

BE

IN

CID

EN

TA

L

ST

A.

11

+4

5.8

1

! B

EA

RIN

G

10

"

10

"

PR

EC

AS

T S

TA

IRS

EL

EV

AT

ION

10

"1

0"

SE

CT

ION

B-B

EL

. 980.9

3 P

IE

R 4

EL

. 9

81

.50

PIE

R 3

EL

. 962.0

PIE

R 4

EL

. 958.5

PIE

R 3

3’-0

" ‘

1’-3�" * 4’-0" 2’-0"

4’-4"

12’-11" PIER 4

17’-0" PIER 3

6’-9" MIN. LAP

12’-0"

6"

6"

2"

3’-0

" ‘

TY

PE

1

TY

PE

4

TY

PE

2

BB

B

A

DA

C

B

A D

C

C

AD

JU

ST

ED

BA

SE

D O

N T

HIS

DIM

EN

SIO

N.

EL

EV

AT

ION

S S

HO

WN

IN

TH

ES

E P

LA

NS

WIL

L N

EE

D T

O B

E

WIT

H T

RU

SS

MA

NU

FA

CT

UR

ER

BE

FO

RE

CO

NS

TR

UC

TIO

N. A

LL

* N

OT

E:

CO

NT

RA

CT

OR

SH

AL

L C

ON

FIR

M T

HIS

DIM

EN

SIO

N

TY

PE

5

TY

PE

3

(S

)(S

)

BE

ND

DIA

ME

TE

RS

.

A S

TIR

RU

P F

OR

PU

RP

OS

ES

OF

TY

PE

S A

RE

TO

BE

CO

NS

IDE

RE

D

WIT

H T

HE

SU

FF

IX (

S)

IN T

HE

BA

R

RE

INF

OR

CIN

G B

AR

S D

ES

IGN

AT

ED

NO

TE

:

EL

. 982.2

2 P

IE

R 4

EL

. 982.7

9 P

IE

R 3

3" 12" 12"

P1

5 P

IE

R 4

P8

PIE

R 3

SH

AF

T

INC

LU

DE

D W

/ D

RIL

LE

D

LA

P T

O D

OW

EL

S

2’-0" *

BR

IDG

E S

LA

BP

RE

CA

ST

ST

AIR

S

EN

DW

AL

L

SU

PE

RS

TR

UC

TU

RE

.

BE

IN

CID

EN

TA

L T

O T

HE

UN

IT P

RIC

E B

ID F

OR

TH

E T

RU

SS

CO

ST

TO

FU

RN

ISH

AN

D I

NS

TA

LL

AN

CH

OR

BO

LT

S S

HA

LL

DE

SIG

N A

NC

HO

R B

OL

TS

FO

R 2

0%

DE

AD

LO

AD

IN

SH

EA

R.

12

BA

RS

P6

@ 1

2" =

11

’-0

"

@ 1

0"=

4’-2

"

BA

RS

P9

-P

14

4 B

AR

S P

3 (

EA

. F

AC

E)

P4

(E

A.

FA

CE

)

BA

RS

P5

(EA.FACE)

@ EQ. SPA.

3 BARS P5

4 BARS P3 @12"=3’-0"

@ E

Q.

SP

A.

6 B

AR

S P

1

P6

BA

RS

P4

@ E

Q.

SP

A.

6 B

AR

S P

2

P16 P

IE

R 4

17

~ P

7 P

IE

R 3

P16 P

IE

R 4

@ E

Q. S

PA

.

17

BA

RS

P7

PIE

R 3

(INCLUDES SLAB)

CO

NS

T. JT

(T

YP

.)

RO

UG

HE

NE

D

(US

E S

EL

F L

EV

EL

ING

SIL

ICO

NE

)

1" E

XP

AN

SIO

N E

ND

�" F

IX

ED

EN

D

SIL

ICO

NE

JO

INT

FO

R E

LE

VA

TIO

NS

8�"

AS

SU

ME

D

NO

TE

: Q

UA

NT

ITY

SH

OW

N I

S T

OT

AL

FO

R B

OT

H P

IER

S.

PIE

R 3

& 4

1 1

3-1

6-1

6

C

CH

AN

GE

D S

PIR

AL

BA

R D

IMS

- D

K1

FILE NAME:

DATE:

DR

AW

ING

NO

.

SH

EE

T N

O.

Co

mm

on

wea

lth

of

Ken

tuck

y

CO

UN

TY

RO

UT

EC

RO

SS

ING

PR

EP

AR

ED

BY

DE

TA

IL

ED

BY

:

DE

SIG

NE

D B

Y:

DA

TE

:C

HE

CK

ED

BY

RE

VIS

IO

ND

AT

E

SHEET LOCATION:

JU

LY

20

15

G:\Engr\HD1246.04\Bridges\Cadd\007-27393-S007-Piers3_4.dgndkirby

3/17/20169:46:25 AM

KY

899

DE

PA

RT

ME

NT

OF

HIG

HW

AY

S

PE

DE

ST

RIA

N O

VE

RP

AS

S

ITE

M N

O.

12

-88

02

.00

KN

OT

T

27

39

3

DC

K

BG

S

BG

S

DC

K

BA A

B

HM

B P

RO

FE

SS

ION

AL

EN

GIN

EE

RS

, IN

C.

Page 8: KNOTT COUNTY PEDESTRIAN BRIDGE OVER KY …transportation.ky.gov/Construction-Procurement/Project Related...TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS INDEX OF SHEETS ... dg e AASHTO

Datu

m

Elev

.

Offset

Statio

n

Ho

le N

o.

Pro

file S

cale:

Verti

cal

1" =

10’

Ho

rizo

ntal n

ot to

scale

SU

BS

UR

FA

CE

DA

TA

datum

)

(NA

VD

88

S-0

72-1

5

970

960

950

940

930

920

91

0

970

960

950

940

930

920

91

0

960.2

0

2.00 ft. R

t.

11

+1

3.0

0

1001

961.5

0

2.00 ft. L

t.

11

+6

1.0

0

10

02

960.3

0

!

12+

40.0

0

1003

96

6.5

0

32.00 ft. L

t.

12+

79.4

0

1004

968.4

0

!

12

+8

5.0

0

100

5

(9

41

.40

)

R

RQ

D R

EC

KY

RQ

D R

EC

KY

KY

RQ

D R

EC

KY

Plan S

cale 1

" =

20’

...

..

....

..

. ..

.

..

..

...

..

.

...

..

.

..

...

..

.

.

.

...

..

...

.. .

..

..

.

...

..

No

w

eath

ered

ro

ck

To

p o

f r

ock

elev

.= 9

41

.20

53

1

00

23

1

00

26

1

00

0

10

0

91

(5

)

89

(6

)

SD

I(JS

)S

DI(JS

)S

DI(JS

)

SD

I(JS

)

N=

24

N=

19

N=

31

N=

50/0

.1

LI

w%

D5

0

(m

m)

N=

6

N=

14

N=

31

LI

w%

D5

0

(m

m)

N=

50/0

.2

N=

15

N=

14

N=

42

N=

64

/0.7

N=

29

N=

7

N=

10

N=

23

N=

36

LI

w%

D5

0

(m

m)

LI

w%

D5

0

(m

m)

spars, durable

m

icaceous, few

coal

to m

edium

grained,

San

dsto

ne: g

ray

, fin

e

lam

in

atio

ns

to silty, sandstone

Sh

ale: g

ray

, clay

ey

No

w

eath

ered

ro

ck

To

p o

f r

ock

elev

.= 9

39

.00

0 6

5

0 83

44

9

4

0 82

0 98

88(5)

95

(6

)

durable

m

icaceous, coal spars,

to m

edium

grained,

San

dsto

ne: g

ray

, fin

e boulders

Cored O

verburden: w

/sandstone

san

dsto

ne lam

in

atio

ns

Sh

ale: g

ray

, silty

to

clay

ey

,

durable

lam

inations @

top, m

icaceous,

g

rain

ed

, few

co

al sp

ars, sh

ale

San

dsto

ne: g

ray

, fin

e t

o m

ed

iu

m

w/sandstone l

am

inations

Sh

ale: g

ray

, silty

to

clay

ey

,

sid

erite n

od

ules, d

urab

le

grain

ed

, w

/sh

ale l

am

in

atio

ns &

San

dsto

ne: g

ray

, fin

e t

o m

ed

iu

m

Base of w

eathered rock elev.=

939.60

938.8

0T

op of rock elev.=

88(4)

95(5)

0 80

0

10

0

50

1

00

7 8

9

0 20

20 84

10

6

4

18

1

00

0

10

0

17

9

3

88(4)

94(5)

70

(3

)

boulders

Cored O

verburden: w

/sandstone

m

icaceous, few

coal spars, durable

Sandstone: gray, fine to m

edium

grained,

many s

andstone l

am

inations

Sh

ale: g

ray

, silty

to

clay

ey

,

shale lam

inations, siderite nodules

Sandstone: gray, fine to m

edium

grained,

Co

al: 1

.4’ r

eco

vered

Sh

ale:(S

iltsto

ne) g

ray

, clay

partin

g

No

w

eath

ered rock

Top o

f r

ock e

lev

.= 9

38

.90

bioturbated @

top

Sandstone: gray, fine grained,

A-2

-4

(0

),S

M,S

+C

=2

2(1

6+

6)

0.2

75 13

, A

-2-4(0),S

M,S

+C

=27(22+

5)

0.1

73

8

A-4(0),S

C-S

M,S

+C

=39(31+

8)

0.1

32

1

9 -

0.4

6

A-4(0),M

L,S

+C

=56(54+

2)

0.050 21

, A

-4

(0

),S

C-S

M,S

+C

=4

4(3

1+

13

)0

.10

9

14

-1

.31

RQ

D R

EC

, A

-2-4(0),S

M,S

+C

=26(21+

5)

0.1

67 22

A-2-4(0),S

M,S

+C

=30(26+

4)

0.1

43 20

, A

-2

-4

(0

),S

C-S

M,S

+C

=3

3(2

7+

6)

0.3

14

6

-2

.73

A-4

(0

),S

C-S

M,S

+C

=4

2(3

2+

10

)0.1

29 13 -1.1

7

A-4(0),M

L,S

+C

=53(49+

4)

0.0

60

1

3

948.5

0

8-5

-1

5

PURPOSE ROAD

KY 899

11+00

PI 10

+69.74

PI 11+

42.73

POT 10

+50.00

POT 12+95.00

#1

00

1

#1

00

2#

10

03

#1

00

4

#1

00

5

C.P. 3

12+00

ITE

M N

UM

BE

R

DR

AW

ING

NO

.

SH

EE

T N

O.

Com

monw

ealt

h o

f K

entu

cky

DE

PA

RT

ME

NT

OF

HIG

HW

AY

SC

OU

NT

Y

RO

UT

EC

RO

SS

ING

PR

EP

AR

ED

BY

DE

TA

IL

ED

BY

:

DE

SIG

NE

D B

Y:

DA

TE

:C

HE

CK

ED

BY

SHEET LOCATION: 3/17/2016G:\Engr\HD1246.04\Bridges\Cadd\008-27393-S008-Subsurface Data.dgn dkirby USERNAME:FILE NAME: DATE: E-SHEET NAME:

12

-88

02

.00

28

-SE

PT

EM

BE

R-2

01

5

E

. B

AIL

EY

D

. G

RE

ER

KN

OT

T

KY

899

Ped

estr

ian

Bri

dg

e

SU

BS

UR

FA

CE

DA

TA

GE

OT

EC

HN

ICA

L B

RA

NC

H

S8

27393

Div

isio

n o

f S

tru

ctu

ral D

esig

n