  • Kings Local School District

    Facility Master Plan

    February 2019

  • Master Facility Planning ProcessLong Range Planning Team

    Thought Exchange #1

    Building Assessments

    Develop Plan Options

    Board Recommendation

    Thought Exchange #3

    March 2019 Aug 2017

    Thought Exchange #2

  • Outreach

    ● Long Range Facility Planning Team

    ○ Large group started meeting August 2017 and have collectively met nearly a dozen times since.

    ○ Small group has been meeting regularly since August 2016

  • Three Thoughtexchange Surveys

    1. 1,274 participants, 1,305 thoughts, 43,937 ratings

    2. 1,003 participants, 784 thoughts, 34,036 ratings

    3. 767 participants, 610 thoughts, 27,660 ratings

    Outreach

  • Top Thoughts

    ○ Build for the future growth○ Keep schools close to athletic facilities

    and on same campus

    ○ Make sure plan is cost-effective and sustainable for the long term

    ○ Keep class size low

    Outreach

  • Enrollment Growth

  • Enrollment Growth and ProjectionsConservative Projection

    https://docs.google.com/spreadsheets/d/1fpqT8Mrwjh_XQvBYf-if8kRlsl3q8xak3oVCUk97S6A/edit?ts=5c64346b#gid=884576321

  • Current Master Plan Scope of Work- *All Elementaries convert to grades k-3

    - Addition/Renovations to JF Burns Elementary School

    - Classroom addition to Columbia Intermediate (becomes grades 4-5)

    - Build new 6-8 Middle School

    - Addition/Renovations to Kings HS

    - Relocate Bus Facility (to accommodate expansion)

    - Road/Traffic Improvements

    *Redistricting is a potential option with additional unexpected student growth

  • Future Master Plan Scope of Work

    ● All buildings will be able to be added onto if growth is

    higher than predicted

    ● Redistricting of the elementary schools will also be

    evaluated if growth is higher than predicted

  • J.F. Burns ElementaryRenovated Kindergarten

    Special-Education Wing

    24 Classroom/Media

    Center two-story addition

    Partially renovated

    common spaces

    New Parking Lot with

    separate bus and car

    areas

    New Main EntryCAR PARKING

    & DROP OFF

    BUS

    DROP OFF

  • J.F. Burns Elementary24 Classroom/Media

    Center two-story addition

    Existing Renovated Building

  • Columbia Intermediate

    (6) New Classrooms

  • Kings HS and MS

    Central Bus Pick-up/Drop off

    O

    ne-w

    ay/

    En

    try O

    nly

    Student/Visitor

    Parking

    Staff

    Parking

    High School

    Middle

    School

    Bus Entry CarEntry/Exit Bus Exit

    New Tennis

    Courts.

    Future Fieldhouse

    Relocated Baseball

    and Softball Fields

  • Kings MS

    Three Story Academic Wing

    Main Entry

    Cafeteria

    Gymnasium

    Administration

    Possible Future Expansion

  • Kings HS

    (12) Future Classrooms

    Cafeteria Addition/Renovation

    New Theater

    Entry-only access drive

    Administration

    Renovated Music

    New Gym / Weight / Locker

    New Main HS Entry

    (24) New Classrooms

  • Scope of Work

    DESCRIPTION COST

    (JFB) J.F. Burns Elem converted to (K-3) (40,600 sqft add / 12,175 sqft reno) $12,280,625

    (JFB) Burns Elementary (22) trailers for 24 mos. $1,000,000

    (CIS) Columbia Int. School converted to (4-5) (7000 sqft add) $2,000,000

    (KMS) Kings Middle School (6-8) (163,000 new) $40,750,000

    (KHS) Kings HS (9-12) School (86,500 sqft add / 22,500 sqft reno) $28,637,500

    (KHS) Softball / Baseball Relocation $800,000

    Miscellaneous / Contingency (bus facility, utility extensions, practice fields, storm water, etc.) $4,500,000

    TOTAL $89,968,125

  • Cost per square footConstruction Date = 2020

    Building SQFT = 150,000

    Hard Construction Cost $215.65 sqft

    Soft Construction Cost $30.87 sqft

    TOTAL $246.52 sqft = NEW CONSTRUCTION

    TOTAL $165-$175 sqft = RENOVATION CONSTRUCTION

    Hard Construction = Total subcontracted work (site, structure, finishes, glazing, roof, MEP, technology, etc.)

    Soft Construction = A/E services, insurance, survey, borings, permits, contingency

    * Numbers have been developed from historical k-12 public data in conjunction with construction industry input

  • Cost Scenario

  • Master Facility Planning ProcessLong Range Planning Team

    Thought Exchange #1

    Building Assessments

    Develop Plan Options

    Board Recommendation

    Thought Exchange #3

    March 2019 Aug 2017

    Thought Exchange #2

  • Potential ScheduleNov 5

    DESIGN (12-18 mos)

    CONSTRUCTION (12-24 mos)

    Nov 2019 2020 2021 2022 2023

    Complete