kit contents - superior signs & prints · pvc backing with led strip mounted and wired with 10...
TRANSCRIPT
KIT CO
NTEN
TS -
Pre- Assem
bled Lighted
LED Splat (6
Version)o
White PV
C Backing w
ith LED Strip
Mounted
and W
ired w
ith 10 Extra Feet of W
ireo
Stainless Face with A
lignment
Pucks for Easy Installo
Double Sid
ed 3M
VHB Tape
oW
all Anchors (8 pcs.)
-29 A
MP O
utput Tra
nsformer
-(+) (-) Red
/Black wire controller to
transformer
-RG
B RF Signal Controller
-RF Function Rem
ote to Change
Colors and
Pulse
HARD
WA
RE
RGB RF Signal Controller and Remote 29 Amp Transformer
Connectors from RGB RF Signal Controller are connected to here to
power sign.
INSTA
LLATIO
N
Before beginning, please identify and confirm that all item
s are included. Please contact us at 954-780-6351 If anything is missing.
Pre-construction installs - Determine the correct hole location. (refer to figures 1-4) Use a 2 inch hole saw and add a conduit raceway
above the drop ceiling.
Post-construction installs – Determine the correct hole location. (refer to figures 1-4) Use a 2 inch hole saw and a snake to fish wires above
the drop ceiling.
Hold the back-plate (white PVC) of the sign up to the wall. Ensure that hole for the wiring harness lines up with the hole in the wall. With
the help of a second person, ensure that the sign is level and in the proper position. Drill 8 pilot holes through the back-plate of the sign and into the drywall.
Lower and remove the back-plate of the sign off the wall. Install the included drywall anchors into the wall.
With the help of a second person, hold the sign back up to the wall and use the included screws to m
ount the back-plate of the sign to the wall. Ensure the screws are going into the anchors. Do not tighten until all screws are confirm
ed to be started into their anchors. Before tightening screws in the top left cor ner, guide the wire into the wall and snake it to the top hole.
Once all screws are started, gently tighten until flush or just past flush of the back-plate of the sign. Do not leave the heads of the screws exposed past flush of the back-plate.
Mount a 10*10*4 junction box above the ceiling. Safely run the wiring harness through a punch out of the junction box. On the LED
controller module, rem
ove the single Phillips head screw holding the terminal cover. Loosen the 4 flat head term
inal screws. Strip back the insulation from
the 4 wires and place each wire in its matching term
inal. Tighten the flat head screws after each wire has been inserted.
V+ ---------- Black wireR ------------ Red wireG ------------Green wir eB ------------W
hite wire
Replace the terminal cover with the single Phillips head screw. On the other end of the LED controller m
odule, remove the single Phillips
head screw holding the terminal cover. Loosen the 2 flat head term
inal screws. Strip back the insulation on the included red and black 2-wire harness. Place the red wire in V+ and the black wire in V-. Tighten the 2 flat head screws after each wire has been inserted. Replace the term
inal cover with the single Phillips head screw.
Strip the insulation from the other end of the red and black 2-wire harness and connect them
to the power output of the transformer. V+ to
red wire. V- to black wire. Ensure that the switch on the power transformer is set to 115V.
Run building power through a punch out in the junction box. Make the appropriate connection to the power transform
er.
Verify that the light on the power transformer is on. Using the rem
ote control, check that the sign powers on. If the sign fails to power on, verify that your connections are correct. M
ake sure that the sign powers on before proceeding.
Test fit the sign face. Ensur e that the white pucks on the back of the face align with the holes in the back-plate of the sign. Ensure that all pucks engage easily. If it is difficult to align or engage the pucks into the back-plate, it m
ay be necessary to loosen the screws and slightly adjust the back-plate of the sign.
Once the face has been test fit successfully, you may rem
ove the face, peel the (red) backing off the tape and reinstall the face of the sign for the final tim
e.
115"
58"
115"
44.5"
106"
58"
106"
44.5"
PVC face mounted to the
wall and wires being fished above drop ceiling
for junction box installation
After all connections are m
ade, TEST sign first before affixing m
etal face to sign. Com
pleted splat
Junction box installed above the drop ceiling. Transform
er and controller installed in the
10x4x4 junction box.