king street station 7.28.11 slide show
TRANSCRIPT
Phase 2AIn this slide show:
12th Floor Tower Lighting
July 28, 2011
New lighting has been installed to improve illumination of the glass pyramid at the top of the tower.
Another interior view of the glass pyramid.
These reels raised and lowered the fluorescent lights that were used to illuminate the space before the new lighting replacement.
These fixtures can be individually adjusted for the best angle of illumination.
A view looking up the top of the tower shows the glass pyramid evenly lit.
New ticketing area
A close-up view of the new ticket counter.
Cabinets behind the ticketing counters are still under installation.
Mezzanine break room for Amtrak employees
New mezzanine restroom for Amtrak employees
These refurbished windows provide natural lighting for both the station level and the new mezzanine level.
Man lift for Amtrak’s new operations area
A view inside the man lift.
West side driveway repaved after the completion of geothermal wells installation.
A view of the new bus/taxi queuing route from the station’s 12th floor balcony.
Installation of new terrazzo treads for the Grand Stairs is almost complete.
The New Jackson Plaza beautifully blend in with the city landscape.