Kirkwood Corridor Reconstruction MeetingCIP No. N-100029Mark L. Loethen, P.E., Deputy DirectorPlanning & Development Services DivisionSeptember 29th, 2016
![Page 2: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/2.jpg)
1 OVERVIEW OF THE PROJECT
2 NEXT STEPS
3 CONTACT INFORMATION
AGENDA
2
![Page 3: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/3.jpg)
What is a Right-of-Way (ROW)?
3
A right-of-way is the portion of land granted or reserved for public infrastructure use.
![Page 4: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/4.jpg)
What is a “Major Thoroughfare”?
Major Thoroughfare & Freeway Plan - http://www.houstontx.gov/planning/mobility/MTFP.html
Major Thoroughfares are those streets designed for fast, heavy traffic, and are intended to serve as traffic arteries of considerable length and continuity throughout the community. The location of these streets is based on a grid system covering the area within the City’s jurisdiction, which provides a theoretical spacing of Major Thoroughfares at one mile intervals.
Kirkwood has been a designated Major Thoroughfare since 1957 .
4
![Page 5: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/5.jpg)
Nottingham (North Kirkwood) M-000247 update
• Nearly 700 comments received regarding median widths and the preservation of trees
• Comment period closed August 12th
• Currently in analysis and integrating comments into design as appropriate and feasible
5
![Page 6: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/6.jpg)
Kirkwood Reconstruction: Westheimer to Buffalo BayouExamples of Current Conditions
6
![Page 7: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/7.jpg)
Kirkwood Reconstruction: Westheimer to Buffalo BayouExamples of Current Conditions
7
![Page 8: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/8.jpg)
Kirkwood Reconstruction: Briar Forest to Buffalo BayouProject Area Overview – Subproject I
8
DRAFT FOR EXHIBIT ONLY
* MEDIAN TREES ARE TO BE PROTECTED OR RELOCATED.
LEGEND
TREE TO REMAIN EXISTING RIGHT-OF-WAY (ROW) 6’ SIDEWALK
EXISTING MEDIAN NEW MEDIAN REPLACED SIGNALS
PROPOSED MEDIAN NEW PAVEMENT ACCESS MANAGEMENT
BUFFALO BAYOUBRIAR FOREST KIRKWOOD
![Page 9: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/9.jpg)
LEGEND
TREE TO REMAIN EXISTING RIGHT-OF-WAY (ROW) 6’ SIDEWALK
EXISTING MEDIAN NEW MEDIAN REPLACED SIGNALS
PROPOSED MEDIAN NEW PAVEMENT ACCESS MANAGEMENT
Kirkwood Reconstruction: Westheimer to Briar ForestProject Area Overview – Subproject II
9
BRIAR FORESTWESTHEIMER KIRKWOOD
DRAFT FOR EXHIBIT ONLY
* MEDIAN TREES ARE TO BE PROTECTED OR RELOCATED.
![Page 10: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/10.jpg)
Improve water and wastewater as needed
Kirkwood Reconstruction: Westheimer to Buffalo BayouIdentified Improvement Needs
Pedestrian safety and accessibility
Improve storm drainage
10
Improve pavement conditions and mobility
Improve existing bike lanes
![Page 11: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/11.jpg)
Kirkwood Reconstruction: Westheimer to Buffalo BayouExisting Cross Section
11DRAFT FOR EXHIBIT ONLY
![Page 12: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/12.jpg)
Kirkwood Reconstruction: Westheimer to Buffalo BayouProposed Typical Cross Section
12DRAFT FOR EXHIBIT ONLY
![Page 13: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/13.jpg)
Kirkwood Reconstruction: Westheimer to Buffalo BayouAlternate Proposed Typical Cross Section
13DRAFT FOR EXHIBIT ONLY
Potential Pedestrian Realm Conflicts with Alternative
Street lights Power Poles Fire Hydrants Sidewalk
![Page 14: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/14.jpg)
September 8, 2016 Stakeholder Meeting Feedback Review
We appreciate the input received during the stakeholder meeting. Here is one example of what we heard:
14
CHALLENGE RECOMMENDATIONS/SOLUTIONS
PWE will work with the HCFCD and Harris County to provide access to Terry Hershey Park from Kirkwood bike lanes and sidewalks
Submit recommendations for a connection between Kirkwood and Terry Hershey Park
There is an option to also recommend wayfinding signs as a ‘detour’ through neighborhood
![Page 15: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/15.jpg)
2012Planning
(Complete)
2016Design
(Ongoing)
2018Scheduled
Construction
2020Anticipated Completion
15
Timeline subject to change
Kirkwood Reconstruction: Westheimer to Buffalo BayouNext Steps
2012Planning
(Complete)
2017Design
(Ongoing)
2020Scheduled
Construction
2022Anticipated Completion
Subproject 1: Briar Forest to Buffalo Bayou
Subproject 2: Westheimer to Briar Forest
Timeline subject to change
![Page 16: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/16.jpg)
KIRKWOOD CIPPART I (N-100029)PANEL REPLACEMENT PROJECT
Kirkwood Reconstruction: Westheimer to Buffalo BayouImprovements to Existing Bike Lanes
16M
EMO
RIAL DRIVE
BUFFALO
BAYOU
BRIAR FOREST DRIVE
WESTHEIM
ER ROAD
NOTTINGHAM CIP PROJECT (M-000247) KIRKWOOD CIP PART II I (N-100029)
• Existing bike lane is 4’ in width and considered substandard
• Increase comfort level by introducing a 5’ bike lane and a 3’ buffer on street bike lane or a 6’ exclusive side path for bikes
• Striped/painted bike lane and buffer allows for street sweeping and maintenance
• Substandard facilities are not considered safe, and will not be restriped along portions of the corridor not programmed with the CIP project we are discussing today. To learn more, please visit the Houston Bike Plan.
• When funding is received, PWE will need to move the curb in this area to update the bike facility
KIRKWOOD ROAD
• 6’ bike lane or 5’ bike lane with a 2’ painted buffer
• 6’ bike lane or 5’ bike lane with a 2’ painted buffer
![Page 17: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/17.jpg)
MATTHEW SEUBERT &ANITA HOLLMANN
Houston Bikeways Program
17
![Page 18: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/18.jpg)
18
Council MemberDavid Robinson
I (N-100029)I (N-100029)
![Page 19: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/19.jpg)
19
By 2026, the City of Houston will be a Safer, More Accessible, Gold Level
Bike-Friendly City
Improve Safety
Increase Access
Increase Ridership
Develop & Maintain Facilities
Vision & Goals
![Page 20: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/20.jpg)
20
Interested &Concerned
No Way, No How
Strong &Fearless
4 Types of People Biking
Enthused &Confident
Source: Dill & McNeil: Four Types Of Cyclists?.2012. Portland State University
An inclusive approach
![Page 21: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/21.jpg)
21Integration of
Bikes and Transit
0
5,000
10,000
15,000
20,000
25,000
30,000
FY2011 FY2012 FY2013 FY2014 FY2015
![Page 22: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/22.jpg)
22
Low Comfort High Stress
High Comfort Low Stress
Focus on High Comfort Facilities
![Page 23: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/23.jpg)
23
12CIP meeting presentations
(2016)
97% supportive feedback
4,000+online survey
responses
600+ ideas & comments on interactive
map
45 community meetings
60+ events
30 locations (transit centers, universities, etc.)
Partnership with BikeHouston and ambassadors allowed team to reach many more people and neighborhoods.
Online
Webinar
Outreach
![Page 24: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/24.jpg)
REBUILD HOUSTON EXECUTIVE
ROB LAZARO
![Page 25: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/25.jpg)
We Want Your Input
25
Or email us your comments at: [email protected]
Fill out a comment card tonight
YOUR INPUT BYOctober 31, 2016 WILL HELP US STAY ON SCHEDULE
![Page 26: Kirkwood Corridor Reconstruction Meeting - Houston...bike lanes and sidewalks Submit recommendations for a connection between Kirkwood and Terry Hershey Park There is an option to](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c03223306e92e0d496f4a/html5/thumbnails/26.jpg)
THANK YOUPlease remember to leave your comment cards at the sign-in table