Page 1: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,
Page 2: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017

FILE NO. 6846A Addendum #4 SEPT. 15, 2017

WILLIAM RAWN ASSOCIATES, Architects, Inc. BID SET, ADDENDUM #4 10 Post Office Square, Suite 1010, Boston, MA 02109 009104 - 1 of 10

CITY OF CAMBRIDGE

CAMBRIDGE, MA

FILE NUMBER - 6846A KING OPEN/CAMBRIDGE STREET

UPPER SCHOOLS & COMMUNITY COMPLEX

BID SET ADDENDUM #4

The attention of Trade and Non-Trade Contractors submitting bids for the project named above, is called to the following addendum to the Bid Set. The items set forth herein, whether of omission, addition, substitution, or clarifications are all to be included in and form a part of the proposal submitted. THE NUMBER OF THIS ADDENDUM NO. 4, MUST BE ACKNOWLEDGED IN THE TRADE AND NON-TRADE BIDDER’S BID FORM. Bid Set Dated July 28, 2017. Previous addenda include the following: Addendum #1 dated 9/1/17, Addendum #2 dated 9/8/17, Addendum #3 dated 9/11/17 PROCUREMENT AND CONTRACTING REQUIREMENTS: N/A BIDDER QUESTIONS: Item-1 See Attachment 1 – Bidder Responses

General Notes: 1. Questions 65 - 158 are responses to Trade Bid questions. Questions 159 – 219 are

responses to Non-Trade Bid questions. 2. Comments/Questions that limit scope such as “all walls not shown on elevations will not

receive wall tile” is/are unacceptable. The Drawings are provided to complement one another, for example if one ELEVATION indicates a scope of work, but a DETAIL also provides a scope of work, both are owned. A bidder cannot limit its work to just elevations, all drawings are owned.

SPECIFICATION CHANGES: Item-2 SECTION 004114 – FORM FOR SUB-BID Delete Section 004114 dated 9/8/17 and replace with Section 004114 dated 9/15/17. Item-3 SECTION 007223 – AGREEMENT BETWEEN CITY OF CAMBRIDGE AND THE CM AT

RISK Replace Exhibit L.11 and Exhibit L.12 forms with those dated 9/15/17 attached.

Item-4 SECTION 012200 – UNIT PRICES Delete Section 1.4.N replace with the following:

N. Unit Price 13: Electrical – Poke-Through Assembly. 1. Trade Bid 260000 – Electrical Work. 2. Specification Section 260001 “Electrical.” 3. Description: Furnish and install one additional poke-through assembly

outlet based on 500 LF of power cable and data cable to nearest closet. 4. Unit of Measurement: Each. 5. Base Bid Quantity: Drawings and Specifications.

Delete Section 1.4.O replace with “Not Used”

Page 3: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017

FILE NO. 6846A Addendum #4 SEPT. 15, 2017

WILLIAM RAWN ASSOCIATES, Architects, Inc. BID SET, ADDENDUM #4 10 Post Office Square, Suite 1010, Boston, MA 02109 009104 - 2 of 10

Item-5 SECTION 055000 – METAL FABRICATIONS 1.2.A.14 – Delete this paragraph “Custom pool fence, with three gates.”

Item-6 SECTION 064020 – INTERIOR ARCHITECTURAL WOODWORK

1.2.A.9 – Delete this paragraph “Benches at pool deck.” 1.2.A – Add “13. Wood base.” 2.1.D.2.a – Delete “Book match and architectural end match” replace with “slip match” 2.1.D.2.c – Delete “Blueprint matched” and replace with “Sequence matched” 2.3.L – Delete “steel” replace with “aluminum powder-coat finish” 2.3.O.1 – Add “Model Number 73023195” 2.3 Add: “P. Piano Hinge: Stainless steel piano hinge, 2” width by Hafele or similar.” 2.8.C.2 – Delete “Book Match” replace with “Slip Match” 2.8.C.4 – Delete “Running Match” replace with “Balance and Center Match” 2.9.C – Add “Medium density particleboard”

Item-7 SECTION 064200 – WOOD PANELING

2.1.A – Delete “Custom” replace with “Premium” 2.1.B – Add: 2. Veneer Matching Requirements:

a. Matching Between Adjacent Veneer Leaves: Slip match b. Matching Within Individual Panel Faces: Balance and Center Match. c. Method of Matching Panels: Sequence-matched panels and components.

2.1.C – Delete paragraph 2.1.D.1 – Delete “Book-matched” replace with “Slip-matched”

Item-8 SECTION 101100 – VISUAL DISPLAY SURFACES

2.1.A.6 – Add “2 in” 2.3.B – Add “Ghent TF, Moore Co Best Rite Fab Tak, Working Walls DT”.

Item-9 SECTION 123550 – LABORATORY CASEWORK

2.2.C.2 – Add “Medium density particleboard for door and drawer fronts.” Item-10 SECTION 131104 – SWIMMING POOL CERAMIC TILE

Delete “(Part of Work of Section 090002 – TILE, Trade Bid Required) Item-11 SECTION 21 00 01 – FIRE PROTECTION

Paragraph 1.2, B.16 – delete in its entirety. Paragraph 2.11, B – delete in its entirety.

Item-12 SECTION 22 00 01 – PLUMBING Paragraph 1.2, C.25 – delete in its entirety. Paragraph 1.7, C.8 – delete phrase “including Seismic Restraints”. Paragraph 2.14, G – delete in its entirety. Paragraph 2.20 – delete in its entirety and replace with the following:

2.20 INDIRECT WATER HEATER

A. Water heater shall be Heat Transfer Products, or equal, model HTP-SR-42-093-3-TC with a storage capacity of 505 gallons. Tank shall be equipped with a steel skirt and constructed of carbon steel in accordance with standard ASME Boiler and Pressure Vessel Code requirements. The storage tank will be stamped and registered with the National Board of Boiler and Pressure Vessel Inspectors. Tanks shall be internally lined with ULTONIUM premium enamel coating per ASME HLW Code procedures at a finished thickness of 24 mils. Tanks shall be hydrostatically tested for 150 PSI working pressure. Tanks shall be equipped with

Page 4: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017

FILE NO. 6846A Addendum #4 SEPT. 15, 2017

WILLIAM RAWN ASSOCIATES, Architects, Inc. BID SET, ADDENDUM #4 10 Post Office Square, Suite 1010, Boston, MA 02109 009104 - 3 of 10

all necessary fittings. Tank shall be externally prime coated with red oxide primer.

B. Tanks shall be furnished with the Electric Anode System designed specifically for the Niles Ultonium lined storage tanks. The electric anode system will provide cathode protection through non-consumable titanium rods for maximum protection.

C. Tank to be equipped with 30 kW, 480 volt, single phase, electric back-up heating element.

D. Tank shall be factory insulated. Insulation shall be spayed-on rigid polyurethane insulation with acrylic topcoat which exceeds ASHREA 90.1b requirements. The spray foam insulation to have a class I foam rating with less than a 25-flame spread rating suitable for boiler room applications. Insulation shall be applied at the factory at room temperature directly to the tank in a 2 step application process with 2.25” of foam added per application with a total insulation value to be R-16. The acrylic top-coat is to be applied in a 2 step application process, applying approximately 12.5 mils of material per coat and allowed to dry between applications.

E. The tank is to be equipped with a diverter tube. The diverter tube is to be constructed with heavy gauge stainless steel and designed with an angled plate opening along the bottom of the tube. The angled plate opening will have a 30% more combined volume than the sparge tube which will allow the incoming water to slow and gently enter the tank maintaining temperature stratification. The diverter tube will allow 85% of the tanks usable hot water to be drawn without a noticeable temperature drop.

F. Tank shall have a minimum 10-year warranty.

Item-13 SECTION 230001 – HVAC Section 2.21 Acoustic Duct Lining, Change the first sentence to read as follows: “Lining for Rectangular Metal Ducts: All ducts, where shown or noted on the drawings, shall be lined with 1 ½ in. thick (R-6 min. performance) liner similar to Johns Manville "Permacote Linacoustic RC" fiberglass duct liner with factory-applied surface and edge coating.”

Item-14 SECTION 260000 – ELECTRICAL WORK Section 1.2 Filed Sub-Bid Requirements, Paragraph B.2: ADD the following Class of Work: Theater Equipment Section 116100 Section 1.3 Description of Work, Paragraph A: ADD the following sub-paragraphs: “8. All work of Section 131108 - SWIMMING POOL ELECTRICAL 9. All work of Section 116100 – THEATER EQUIPMENT” Section 1.3 Description of Work, Paragraph C: ADD “AQ1.03, AQ1.04, AQ1.05. AQ1.06, AQ1.08, AQ3.01. AQ3.02, AQ3.03, AQ3.04, AQ3.05, AQ3.06, TL1.01, TL1.02, TL2.01, TL3.01, TL3.02, TL4.01, TL4.02, TR1.01, TR1.02, TR1.11, and TR2.01” to the list of drawings.

Item-15 SECTION 260001 - ELECTRICAL Section 1.2 Description of Work, Paragraph B.14: REPLACE with the following “14. Theatrical lighting, dimming racks, controls, curtains and rigging.”

Page 5: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017

FILE NO. 6846A Addendum #4 SEPT. 15, 2017

WILLIAM RAWN ASSOCIATES, Architects, Inc. BID SET, ADDENDUM #4 10 Post Office Square, Suite 1010, Boston, MA 02109 009104 - 4 of 10

Section 1.2 Description of Work, Paragraph B.29: ADD ”Refer to Section 131108” to the end of the paragraph. Section 2.9 Theatrical Lighting, Dimming Rack and Controls, Paragraph A: ADD “EC shall provide all Theatrical lighting, dimming racks, controls, curtains and rigging, refer to section 116100.” to the end of the paragraph. Section 2.9 Theatrical Lighting, Dimming Rack and Controls, Paragraph B.1: DELETE paragraph and replace with the following: “1. Electrical contractor shall be responsible for complete furnishing and installation of all theatrical equipment, lighting, dimming racks, controls, curtains and rigging.” Part 2 – Products – ADD the following paragraph: 2.31 VERY EARLY SMOKE DETECTION SYSTEM (VESDA)

A. Furnish and install an Aspiration Sensing Technology detection system. All aspiration technology fire detection systems components items under this specification shall comply with all applicable code requirements and manufacturer’s recommendations.

B. The Aspirating Smoke Detector shall be tested, approved and/or listed by:

1. Underwriters Laboratories (UL) S911 2. Factory Mutual (FM) 3. California State Fire Marshal (CSFM) 7259-1653:0215 4. Maryland State Fire Marshall (MSFM) 2244 5. Underwriters Laboratories for Class I Division II, Groups A, B, C and D

Hazardous Locations. C. The aspirating smoke detector shall be installed per manufacturer’s

instructions, including pipe network, programming, and power requirements, and shall comply with one or more of the following codes and standards: 1. National Fire Protection Association (NFPA) 2. National Electrical Code (NEC) 3. UL 268: Standard for Smoke Detectors for Open Areas 4. Local codes and standards

D. The Aspirating Smoke Detector (ASD) shall provide Very Early Warning Smoke Detection (VEWFD as identified per the requirements of NFPA.

E. The ASD shall be self-contained and monitored by a display featuring LEDs and/or LCD to include a control system utilizing microprocessor-based technology with all functions fully programmable, LED displays, alarm indications, airflow and detector faults.

F. The system shall constantly sample air from the environment. In operation, air shall be drawn from the air sampling piping network, through a particle separator and a 30 micron filter assembly being pulled through the detection chamber by the aspirator.

G. The ASD shall incorporate a dual light source technology system for the automatic discrimination of signals from non-fire related sources, such as dust. The system shall automatically compensate for changes in environmental conditions and the negative effect of filter contamination.

Page 6: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017

FILE NO. 6846A Addendum #4 SEPT. 15, 2017

WILLIAM RAWN ASSOCIATES, Architects, Inc. BID SET, ADDENDUM #4 10 Post Office Square, Suite 1010, Boston, MA 02109 009104 - 5 of 10

H. The ASD shall have the capability to connect to the building automation/management system.

I. A test port shall be provided at each pipe run located at 18” above the finished floor for under floor systems, or 5ft above the finished floor when pipe network is above the ceiling. The test port shall be constructed using a vented end cap. Provide a decal indicating the install date, detector zone, pipe number, test point ID, transport time and suction pressure (Pa).

J. System shall be complete in all ways and shall include all engineering and electrical installation, all detection and control equipment, auxiliary devices and controls, alarm interfaces, functional testing, training, and all other operations necessary for a functional, UL Listed, and FM Approved system. Wire gauge shall range from 24 to 12 AWG (0.5-2.05 mm). Wire or conduit shall enter the detector from either the top or the bottom of the device. Pluggable terminals shall be used to wire the detector. All wiring installed shall conform to the requirements of DIVISION 26.

K. Prepare product data and site drawings indicating the system layout, including location of modules, detection/aspiration unit, air intake ports, flow calculations, transport times, power requirements, and sample hole obscuration sensitivity level calculations

L. The equipment installer shall be authorized and trained by the manufacturer and shall have the ability to design a system based on code requirements. The installer shall be capable of providing calculations, design, and testing documents upon request.

M. The entire system shall be installed in accordance with national and local codes and per the manufacturer’s installation manual.

N. The manufacturer shall guarantee the product by warranty for a period of three years. All components of the detector shall be replaced with the exception of regular maintenance accessories: replaceable micron filter. Any damage to the ASD due to poor handling or operating outside of the listed criteria will void any such warranty. The installation and programming of the ASD shall be completed by factory-trained installer.

O. The contractor shall provide complete training to the Owner by factory-trained technicians.

Item-16 SECTION 270000 - TECHNOLOGY

Part 2 – Products – ADD the following paragraph:

2.14 TWO WAY COMMUNICATIONS CALL BOXES

A. SUMMARY 1. Section Includes: Area of Refuge Base Stations, call boxes and signage

a. The Area of Refuge Base Station is to be located at a central control point on the first floor or as determined by local Authority having jurisdiction. Rath Call Boxes are to be located on all floors above and below the first floor, ideally next to a stairwell emergency exit on each floor.

b. The Area of Refuge Base Station must be capable of handling a minimum of 5 Rath Call Boxes. Visual indicators on the base station

Page 7: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017

FILE NO. 6846A Addendum #4 SEPT. 15, 2017

WILLIAM RAWN ASSOCIATES, Architects, Inc. BID SET, ADDENDUM #4 10 Post Office Square, Suite 1010, Boston, MA 02109 009104 - 6 of 10

allow Rescue personnel to know which Area of Rescue Call Box needs assistance. The Base Station must allow Rescue personnel to speak to all Call Boxes or individual Call Boxes.

c. The Emergency communication hardware shall comply with the Americans with Disabilities Act (ADA). The phone shall have the ability to be programmed with up to 5 emergency phone numbers. Upon activation of the emergency push button, a call will be automatically placed to the Base Station. If no one answers at the Base Station, the Call Box must dial a secondary location outside the building to activate two way off-site person to person voice communications.

B. MANUFACTURERS 1. Manufacturers: Subject to compliance with requirements, provide

products by one of the following: a. Rath Area of Refuge b. Aiphone c. Housing Devices, Inc. d. Or Equal.

C. FUNCTIONAL DESCRIPTION OF SYSTEM 1. Construction

a. The Area of Refuge Base Station (models 2500) must have a stainless steel or powder coated steel housing, red coil cord emergency Handset, be 120vac powered, and maintain back-up power for 4 hours.

b. The Area of Refuge Call Boxes (models 2100) must be in full compliance with Americans with Disabilities ACT (ADA). Call Boxes require a hands-free speakerphone with an LED to indicate status of call.

c. The Area of Refuge Call Boxes must allow the programming in of a specific location message of the Call Box. This allows Rescue personnel to know the location of the activated Call Box.

d. The Area of Refuge Call Boxes are to be located no higher than 48” above ground level to ensure conformance with the ADA requirements.

e. The Area of Refuge Call Boxes must have a Braille faceplate located no higher than 48” for front reach and 54” for side reach above ground level to ensure conformance with the ADA requirements.

f. The Area of Refuge Base Station must provide an audible and visual indicator that a Call Box has been activated.

g. The area of Refuge 24vac Power Supply model 2500-PWR24 must be capable of supplying power to a minimum of 40 Call Boxes. (does not power Base Station)

2. Mounting a. The Area of Refuge Base Station is to be mounted on a wall surface or

flush mounted. b. Areas of Refuge Call Boxes are to be wall surface or flush mounted.

3. Electrical a. The Base Station is to be powered by 120vac. Call Boxes are to be

powered by Rath 24vac Power Supply model 2500-PWR24. b. Call Boxes must have a battery back-up capable of providing up to 4

hours of electrical back-up in case of building power failure. c. Base Station must have a battery back-up capable of providing up to 4

hours of electrical back-up in case of building power failure. d. System shall be in compliance with all state and local Electrical Codes.

4. Communications a. The Call Boxes shall have an ADA compliant and vandal resistant

speakerphone.

Page 8: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017

FILE NO. 6846A Addendum #4 SEPT. 15, 2017

WILLIAM RAWN ASSOCIATES, Architects, Inc. BID SET, ADDENDUM #4 10 Post Office Square, Suite 1010, Boston, MA 02109 009104 - 7 of 10

b. The Call Boxes shall be Hands-Free and be a push-button-once to talk system. Once the button has been pushed, the Call Box will call the Base Station. If no answer at the Base Station, it will automatically call preprogrammed emergency numbers. The Call Box must be capable of being programmed with up to 5 emergency numbers.

c. Call Box shall have Location Message capability. Call Box must have a minimum 18 second recordable message capability, programmable to play 1 or 2 times. Call Box shall notify called party of the location of the call upon being received at the emergency dispatch center.

d. Call Box shall be capable of allowing the called party to replay the Location Message if necessary to ensure an understanding of the caller location.

e. If system is not attended to 24 hours a day, the Call Box must dial a secondary location outside the building to activate two way off-site person to person voice communications.

f. Once call has been made (button pushed), the call can only be terminated by the called party.

g. Call Box must have a red LED that will light up upon push of the button. The light shall be a solid color when the Call Box is activated, and will flash when call has been answered.

h. The Call Box must be capable of being programmed and reprogrammed on-site and remotely.

5. Standard Call Box features: a. Five number programming. b. Operating Temperature of between -40˚F to +150˚F (-40˚ to + 65˚ C) c. Programmable passwords. d. On-Site or Remote Programmable. e. EEPROM memory to protect programming.

6. Signage a. System shall consist of a minimum of one photoluminescent (Part

#7041) sign or one 120vac edge light sign (Part #7050), “location” and “instruction” sign (Part #7049) stating, “Area of Refuge” to clearly indicate location of designated area. A tactile sign (Part #7043 or #7044) with raised letter and Braille shall be located at entrance to Area of Refuge.

7. Monitoring a. Off-Site monitoring of the system shall be provided by Rath Monitoring. b. Must be a UL Listed monitoring service provider c. Minimum 3 year agreement for monitoring of the system. d. Call Boxes shall dial Rath Monitoring at 800-xxx-xxxx.

8. Graphics a. Area of Refuge Base Station must include wording identifying the

location of each Call Box and light an LED when a particular Call Box has been activated.

b. Call Box wording must include “Help Phone”, “International Phone symbol” and raised Braille lettering.

D. STARTUP SERVICE 1. Engage a factory-authorized service representative to perform startup

service. a. Verify that electrical wiring installation complies with manufacturer's

submittal and installation requirements. b. Complete installation and startup checks according to manufacturer's

written instructions.

E. ADJUSTING

Page 9: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017

FILE NO. 6846A Addendum #4 SEPT. 15, 2017

WILLIAM RAWN ASSOCIATES, Architects, Inc. BID SET, ADDENDUM #4 10 Post Office Square, Suite 1010, Boston, MA 02109 009104 - 8 of 10

1. On-Site Assistance: Engage a factory-authorized service representative to provide on-site assistance in adjusting sound levels, resetting transformer taps, and adjusting controls to meet occupancy conditions.

2. Occupancy Adjustments: When requested within 12 months of date of Substantial Completion, provide on-site assistance in adjusting system to suit actual occupied conditions. Provide up to three visits to Project during other-than-normal occupancy hours for this purpose.

F. DEMONSTRATION 1. Engage a factory-authorized service representative to train Owner's

maintenance personnel to adjust, operate, and maintain the public address and mass notification systems and equipment.

DRAWING CHANGES: Item-17 SHEET A2.13 – RCP LEVEL 1-C

Delete tag AWC-4 and add note “064200 WOOD PANELING – 10’ – 10”” Item-18 SHEET A5.03 – EXTERIOR WALL TYPES

Wall Type X12 – Delete note “042000.70 SEMI-RIGID INSULATION” and replace with “072100.02 SEMI-RIGID INSULATION”.

Item-19 SHEET A5.65 – EAST BLDG (L2-L3 CPS ADMIN)

Detail 1,2,3,4,17,18,19 – Delete note “076200.01 FORMED METAL FLASHING” replace with “042000.67 STAINLESS STEEL FLASHING” Detail 2, 12 – Add 1 ½” x 1 ½” solid wood edge similar to detail 3/A5.45.

Item-20 SHEET A5.81 – EAST BLDG (GYM) Detail 14– Add 1 ½” x 1 ½” solid wood edge similar to detail 3/A5.45.

Item-21 SHEET A6.58 – TOILET ENLARGEMENTS – POOL Detail 4,7 – Delete note “WT-15” replace with “WT-25”

Item-22 SHEET A7.07 – ENLARGEMENTS – NURSE, KITCHEN, ASD, SPED Detail 2 – Change title from “1226” TO “1224”. Detail 3 – Change tag on wall cabinets from “LWG-“ to “WCG-“.

Item-23 SHEET A7.09 – ENLARGEMENTS – GRADE 5 & AFTER SCHOOL

Detail 11 – Change tag on wall cabinets from “LWG-“ to “WCG-“. Item-24 SHEET A7.10 – ENLARGEMENTS – GRADE 5 & AFTER SCHOOL

Detail 12 – Add tag to base cabinet “SCA-2A”. Item-25 SHEET A7.56 – ENLARGEMENTS – VALENTE VESTIBULE

Detail 8 – Delete “064020.12 SOLID HARDWOOD EDGEBAND” Delete note “083110.01 30” x 30” FLUSH ACCESS DOOR” and replace with “064020.06 30” x 30” WOOD FRAMING DOOR W/ EXTENDED HINGE”

Detail 9 – Delete “064020.12 SOLID HARDWOOD EDGEBAND” Detail 10 – Delete “064020.05 WOOD BENCH” and replace with “064020.87 SOLID

SURFACING” Item-26 SHEET A7.71 – INTERIOR ELEVATIONS – BAND AND MUSIC

Detail 3 and 6 – Change tag on wall cabinets from “LWG-“ to “WCG-“. Item-27 SHEET A7.75 – INTERIOR ELEVATIONS – GYM, OFFICES, RECEIVING

Detail 7 – Change tag on wall cabinets from “LWG-“ to “WCG-“.

Page 10: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017

FILE NO. 6846A Addendum #4 SEPT. 15, 2017

WILLIAM RAWN ASSOCIATES, Architects, Inc. BID SET, ADDENDUM #4 10 Post Office Square, Suite 1010, Boston, MA 02109 009104 - 9 of 10

Item-28 SHEET A8.51 – INTERIOR DETAILS – VALENTE

Detail 1 – Delete note “WOOD BASE” replace with “RUBBER BASE”. Item-29 SHEET A8.61 – INTERIOR DETAILS – AUDITORIUM

Detail 3 – Delete note “055000.94 PERFORATED METAL PANEL” replace with “PAINTED METAL PANEL”

Item-30 SHEET A8.65 – INTERIOR DETAILS – AUDITORIUM CEILING

Detail 5,6,7 – Delete note “AMC-2” replace with “AMC-3” Item-31 SHEET A9.82 – CASEWORK DETAILS – CAFETERIA & PROMENADE

Details 1, 2, 3, 5, 6, 8, 9 – Delete note “064020.09 VENEER PLYWOOD” and replace with “064200.01 VENEER PLYWOOD WALL PANEL”

Item-32 SHEET A9.83 – CASEWORK DETAILS – CAFETERIA & PROMENADE

Detail 4 – Tray unit at end to be BCW-1B, similar to tray unit in detail 3/A9.83. Item-33 SHEET A10.01 – FINISH LEGEND

For WT-17 delete the comment “A6.40” and replace with “A7.11”. For RF-1 and RF-2 change “SHEET” to “TILE”. For PL-6 delete “D92-20” and replace with D92-60”. For SB-1 – delete “18GA” replace with “20GA”. Delete “CLEAR POLYGLOSS FINISH” replace with “#4 FINISH”. Add “SS-3 – SOLID SURFACE – CEASERSTONE” model to be chosen by architect

Item-34 SHEET A10.02 – FINISH SCHEDULE

Room 1082 and 1092 – add to column CASEWORK=PL-5. Room 1501 – add to column COUNTERTOP=SS-2 Room 1524 – delete BASE FINISH RB-3 and replace with BASE FINISH=WB-1

Room 1724 – add to column COUNTERTOP=PL-6 Room 1776 – add to column CASEWORK=PL-5. Delete FRP-1 from column WALL FINISH. Room 1510 and 1511 – delete PL from columns CASEWORK and COUNTERTOP Room 1943 - add to column CASEWORK=PL-5 Item-35 SHEET A10.03 – FINISH SCHEDULE

Room 2004, 2401, and 2402 – add to column COUNTERTOP=SS-1 Room 2012 – delete “EPXY-1” and replace with “ES-1”. Room 2207 – delete FB-1 from column CASEWORK Room 2490 - add to columns TACK-TS-5, CASEWORK=PL-5, COUNTERTOP=PL-6 Room 2030 - add to columns CASEWORK=PL-5, COUNTERTOP=PL-6 Room 2606 - and 2627 add to column CASEWORK=PL-5 Room 2611 – delete PL from columns CASEWORK and COUNTERTOP

Item-36 SHEET A10.04 – FINISH SCHEDULE Room 3004, 3401, and 3402 – add to column COUNTERTOP=SS-1

Room 3250 – delete PL from columns CASEWORK and COUNTERTOP Room 3260 – delete PL from column CASEWORK. Add to column COUNTERTOP=PL-6

Room 3603 - add to columns CASEWORK=PL-1, COUNTERTOP=PL-4 Item-37 SHEET A10.21A – WALL FINISH PLAN LEVEL 2-A

Room 2401 – change “EG3” to “EG4”. Add tag for “CG4” Room 2402 – add tag for “EG4”.

Item-38 SHEET A10.31A – WALL FINISH PLAN LEVEL 3-A

Room 3401 – change “EG3” to “EG4”. Add tag for “CG4”

Page 11: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017

FILE NO. 6846A Addendum #4 SEPT. 15, 2017

WILLIAM RAWN ASSOCIATES, Architects, Inc. BID SET, ADDENDUM #4 10 Post Office Square, Suite 1010, Boston, MA 02109 009104 - 10 of 10

Room 3402 – change “EG3” to “EG4”.

Item-39 SHEET M0.02 – HVAC DETAILS Rooftop Unit Detail: Delete “Hospital Grade” and “with Mylar Finish”.

Item-40 SHEET M4.09 – HVAC CONTROLS Miscellaneous BMS Points Chart: Delete “Door Locks” Reference.

Item-41 SHEET E3.11 POWER RISER DIAGRAM

A weather-proof pull box shall be indicated between the C/T Main breaker for MSB-1B and the Main Switchboard (MSB-1B), and shall be tagged with note: Drop to pull box at garage ceiling below & transition to below slab in storage room 0740. Run feeder below slab of CSUS Connector.

Item-42 SHEET E3.12 ELECTRICAL PANEL SCHEDULES

A 90A/2P breaker shall be added to the 277/480V panel EHP1C and the quantity of 50A/3P breakers shall be indicated as 2.

Item-43 SHEET E3.15A MECHANICAL SCHEDULE For IWH-1 Indirect Water Heater, the following information shall be changed: voltage & phase shall be 480V, 1 phase, panel circuit shall be EHP1C-25,27, circuit breaker shall be 90A-2P and feeder shall be 3#3+1#8G, 1 ¼”C..

DRAWING (NEW/REPLACED): Item- 44 SHEET A10.01 Finish Legend – Delete sheet dated 7/28/17 and replace with Sheet A10.01

dated 9/15/17.

END OF ADDENDUM #4

Page 12: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN / CAMBRIDGE STREET UPPER SCHOOLS & COMMUNITY COMPLEX

RESPONSE TO BIDDING QUESTIONS

Bidder

Question #Reference Document Question Addendum #4 Response

65

Is this a wrap-up job?

The Wording in the insurance sections as well as Exhibit C it seems to be worded from our interpretation, that the GC would be responsible for the

Owner's Protective. It specifically says the CM $5M/5M pollution. Are you requiring same limits from the sub trades?

a. No this is not a wrap-up job

b. Builders risk is by CM.

c. Refer to 007225, 1.12, A, 2

661. Spec 230001, Para E, 1 is calling for Polytherm fiberglass jacketed or equal, and Para E, 2 is calling for PVC. The drawings also call for PVC. Is PVC

acceptable?

Underground Polytherm pre-insulated piping shall be installed in PVC carrier pipes as indicated in

Section 230001 Paragraphs 2.8.E.1&2 and Sheet M2.10. NO CHANGE.

67 Are there any details for the temporary heat? I.e. number of heaters, locations, fuel (gas, oil, electric?), temperature requirement, sheetmetal layout? See response to Addendum #1 Question 4.

68

Bid Section 090005: Section 090005.1 CM Supplemental Scope, paragraph II/1 vs. specification section 096510, article 2.2/A; these two paragraphs do not

describe the same level of floor preparation, this must be a quantifiable item so that all bidders are representing this on equal footing. Please give a

quantifiable amount of floor preparation that each bidder is to carry.

Replace 1/8" in 090005.1 with 1/4"

69Bid Section 090002: For toilet rooms listed on the Finish Schedule with a wall finish code of PTX/WT-X, it will be understood that only walls shown on the

elevations to have wall will receive wall tile. All walls not shown on the elevations will not receive wall tile.Wall tile to be on walls as shown on Interior Elevations and Finish Plans.

70 Bid Section 090002: Please clarify what areas receive a mudset or a thinset installation. Also what areas receive crack/waterproof membrane. Mudset at Stone Flooring in Valente Library is required.

71

Bid Section 090005 & 090002: Individual specification sections do not indicate what products are owned by that section, bidders are directed to the FINISH

LEGEND. The FINISH LEGEND does not indicate what specification section a product belongs to. This MUST be clarified to avoid any crossovers, duplications

or omissions from bidders. There must be some kind of product matrix supplied in order to maintain a fair bidding field for ALL bidders. Bidders cannot be

left to assume what products they own, this must be specified properly to avoid a bid protest and to insure that each bidder is bidding the same thing.

Specification sections added to FINISH LEGEND.

See Addendum 4 Drawing Change Item-44.

72

Chapman Waterproofing wish to submit a bid for the above. We have looked at the plans and specs electronically and they are so large and mostly

irrelevant to our trade, can we therefore order a set of “Volume 1” plans and specs only?

Please let me know if this is a possibility and if so, what would be the cost.

No change.

73

1. Drawing M3.04, Chilled water/Ground water flow diagram, indicates a automatic filtration & strainer system near the top right hand side of the drawing

but I don’t see it indicated in the plan view, detail 1, drawing M2.51. If it is to be provided please indicate it on detail 1, drawing M2.51 with the required

piping connections.

Chilled water buffer tank and Automatic Water Filtration & Strainer System have been removed

from project. Refer to updated flow diagram on sheet M3.04.

See Addendum 1 dated 9/1/17 Drawing Change Item-103 for revised M3.04

74

2. Detail 1, drawing M2.51 indicates the HVAC contractor to extend the 6” HDPE ground water piping to the well vaults & to make the connections there.

The geothermal water flow diagram on drawing M3.04 indicates the HVAC contractor is to end at the wall sleeves and that the geothermal well contractor

continues the piping from the wall sleeves to the well vaults. Which is correct?

HVAC contractor to extend the 6" HDPE ground water piping 10' from the building as noted on

M2.51. No Change.

75 Spec book says last day for questions is August 22, 2017. Is this correct? No change.

76Please confirm Glass railing system at stair #3& 6 shown on A6.02 is by Glazing sub. Misc. metals is only responsible for the stair framing and

treads/landings. Please advise.

Work of Section 057300 includes installation of glass for railings per Par. 1.2D1a furnished by

Section 088100 Par. 1.2E1a.

78Bid Section 090005: Specification section 090005.1, article II, paragraph 4 would indicate this section is to ‘maintain’ floor protection until substantial

completion, we have no way of policing other trades on our protected surfaces, therefore this cannot be bid. Initial protection will be carried.

All initial floor protection shall be furnished and installed by 090005. All further maintenance

shall be completed by CM.

79

Bid Section 090005: Specification section 090005.1, article II, paragraph 1/B/5 would indicate this section is to remove paint ‘overspray/markings’, this is

not a quantifiable item and therefore cannot be fairly bid by all bidders. Please quantify this item so that all bidders are representing this item equally.

Unless quantified via addenda this item cannot be included (trade section 090007 should be responsible for their overspray and markings).

090005.1 II 1 / B / 5, Assume a 1.5” strip of paint overspray will occur along the entire length of

all walls – both exterior and interior. All necessary prep to be included to maintain factory

warranty including but not limited to – scraping, grinding, flashing and/or leveling

80

Bid Section 090002: Please clarify what section owns specification section 131104, there is no indication in the following specification sections that this is

owned by 090002, 090002.1 or 093000. The section header for 131104 indicates that it part of 090002 but section 090002 makes no reference to it, and is

therefore not included in that section, this is the same for all other above mentioned sections. Unless clarified via addenda, section 131104 will not be

included in the sections owned by trade bid 090002 (this section is best owned by the pool contractor and not the tile trade).

131104 is not part of 090002 trade bid.

See Addendum 4 Specification Change Item-10.

ADDENDUM #4 - 9/15/2017

Trade Bidder Questions After Original Bidder Questions Deadline (8/22/17)

ATTACHMENT 1 - BIDDER RESPONSES 9/15/17 1 of 15

Page 13: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN / CAMBRIDGE STREET UPPER SCHOOLS & COMMUNITY COMPLEX

RESPONSE TO BIDDING QUESTIONS

Bidder

Question #Reference Document Question Addendum #4 Response

ADDENDUM #4 - 9/15/2017

81Please confirm our interpretation that the Geothermal scope shall not to be included in the Mechanical Sub contractors trade bid and is to be performed

under a separate contract.

Geothermal scope is part of BP-2 as indicated in the Contract Documents. See response to

Bidder Question #74.

82

Please confirm who owns the utility back charges. If utility back charges are to be by the Electrical Contractor please provide the utility company work

order #. If you are unable to provide a work order # for the utility company to tell us the cost of their services then please specify an amount to carry for

utility back charges so as to maintain an equal footing amongst bidders.

CM owns the temporary electric utility charges.

83

Bid Section 090005: Specification section 096510; paragraph 1.2/B contradicts 090005.1, article II, paragraph 2. Please indicate if it has been determined

that the use of the high moisture adhesive is acceptable or if this is still an option and vapor mitigation/underlayment is to be carried. These two directly

contradict one another and will cause skewed results from all bidders. In order to maintain a level bidding field for all bidders this must be clarified. Unless

clarified via addenda it will be understood that 090005.1 will take precedent over 096510 since 090005.1 by

its own definition is to ‘amend’ the specification and no Vapor Mitigation or the associated underlayment will be carried.

Utilize 99% RH glue as specified. No change.

84

Bid Section 090002: Specification section 090006.1, article II, paragraph 1/B mentions ‘Tile Trade Contractor’, is this sections (090006) floor preparation

owned by the Tile Trade or is this a typographical error. Unless clarified via addenda it will be understood that this is a typographical error as there is no

other mention of the Tile Trade owning anything within trade bid section 090006.

Yes, it is a typographical error. In Section 090006.1, modify Tile Trade Contractor to Terrazzo

Trade Contractor.

85

Detail 11/A5.06 ROOF - PV PANELS, BALLAST-MOUNTED, TYPICAL

The detail shows membrane roofing slip sheets below all PV ballast pans extended 6”min. beyond pans. The typical general note #11 on Roof Plan-A

(A1.51), Roof Plan-B (A1.52), Roof Plan-C (A1.53), and Roof Plan-D (A1.54) calls for membrane slip sheet under all PV regions as indicated by dashed

rectangles on plans typical. Is it the intent to provide the slip sheets just below the pans or to cover the entire region of the PV panels?

Please issue an addendum clarifying the intent of the contract documents.

Provide slip sheets below and 6" past all PV ballast pans as shown on detail 11/A5.06.

No Change.

86

Detail 10 & 12/A5.06 ROOF – PV PANELS, FLUSH MOUNTED AND ANCHOR DETAIL

The panel system is based on the Schletter standard flush mount system to withstand wind speeds up to 105MPH. The above roofing details show the

attachment method to roof membrane but do not indicate what the spacing is for the module carrying rails or the roof attachment anchors. Please provide

the carrying rail and anchor spacing.

Please issue an addendum clarifying the intent of the contract documents.

Bidder to perform per Section 481400 Part 1.7 - Description of Work.

No Change.

87

Details 1-4, 17-19/A5.65: Keynote – 076200 Formed Metal Flashing

The above typical thru-wall flashing details at masonry walls indicate that the metal through-wall flashing is by Section 076200 but CM Supplementary

conditions – 007225-16 3.8 C., Section 076200-1 1.2 A.1.a as well as typical details X8B, X8WX, X9B, X9W, X9X/A5.02 indicate that the masonry through-

wall flashing is by section 040001-Masonry.

We believe the above typical details on A5.65 and other similar masonry details are by the masonry contractor (NOT SECTION 070002 – ROOFING AND

FLASHING TRADE CONTRACTOR).

Please issue an addendum clarifying the intent of the contract documents if our understanding is incorrect.

Confirmed. Through-wall flashing at masonry walls are by masonry contractor.

See Addendum 4 Drawing Change Item-19.

88

I am bidding on the Tiling 093000 for this project, and need some direction please?

On drawing A10.01 Finish Legend, Wall type WT-17 calls for 39”x118” Lines-Textured Legno Liscia by “T-ONE”. I cannot find this material on the internet

and have no idea what it is or where to get it. Do you have a supplier or Rep for this material?

Comments column says “see A6.40 for Cut Widths A, B, C.” There is nothing shown on A6.40?

The rep is:

Tony Butlin

Division 9 Collaborative

555 E 2nd Street, 2nd Floor, South Boston, MA 02127

617 592 2200

www.division9collaborative.com

The comment column should say “A7.11” not “A6.40”.

See Addendum 4 Drawing Change Item-33

89

We just received Addendum #1 for this project and we noticed that there is no bid extension was issued with it, we also notice that the body of the

addendum was sent out on 9/1, but it wasn’t sent to us till today, we lost a week of time to review it, this addendum is very extensive and will take some

time to go through it, is there any way a bid extension can be granted for the trade contractors?

Per Addendum 3, Bid due date extended to 2pm on 9/21/17

ATTACHMENT 1 - BIDDER RESPONSES 9/15/17 2 of 15

Page 14: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN / CAMBRIDGE STREET UPPER SCHOOLS & COMMUNITY COMPLEX

RESPONSE TO BIDDING QUESTIONS

Bidder

Question #Reference Document Question Addendum #4 Response

ADDENDUM #4 - 9/15/2017

90Spec Section 055000 description of work item #8 Trench covers at both sides connector and library. There are many types of trench covers styles that meet

the description on A5.87 detail #12. Please provide specification on this item and extent required.See Addendum 1 dated 9/1/17.

91In spec section 055000 metal fabrications description of work item #14 custom pool fence with 3 gates. Wouldn't spec section 323100 fences and gates be

providing this item? Please clarify what 055000 metal fabrications is required to do at pool area.

Pool fence and gates by 323100.

See Addendum 4 Specification Change Item-5.

92In Spec section 055000 under description item #9 Bollards, embedded and surface mounted. This item is listed in two difference spec sections 055000

Metal Fabrications and 324000 Site Improvements. Please clarify what spec section is to provide the different type of bollards.

Bollards are to be provided by 055000 Metal Fabrications.

See Addendum 1 dated 9/1/17.

93

N. B. Kenney is preparing the bid docs for your project; upon doing so we ran into an issue/question. In your “filed sub-bid must include list” the fourth

item down on the list (sub-contractors Certification) there is no form to sign. Not only that, but the item states it is an agreement between city of

Cambridge and Construction Manager at Risk. Please advise.See Addendum 2 dated 9/8/17.

94 What trade constractor is resposible for the beams, plates, angles, ect on L6.03 detail #6. Please clarify 055000

95Just wondering if the additional Unit Prices added under Addendum #1 Section: C: that we need to complete is going to have it's own form or should we

just extract pages 2 + 3 from the Addenda and use this to add with the bid forms. See Addendum 2 dated 9/8/17.

96

Per the answer to question 40 an extension to the bid due date has not been granted. We would like to request a two week bid extension due the

complexity and the size of the project. With vacations & the holiday weekend, our vendors & subcontractors require more time to quote. We depend on

multiple vendor & subcontractor quotes on each scope item to make our proposal as accurate and competitive as we can. Also it took the design team two

weeks to produce the addendum and to answer questions. We hope that you will reconsider and grant us more time.

See response to Bidder Question #89.

97Spec section 055000 desription of work item #8 trench covers at both sides of connector and library recessed for applied floor finishes. There is no rooms

in this building called Lirbary. Please clarify where this is required.Library refers to Valente Library (Rooms 1501, 1510, 1570). No Change.

98

On Plan E0.03; Notes 12 and 13 refer to fixtures SLP1, SLP2, SLP3, and SLA6. Please provide information as to what panel and circuit these lights are to be

fed from. Please provide conduit and wire sizes and quantities. Is the circuits for the existing fixtures SLP3 and SLA6 to be re used or are these lights being

re fed.

Circuiting serving for the type SLP1, SLP2, SL3P & SLA6 is existing to remain. Capture & extend to

accommodate the new poles for the type SLP1 & SLP2 pole fixtures. The type SLP3 & type SLA6

poles are existing to remain.

99On A1.10 please provide details for ramp rails at mechanical room door #0760A and rainwater treatment room door #0770. Spec Section listed on

drawings 057300.13 would make these railing stainless steel or glass. But the drawing says painted steel. Please clarify.Painted steel handrails to be used at those 2 locations per A1.10. No Change.

100Please confirm that the Electrical Contractor does not own providing the 13.8KV 1200A S&C Primary Switchgear that is shown on plan E0.04 in detail # 3.

Please confirm that it is to be provided by Eversource.Confirmed. The 13.8kV switchgear is to be provided by Eversource.

101

Addendum #1 issued today, lists Cambridge Responsible Employer Plan Subcontractor’s Certificate(City of Cambridge form for Projects over

$100,000)Exhibit L.1. Can you please advise to where this form is located? The original instructions to bidders lists this form as not issued/or required. See Addendum 2 dated 9/8/17.

1021. What forms are required to be submitted at bid time? Are these the only forms required; Bid Form, Cert. of Eligibility, Update Statement and Bid

Deposit?See Addendum 2 dated 9/8/17.

103 2. How will the sub bidders be notified if there are bulletins/addendums? Will a cd be mailed? Is there a website to obtain the documents. City of Cambridge Purchasing Department notifies all pre-qualified trade bidders.

104 Also, can you on drawing A10.01 Finish Legend List out what the Acoustical Tile Contractor owns? Ceilings and Wall Finishes Category

As indicated in the specs the trade bid includes section 095100 ACOUSTICAL CEILINGS and

098430 SOUND-ABSORBING PANELS. Provide ceilings except those that are 098120 SPRAYED

ACOUSTIC AND THERMAL INSULATION and all of the AP wall finishes (098430 SOUND

ABSORBING PANELS). No Change.

105Addendum 1 contained Section 004114 - form for Sub bid Unit Prices which are to be added. Does this replace Document 004322 (Unit Prices Form) or

should both be submitted with bid?See Addendum 2 dated 9/8/17. Section 004322 is part of Bid Package 2.

ATTACHMENT 1 - BIDDER RESPONSES 9/15/17 3 of 15

Page 15: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN / CAMBRIDGE STREET UPPER SCHOOLS & COMMUNITY COMPLEX

RESPONSE TO BIDDING QUESTIONS

Bidder

Question #Reference Document Question Addendum #4 Response

ADDENDUM #4 - 9/15/2017

106

Are the filed sub bidders required to attached MBE/WBE forms with bid?

The forms in Section 007223 are all labeled for the GC. See Addendum 4 Specification Change Item-3.

107Is there going to be a bid extension on this project some of my suppliers are not going to be able to make the deadline for me. I won't be able to bid this if

that's the case and there are only 2-pre-qualified miscellaneous metals biddersSee response to Bidder Question #89.

108

Please review wall between the Ramp and the Loading dock along column line EQ.

Refer to blowup detail on 5/A5.64 & Elevation 1/A7.86, shows the loading dock wall to be an 8” cmu wall and the ramp wall on the back side to be a 4”

cmu w/rigid insulation wall type.

If you look at detail sections both 2 & 3 on A4.48, there is no cmu being shown on the loading dock side. Also detail 14 & 22 on A5.92 does not show an

8” cmu at the loading dock.

Please confirm the wall type facing the loading dock along column line EQ.

Wall type to be "X9K" per 5/A7.86 and 5/A5.64. No Change.

109

In reference to Addendum 1 Attachment 1; please be more specific when giving us the response of question #2; See Specification change item -4: You

want us to use the form in addendum 1; (bottom left Corner 9101 – 2 of 20) and include these 2 pages? See Addendum 2 dated 9/8/17.

110 What about Document 004322 (2 pages) Unit Prices Form? Do we submit this also? See Addendum 2 dated 9/8/17.

111Also all MBE/WBE forms want general Contractor signatures – will you be issuing subcontractor forms or shall we use these?

See response to Bidder Question #106.

1121.In my section 093000-12 3.11.B.2 installation calls for polymer Unsanded grout at FT-1. Please confirm this is not Epoxy Grout as Epoxy is the only one

specified.Epoxy Grout all locations.

1132.On Finish Schedule A10.14A Toilets 1910 and 1915 call for “WT-25” wall tile. On drawing A6.58 Elevations 4 & 7 says “WT-15” on walls. Please clarify

which tile?WT-25 per A10.14A. See Addendum 4 Drawing Change Item-21.

1143.There are no Elevations for Corridor 1080. How high does the WT-9 wall tile panels go? I am assuming as shown on A6.40? Yes, refer to the tile wainscot height as described on A6.40 MOUNTING HEIGHT – AED & FIRE

PROTECTION. No Change.

115 Paragraph 2.3C: The unit specified is not in production and the manufacturer does not have a replacement. Confirm that the Shure SCM800 is acceptable.The Shure SCM800 is an acceptable substitution. A blank rack panel is to be provided to fill the

empty space as the SCM800 is not as tall as the Rane MLM103.

116 Paragraphs 2.5A-C: The amplifier model series is not in production. Confirm that the DCI series is desiredCrown DCI series amplifiers with equivalent output power ratings are acceptable substitutions

for the Crown CTS series amplifiers.

117 Paragraph 2.5F: The "XPA" model specified does not exist. Confirm that the MPA 601 70V is the desiered model.The Extron XPA 2001-70V is the preferred model

(http://www.extron.com/product/product.aspx?id=xpa2001&s=4).

118Paragraph 2.5G: The RU series amplifier is not in production. Confirm the RU-ADA4D is required. Note also that this item does not appear within the

system riser diagrams and not required per the design.

The Radio Design Labs RU-ADA4D is an acceptable substitution. Please refer to AV drawing

AV6.00, lower right hand section for the wiring of the stereo audio DA.

119Paragraph 2.7C: The specified intercom belt pack model is not available. Confirm that the RS-703 is desired and that all intercom wall jacks shall be 3-pin,

not the 6-pin shown on plan AV6.02.6The RS-702 Beltpack is acceptable with 6-pin intercom wall jacks as shown.

120 Paragraph 2.8A.5: Provide the total quantity of assistive listening receivers and accessories needed for the project. Provide (38) receivers/headsets and (10) neckloops

121 Paragraph 2.9B: The Blu-Ray players specified are no longer available. Confirm that the Denon DN 500BDMKII is an acceptable model. The Denon DN 500BDMKII is an acceptable substitution

122In the Auditorium the Finish Schedule calls for AMC-3. But if you go to the cut sheets AMC-2 is noted A8.65. Please advise.

Per finish schedule, AMC-3. See Drawing Change Item-30.

ATTACHMENT 1 - BIDDER RESPONSES 9/15/17 4 of 15

Page 16: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN / CAMBRIDGE STREET UPPER SCHOOLS & COMMUNITY COMPLEX

RESPONSE TO BIDDING QUESTIONS

Bidder

Question #Reference Document Question Addendum #4 Response

ADDENDUM #4 - 9/15/2017

123There are a lot of rooms on the finish schedule calling for Acoustical Wall panels and elevation views are missing for these rooms, preventing us from

quantifying the material. Please advise.

If room is not elevated, refer to corresponding similar room type for elevations. For SLL and

Control Rooms in East building, elevations are on A7.66. For rooms 1737 and 1738 acoustic wall

panels to be floor to ceiling in locations noted on finish plan A10.13A.

124

Per Structural Drawing S0.02, noting this building is designated as a Seismic Design Category “B”, will seismic bracing be required for the fire protection

scope 210000? Per the Mass State Building Code, and ASCE 7-05 (paragraph 13.1.4), seismic bracing may be eliminated in buildings that fall under Seismic

Design Category “B”. Except in specific cases like Emergency shelters, or the like.

Seismic bracing is not required for buildings classified as Category B. Refer to Specification

Section 23 05 48, Paragraph 1.4 for applicable Codes, Standards and Categories. Specification is

performance based for Vibration Isolation and Seismic Control.

125

There appears to be several conflicting milestone dates as the contract docements now stand that will affect how the HVAC project scope would be priced

by a Trade Subcontractor. Please see attached document. See Specification 011300, which shall have precedence

126

"Addendum #1 indicates a Substantial Completion Date of June 2019.

Section 011300-3, Project Schedule states, Project Substantial Completion (including site) and Certificate Of Occupancy, August 15,2019." See Specification 011300, which shall have precedence

127

"Section 0113000-3, Project Schedule states, New permanent HVAC system operational (sufficient to install finishes and remove temporary heating

systems) 12/1/18.

Section 230001.1-2,II,6. States to provide temporary heating system,( not the Permanent HVAC system), 11/1/18 to 4/1/19."See Specification 011300, which shall have precedence

128

Section 011300-3, Project Schedule states, Permanent power available for Elevator and Lighting. There is no mention of Permanent power for HVAC. The

HVAC Trade Subcontractor would need Permanent power by 9/1/18 In order to provide that the HVAC system is operational (sufficient to install finishes

)by 12/1/18

See Specification 011300, which shall have precedence

129In addition to make the permanent HVAC system available, many of the interior finishes would have to be completed prior to 12/1/18. Section 011300-3,

Project Schedule shows Interior finishes starting on 3/22/19 well beyond the 12/1/18 date.See Specification 011300, which shall have precedence

130

1) The 274100 section if read carefully requires the bidder to list all AV equipment and equipment costs in our sub bid and also opens the door for and EC

to list themselves and shop the AV system after in a piecemeal procurement. Listing AV equipment and equipment costs in sub bid is not required.

1312)The 481400 section is very restrictive and does not allow the EC to team with a reputable vendor who sells the equipment that is specified and desired

by the city and opens the door for bid protests and forced acceptance of non proprietary equipment.

With regards to “contactor experience”, each Electrical Trade Bidder has been prequalified

already and we take no issue to your standing or ability to complete the PV Work. With regards

to the “restrictions” on installation, the Electrical Trade Bidder may also install the PV Systems

(furnished by others) or have the PV Supplier Install. This is entirely up to the Electrical Trade

Bidder, the requirement is to have a 100% operational system furnishe, installed, certified,

warrantied, etc.

ATTACHMENT 1 - BIDDER RESPONSES 9/15/17 5 of 15

Page 17: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN / CAMBRIDGE STREET UPPER SCHOOLS & COMMUNITY COMPLEX

RESPONSE TO BIDDING QUESTIONS

Bidder

Question #Reference Document Question Addendum #4 Response

ADDENDUM #4 - 9/15/2017

132

070002.1 II – 2. Temporary Roofing and Weather Protection:

075400-PROTECTION AND CLEANING

A. Protect membrane-roofing system from damage and wear during remainder of construction period.

The response to question number 22 appears to be a clerical error in that it is the same response given to

question number 21. The response to question number 23 does not address our concern that it is unreasonable

to require that the Roofing Trade Contractor be responsible for any damages and repairs that are caused by

others.

If the Roofing Trade Contractor installs temporary protection pathways after the new roof has been installed as

directed by the Construction Manager and other Trade Contractors and/or Subcontractors fail to follow these

pathways and damage the roof membrane, what justification is there to hold the Roofing Trade Contractor

responsible for the resulting damage or repair?

Also based on our interpretation, we believe it is reasonably inferred that the 6’ x 1,000’of temporary protection

pathways will be completely installed after the new roof has been installed, inspected and accepted by the

roofing system manufacturer. We do not expect to be called upon to install, remove and reinstall these

temporary protection pathways at will and we have no way of quantifying the cost associated with doing so. We

are also concerned that it may not be feasible to adequately secure these temporary protection pathways from

high winds, especially if they are subjected to heavy use and lengthy duration. Also, is the Roofing Trade

Contractor’s Base Bid to include the removal and disposal of these temporary protection pathways following the

completion of roof level work? In the interest of avoiding potential litigation, we maintain that an addendum be

issued stipulating that the Construction Manager will require that all other Trade Contractors and/or

subcontractors provide work platforms and/or traffic protection as required to perform their work and will hold

them responsible to restore to original condition, or replace work and roofing materials damaged by them.

Please issue an addendum addressing our concern that it is unreasonable to require that the Roofing Trade Contractor

be responsible for any damages and repairs that are caused by others and clarifying if the Roofing Trade Contractor’s

Base Bid is to include the removal and disposal of these temporary protection pathways?

In regards to "Protect and Cleaning", should any damages to the newly installed roofing system

be witnessed, those damages will be backcharged (new repair) to the offending subcontractor.

133

075400-1.4 PERFORMANCE REQUIREMENTS

The response to question number 26 does not address our concern that due to our lack of expertise in roof

system design, as well as the lack of adequate time and resources during the bid process; it is not possible for us

to confirm that the specified roof system types, the material components to be applied and the application

methods to be employed on this project meet the specified performance criteria or state and local building

codes.

Also, paragraph N.4 on drawing S0.02 provides some of the specific project conditions pertaining to wind load;

however, there are no design uplift pressures for the roof indicated on the drawings.

Please issue an addendum identifying the design uplift pressures required for field, perimeter and corners of the roof

as determined by the registered project design professional?

See response to Question 29 in Addendum 1 dated 9/1/17.

134"The response to question number 29 does not address our concern that warranty wind speed coverage is not determined by code.

Please issue an addendum identifying the required roof system warranty wind speed coverage for this project?"See response to Question 29 in Addendum 1 dated 9/1/17.

ATTACHMENT 1 - BIDDER RESPONSES 9/15/17 6 of 15

Page 18: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN / CAMBRIDGE STREET UPPER SCHOOLS & COMMUNITY COMPLEX

RESPONSE TO BIDDING QUESTIONS

Bidder

Question #Reference Document Question Addendum #4 Response

ADDENDUM #4 - 9/15/2017

135

075400-3.9 FIELD QUALITY CONTROL

The response to question number 35 does not address our question concerning the type of tests to be

performed and the frequency of the inspections. This information is critical to our determining the cost

associated with meeting this requirement.

Please issue an Addendum confirming the type of tests to be performed and the frequency of the inspections required

of an independent testing and inspecting agency or qualified manufacturer’s technical representative?.

No change.

136

I’m looking at Addendum 2, page 3, Instruction to Bidders. You have included L.11 Minority Business Enterprise Requirements and L.12 Projected

Workforce Certification Form under the Filed Sub-Bid Requirements. These forms require the General Contractor signatures, not Filed Sub-Bidders. It

doesn’t look like they should be part of the Filed Sub-Bids, please advise.

See response to Bidder Question #106.

137 Most of the forms have places for the GC to sign. I assume it is acceptable for the FSB to sign in these locations. Please confirm. See response to Bidder Question #106.

138

Page 4 of Addendum #2, dated September 8, revised the list of what must be included with the

submission of Filed Sub-Bids. L.11 Minority Business Enterprise Requirements and L.12 Projected

Workforce Certification Form were both added to the list of what is to be included; however, both of

the newly added forms are for the General Contractor. Please confirm that L.11 Minority Business

Enterprise Requirements and L.12

See response to Bidder Question #106.

139

Are the forms provided in Addenda #2 for the L.11 (Form 1-4 M.B.E) & (Form 1-4 W.B.E.) Minority Business Enterprise Requirements and the L.12

Projected Workforce Certification Form to be used by BOTH the General Contractors AND Filed Sub-Bidders or are there different forms for only the Filed

Sub-Bidders?

It appears the language is specific to General Contractors with no mention of Filed Sub-bidders and the signature areas are all specifically named GENERAL

CONTRACTOR.

See response to Bidder Question #106.

140RFI 6. Is EST ( Edwards) fire alarm acceptable in this bid next week. They are not listed in the spec and I just want to make sure we have approvable

quotes?No change.

141RFI 7. Specification 2.17b says FPLP fire alarm cable can be run above exposed ceilings, but note # 4 on the FA Plans note MC Cable should be used.

Please clarify.

FPLP fire alarm cable can be run concealed above ceilings, refer to Section 260001, 2.3.H for

requirements.

142

1. Addendum #1 Item# 4-unit prices:

Unit price #12 What floor box is being priced?

Unit price #13 Cameras are by C/M what is being Priced?

Unit price #14 Card Readers are by C/M what is being Priced

Unit price #18 What is a “Fire Alarm- Exit Sign” provide specifications

See Addendum 4 Specification Change Item-2 and Item-4.

143

2. Addendum #1 Item# 18 Section 116100 Theater Equipment:

Is this added item referring the Electrical subcontractor to the section 116100 to verify what is owned by section 260000 or is it adding the entire Theater

Equipment Section including all Curtains and Rigging as a Paragraph E sub-sub Listing to section 260000?

None of the Theater Equipment drawings are listed or included in the electrical filed sub bid documents?

Section 116100 1.04 D states this section is by General Contractor?

Entire section 116100 to be part of 260000.

See Addendum 4 Specification Change Item-14 and Item-15.

ATTACHMENT 1 - BIDDER RESPONSES 9/15/17 7 of 15

Page 19: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN / CAMBRIDGE STREET UPPER SCHOOLS & COMMUNITY COMPLEX

RESPONSE TO BIDDING QUESTIONS

Bidder

Question #Reference Document Question Addendum #4 Response

ADDENDUM #4 - 9/15/2017

144

3. There is NO reference to section 131108 in the 260000 sections, yet this section states it is part of 260000. This violates the sub bid laws, as the electrical

scope must reference all sections and plans that the filed sub bidder is submitting a price on.

What plans are associated with the scope of section 131108?

Electrical specification updated to include pool section and drawings. See Addendum 4

Specification Change Item-14.

145 4. Currently there are not any wireless clocks shown on drawings T1.23, T1.24, T1.33 is it the intent to not have any wireless clocks in these areas? No wireless clocks provided in these areas.

1465. Is there currently a roof racking layout that is more detail then currently in the set of Drawings for the PV system. There are situations like the south facing

wall mount PV panels that do not show a specific detail. Also, can you provide a detail for the PV panels mounted over the mechanical wells?

Refer to roof plans (A1.51-A1.54) for panel layout. For south facing wall mount panels see detail

14/A5.81. For panels mounted over mechanical wells see detail 15/A5.06. No Change.

147

Please review the X12 detail shown below. Would like to clarify if masons in fact own the installation of the 4” semi rigid insulation on these cmu walls at

the garage?

Normally the masons would build the cmu wall and demobilize for other trades to proceed with AVB/Insulation and sheathing.

Based on the detail below, looks like masons are to build cmu ; AVB contractor to apply air barrier ; Z clips to be installed by others; Masons to come back

to install insulation.

Please confirm the intent on construction X12 wall type at the garage.

Insulation in wall type X12 to be by Division 072100.

See Addendum 4 Drawing Change Item-18.

148 On A9.71 detail #3 calls out 055000.98 shouldn't the HVAC contractor be furnishing and installing this itme for his radiator. Please clarify. Architectural metal grille by 055000. No Change.

149On A8.61 detail #3 calls out for 055000.94 perforated metal panels. My assumption is that this item goes the whole length of the auditorium seat risers.

Please clarify. Also please provide specification for said perforated panels

Metal panels extend length of seat risers, not including stairs. Panel to be solid metal (not

perforated) 20 gauge steel shop primed filed painted to match surrounding concrete floor. See

Addendum 4 Drawing Change Item-29

150On A8.63 detail #3 calls out for 055000.94 perforated metal panel. Please provide extent of perforated panel that is required and a specification for said

panel.See extent on Auditorium elevations 1,3 / A7.65. No Change.

151 Will standard AIA P&P bond forms be acceptable for this project? If not please provide sample performance and payment bond forms. Yes, standard AIA P&P bond forms are acceptable.

152

Bid Section 090005: The products listed under RF-1 & RF-2 are not available in ‘sheet’ format with a round profile, only ‘tile’ is available. Unless clarified via

addenda the tile product will be carried to provide the designated profile.

Also, please clarify a thickness for this material (it would be helpful to all bidders if technical specifications were included for the basis of design products)

Rubber flooring to be tile. Provide in 3.0mm thickness.

See Addendum 4 Drawing Change Item-33.

153

Plumbing Spec. Section 22 00 01

Can you please clarify what kind of pipe carries the solar hot water.

Solar water piping shall be Type ‘L’ hard tempered copper tubing. Fittings shall be cast bronze or

wrought copper sweat type, water pattern fittings. Solar water copper tubing and sweat fittings

shall be assembled with lead free solder and a non-corrosive flux recommended by the

manufacturer. Solar water piping shall be insulated the same as domestic water piping.

154

Specifications call for 1.5" liner as shown or noted on the drawings. This is clearly shown on the drawings and noted, Auditorium, Band Room, transfers.

Drawing M0.01 HVAC Details Typical VAV box Ductwork shall be lined 10' developed length down stream of VAV box. VAV boxes are scheduled with sound

attenuators, is liner required

Yes, liner is required for a minimum of 10’ after VAV boxes per detail on sheet M0.01. No

Change.

155 What section is responsible for caulking the perimeter of hollow metal door frames to drywall? Division 079200.

156

If the following joint locations need to be caulked by section 079200…

1. Chair rails to wall joints

2. Perimeter of Access panels in drywall

3. Perimeter of access panels in masonry

4. Cabinets to Drywall

5. Cabinets to Masonry

6. Masonry wall to drywall ceiling joint

7. Lockers to drywall

8. Lockers to masonry

1. Yes

2. Yes

3. Yes

4. Yes

5. Yes

6. Yes

7. Yes

8. Yes

ATTACHMENT 1 - BIDDER RESPONSES 9/15/17 8 of 15

Page 20: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN / CAMBRIDGE STREET UPPER SCHOOLS & COMMUNITY COMPLEX

RESPONSE TO BIDDING QUESTIONS

Bidder

Question #Reference Document Question Addendum #4 Response

ADDENDUM #4 - 9/15/2017

157On A1.14 at column line EH and 38.6 shows a stainless steel guardrail marked 055000.97 but on AQ3.02 it calls for galvanized guardrail. Please clarify what

type of material and who is responsible Miscellaneous metals or Section 131106 swimming pool equipment.Provide galvanized guardrail per AQ3.02. Guardrail by Div 055000

158 Who is responsible for all railings and fiberglass ladders for pool area. Please clarify. Division 131106

15964020 A1.14

064020 States benches at pool deck. Drawing A1.14 shows HDPE benches. Please confirm bench type, details, and specifications HDPE Benches with metal legs. Surface mounted. Per spec 105126

160 A8.52 Please provide specification and call-out for Flat Seam MetalRefer to A10.01 FINISH LEGEND for WP-2. WP-2 to be painted metal panels, 18 gauge, Architect

to provide specification in forthcoming Field Bulletin 026.

161 A7.28The IG-7xx openings indicate wood trim however there is nothing detailed. Dwgs A8.14 & A8.21 do not indicate any wood. 60% CD's previously had trim

drawn on 1/A7.37 however that doesn't appear to exist anymore.IG7XX types are found on A8.22. The details are located on A8.30. No Change.

162 -18" high base specified for Locker Type 5. No manufacturer makes an 18" base (max is 8"). Is the intent to wall-mount these lockers? Or is an 18" base

desired? If desired, updated details and specs will need to be provided to have base built from alternate materials to HDPE lockers. Provide 18" integral base.

163 062010

AWC-1 T&G Ceiling calls for Clear White Cedar. I have reached out to all my suppliers and cannot find any White Cedar available. Western Red Cedar is

available in a select grade that only has tight knots.

I just found White Cedar but knots are acceptable in the C select grade of White Cedar which is the highest grade available.

I did find a small mill that will select lumber to get to an almost clear grade with only small pin holes but price will almost quadruple.

Meet the specification. No Change.

164 064020

There is a Band Room shown in Elevations 3 and 6 on Sheet A7.71 where the wall cabinets have lab casework designations (Div 12) and the base cabinets

and countertops are by the millworkers. Unless directed otherwise, we do plan to carry those upper cabinets, but the millworkers may cover them as well.

Can you please clarify?

All of the cabinets, including upper cabinets, in this room are by 064020.

See Addendum 4 Drawing Change Item-26.

165 064020

Specs in 064020 Interior Architectural Woodwork ask for clear maple (see paragraph 2.1.D). This usually indicates the architect wants “white” maple that is

consistent in colour, which means the lumber or veneers are all sapwood instead of “natural” maple which can include sap and heartwood. However, in

paragraph 2.1.E.1, the specs say, “Components shall be free of defects and sapwood.” Is the intent actually for dark maple that is all heartwood (i.e. free of

sapwood)?

White maple without sapwood AWI Premium Grade per specification. No change.

Non-Trade Bidder Questions

ATTACHMENT 1 - BIDDER RESPONSES 9/15/17 9 of 15

Page 21: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN / CAMBRIDGE STREET UPPER SCHOOLS & COMMUNITY COMPLEX

RESPONSE TO BIDDING QUESTIONS

Bidder

Question #Reference Document Question Addendum #4 Response

ADDENDUM #4 - 9/15/2017

166 064020

3. Specs in 064020 include an extensive list of veneer matching requirements in the materials specs (see paragraph 2.1.D.2):

However, later in the specs, the veneer match requirements for the wood casework are different (see paragraph 2.8.C):

Both specs include end match. End match is not available because of the veneer cut and coupon width specified (quarter sawn veneer made from coupons

that must be 6” or wider).

One spec is for centre match (which, by definition, means they are balanced as well) and the other spec is for running match. Centre match and running

match are mutually exclusive – i.e. it’s one or the other. Running match is the most common and most cost-efficient matches. It is used for custom grade

projects. Centre match is a premium grade match. It is a specialized version of balance match that uses an even number of coupons so the veneer leaves

are centered on the panel as well as balanced.

One spec is for blueprint match and the other is for sequence match. Blueprint matching is no longer offered by mills. It has been replaced by sequence

match.

Specs in 064020 indicate that the architectural woodwork is to be premium grade (see paragraphs 2.1.E, 2.6.A, 2.7.A, 2.8.A, 2.9.A, 2.10.A, 2.11.A, and

2.12.A). Is the intent for one panel throughout the section? Are sequence matched panels that are book matched & center matched acceptable? Or is the

intent for running match panels at the casework and centre match panels at other locations?

3. Specs in 064020 include an extensive list of veneer matching requirements in the materials specs (see paragraph 2.1.D.2):

AWI Premium Grade; SLIP match; Balance & Center match; Sequence match.

See Addendum 4 Specification Change Item-6.

167 064020

4. Specs in 064020 include the following description for countertop supports (see paragraph 2.3.L):

a) Rakks brackets are not steel. They are aluminum.

b) What type of finish does “prefinished” refer to? Rakks are available in a powder-coat finish or an anodized finish.

c) Please confirm that any in-wall brackets are supplied by the millworker but installed by the general trades when the walls are framed (before the drywall

is in place).

a) Correct.

b) Provide Powder-Coat finish.

c)Yes

See Addendum 4 Specification Change Item-6.

168 064020

5. Specs in 064020 include plastic laminate components with MDF cores (see paragraph 2.9). In our experience, MDF is not a recommended as a substrate

for plastic laminate. MDF was originally designed for applications that require a paint finish so the surface is smooth but not porous. As a result, the glue

cannot get a good grip and delamination can occur, especially at the edges. Particleboard is much better for plastic laminate applications and it is specified

with the materials in paragraph 2.1.F. Is it acceptable to use particleboard cores for plastic laminate components?

Medium density particleboard as core material is an acceptable substitution.

See Addendum 4 Specification Change Item-6.

169 064020

6. Specs in 064020 do not include a model number for Coat Hook Type 1 (see paragraph 2.3.O.1). The model is called “Richelieu Hardware, Ltd.,

Contemporary Coat Rack”. There are many products with that name on the Richelieu website that vary in material, finish, and number of hooks per rack.

Please provide a model number

Richelieu Contemporary Hook Rack - 73023195

See Addendum 4 Specification Change Item-6.

170 0642007. Specs in section 064200 Wood Paneling indicate that the wood species and cut is both “clear maple, quarter sawn” (see paragraph 2.1.B) and “as

selected by the Architect” (see paragraph 2.1.C). Are we correct in assuming paragraph B is correct?

Follow 064200 2.1.B.

See Addendum 4 Specification Change Item-7.

171 064200

8. Specs in section 064200 include similar veneer matching requirements as section 064020 (see paragraph 2.1.C.2):

As noted in question #2, end match is not available, centre match is for premium grade, and blueprint match has been replaced by sequence match. Are

sequence matched panels that are book matched & center matched acceptable? Can running match panels be used instead of centre match, as this is

custom grade paneling not premium grade (see paragraph 2.1.A)?

AWI Premium Grade per 064200 2.1.D; SLIP match; Balance & Center match; Sequence match.

See Addendum 4 Specification Change Item-7.

172 064200

9. Where is the wall paneling from section 064200 required? The only paneling we have found is in 1755 Cafeteria outside the entrance to 1730

Auditorium and the keynotes on the details identify it as section 064020 (see A7.72 and A9.82). Note that Section 064200 says wood paneling has fire-

rated cores (see paragraph 2.1.F), while section 064020 says materials are only fire-rated if indicated (see paragraph 2.2.A). Is this wood paneling intended

to have fire-rated cores?

064200 wall paneling in 1755 at entrance to Auditorium. Yes wall paneling is to have fire-rated

cores.

See Addendum 4 Drawing Change Item-31.

ATTACHMENT 1 - BIDDER RESPONSES 9/15/17 10 of 15

Page 22: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN / CAMBRIDGE STREET UPPER SCHOOLS & COMMUNITY COMPLEX

RESPONSE TO BIDDING QUESTIONS

Bidder

Question #Reference Document Question Addendum #4 Response

ADDENDUM #4 - 9/15/2017

173 123550

10. Specs in 123550 Laboratory Casework include a requirement for veneer cores in the Maple plywood (see paragraph 2.2.C.2). AWI standards do not

allow for veneer cores at casework doors & drawer faces because of warping. Typically, we would build the cabinet box with veneer cores and the doors &

drawer faces would have particleboard cores. Is this acceptable? Note that if the architect/owner insists on veneer core, the doors & drawer faces will not

be covered by the warranty.

Particleboard cores is acceptable for doors and drawer fronts for lab casework.

See Addendum 4 Specification Change Item-9.

174 064020/064200/123550

11. Specs in 064020 indicate that the “transparent” finish for architectural woodwork is a stain finish (see paragraph 2.13.D). Specs for 064200 are similar

and also include stain finish for wood paneling (see paragraph 2.6.C). Specs in 123550 include a chemical-resistant stain finish for lab casework (see

paragraph 2.6). The finish legend on A10.01 lists a clear finish (i.e. no stain) for both WD-1 (solid wood) and WD-2 (veneer-faced panels). Which is correct –

specs or finish legend?

Wood with transparent finish is clear not stained as called out in section 064020.2.1.D and on

the FINISH LEGEND. The only staining 064020.2.13.D is for items that fall under section

064020.2.8.D. Section 064200 and 123550 to be clear finish.

175 064020 12. Elevation & detail drawings use keynotes to identify components, but there is no Keynote Legend to define them. Please provide a Keynote Legend. Keynotes refer to specification sections. No Change.

176 064020

13. At several locations in the drawings there are keynotes for 06 40 20.56 and/or 06 40 20.78 at in-wall blocking (see A8.51, A8.71, or A8.77 for

examples). Please confirm that the millworker is not responsible for any in-wall blocking and that all in-wall blocking will be provided by section 061000

Rough Carpentry.

Yes, that is correct.

177 064020

14. A keynote on floor plan A1.13 indicates that section 064020 is responsible for the barn door at the entrance to room 1580 Program. Detail A8.42/2

indicates that the metal components (steel tube frame and metal panel finish) are by division 5 metal fabricators. The detail shows that the millworker (per

section 064020) is responsible to supply the plywood substrate under the metal paneling. This does not make sense. That plywood should be provided by

the metal fabricators who are making the barn door (or general trades/rough carpentry). Please confirm that this is the case and delete any keynotes for

064020 at this door.

Barn door by millwork Division 064020. Architect to provide specification in upcoming Field

Bulletin 026.

178 064020

15. There is a note on floor plan A1.14 for adjustable shelving in 1943 Janitor.

a. No elevation is provided to indicate size or number of shelves. Is this shelving similar to A7.21/5 or similar to A7.75/1,2,3,4?

b. No finishes are listed in Finish Schedule A10.02 for this room. Please provide material/finish information.

Similar to 5/A7.21 - Type SS-A. See 064020 2.21 Closet and Utility Shelving - Casework= PL-5

See Addendum 4 Drawing Change Item-34.

179 064020

16. Floor plan A1.21 shows what appear to be L-shaped low walls in RTI 2401 & RTI 2402. Floor plan A1.31 shows similar walls in RTI 3401 & RTI 3402.

Often low walls will include a wall cap by the millworker. There are no section tags included on the floor plan. There is no information re: wall caps with

the partition types on A8.01. Are wall caps by the millworker required at these locations? If so please provide a detail drawing that includes dimensions,

profile, and material/finish.

See 9/A8.42. No Change

180 06402017. Floor plan A1.21 and elevation A7.23/7 show casework in 2490 K/1 ASD. There are no casework or countertop finishes listed for this room on finish

schedule A10.03. Please provide casework & countertop finishes

Casework and countertop finishes to match finishes in room 2470.

See Addendum 4 Drawing Change Item-35.

181 06402018. Floor plan A1.22 and elevation A7.22/31 show casework in 2030 Bldg Sub/Data Spec. There are no casework or countertop finishes listed for this room

on finish schedule A10.03. Please provide casework & countertop finishes.

CASEWORK=PL-5, COUNTERTOP=PL-6

See Addendum 4 Drawing Change Item-35.

182 064020

19. Floor plan A1.23 appears to show millwork in 2606 Closet and 2627 Closet. Similarly, floor plan A1.41 appears to show millwork in the closet along the

south wall of 4310 OT/PT. There are no elevation/detail tag or notes at these closets. Is millwork required in these closets? If so, please provide elevations,

section details, and materials/finishes.

2606 and 2627 to have one shelf and one hanging rod. 4310 to have 4 adjustable shelves. All PL-

5. Refer to spec section 064020.2.12 for information.

See Addendum 4 Drawing Change Item-35.

183 06402020. Floor plan A1.32 includes casework in 3603 Mothers similar to that in 1015 Mothers. Finish Schedule A10.04 does not include casework & countertop

finishes for room 3603. Are we correct in assuming the same finishes as room 1015?

CASEWORK=PL-1, COUNTERTOP=PL-4

See Addendum 4 Drawing Change Item-36.

184 06402021. Details A5.65/2,12 and A5.81/14 show veneer plywood CW sills with an unfinished front edge in the East Building. Is this correct? The typical sill in the

West Building is veneer plywood finished with 1½” x 1½” solid wood along the front edge.

Provide solid wood edge similar to west building details (i.e. 2, 3/A5.45)

See Addendum 4 Drawing Change Item-19 and Item-20.

185 064020

22. Detail A5.65/2 is for a sill at Level 2 in Stair 7. Enlarged plan A3.05/3 is Level 2 of Stair 7 but there is no note for a sill at the window.

a. Is a sill required at the window at Level 2?

b. If so, is a similar sill required at the window at Level 3 as well?

a. Yes a sill is required per detail 2/A5.65

b. Yes a sill is required on Level 3.

No Change.

186 06402023. Stair plans A6.01/8,9,10 show sills at levels 1, 2 & 3 of Stair 1. Wall section A4.14/2 shows sills at levels 1 & 3 (but not level 2) of Stair 1. Which is

correct?

Sills are required at locations shown on Stair Plans 8,9,10/A6.01.

No Change.

187 064020

24. Enlarged floor plan A7.07/1 and elevation A7.07/3 show casework in 1221 Waiting, but not in 1223 Exam. Finish Schedule A10.02 provides finishes for

room 1223 but not room 1221. Are we correct in assuming that the finishes provided for room 1223 are intended to go on the casework that is actually in

room 1221?

Yes. No Change.

188 06402025. Enlarged floor plan A7.07/1 shows elevation A7.07/2 is in 1224 Exam. The title of the elevation indicates the room number is 1226. Are we correct in

assuming there is a typo in the elevation title and it should read 1224 per the floor plans?

Yes, title should be 1224

See Addendum 4 Drawing Change Item-22.

ATTACHMENT 1 - BIDDER RESPONSES 9/15/17 11 of 15

Page 23: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN / CAMBRIDGE STREET UPPER SCHOOLS & COMMUNITY COMPLEX

RESPONSE TO BIDDING QUESTIONS

Bidder

Question #Reference Document Question Addendum #4 Response

ADDENDUM #4 - 9/15/2017

189 064020

26. Elevations A7.07/3, A7.09/11, A7.71/3&6, and A7.75/7 show regular base cabinets but lab wall cabinets in 1221 Waiting, 1715 Music, 1735 Band, 1778

Custodian Office, 3270 Community School, and 3280 Community School. Is this correct? Finish schedule A10.02 shows plastic laminate cabinets in these

rooms. Lab casework is wood veneer cabinets.

All of those locations should be labeled with WCG- wall cabinets.

See Addendum 4 Drawing Change Item-22, Item-23, Item-26, and Item-27.

190 064020 27. Please provide the cabinet tag for the base cabinet in elevation A7.10/12.SCA-2A

See Addendum 4 Drawing Change Item-24.

191 06402028. Are we correct in assuming adjustable shelving per A7.21/5 is in every Printer closet location, even if floor plans show an empty closet with no

elevation tags or notes for shelving?Yes. No Change.

192 064020

29. Elevation A7.28/14 shows includes the detail tag for a solid surface wall cap at the low wall in 2004 Breakout.

a. There is no countertop finish listed for this room on finish schedule A10.03. Please identify which solid surface is required.

b. Are we correct in assuming a similar low wall cap in 3004 Breakout (see A1.32)?

a. This is the typical detail for all low walls UNO and the finish is SS-1.

See Addendum 4 Drawing Change Item-35.

b. Yes.

193 064020

30. Elevations A7.30/8,9,10 show plastic laminate countertops in 3260 Shared Workroom. No casework is shown in this room. Finish schedule A10.04 lists

casework finish for this room but no countertop finish.

a. Which plastic laminate colour is intended for these countertops?

b. Is there any casework required in this room? If so, please provide elevations.

a. COUNTERTOP=PL-6. See Addendum 4 Drawing Change Item-36.

b. No casework in room 3260

194 06402031. There are notes for piano hinge at elevation A7.55/12 and detail A8.51/1. There is no piano hinge specified in section 064020. Please provide specs,

including manufacturer and model number.

Stainless steel piano hinge, 2" width by Hafele or similar.

See Addendum 4 Specification Change Item-6.

ATTACHMENT 1 - BIDDER RESPONSES 9/15/17 12 of 15

Page 24: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN / CAMBRIDGE STREET UPPER SCHOOLS & COMMUNITY COMPLEX

RESPONSE TO BIDDING QUESTIONS

Bidder

Question #Reference Document Question Addendum #4 Response

ADDENDUM #4 - 9/15/2017

195 064020

32. Please clarify the millwork required inside 1501 Vestibule:

a. Finish schedule A10.02 shows finishes as WD-1 & WD-2 but no solid surface finishes are listed.

b. Elevation A7.56/1 shows a wood bench with a solid surface seat next to the book cart enclosure. Detail A7.56/8 shows solid surface seat. Detail

A7.56/10 and enlarged plan A5.57/5 show a wood bench seat. Which is correct? If solid surface is required, which one?

c. Details A7.56/8&9 both show a solid surface countertop with a hardwood edge on top of the book cart enclosure. Which solid surface is required – SS-1

or SS-2? Is the edge note correct? Both solid surfaces are Caesarstone (i.e. engineered quartz). It would be very difficult, if not impossible, to attach a

hardwood edge to that.

d. Detail A7.56/8 shows the 30”x30” access door is by division 8 per keynote 08 31 10 .01. Detail A7.56/9 and enlarged plan A5.57/5 show a wood access

door by the millworker per keynote 06 40 20.06. Which is correct? If this is a door by the millworker please provide specs, including manufacturer & model

number, for the “extended hinge” noted.

a. Provide SS-3 - To be chosen by architect.

b. Provide solid surface bench seat - SS-3 - to be chosen by architect.

c. No hardwood edge at solid surface countertop. Provide 1/2" overhang of solid surface over

edge. Provide SS-3 - to be chosen by architect.

d. Access door by millwork.

See Addendum 4 Drawing Change Item-25 and Item-33.

196 06402033. Elevation A7.66/18 and detail A8.64/3 show a countertop in 1724 Control but no finishes are noted on the drawings. Finish schedule A10.02 does not

include a countertop finish at room 1724. Is this a millwork counter? If so, please provide finish

Yes - Countertop = PL-6

See Addendum 4 Drawing Change Item-34.

197 06402034. Elevations A7.75/1,2,3,4 show shelving in 1776 Receiving/Supply but no finishes are listed for casework in the Finish Schedule A10.02 for this room.

Please provide material/finish information.

Casework = PL-5

See Addendum 4 Drawing Change Item-34.

198 064020 35. Detail A8.51/1 shows wood base in 1525 Quiet. Finish Schedule A10.02 show base RB-3 in room 1525. Which is correct?Wood Base per 1/A8.51.

See Addendum 4 Drawing Change Item-34.

199 064020

36. Please clarify the millwork required at the recessed display case openings in 1710 Promenade and 1850 Promenade (see also elevations A7.72/1,8):

a. Detail A8.72/1 tags the plywood above & below the display case (but not behind it) with a keynote for 06 40 20.10. This is substrate attached directly to

steel framing. Detail A8.72/2 tags the plywood at the jambs and behind the display case with a keynote for 06 40 20.10. This is substrate between the

GWB and the display case. Detail A8.72/2A tags the plywood at the jambs of the display case (but not behind it) with a keynote for 06 40 20.10. In all

cases, this is substrate, not visible paneling. Please confirm the millworker is not responsible for any of this substrate and that it will be provided by section

061000 Rough Carpentry. If the millworker must provide this, please clearly identify where it is required.

b. Detail A8.72/1 shows wood trim across the bottom of the display case openings (but not across the top). Details A8.72/2,2A show a smaller piece of trim

vertically down the sides of the openings. Is there trim required across the top of the openings? If so, does it match the bottom trim or the side trim?

Refer to A8.41 for Display Case details.

200 064020

37. Details A9.03/6 and A9.82/6 tag the wood panels on the ceiling leading into the Auditorium with keynote 06 40 20.09 (by millworker). The RCP on

A2.13 show acoustic wood ceiling AWC-4 at this location. Acoustic wood ceilings are not by the millworker. Finish Legend A10.01 does not include AWC-4.

Who is responsible for this wood ceiling?

Per details on A9.03 & A9.82, wood panels by Div 064200

See Addendum 4 Drawing Change Item-17.

201 06402038. Is the tray unit at the far left end of the south recycle station in 1755 Cafeteria (see A9.83/4) intended to be a BCW-1B base cabinet similar to the tray

unit at the far right end of the north recycle station (see A9.83/3)? Or is it intended to be a solid surface counter over open tray storage?

Similar to tray unit at north.

See Addendum 4 Drawing Change Item-32.

202 06402039. On A10.01 Finish Legend, the colour for PL-6 is listed as “D92-20 Dove Grey”. Wilsonart laminates do not have a “20” finish. Are we correct in assuming

the intent is for a “60” finish, which is the standard matte finish?

Yes, provide D92-60 Dove Grey by Wilsonart.

See Addendum 4 Drawing Change Item-33.

203 064020

40. On A10.01 Finish Legend, wood wall base WB-1 & WB-2 is not included with the Architectural Woodwork & Casework finishes, which suggests that the

millworker is not responsible to provide them. Is this correct? Will this base be provided by another subcontractor? Or should WB-1 & WB-2 be included

with the Architectural Woodwork finishes?

The wood base is by 064020

See Addendum 4 Specification Change Item-6.

204 064020

41. Finish schedule A10.02 includes casework finishes for 1510 Adults and 1511 Teens. Finish Schedule A10.03 includes casework finishes for 2611 Small

Conference. Finish Schedule A10.04 includes casework finishes for 3250 Corridor. Floor plans and elevations do not show any casework in these rooms.

Please provide elevations and a revised floor plan if casework is required.

2611 and 3250 do not have any casework. 1510 and 1511 do not have millwork, the objects in

these rooms are FF&E. No Change.

ATTACHMENT 1 - BIDDER RESPONSES 9/15/17 13 of 15

Page 25: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN / CAMBRIDGE STREET UPPER SCHOOLS & COMMUNITY COMPLEX

RESPONSE TO BIDDING QUESTIONS

Bidder

Question #Reference Document Question Addendum #4 Response

ADDENDUM #4 - 9/15/2017

205 06402042. The finish schedules on A10.02 through A10.04 only indicate which pulls are required at some of the 064020 casework. If no pull is indicated, which

one is to be used – DP-1 or DP-2?Refer to the General Note #12 on sheets A10.02-A10.04. No Change.

206 06402043. Finish Schedule A10.03 lists the countertop in room 2012 Prep as “EPXY-1”. Are we correct in assuming this is a typo that should actually read “ES-1”

for the standard epoxy top that is used with lab casework?

Yes, ES-1.

See Addendum 4 Drawing Change Item-35.

207 06402044. Finish Schedule A10.03 lists the countertop in 2207 IT Work office as both PL-10 and FB-1. The drawings do not appear to show any upholstered

components (see elevations A7.10/4,5,6). Where does the fabric go in this room?

There is no FB-1 in room 2207.

See Addendum 4 Drawing Change Item-35.

208 064020

45. At many rooms, the finish schedules on A10.02 through A10.04 include more than one casework finish or countertop finish, but there is nothing in the

notes column to indicate locations for the different finishes. Frequently the elevations & details do not indicate which finish goes where either. Please

provide more information.

For example, the finish schedules say that twenty-three (23) kindergarten & elementary classrooms have the following finishes: casework PL-5 & PL-11 and

countertop PL-6 & SS-1. There is a low wall with a solid surface wall cap in some of the classrooms, so one could assume that the SS-1 countertop

corresponds to that wall cap, but does that mean all of the other countertops are PL-6? What about the classrooms that do not include a low wall? Where

does SS-1 go in those rooms? In addition, elevations do not indicate cabinet finish and the two finishes noted are significantly different in price. Which

cabinets are PL-5 vs. PL-11?

The solid surface (SS-1) is at low wall caps and on top of cabinets BS-0A, BS-1A, BS-1B as shown

on elevations and detail 2/A9.51. BS- cabinets are PL-11. All other cabinets are PL-5.

209 06402046. What finish is intended for the wood veneer window sills. Most details have no finish noted. Detail A5.86/12 says paint finish. Enlarged plans for Stairs

1 & 4 also say paint finish (see A6.01/8,9,10 and A6.03/3,4). Are all the sills in the project to have a paint finish?Clear finished wood veneer sills.

210 064020

47. Drawings A11.01 through A11.06 are the FF&E details for the Valente area. There is a note in the title block that reads “FF&E NOT IN CONTRACT” but

the detail drawings provided include many keynotes for section 064020 Architectural Woodwork. Is the millworker required to provide any of these

components?

No. These drawings are provided for reference only.

211 101100 2.1

Visual Display Surfaces:

a) Map Rail 1" or 2"

b) Any clips or winders, or both, required for map rails?

c) Flag Holders (these were a CO on MLK)

d) Tackstrips all one color?

a)2"

b)no

c)yes

d)yes

See Addendum 4 Specification Change Item-8.

212 101100 2.4

Display Cases:

a) No depth shown in specs or drawings

b) Any accessories other than those listed?

a)Depths are shown for each type on 1/A8.41.

b)No

No Change.

213 101100 2.3

Felt-Boards:

a) Aside from the standard Frame, no accessories are required for the felt boards?

b) Is there a basis of design model # available for a particular manufacturer?

a)No

b)Ghent TF, Moore Co Best Rite Fab Tak, Working Walls DT

See Addendum 4 Specification Change Item-8.

214111300

A7.86Please confirm size and quantity of dock bumpers. A7.86 indicates bumpers but only shows two rectangles.

Provide length shown on 4/A7.86. Different manufacturers provide different lengths. See

1/A5.91 & Spec 111300

215 064020

We have a question based on feedback from one of the manufacturers. The specs in the Finish Legend on A10.01 for SB-1 say:

SB-1: Moz Metals Neutral Collection/Grain-Linen 18GA with clear/polycoat gloss finish

The manufacturer, Moz Designs, has the following concerns:

1. Standard gauge for that product in stainless steel is 20GA not 18GA. There are minimum order requirements for 18GA that exceed what is required for

this project.

2. The clear polygloss finish specified is for aluminum, not stainless steel. The stainless steel has no finish.

Our question: Is the intent for aluminum with polygloss finish or is the intent for stainless steel (no finish)? If stainless steel, is 20GA acceptable in lieu of

18GA?

Intent is for stainless steel. Stainless steel 20GA is acceptable. Provide #4 finish.

See Addendum 4 Drawing Change Item-33.

21664020

A6.41, 14

We have found a millwork wall cabinet in elevation A6.41/14 for the typical Pre-K toilets (rooms 1082 & 1092). There are no cabinet finishes listed in the

finish schedule on A10.02 for these rooms. Are we correct in assuming PL-11 to match the Pre-K classroom casework?

PL-5

See Addendum 4 Drawing Change Item-34.

ATTACHMENT 1 - BIDDER RESPONSES 9/15/17 14 of 15

Page 26: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN / CAMBRIDGE STREET UPPER SCHOOLS & COMMUNITY COMPLEX

RESPONSE TO BIDDING QUESTIONS

Bidder

Question #Reference Document Question Addendum #4 Response

ADDENDUM #4 - 9/15/2017

217 066400

1. The finish schedule on A10.02 says 1756 Servery/Kitchen has FRP paneling on all walls. The wall finish plan on A10.14A only shows FRP at some walls.

Which is correct?

2. The finish schedule on A10.02 says 1775 Corridor has FRP paneling on all walls. Interior elevation A6.06/9 does not show FRP panels at the ramp area of

the corridor. Wall finish plan A10.13A does not show any FRP in this corridor. Which is correct?

3. The finish schedule on A10.02 says 1776 Receiving/Supply has FRP paneling AFF on all walls. The interior elevations on A7.75 show shelving on the walls

in this room, not FRP panels. The wall finish plan on A10.14A does not show any FRP in this room. Which is correct?

4. The finish schedules on A10.02 – A10.04 say ten (10) janitor rooms, two (2) storage rooms, and one (1) trash room have FRP paneling on all walls. Wall

finish plans on A10.11A – A10.42A do not show FRP in any of these rooms. Which is correct?

1) A10.14A is accurate. The FRP does not go behind the coolers.

2)A10.02 is correct.

3)No FRP in 1776

4)A10.02-10.04 are correct. When FRP is on all walls, it is not shown on finish plans.

See Addendum 4 Drawing Change Item-34.

218102610

A10.11A - A10-42A

1. Wall finish plans use tags “CG4”, “CG7”, “EG3”, “EG4”, and “EG7”. Specs in 102310 do not define these tags. Finish legend A10.01 does not define these

tags. Please provide more info. Addendum 1 to be issued today clarifies this.

a. We assume CG = corner guard and EG = end guard. Is this correct? Addendum 1 clarifies this.

b. Do 3, 4 & 7 refer to height (i.e. 3’ vs. 4’ vs. 7’)?

c. Specs refer to 90˚ and 135˚ turns (see paragraph 2.1.A). Is there something that indicates when/where 135˚ is required?

2. Wall finish plan A10.14A shows empty boxes at either end of the curved bench in the cafeteria. Should those boxes say “EG4”, similar to the ends of the

recycle stations?

3. Please clarify requirements at L-shaped walls in RTI 2401, 2402, 3401 & 3402:

a. Wall finish plan A10.21A shows an empty box at the corner of the RTI 2401 wall. Should this box say “CG4”, similar to the corner of the RTI 2402 wall?

b. Wall finish plan A10.31A shows no corner guard at RTI 3401. Should there be a CG4 there as well?

c. Wall finish plans A10.21A & A10.31A include a mix of EG3 and EG4 tags at RTI walls. Is this correct? Or should they all say “EG4”?

1a)See Addendum #1

1b)See Addendum #1

1c)See Addendum #1

2)Yes provide EG at custom height, See 5/A9.83

3a)CG4

3b)CG4

3c)All EG4

See Addendum 4 Drawing Change Item-37 and Item-38.

219

Glass at Wood Doors:

Glass is obviously a filed sub

The wood door spec calls for doors to be factory glazed. However it appears that a decent number of doors will require privacy blinds integral to the

glazing.

In the glass spec it refers to the blinds in hollow metal borrowed lite frames but not specifically for use in the wood doors

Can you provide a little clarity and direction?

Refer to GENERAL NOTES #1 on A/8.11. No Change.

ATTACHMENT 1 - BIDDER RESPONSES 9/15/17 15 of 15

Page 27: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN / CAMBRIDGE STREET UPPER SCHOOLS & COMMUNITY COMPLEX

RESPONSE TO BIDDING QUESTIONS

Bidder

Question #Reference Document Question Addendum #4 Response

ADDENDUM #4 - 9/15/2017

217 066400

1. The finish schedule on A10.02 says 1756 Servery/Kitchen has FRP paneling on all walls. The wall finish plan on A10.14A only shows FRP at some walls.

Which is correct?

2. The finish schedule on A10.02 says 1775 Corridor has FRP paneling on all walls. Interior elevation A6.06/9 does not show FRP panels at the ramp area of

the corridor. Wall finish plan A10.13A does not show any FRP in this corridor. Which is correct?

3. The finish schedule on A10.02 says 1776 Receiving/Supply has FRP paneling AFF on all walls. The interior elevations on A7.75 show shelving on the walls

in this room, not FRP panels. The wall finish plan on A10.14A does not show any FRP in this room. Which is correct?

4. The finish schedules on A10.02 – A10.04 say ten (10) janitor rooms, two (2) storage rooms, and one (1) trash room have FRP paneling on all walls. Wall

finish plans on A10.11A – A10.42A do not show FRP in any of these rooms. Which is correct?

1) A10.14A is accurate. The FRP does not go behind the coolers.

2)A10.02 is correct.

3)No FRP in 1776

4)A10.02-10.04 are correct. When FRP is on all walls, it is not shown on finish plans.

See Addendum 4 Drawing Change Item-34.

218102610

A10.11A - A10-42A

1. Wall finish plans use tags “CG4”, “CG7”, “EG3”, “EG4”, and “EG7”. Specs in 102310 do not define these tags. Finish legend A10.01 does not define these

tags. Please provide more info. Addendum 1 to be issued today clarifies this.

a. We assume CG = corner guard and EG = end guard. Is this correct? Addendum 1 clarifies this.

b. Do 3, 4 & 7 refer to height (i.e. 3’ vs. 4’ vs. 7’)?

c. Specs refer to 90˚ and 135˚ turns (see paragraph 2.1.A). Is there something that indicates when/where 135˚ is required?

2. Wall finish plan A10.14A shows empty boxes at either end of the curved bench in the cafeteria. Should those boxes say “EG4”, similar to the ends of the

recycle stations?

3. Please clarify requirements at L-shaped walls in RTI 2401, 2402, 3401 & 3402:

a. Wall finish plan A10.21A shows an empty box at the corner of the RTI 2401 wall. Should this box say “CG4”, similar to the corner of the RTI 2402 wall?

b. Wall finish plan A10.31A shows no corner guard at RTI 3401. Should there be a CG4 there as well?

c. Wall finish plans A10.21A & A10.31A include a mix of EG3 and EG4 tags at RTI walls. Is this correct? Or should they all say “EG4”?

1a)See Addendum #1

1b)See Addendum #1

1c)See Addendum #1

2)Yes provide EG at custom height, See 5/A9.83

3a)CG4

3b)CG4

3c)All EG4

See Addendum 4 Drawing Change Item-37 and Item-38.

219

Glass at Wood Doors:

Glass is obviously a filed sub

The wood door spec calls for doors to be factory glazed. However it appears that a decent number of doors will require privacy blinds integral to the

glazing.

In the glass spec it refers to the blinds in hollow metal borrowed lite frames but not specifically for use in the wood doors

Can you provide a little clarity and direction?

Refer to GENERAL NOTES #1 on A/8.11. No Change.

ATTACHMENT 1 - BIDDER RESPONSES 9/15/17 14 of 14

Page 28: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN/CAMBRIDGE STREET BID SET

UPPER SCHOOLS & COMMUNITY COMPLEX JULY 28, 2017

FILE NO. 6846A Addendum #4 SEPT. 15, 2017

Name of Sub-Bidder: _______________________________________ FORM FOR SUB-BID 004114 - 1 of 4

FORM FOR SUB-BID

To all General Bidders Except those Excluded: A. The undersigned proposes to furnish all labor and materials required for completing, in

accordance with the hereinafter described plans, specifications and addenda, all the work specified in Section No. _______ of the specifications and in any plans specified in such section, prepared by William Rawn Associates, Architects, Inc for King Open/Cambridge Street Upper Schools & Community Complex (project) in Cambridge (city or town), Massachusetts, for the contract sum of _______________________________________________________ dollars ($____________).

B. This sub-bid includes addenda numbered _______ C. Unit Prices: The undersigned Bidder proposes the amounts below beaded to or deducted

from the Contract Sum on performance and measurement of the individual items of Work. If the unit price does not affect the Work of this Contract, the Bidder shall indicated "NOT APPLICABLE." Unit Price 1: PVC Roofing – Pitch Pockets.

1. _____________________________________Dollars ($________________) Each.

Unit Price 2: PVC Roofing – Roof Patches. 2. _____________________________________Dollars ($________________) Each.

Unit Price 3: Resilient Athletic Flooring. 3. _____________________________________Dollars ($________________) SF.

Unit Price 4: Terrazzo Flooring. 4. _____________________________________Dollars ($________________) SF.

Unit Price 5: Tile Carpeting. 5. _____________________________________Dollars ($________________) SF.

Unit Price 6: Sheet Carpeting. 6. _____________________________________Dollars ($________________) SF.

Unit Price 7: Water Vapor Emission Control System at Sheet Carpeting 7. _____________________________________Dollars ($________________) SF.

Page 29: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN/CAMBRIDGE STREET BID SET

UPPER SCHOOLS & COMMUNITY COMPLEX JULY 28, 2017

FILE NO. 6846A Addendum #4 SEPT. 15, 2017

Name of Sub-Bidder: _______________________________________ FORM FOR SUB-BID 004114 - 2 of 4

Unit Price 8: HVAC – BMS Point. 8. _____________________________________Dollars ($________________) Each.

Unit Price 9: Electrical – Duplex Outlet. 9. _____________________________________Dollars ($________________) Each.

Unit Price 10: Electrical – Quad Receptacle Outlet. 10. _____________________________________Dollars ($________________) Each.

Unit Price 11: Electrical – Quad Data Outlet. 11. _____________________________________Dollars ($________________) Each.

Unit Price 12: Electrical – Floor Box Outlet. 12. _____________________________________Dollars ($________________) Each.

Unit Price 13: Electrical – Poke-Through Assemblies. 13. _____________________________________Dollars ($________________) Each.

Unit Price 13: Electrical – Security Camera. 13. _____________________________________Dollars ($________________) Each.

Unit Price 14: Electrical – Security Card Reader. 14. _____________________________________Dollars ($________________) Each.

Unit Price 15: Fire Alarm – Smoke Detector. 15. _____________________________________Dollars ($________________) Each.

Unit Price 16: Fire Alarm – Horn / Strobe. 16. _____________________________________Dollars ($________________) Each.

Unit Price 17: Fire Alarm – Pull Station. 17. _____________________________________Dollars ($________________) Each.

Unit Price 18: Fire Alarm – Exit Sign. 18. _____________________________________Dollars ($________________) Each.

Page 30: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN/CAMBRIDGE STREET BID SET

UPPER SCHOOLS & COMMUNITY COMPLEX JULY 28, 2017

FILE NO. 6846A Addendum #4 SEPT. 15, 2017

Name of Sub-Bidder: _______________________________________ FORM FOR SUB-BID 004114 - 3 of 4

D. The undersigned agrees that, if he is selected as a sub-bidder, he will, within 5 days, Saturdays, Sundays and legal holidays excluded, after presentation of a subcontract by the general bidder selected as the general contractor, execute with such general bidder a subcontract in accordance with the terms of this sub-bid, and contingent upon the execution of the general contract, and, if requested so to do in the general bid by the general bidder, who shall pay the premiums therefor, or if prequalification is required pursuant to section 44D 3/4, furnish a performance and payment bond of a surety company qualified to do business under the laws of the commonwealth and satisfactory to the awarding authority, in the full sum of the subcontract price.

E. The names of all persons, firms and corporations furnishing to the undersigned labor or

labor and materials for the class or classes or part thereof of work for which the provisions of the section of the specifications for this sub-trade require a listing in this paragraph, including the undersigned if customarily furnished by persons on his own payroll and in the absence of a contrary provision in the specifications, the name of each such class of work or part thereto and the bid price for such class of work or part thereof are:

Name Class of Work Bid price

_______________________ __________________ _______________ _______________________ __________________ _______________ _______________________ __________________ _______________ _______________________ __________________ _______________ _______________________ __________________ _______________

[Do not give bid price for any class or part thereof furnished by undersigned.]

F. The undersigned agrees that the above list of bids to the undersigned represents bona fide

bids based on the hereinbefore described plans, specifications and addenda and that, if the undersigned is awarded the contract, they will be used for the work indicated at the amounts stated, if satisfactory to the awarding authority.

G. The undersigned further agrees to be bound to the general contractor by the terms of the

hereinbefore described plans, specifications, including all general conditions stated therein, and addenda, and to assume toward him all the obligations and responsibilities that he, by those documents, assumes toward the owner.

H. The undersigned offers the following information as evidence of his qualifications to perform

the work as bid upon according to all the requirements of the plans and specifications: –

1. Have been in business under present business name _______________ years. 2. Ever failed to complete any work awarded?_______________ 3. List one or more recent buildings with names of the general contractor and architect on

which you served as a sub-contractor for work of similar character as required for the above-named building.

Building Architect General Contractor Amount of Contract

Page 31: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

KING OPEN/CAMBRIDGE STREET BID SET

UPPER SCHOOLS & COMMUNITY COMPLEX JULY 28, 2017

FILE NO. 6846A Addendum #4 SEPT. 15, 2017

Name of Sub-Bidder: _______________________________________ FORM FOR SUB-BID 004114 - 4 of 4

(a)___________ ____________ ___________________ ________________ (b)___________ ____________ ___________________ ________________ (c)___________ ____________ ___________________ ________________ 4. Bank reference ___________________________________________ I. The undersigned hereby certifies that he is able to furnish labor that can work in harmony with

all other elements of labor employed or to be employed on the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and that he will comply fully with all laws and regulations applicable to awards of subcontracts subject to section 44F

The undersigned further certifies under penalties of perjury that this sub-bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this subsection the word "person" shall mean any natural person, joint venture, partnership, corporation or other business or legal entity. The undersigned further certifies under penalty of perjury that the said undersigned is not presently debarred from doing public construction work in the commonwealth under the provisions of section twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder.

Date___________________________

___________________________________ (Name of Sub-bidder) By_________________________________ (Name of Person Signing Bid and Title)

___________________________________ (Print Name and Title)

___________________________________

(Business Address) ___________________________________

(City and State) ___________________________________ (Contact Phone Number) ___________________________________ (Email)

Page 32: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

chapter  for  which  the  variance  was  granted.    

5.   Application   for   extension   of   time   limits   specified   in   variances   in   time   to   comply   or   for  modification  of  other  substantial  conditions  shall  be  treated  like  applications  for  initial  variances  under  subsection  B  of  Section  8.16.090,  except   that   the  License  Commission  must   find   that   the  need   for   the  extension   or   modification   clearly   outweighs   any   adverse   impacts   of   granting   the   extension   or  modifications.    

6.   The  License  Commission  may  issue  guidelines  defining  the  procedures  to  be  followed  in  applying  for   a   variance   in   time   to   comply   and   the   criteria   to   be   considered   in   deciding   whether   to   grant   a  variance.    

D.   Reconsideration.  Any  person  aggrieved  by  a  decision  or  action  of  the  authorized  enforcement  officials  may,  within  ten  business  days  of  said  decision  or  action,  request  reconsideration  of  same  by  the  official.    

(Ord.  1121  (part),  1991)    

8.16.100-­‐  Miscellaneous.    

A.   Severability.  It  is  the  intention  of  the  City  Council  that  each  separate  provision  of  this  chapter  shall  be  deemed  independent  of  all  other  provisions  herein,  and  it   is   further  the   intention  of  the  City  Council   that   if  any  provision  of   this   chapter   be  declared   to  be   invalid,   all   other  provisions   thereof   shall   remain   valid   and  enforceable.    

B.   All  ordinances  or  parts  of  ordinances  inconsistent  herewith  are  repealed.  

C.   This  chapter  shall  take  effect  thirty  days  after  its  adoption.  

(Ord.  1121  (part),  1991)    

MINORITY & WOMEN BUSINESS ENTERPRISE REQUIREMENTS

CHAPTER 193 ACTS OF 2004

KING OPEN/CAMBRIDGE STREET 90% CONSTRUCTION DOCUMENTS UPPER SCHOOLS & COMMUNITY COMPLEX FILE NO. 6846A MAY 26, 2017

AGREEMENT BETWEEN THE CITY OFCAMBRIDGE AND THE CM AT RISK

007223 ­ EXHIBIT L.10/L.11

JULY 28, 2017

BID SETJuly 28,2017

Addendum #4 SEPT. 15, 2017

Page 33: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

GENERAL To comply with the City of Cambridge Minority Business Enterprise requirements (MBE) and the Commonwealth of Massachusetts Construction Reform laws, general contractors must submit Minority Business Enterprise (MBE) Forms and Women’s Business Enterprise, (WBE) forms with its bid. The process is explained below. Failure to meet the requirements may result in automatic disqualification of the bidder. Upon request or upon its own initiative, the City may grant an extension of time for submission of the appropriate MBE/WBE Forms. Extensions shall be granted only upon a finding by the City that the bidder's failure to submit the appropriate MBE/WBE forms was excusable.

PROCEDURE Steps you should take to comply with the City's MBE & Chapter 193 Acts of 2004 requirements are as follows:

• Consult the State Office of Minority and Women Business Assistance (SOMWBA) Certified Minority/Women Business Directory Only MBE & WBE firms approved by SOMWBA will be accepted by the City of Cambridge.

• Attempt to develop a bid that includes at least ten percent (10%) of your total bid price in

the form of work subcontracted to (or materials purchased from) one or more Minority Businesses.

• Attempt to develop a bid that includes at least four percent (4%) of your total bid price in

the form of work subcontracted to (or Materials purchased from) one or more Women Business Enterprises.

To reach the MBE & WBE goals, you (the General Contractor) must contact as many of the

subcontractors or suppliers in the SOMWBA directory as necessary. Please note that MBE/WBE FORM #3 - CONTRACT REQUEST-FOR-EXTENSION and MBE/WBE FORM #4 - INFORMATION ON UNSUCCESSFUL CONTACT require you to provide a list of each firm contacted and other related information.

If you are successful in achieving or exceeding the 10% MBE & 4% WBE goals you must:

A. Complete and submit MBE/WBE FORM #1 - CONTRACTOR CERTIFICATION OF COMPLIANCE.

B. Have your participating SOMWBA sub-contractor complete MBE/WBE FORM #2 - LETTER

OF INTENT TO PARTICIPATE, to be submitted with your bid.

If you are unsuccessful securing SOMWBA certified businesses to fulfill the MBE & WBE goals then complete and submit with your bid MBE/WBE FORM#3 - CONTRACTOR REQUEST FOR EXTENSION and MBE/WBE FORM #4 - INFORMATION ON UNSUCCESSFUL MBE CONTACT.

SOMWBA (617) 973-8692

www.somwba.state.ma.us/ Amy Witts, Purchasing Agent - 617 349-4310

KING OPEN/CAMBRIDGE STREET 90% CONSTRUCTION DOCUMENTS UPPER SCHOOLS & COMMUNITY COMPLEX FILE NO. 6846A MAY 26, 2017

AGREEMENT BETWEEN THE CITY OFCAMBRIDGE AND THE CM AT RISK

007223 ­ EXHIBIT L.11

JULY 28, 2017

BID SETJuly 28,2017

Addendum #4 SEPT. 15, 2017

Page 34: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

Duane Brown, Affirmative Action Director - 617 349-4331 or email [email protected]

MINORITY/WOMEN BUSINESS ENTERPRISE PROGRAM COMPLIANCE DETAILS PERCENTAGE OF MBE PARTICIPATION - percentage of MBE participation shall be that percentage of the total bid price represented by the amount to be paid to MBE(s). The General Bidder's compliance with the percentage requirement shall continue to be determined by reference to the above-described method throughout the term of the contract, even though the actual may be greater or less than the bid price. The General Bidder shall submit to the Minority Business Compliance Officer signed copies of its subcontracts with all MBE's involved in meeting the percentage of Minority Business Enterprise Requirement. PERCENTAGE OF WBE PARTICIPATION - percentage of WBE participation shall be that percentage of the total bid price represented by the amount to be paid to WBE(s). The General Bidder's compliance with the percentage requirement shall continue to be determined by reference to the above-described method throughout the term of the contract, even though the actual may be greater or less than the bid price. The General Bidder shall submit to the Minority Business Compliance Officer signed copies of its subcontracts with all WBE’s involved in meeting the percentage of Women Business Enterprise Requirement. ROLE of the MBE/WBE REVIEW COMMITTEE - The MBE Review Committee shall have referred to it by the Purchasing Agent and the Minority Business Compliance Officer all questions of interpretation of the MBE/WBE Program that arise during the Program's operation. The MBE Review Committee shall have the responsibility and authority to respond with binding answers to these questions. It also has the responsibility and authority to recommend to the City Manager whatever improvements it believes can be made in the program, based on operating experience. CHANGES OF MBE/WBE STATUS - Any change or substitution of the officers or stockholders in a participating MBE/WBE company that reduces the minority ownership or control to less than the requisite percentage will immediately rescind the MBE/WBE designation previously given by SOMBWA. The General Bidder (Prime Contractor) shall immediately notify the Minority Business Compliance Officer upon learning of such a change in status. In this event, the Prime Contractor shall submit to the Minority Business Compliance Officer a revised Contractor Certification of Compliance with MBE/WBE Requirements, showing how the lost participation will be replaced. SANCTIONS A. If the Prime Contractor does not comply with the terms of the Minority Business Enterprise

requirements of the contract, the City may (1) suspend any payment for the activity that should have been performed by the MBE/WBE pursuant to the contract, or (2) require specific performance of the Prime Contractor's obligation by requiring the Prime Contractor to sub contract with any MBE/WBE for any contract or specialty item at the contract price established for that item in the proposal submitted by the Prime Contractor.

B. To the extent that the Prime Contractor has not Complied with the MBE/WBE requirements of the

contract, the City may retain an amount determined by multiplying the bid price of this contract by the required percentage of MBE/WBE participation, less the amount paid to the MBE/WBE for work performed under the contract and any payments already suspended under "A" above.

C. In addition, or as an alternative, to the remedies under "A" and "B" above, the City may suspend,

terminate, or cancel this contract, in whole or in part, or may call upon the Prime Contractor's

KING OPEN/CAMBRIDGE STREET 90% CONSTRUCTION DOCUMENTS UPPER SCHOOLS & COMMUNITY COMPLEX FILE NO. 6846A MAY 26, 2017

AGREEMENT BETWEEN THE CITY OFCAMBRIDGE AND THE CM AT RISK

007223 ­ EXHIBIT L.11

JULY 28, 2017

BID SETJuly 28,2017

Addendum #4 SEPT. 15, 2017

Page 35: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

surety to perform all terms and conditions in the contract, unless the Prime Contractor is able to demonstrate its compliance with the MBE/WBE requirements, and may further deny to the Prime Contractor the right to participate in any future contracts awarded by the City for a period of up to three years.

D. In any proceeding involving the imposition of sanctions by the City, no sanctions shall be imposed

if the City finds that the Prime Contractor has taken every possible measure to comply with MBE/WBE requirements, or that some other justifiable reason exists for waiving the MBE requirements in whole or part.

E. Any bidder or contractor shall provide such information as is necessary in the judgment of the

City to ascertain its compliance with the MBE/WBE Requirements. F. No sanctions shall be imposed by the City except in an adjudicatory proceeding under Chapter

30A of the General Laws. G A Prime Contractor shall have the right to request suspension of any sanctions imposed by the

City upon showing that it is once again in compliance with the MBE/WBE Requirements.

KING OPEN/CAMBRIDGE STREET 90% CONSTRUCTION DOCUMENTS UPPER SCHOOLS & COMMUNITY COMPLEX FILE NO. 6846A MAY 26, 2017

AGREEMENT BETWEEN THE CITY OFCAMBRIDGE AND THE CM AT RISK

007223 ­ EXHIBIT L.11

JULY 28, 2017

BID SETJuly 28,2017

Addendum #4 SEPT. 15, 2017

Page 36: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

FORM

CONTRACTOR CERTIFICATION OF COMPLIANCE 1 Minority Business Enterprise Requirements M.B.E. ______________________________________________________________________________ Name & Address of Participating Name of Participant Dollar Value of Participation Minority Bus. Enterprises 1. 2.

3.

4.

5.

6.

7. GRAND TOTAL FOR MINORITY BUSINESS COMMITMENT $

8. PERCENTAGE MBE PARTICIPATION (Line 7 Divided by tot. bid price) %

The below-signed bidder certifies that it will honor the above Minority Business Enterprise Commitment and that it understands that a breach of this commitment constitutes a breach of the contract.

_________________________ ____________________________ Date General Contractor

_________________________ ____________________________ Authorized Signature

____________________________ Business Address

KING OPEN/CAMBRIDGE STREET 90% CONSTRUCTION DOCUMENTS UPPER SCHOOLS & COMMUNITY COMPLEX FILE NO. 6846A MAY 26, 2017

AGREEMENT BETWEEN THE CITY OFCAMBRIDGE AND THE CM AT RISK

007223 ­ EXHIBIT L.11

JULY 28, 2017

BID SET

Bidder

July 28,2017Addendum #4 SEPT. 15, 2017

Page 37: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

FORM

LETTER OF INTENT TO PARTICIPATE 2 Minority Business Enterprise Requirements M.B.E. TO: _____________________________________________________________

(Name of General Bidder) 1. My company intends to perform work under the above-identified contract as:

___________ an individual ___________ a partnership ___________ a corporation ___________ a joint venture with _______________________________________ ___________ other (explain) ____________________________________________ _____________________________________________________________

2. My company has been certified by the State Office of Minority and Woman Owned Business

Assistance (SOMBWA) as a Minority Business Enterprise and is listed as such in the most recently issued SOMBWA Minority Business Directory. I hereby certify that my company's qualification as a Minority Business Enterprise have not changed since its application was submitted to SOMBWA. I further certify that my company will give immediate notification in writing to both SOMBWA and your Company in the event that its minority ownership, control, or management should change.

3. My company understands that if your company is awarded the contract, your company intends to

enter into an agreement with my company to perform the activity described below for the prices indicated. My firm also understands that your firm, as General Bidder, will make substitutions and quantity changes only as allowed or required by the provisions of the contract with the City of Cambridge.

ITEM NO DESCRIPTION OF MY COMPANY’S

ACTIVITY* QUANTITY UNIT PRICE AMOUNT

TOTAL AMOUNT$

* Description of Activity should include notations such as "Labor Only", "Material Only", etc. _________________________ __________________________ Date General Contractor __________________________

Authorized Signature __________________________

__________________________

Business Address

KING OPEN/CAMBRIDGE STREET 90% CONSTRUCTION DOCUMENTS UPPER SCHOOLS & COMMUNITY COMPLEX FILE NO. 6846A MAY 26, 2017

AGREEMENT BETWEEN THE CITY OFCAMBRIDGE AND THE CM AT RISK

007223 ­ EXHIBIT L.11

JULY 28, 2017

BID SET

Bidder

July 28,2017Addendum #4 SEPT. 15, 2017

Page 38: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

FORM

CONTRACTOR REQUEST FOR EXTENSION 3 Minority Business Enterprise Requirements M.B.E CONTRACTOR REQUEST-FOR-EXTENSION OF MINORITY BUSINESS ENTERPRISE REQUIREMENTS The below-signed General Bidder certifies that it made a good faith effort to develop the required 10 % (M.B.E.) Minority Business Enterprise participation in this contract, but was able to develop only MBE______ %. The below-signed General Bidder further certifies that it contacted the below-listed firms from the SOMBWA MINORITY BUSINESS DIRECTORY supplied by the City of Cambridge Purchasing Department with the Bidding Documents; that said contracts were bona fide efforts to develop the required Minority Business Enterprise participation in the above-identified contract but were unsuccessful due to circumstances beyond the control of the General Bidder; and that the information given on the following pages about each contract has made is accurate and complete. MBE Companies Contacted

1.____________________________________ 11.____________________________________

2.____________________________________ 12.____________________________________

3.____________________________________ 13.____________________________________

4.____________________________________ 14.____________________________________

5.____________________________________ 15.____________________________________

6.____________________________________ 16.____________________________________

7.____________________________________ 17.____________________________________

8.____________________________________ 18.____________________________________

9.____________________________________ 19.____________________________________

10.___________________________________ 20.____________________________________ The below-signed General Bidder therefore requests that the City of Cambridge grant an extension of ten working days in order to provide the General Bidder and opportunity to secure the required percentage of Minority Business participation.

_________________________ ____________________________ Date General Contractor

_________________________ ____________________________ Authorized Signature

____________________________ Business Address

KING OPEN/CAMBRIDGE STREET 90% CONSTRUCTION DOCUMENTS UPPER SCHOOLS & COMMUNITY COMPLEX FILE NO. 6846A MAY 26, 2017

AGREEMENT BETWEEN THE CITY OFCAMBRIDGE AND THE CM AT RISK

007223 ­ EXHIBIT L.11

JULY 28, 2017

BID SET

Bidder

July 28,2017Addendum #4 SEPT. 15, 2017

Page 39: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

FORM

INFORMATION ON UNSUCCESSFUL MBE CONTACT 4 Minority Business Enterprise Requirements M.B.E. Additional copies of this information form shall be prepared by the General Bidder in the quantity necessary to comply with bidding requirements.

ITEM NO. ON REQUEST-FOR-EXTENSION ___________________________________

NAME OF MBE COMPANY CONTACTED _________________________________________

ADDRESS _________________________________________

TELEPHONE NO. _________________________________________

DATE OF INITIAL CONTACT _____________________

HOW WAS CONTACT MADE? (Check appropriate answer) ____Telephone ____ in person____ internet

SUB-CONTRACT WORK OFFERED TO THIS MBE COMPANY _________________________

_______________________________________________________________________

_______________________________________________________________________

RESULT OF CONTACT (Check appropriate answer) MBE FIRM DECLINED JOB _____;

MBE FIRM OFFERED TO DO JOB AT PRICE OF $ ____________, WHICH WAS DETERMINED BY

OUR COMPANY TO BE TO HIGH ______; MBE COMPANY OFFERED TO DO THE JOB AT A PRICE

OF $ __________, WHICH WAS SATISFACTORY, BUT THE MBE COMPANY WAS JUDGED BY OUR

COMPANY TO BE UNQUALIFIED FOR THE JOB _______.

OTHER_______________________________________________

NAME AND TITLE OF THE MBE COMPANY OFFICER WHO CAN VERIFY ABOVE INFORMATION AS

TO MBE COMPANY'S RESPONSE _____________________________________________________

_____________________________________________________________________________

It is certified herewith by the below-signed officer of the General Bidder that the above information is accurate and complete.

_________________________ ____________________________ Date General Contractor

_________________________ ____________________________ Authorized Signature

____________________________ Business Address

KING OPEN/CAMBRIDGE STREET 90% CONSTRUCTION DOCUMENTS UPPER SCHOOLS & COMMUNITY COMPLEX FILE NO. 6846A MAY 26, 2017

AGREEMENT BETWEEN THE CITY OFCAMBRIDGE AND THE CM AT RISK

007223 ­ EXHIBIT L.11

JULY 28, 2017

BID SET

Bidder

July 28,2017Addendum #4 SEPT. 15, 2017

Page 40: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

FORM

CONTRACTOR CERTIFICATION OF COMPLIANCE 1 Women Business Enterprise Requirements W.B.E. ______________________________________________________________________________ Name & Address of Participating Name of Participant Dollar Value of Participation Women Bus. Enterprises 1. 2.

3.

4.

5.

6.

7. GRAND TOTAL FOR WOMEN BUSINESS COMMITMENT $

8. PERCENTAGE WBE PARTICIPATION (Line 7 Divided by tot. bid price) %

The below-signed bidder certifies that it will honor the above Women Business Enterprise Commitment and that it understands that a breach of this commitment constitutes a breach of the contract.

_________________________ ____________________________ Date General Contractor

_________________________ ____________________________ Authorized Signature

____________________________ Business Address

KING OPEN/CAMBRIDGE STREET 90% CONSTRUCTION DOCUMENTS UPPER SCHOOLS & COMMUNITY COMPLEX FILE NO. 6846A MAY 26, 2017

AGREEMENT BETWEEN THE CITY OFCAMBRIDGE AND THE CM AT RISK

007223 ­ EXHIBIT L.11

JULY 28, 2017

BID SET

Bidder

July 28,2017Addendum #4 SEPT. 15, 2017

Page 41: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

FORM

LETTER OF INTENT TO PARTICIPATE 2 Women Business Enterprise Requirements W.B.E. TO: _____________________________________________________________

(Name of General Bidder) 1. My company intends to perform work under the above-identified contract as:

___________ an individual ___________ a partnership ___________ a corporation ___________ a joint venture with _______________________________________ ___________ other (explain) ____________________________________________ _____________________________________________________________

2. My company has been certified by the State Office of Minority and Woman Owned Business

Assistance (SOMBWA) as a Women Business Enterprise and is listed as such in the most recently issued SOMBWA Women Business Directory. I hereby certify that my company's qualification as a Women Business Enterprise have not changed since its application was submitted to SOMBWA. I further certify that my company will give immediate notification in writing to both SOMBWA and your Company in the event that its minority ownership, control, or management should change.

3. My company understands that if your company is awarded the contract, your company intends to

enter into an agreement with my company to perform the activity described below for the prices indicated. My firm also understands that your firm, as General Bidder, will make substitutions and quantity changes only as allowed or required by the provisions of the contract with the City of Cambridge.

ITEM NO DESCRIPTION OF MY COMPANY’S

ACTIVITY* QUANTITY UNIT PRICE AMOUNT

TOTAL AMOUNT$

* Description of Activity should include notations such as "Labor Only", "Material Only", etc. _________________________ __________________________ Date General Contractor __________________________

Authorized Signature __________________________

__________________________

Business Address

KING OPEN/CAMBRIDGE STREET 90% CONSTRUCTION DOCUMENTS UPPER SCHOOLS & COMMUNITY COMPLEX FILE NO. 6846A MAY 26, 2017

AGREEMENT BETWEEN THE CITY OFCAMBRIDGE AND THE CM AT RISK

007223 ­ EXHIBIT L.11

JULY 28, 2017

BID SET

Bidder

July 28,2017Addendum #4 SEPT. 15, 2017

Page 42: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

FORM

CONTRACTOR REQUEST FOR EXTENSION 3 Women Business Enterprise Requirements W.B.E. CONTRACTOR REQUEST-FOR-EXTENSION OF WOMEN BUSINESS ENTERPRISE REQUIREMENTS The below-signed General Bidder certifies that it made a good faith effort to develop the required 4% (W.B.E.) Women Business Enterprise participation in this contract, but was able to develop only WBE_____% The below-signed General Bidder further certifies that it contacted the below-listed firms from the SOMBWA WOMEN BUSINESS DIRECTORY supplied by the City of Cambridge Purchasing Department with the Bidding Documents; that said contracts were bona fide efforts to develop the required Women Business Enterprise participation in the above-identified contract but were unsuccessful due to circumstances beyond the control of the General Bidder; and that the information given on the following pages about each contract has made is accurate and complete. WBE Companies Contacted

1.____________________________________ 11.____________________________________

2.____________________________________ 12.____________________________________

3.____________________________________ 13.____________________________________

4.____________________________________ 14.____________________________________

5.____________________________________ 15.____________________________________

6.____________________________________ 16.____________________________________

7.____________________________________ 17.____________________________________

8.____________________________________ 18.____________________________________

9.____________________________________ 19.____________________________________

10.___________________________________ 20.____________________________________ The below-signed General Bidder therefore requests that the City of Cambridge grant an extension of ten working days in order to provide the General Bidder and opportunity to secure the required percentage of Minority Business participation.

_________________________ ____________________________ Date General Contractor

_________________________ ____________________________ Authorized Signature

____________________________ Business Address

KING OPEN/CAMBRIDGE STREET 90% CONSTRUCTION DOCUMENTS UPPER SCHOOLS & COMMUNITY COMPLEX FILE NO. 6846A MAY 26, 2017

AGREEMENT BETWEEN THE CITY OFCAMBRIDGE AND THE CM AT RISK

007223 ­ EXHIBIT L.11

JULY 28, 2017

BID SET

Bidder

July 28,2017Addendum #4 SEPT. 15, 2017

Page 43: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

FORM

INFORMATION ON UNSUCCESSFUL WBE CONTACT 4 Women Business Enterprise Requirements W.B.E. Additional copies of this information form shall be prepared by the General Bidder in the quantity necessary to comply with bidding requirements.

ITEM NO. ON REQUEST-FOR-EXTENSION ___________________________________

NAME OF WBE COMPANY CONTACTED _________________________________________

ADDRESS _________________________________________

TELEPHONE NO. _________________________________________

DATE OF INITIAL CONTACT _____________________

HOW WAS CONTACT MADE? (Check appropriate answer) ____Telephone ____ in person____ internet

SUB-CONTRACT WORK OFFERED TO THIS WBE COMPANY _________________________

_______________________________________________________________________

_______________________________________________________________________

RESULT OF CONTACT (Check appropriate answer) WBE FIRM DECLINED JOB _____; WBE FIRM

OFFERED TO DO JOB AT PRICE OF $ ____________, WHICH WAS DETERMINED BY OUR

COMPANY TO BE TO HIGH ______; WBE COMPANY OFFERED TO DO THE JOB AT A PRICE OF $

__________, WHICH WAS SATISFACTORY, BUT THE WBE COMPANY WAS JUDGED BY OUR

COMPANY TO BE UNQUALIFIED FOR THE JOB _______.

OTHER_______________________________________________

NAME AND TITLE OF THE MBE COMPANY OFFICER WHO CAN VERIFY ABOVE INFORMATION AS

TO MBE COMPANY'S RESPONSE _____________________________________________________

_____________________________________________________________________________

It is certified herewith by the below-signed officer of the General Bidder that the above information is accurate and complete.

_________________________ ____________________________ Date General Contractor

_________________________ ____________________________ Authorized Signature

____________________________ Business Address

KING OPEN/CAMBRIDGE STREET 90% CONSTRUCTION DOCUMENTS UPPER SCHOOLS & COMMUNITY COMPLEX FILE NO. 6846A MAY 26, 2017

AGREEMENT BETWEEN THE CITY OFCAMBRIDGE AND THE CM AT RISK

007223 ­ EXHIBIT L.11

JULY 28, 2017

BID SET

Bidder

July 28,2017Addendum #4 SEPT. 15, 2017

Page 44: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

Exhibit L12

THIS FORM MUST BE SUBMITTED WITH YOUR BID

PROJECTED WORKFORCE CERTIFICATION

I, ________ (general contractor) certify that the following is my projected workforce for this contract:

GENERAL CONTRACTOR ESTIMATED # OF NEW HIRES SUBTRADE ESTIMATED # OF NEW HIRES

Signed under the penalties of perjury,

______ General Contractor

KING OPEN/CAMBRIDGE STREET 90% CONSTRUCTION DOCUMENTS UPPER SCHOOLS & COMMUNITY COMPLEX FILE NO. 6846A MAY 26, 2017

AGREEMENT BETWEEN THE CITY OFCAMBRIDGE AND THE CM AT RISK

007223 ­ EXHIBIT L.12

JULY 28, 2017

BID SETJuly 28, 2017

Addendum #4 SEPT. 15, 2017

Bidder

Page 45: KING OPEN/CAMBRIDGE STREET BID SET...KING OPEN/CAMBRIDGE STREET BID SET UPPER SCHOOLS & COMMUNITY COMPLEX July 28, 2017 FILE NO. 6846A Addendum #4 SEPT. 15, 2017 WILLIAM RAWN ASSOCIATES,

1. REFER TO FINISH LEGEND FOR BASIS OF DESIGN PRODUCTINFORMATION. BASIS OF DESIGN DESCRIBES ALL DESIGNINTENT INCLUDING BUT NOT LIMITED TO SIZE, FINISH, COLOR,PATTERN, TEXTURE, PERFORMANCE, MATERIAL CONTENT.

2. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.3. REFER TO FINISH SCHEDULE FOR LOCATION OF FINISHES.

ROOMS IN COMMENTS COLUMN ARE FOR REFERENCE AND NOTDIRECTION FOR WHERE FINISH IS APPLIED.

4. REFER TO FINISH FLOOR PLANS, FINISH WALL PLANS, ANDINTERIOR ELEVATIONS FOR ADDITIONAL INFORMATION.

5. REFER TO FINISH FLOOR PLANS FOR PATTERNS AND COLORLAYOUTS OF FLOORING. FLOORING TO CONTINUE UNDERMILLWORK.

6. REFER TO FLOOR TRANSITION DRAWINGS IN A8.00 SERIESFOR TRANSITIONS BETWEEN FLOORING TYPES.

7. PROVIDE METAL TRIM AT TOP, BOTTOM, EDGE AND CORNER OFALL WALL TILE AS SHOWN IN DETAILS.

8. PAINT ALL SOFFIT, GWB, CEILINGS, FASCIA, EXPOSEDSTRUCTURE, DUCTWORK, CONDUITS AND PIPING PT-20 U.N.O.ON RCP.

9. HM DOORS AND DOOR FRAME ARE TO BE PAINTED TO MATCHADJACENT WALL PAINT, U.N.O. REFER TO DOOR SCHEDULEFOR EXCEPTIONS.

10. HVAC REGISTERS, DIFFUSERS, AND GRILLS, ELECTRICALPANELS, ACCESS PANELS, AND ELECTRICAL OUTLET STRIPSMUST BE PAINTED TO MATCH ADJACENT WALL OR CEILING.

11. LOCATION DESIGNATED TO HAVE FLASH COVE BASE TOHAVE FINISHING TRIM AT TOP.

12. ALL DOOR/DRAWER PULLS TO BE DP-1 U.N.O. EXCEPTIONSNOTED IN ROOM FINISH SCHEDULES.

13. ALL WALL DIFFUSERS PAINTED PT-1 U.N.O ON ELEVATIONS ORDETAILS.

14. PAINT WALL, DUCTS, CONDUIT BEHIND PERFORATEDMATERIALS BLACK.

15. REFER TO A3.10 FOR EXTERIOR FINISH LEGEND

Cambridge,MA02141

DATE:

CityofCambridgeKingOpen&

CambridgeStreetUpperSchools&CommunityComplex

DRAWING TITLE:

DRAWING NUMBER:

SCALE:

CHECKED BY:

DRAWN BY:

ISSUANCES & REVISIONS:

© 2

017 W

ILL

IAM

RA

WN

AS

SO

CIA

TE

S, A

RC

HIT

EC

TS

, IN

C.

GENERAL NOTES:

ARCHITECT:WILLIAMRAWNASSOCIATES,ARCHITECTS,INC.10POSTOFFICESQUARE,SUITE1010NBOSTON,MASSACHUSETTS02109T:617.423.3470F:617.451.9205

INASSOCIATIONWITH

ARROWSTREETINC.10POSTOFFICESQUARE,SUITE700NBOSTON,MASSACHUSETTS02109T:617.623.555

MEP/FP/SECURITY/TELECOM:GARCIAGALUSKADESOUSA,CONSULTINGENGINEERSINC.370FAUNCECORNERROADN.DARTMOUTH,MA02747‐1217T:508‐998‐5700

STRUCTURALENGINEER:LEMESSURIERCONSULTANTS1380SOLDIERSFIELDROADBOSTON,MASSACHUSETTS02135T:617‐868‐1200

CIVIL:NITSCHENGINEERING2CENTERPLAZA,SUITE430BOSTON,MA02108‐1928T:617‐338‐0063

LANDSCAPE:COPLEYWOLFFDESIGNGROUPLANDSCAPEARCHITECTS&PLANNERS10POSTOFFICESQUARE,SUITE1315BOSTON,MA02109T:617‐654‐9000

FOODSERVICE:CRABTREEMCGRATHASSOCIATES,INC.161WESTMAINSTREETGEORGETOWN,MA01833T:978‐352‐8500

POOL:AQUATICDESIGNGROUP2226FARADAYAVENUECARLSBAD,CA92008T:760‐438‐8400

AUDIOVISUAL:ACENTECH33MOULTONSTREETCAMBRIDGE,MA02138T:617‐499‐8000

TRUEN

PROJECTN

BC

AD

BID SET

1/2" = 1'-0"

9/1

4/2

017 5

: 55:4

0 P

MC

:\~

Revit

2016 P

roje

cts

\21411_K

OC

SU

S_A

RC

H_C

EN

TR

AL

_b

ub

riski@

arr

ow

str

eet.

co

m.r

vt

09/15/17

A10.01

KO

KB

FINISH LEGEND

BASIS OF DESIGN FINISH LEGEND

SPECSECTION TYPE DESCRIPTION MANUFACTURER MODEL SIZE COLOR COMMENTS

09 68 10 WOM-1 WALK OFF MAT CARPET FORBO CORAL BRUSH TILES 50cmx50cm/6mm THICKNESS ASHPHALT GREY 5710 VESTIBULES

PAINTING AND COATING09 90 00 PT-1 PAINT BENJAMIN MOORE NEUTRAL, GENERAL WALL PAINT EGGSHELL BM OC-25 CLOUD COVER OVERALL WHITE09 90 00 PT-2 PAINT BENJAMIN MOORE NEUTRAL EGG SHELL BM 1471 SHORELINE09 90 00 PT-3 PAINT SHERWIN WILLIAMS NEUTRAL EGGSHELL BM 1473 GRAY HUSKIE09 90 00 PT-5 PAINT SHERWIN WILLIAMS ACCENT EGGSHELL SW 6711 PARAKEET09 90 00 PT-6 PAINT BENJAMIN MOORE ACCENT EGGSHELL BM 2054-60 OLD PICKUP BLUE09 90 00 PT-7 PAINT SHERWIN WILLIAMS ACCENT EGGSHELL SW 6622 HEARTY ORANGE09 90 00 PT-8 PAINT SHERWIN WILLIAMS ACCENT EGGSHELL SW 6488 GRAND CANAL09 90 00 PT-9 PAINT BENJAMIN MOORE ACCENT EGGSHELL BM 2054-50 SEASIDE BLUE CSUS BLUE09 90 00 PT-10 PAINT SHERWIN WILLIAMS ACCENT EGGSHELL SW 6696 QUILT GOLD09 97 36 PT-11 MAGNETIC DRY ERASE SURFACE IDEA PAINT CREATE N/A CLEAR U.N.O. BASE PAINT TO BE PT-109 90 00 PT-12 PAINT SHERWIN WILLIAMS ACCENT EGGSHELL SW 9059 SILKEN PEACOCK09 90 00 PT-13 PAINT BENJAMIN MOORE ACCENT EGGSHELL BM 674 SPRING SKY09 90 00 PT-14 PAINT BENJAMIN MOORE ACCENT EGGSHELL BM 444 CEDAR GROVE09 90 00 PT-15 PAINT BENJAMIN MOORE ACCENT EGGSHELL BM HC-155 NEWBURYPORT BLUE09 90 00 PT-16 PAINT BENJAMIN MOORE ACCENT EGGSHELL BM 719 HEMLOCK09 90 00 PT-17 PAINT BENJAMIN MOORE ACCENT EGGSHELL BM 675 THUNDERBIRD09 90 00 PT-18 PAINT SHERWIN WILLIAMS ACCENT EGGSHELL SW 6913 FUNKY YELLOW LEARNING COMMONS09 90 00 PT-19 PAINT BENJAMIN MOORE ACCENT EGGSHELL BM 747 BAYVILLE BLUE LEARNING COMMONS09 90 00 PT-20 PAINT BENJAMIN MOORE NEUTRAL, CEILING PAINT FLAT BM OC-57 WHITE HERON09 90 00 PT-21 PAINT BENJAMIN MOORE ACCENT EGGSHELL BM 405 PERENNIAL KO GREEN09 90 00 PT-22 PAINT BENJAMIN MOORE ACCENT EGGSHELL BM 1602 GUNMETAL LEARNING COMMONS09 90 00 PT-23 PAINT SHERWIN WILLIAMS ACCENT EGGSHELL SW 6684 BRITTLEBUSH CSUS GYM/PROMENADE ACCENT09 90 00 PT-24 PAINT SHERWIN WILLIAMS ACCENT EGGSHELL SW 6689 OVERJOY KO GYM/PROMENADE ACCENT09 90 00 PT-25 PAINT BENJAMIN MOORE ACCENT EGGSHELL BM 433 FOREST HILL GREEN SERVERY/CAFETERIA ACCENT09 90 00 PT-26 PAINT SHERWIN WILLIAMS ACCENT EGGSHELL SW 6501 MANITOU BLUE MUSIC ROOM ACCENT09 90 00 PT-27 PAINT SHERWIN WILLIAMS ACCENT EGGSHELL BM 1473 GRAY HUSKIE UNDER STAIR COLOR09 90 00 PT-28 PAINT SHERWIN WILLIAMS ACCENT EGGSHELL SW 6809 DANUBE VALENTE09 90 00 PT-29 PAINT BENJAMIN MOORE ACCENT EGGSHELL BM 200 WESTMINSTER GOLD AUDITORIUM09 90 00 PT-30 PAINT SHERWIN WILLIAMS ACCENT EGGSHELL BM 1407 MAUVE BAUHAUS VALENTE09 90 00 PT-31 PAINT BENJAMIN MOORE ACCENT EGGSHELL 718 OCEAN CITY BLUE CPS - PRIV OFFICE ACCENT09 90 00 PT-32 PAINT SHERWIN WILLIAMS ACCENT EGGSHELL SW6502 LOCH BLUE CPS - FEATURE WALL09 90 00 PT-33 PAINT SHERWIN WILLIAMS ACCENT EGGSHELL SW9060 CONNOR'S LAKEFRONT CPS - ACCENT WALL09 90 00 PT-34 PAINT BENJAMIN MOORE ACCENT EGGSHELL 278 ANGEL'S TRUMPET CPS - PUBLIC SPACE ACCENT09 90 00 PT-35 PAINT BENJAMIN MOORE ACCENT EGGSHELL 2034-10 CLOVER GREEN CPS - PUBLIC SPACE ACCENT09 90 00 PT-36 PAINT BENJAMIN MOORE ACCENT FLAT BM 2124-10 WROUGHT IRON AUDITORIUM STAGE09 90 00 PT-37 PAINT SHERWIN WILLIAMS ACCENT EGGSHELL SW 6881 CAYENNE VALENTE09 90 00 PT-38 PAINT BENJAMIN MOORE ACCENT EGGSHELL BM HC-38 DECATUR BUFF VALENTE09 90 00 PT-39 PAINT BENJAMIN MOORE ACCENT EGGSHELL AC-25 HARBOR GRAY CPS - PUBLIC SPACE ACCENT09 90 00 PT-40 PAINT SHERWIN WILLIAMS ACCENT EGGSHELL/SEMI-GLOSS FOR

DOOR FRAMES6170 TECHNO GREY DOORS AND FRAMES

09 90 00 PT-41 PAINT BENJAMIN MOORE ACCENT EGGSHELL COLOR TO MATCH WALL PADS KO & CSUS GYM09 90 00 PT-42 PAINT BENJAMIN MOORE ACCENT EGGSHELL COLOR TO MATCH AWC-2 VALENTE09 90 00 PT-43 PAINT SHERWIN WILLIAMS CEILING EGGSHELL SW 0055 LIGHT FRENCH GRAY AUDITORIUM CIELING09 90 00 PT-44 PAINT BENJAMIN MOORE ACCENT EGGSHELL COLOR TO MATCH CURTAIN WALL ALL EXPOSED COLOMNS U.N.O.

SHADES12 24 00 RS-1 MANUAL ROLLER SHADES , 3% MECHOSYSTEMS MECHO 5 ECO VEIL SHEER SLATE INTERIOR GLAZING12 24 00 RS-2 MANUAL ROLLER SHADES , 1% MECHOSYSTEMS MECHO 5 ECO VEIL SHEER SLATE EXTERIOR GLAZING12 24 00 RS-4 MOTERIZED ROLLER SHADES , 3% MECHOSYSTEMS ELECTRO 1 ECO VEIL SHEER SLATE INTERIOR GLAZING12 24 00 RS-5 MOTERIZED ROLLER SHADES , 1% MECHOSYSTEMS ELECTRO 1 ECO VEIL SHEER SLATE EXTERIOR GLAZING

WALL BASE09 67 10 EPB-1 EPOXY BASE STONHARD STONCLAD G2 N/A TO MATCH EP-1 INTEGRAL COVE BASE09 65 00 RB-1 RUBBER BASE JOHNSONITE RUBBER BASE 4" HIGH 63 BURNT UMBER STAIRS, COVE AT RESILENT, STRAIGHT AT CARPET09 65 00 RB-2 RUBBER BASE JOHNSONITE RUBBER BASE 4" HIGH 461 WICKER AT LIN-1 & 2 LOCATIONS, COVE AT RESILENT, STRAIGHT AT CARPET09 65 00 RB-3 RUBBER BASE JOHNSONITE RUBBER BASE 4" HIGH 282 VAPORIZE AT LIN-13 LOCATIONS, COVE AT RESILENT, STRAIGHT AT CARPET09 65 00 RB-4 RUBBER BASE JOHNSONITE RUBBER BASE 4" HIGH 63 BURNT UMBER AUDITORIUM, STAGE, COVE AT RESILENT, STRAIGHT AT CARPET09 65 00 RB-5 RUBBER BASE JOHNSONITE RUBBER BASE 4" HIGH 121 CEMENT CPS (GENERAL) - COVE AT RESILENT, STRAIGHT AT CARPET09 65 00 RB-6 RUBBER BASE JOHNSONITE RUBBER BASE 4" HIGH 92 BLUE LAGOON CPS (ACCENT) - COVE AT RESILENT, STRAIGHT AT CARPET09 65 00 RB-7 RUBBER BASE JOHNSONITE RUBBER BASE 4" HIGH 20 CHARCOAL WG WALK OFF MAT - COVE AT RESILENT, STRAIGHT AT CARPET09 65 00 RB-9 RUBBER BASE JOHNSONITE RUBBER BASE 4" HIGH 192 TIDEWATER AT LIN-5 LOCATIONS - COVE AT RESILENT09 30 00 STB-1 STONE BASE LIMESTONE QUARRA

STONEHUNGARIAN GOLDEN LIMESTONE 4" HIGH C320 HONED FINISH AT ST-1 - VALENT ENTRY

09 30 00 TB-1 TILE BASE DALTILE IMAGICA IG9712241P 4" HIGH IG97 HAZE AT FT-1 - VALENTE BATHROOMS09 66 20 TERB-1 TERRAZZO BASE, PRE-CAST KEY RESIN COMPANY KEY EPOXY TERRAZZO GREEN 8" HIGH TO MATCH TER-1 MIXTURE09 64 60 VB-1 VENT COVE BASE JOHNSONITE VENTED RUBBER BASE 6" HIGH, 4" TOE CUSTOM COLOR TO MATCH WALL PADS AT ATHLETIC WOOD FLOOR06 40 20 WB-1 WOOD BASE N/A MAPLE 4" HIGH STAINED TO MATCH FLOOR VALENTE06 40 20 WB-2 WOOD BASE N/A PAINTED WOOD BASE 4" HIGH PAINTED TO MATCH WALL LEARNING COMMONS

WALL FINISHES09 84 30 AP-1 ACOUSTICAL PANEL DECOUSTICS FABRIC WRAPPED HIR #2 PANELS 2" THICKNESS FABRIC- CARNEGIE XOREL METEOR 6427- 739 BAND/MUSIC09 84 30 AP-2 WALL REFLECTOR DECOUSTICS REFLECTIVE WALL PANELS 2" THICKNESS FABRIC- CARNEGIE XOREL METEOR 6427- 739 BAND/MUSIC/6" DEEP AT POINT09 84 30 AP-3 ACOUSTICAL PANEL DECOUSTICS FABRIC WRAPPED HIR #2 PANELS 1" THICKNESS FABRIC- CARNEGIE XOREL METEOR 6427- 705 CAFETERIA09 84 30 AP-4 ACOUSTICAL PANEL KIREI ECHOPANEL 12mm THICKNESS GREEN 381 KO LOBBY/ WITH AIR GAP09 84 30 AP-5 ACOUSTICAL PANEL KIREI ECHOPANEL 12mm THICKNESS GREEN 381 KO LOBBY09 84 30 AP-6 ACOUSTICAL PANEL KIREI ECHOPANEL CUSTOM RECTANGLE/SQUARE

12mm3 COLORS : (A) BLUE 551, (B) GREY 101, (C)GREEN 381

REFER TO ELEVATIONS FOR LAYOUT

09 84 30 AP-7 ACOUSTICAL PANEL KIREI ECHOPANEL CUSTOM CIRCLE 12mm 3 COLORS : (A) BLUE 551, (B) GREY 101, (D)ORANGE 151

REFER TO ELEVATIONS FOR LAYOUT

09 84 30 AP-8 ACOUSTICAL PANEL KIREI ECHOPANEL CUSTOM TRIANGLE 12mm 4 COLORS : (A) BLUE 551, (B) GREY 101, (E)DARK BLUE 365, (F) YELLOW 108

REFER TO ELEVATIONS FOR LAYOUT

09 84 30 AP-9 ACOUSTICAL PANEL KIREI ECHOPANEL CUSTOM HEXAGON 12mm 3 COLORS : (A) BLUE 551, (B) GREY 101, (E)DARK BLUE 365

REFER TO ELEVATIONS FOR LAYOUT

09 84 30 AP-10 ACOUSTICAL PANEL KIREI ECHOPANEL 12mm THICKNESS BLUE 551 CSUS LOBBY, OSS CLASSROOMS09 84 30 AP-11 ACOUSTICAL PANEL KIREI ECHOPANEL 12mm THICKNESS WHITE 500 LEARNING COMMONS/ WITH AIR GAP09 84 30 AP-12 ACOUSTICAL PANEL DECOUSTICS FABRIC WRAPPED HIR #2 PANELS 2" THICKNESS FABRIC- CARNEGIE XOREL METEOR 6427- 712 AUDITORIUM09 84 30 AP-13 ACOUSTICAL PANEL DECOUSTICS FABRIC WRAPPED HIR #2 PANELS 1" THICKNESS FABRIC- CARNEGIE XOREL METEOR 6427- 731 MULTIPURPOSE ROOM09 84 30 AP-15 ACOUSTICAL PANEL DECOUSTICS FABRIC WRAPPED HIR #2 PANELS 2" THICKNESS FABRIC- CARNEGIE XOREL METEOR 6427- 749 VALENTE09 84 30 AP-16 ACOUSTICAL PANEL DECOUSTICS FABRIC WRAPPED HIR #2 PANELS 2" THICKNESS FABRIC- CARNEGIE XOREL METEOR 6427- 769 SLL AND CONTROL ROOM09 84 30 AP-17 ACOUSTICAL PANEL KIREI ECHOPANEL 24mm THICKNESS GREY 10109 84 30 AP-18 ACOUSTICAL PANEL KIREI ECHOPANEL 24mm THICKNESS BLUE 325 CPS ADMIN09 84 30 AP-19 ACOUSTICAL PANEL KIREI ECHOPANEL 24mm THICKNESS BLUE 365 CPS ADMIN09 84 30 AP-20 ACOUSTICAL PANEL KIREI ECHOPANEL 12mm THICKNESS GREY 10109 84 30 AP-21 ACOUSTICAL PANEL DECOUSTICS FABRIC WRAPPED HIR #2 PANELS 2" THICKNESS FABRIC- CARNEGIE XOREL METEOR 6427-726 VALENTE09 84 30 AP-22 ACOUSTICAL PANEL DECOUSTICS FABRIC WRAPPED HIR #2 PANELS 2" THICKNESS FABRIC- CARNEGIE XOREL METEOR 6427- 719 VALENTE STORYTIME10 21 20 C-1 CUBICAL CURTAIN CARNEGIE EFFERVESCENCE N/A 4560 / 211 61 00 C-2 DRAMA/STAGE CURTAIN REFER TO

SPECIFICATION 116100REFER TO SPECIFICATION 116100 REFER TO SPECIFICATION

116100BLACK

06 64 00 FRP-1 FIBERGLASS REINFORCED PANEL PANOLAM FRP SMOOTH WHITE10 11 00 TS-1 TACKABLE SURFACE FORBO BULLENTIN BOARD N/A 2213 BABY LETTUCE PROVIDE ALUMINUM TRIM AS NOTED10 11 00 TS-2 TACKABLE SURFACE FORBO BULLENTIN BOARD N/A 2211 TANGERINE ZEST PROVIDE ALUMINUM TRIM AS NOTED10 11 00 TS-3 TACKABLE SURFACE FORBO BULLENTIN BOARD N/A 2212 FRESH PINEAPPLE PROVIDE ALUMINUM TRIM AS NOTED10 11 00 TS-4 TACKABLE SURFACE FORBO BULLENTIN BOARD N/A 2214 BLUE BERRY PROVIDE ALUMINUM TRIM AS NOTED10 11 00 TS-5 TACKABLE SURFACE FORBO BULLENTIN BOARD N/A 2162 DUCK EGG PROVIDE ALUMINUM TRIM AS NOTED05 50 00 WP-1 PERFORATED WALL PANEL ARMSTRONG METALWORKS WH1100 SEE ELEVATIONS CUSTOM PT-29 CURVED PANELS; REFER TO AUD. DETAILS05 50 00 WP-2 METAL WALL PANEL CUSTOM FLAT SEAM PANEL SEE ELEVATIONS CUSTOM TO PT-37 VALENTE09 30 00 WT-1 WALL TILE JOHNSON TILES PRISMATICS - GLAZED CERAMIC WALL TILE 8"X4" PRG 117 OLIVE 1/8" GROUT TO BE SELECTED / LEVEL 1 ACCENT TILE / TILE A09 30 00 WT-2 WALL TILE JOHNSON TILES PRISMATICS - GLAZED CERAMIC WALL TILE 8"X4" PRG 44 OCEAN BLUE 1/8" GROUT TO BE SELECTED / LEVEL 1 ACCENT TILE / TILE B09 30 00 WT-3 WALL TILE JOHNSON TILES PRISMATICS - GLAZED CERAMIC WALL TILE 8"X4" PRG 55 PUMPKIN 1/8" GROUT TO BE SELECTED / LEVEL 2 ACCENT TILE / TILE B09 30 00 WT-4 WALL TILE JOHNSON TILES PRISMATICS - GLAZED CERAMIC WALL TILE 8"X4" PRG 28 DUCK EGG 1/8" GROUT TO BE SELECTED / LEVEL 2 ACCENT TILE / TILE A09 30 00 WT-5 WALL TILE JOHNSON TILES PRISMATICS - GLAZED CERAMIC WALL TILE 8"X4" PRG 16 TEAL 1/8" GROUT TO BE SELECTED / LEVEL 3 & 4 ACCENT TILE / TILE A09 30 00 WT-6 WALL TILE JOHNSON TILES PRISMATICS - GLAZED CERAMIC WALL TILE 8"X4" PRG 105 LAGOON 1/8" GROUT TO BE SELECTED / LEVEL 3 ACCENT TILE / TILE A09 30 00 WT-7 WALL TILE JOHNSON TILES PRISMATICS - GLAZED CERAMIC WALL TILE 8"X4" PRG 43 PEPPERMINT 1/8" GROUT TO BE SELECTED / LEVEL 4 ACCENT TILE / TILE B09 30 00 WT-9 PORCELAIN WALL PROTECTION LEA CERAMICHE SLIMTECH ABSOLUTE 39"X118" (1000mmX3000mm) TOTAL WHITE LEVIGATA 1/16" GROUT TO BE SELECTED / CORRIDOR WALL PROTECTION09 30 00 WT-10 MOSAIC WALL TILE DALTILE KEYSTONES SQUARE MOSAIC 2"x2" SQUARE D617, D620, D182, D619 RANDOM BLEND GROUT TO BE SELECTED / LEVEL 1 STUDENT BATHROOM TILE09 30 00 WT-11 MOSAIC WALL TILE DALTILE RETRO ROUNDS MOSAIC 1"X1" PENNY ROUNDS GLOSS RR09, RR08, RR01 RANDOM BLEND GROUT TO BE SELECTED / LEVEL 2 STUDENT BATHROOM TILE09 30 00 WT-12 MOSAIC WALL TILE DALTILE KEYSTONES SQUARE MOSAIC 1"x1" SQUARE D620, D167, D189, D169 RANDOM BLEND GROUT TO BE SELECTED / LEVEL 3 STUDENT BATHROOM TILE /

INSTALLED TURNED 90 DEGREES09 30 00 WT-13 MOSAIC WALL TILE DALTILE KEYSTONES HEXAGON MOSAIC 2" HEXAGON D148, D617, D159, D189 RANDOM BLEND GROUT TO BE SELECTED / LEVEL 4 STUDENT BATHROOM TILE09 30 00 WT-14 WALL TILE JOHNSON TILES PRISMATICS - GLAZED CERAMIC WALL TILE 8"X4" PRG 1 WHITE 1/8" GROUT TO BE SELECTED/ BATHROOM TILE / FIELD COLOR09 30 00 WT-15 WALL TILE JOHNSON TILES PRISMATICS - GLAZED CERAMIC WALL TILE 8"X4" PRG 24 STORM GREY 1/8" GROUT TO BE SELECTED/ LOCKER ROOMS09 30 00 WT-16 WALL TILE JOHNSON TILES PRISMATICS - GLAZED CERAMIC WALL TILE 8"X4" PRG 87 PEACOCK 1/8" GROUT TO BE SELECTED09 30 00 WT-17 WALL TILE T-ONE LINES -TEXTURE LEGNO LISCIA 39"x118" (100mmX300mm) IVORY 1/16" GROUT TO BE SELECTED / WOOD-LOOK TILE / REFER TO A7.11

FOR CUT WIDTHS A,B,C09 30 00 WT-18 WALL TILE JOHNSON TILES PRISMATICS - GLAZED CERAMIC WALL TILE 8"X4" PRG 48 GOLDCREST 1/8" GROUT TO BE SELECTED / GYM BATHROOMS09 30 00 WT-19 WALL TILE JOHNSON TILES PRISMATICS - GLAZED CERAMIC WALL TILE 8"X4" PRG 121 SUNFLOWER 1/8" GROUT TO BE SELECTED / GYM BATHROOMS09 30 00 WT-20 WALL TILE DALTILE ARTIGIANO 3"X12" AR98 ROMAN SKYLINE STD 1/8" GROUT TO BE SELECTED / CPS / HERRINGBONE INSTALL09 30 00 WT-21 WALL TILE DALTILE ARTIGIANO 3"X12" AR93 ITALIAN ALPS 1/8" GROUT TO BE SELECTED / CPS BATHROOMS / SINGLE

HERRINGBONE INSTALL09 30 00 WT-24 WALL TILE JOHNSON TILES PRISMATICS - GLAZED CERAMIC WALL TILE 8"X4" PRG 40 PISTACHIO 1/8" GROUT TO BE SELECTED09 30 00 WT-25 WALL TILE JOHNSON TILES PRISMATICS - GLAZED CERAMIC WALL TILE 8"X4" PRG 111 ELECTRIC 1/8" GROUT TO BE SELECTED / POOL

BASIS OF DESIGN FINISH LEGEND

SPECSECTION TYPE DESCRIPTION MANUFACTURER MODEL SIZE COLOR COMMENTS

ARCHITECTURAL WOODWORK & CASEWORK06 40 20 DP-1 PULLS DOUG MOCKETT DP57C 5 7/16" LENGTH SATIN STAINLESS STEEL06 40 20 DP-2 PULLS DOUG MOCKETT DP148B-26M 10 5/8” LENGTH MATTE CHROME12 35 50 ES-1 EPOXY SURFACE DURCON GREENSTONE 1" THICKNESS GRAPHITE SCIENCE ROOMS06 40 20 FB-1 FABRIC ARC COM SOLITUDE AC-62495 54" WIDTH SKY #16 LEARNING COMMONS WINDOW SEATS FABRIC06 40 20 FB-2 FABRIC ARC COM GAMMA AC-61903 54" WIDTH PAPAYA #14 VALENTE WINDOW SEATS FABRIC06 40 20 FB-3 FABRIC ARC COM MARATHON AC-60297 54" WIDTH CITRINE #8 CAFETERIA BACK SEAT FABRIC06 40 20 FB-4 FABRIC MOMENTUM TEXTILES BEELINE 54" WIDTH VALLEY CAFETERIA SEAT CUSHION FABRIC06 40 20 PL-1 PLASTIC LAMINATE NEVAMAR WOOD ESSENCE REFER TO SPECIFICATIONS WU0010-WE OUTER LIMITS CPS06 40 20 PL-2 PLASTIC LAMINATE WILSONART AEON REFER TO SPECIFICATIONS 7939K-18 BLOND ECHO, LINEARITY FINISH CPS06 40 20 PL-3 PLASTIC LAMINATE FORMICA COLORCORE2 REFER TO SPECIFICATIONS 7223C-90 NEW WHITE - GLOSS FINISH CPS06 40 20 PL-4 PLASTIC LAMINATE FORMICA COLORCORE2 REFER TO SPECIFICATIONS 72236-58 NEW WHITE - MATTE FINISH OVERALL WHITE06 40 20 PL-5 PLASTIC LAMINATE WILSONART STANDARD LAMINATE REFER TO SPECIFICATIONS 4942-38 CRISP LINEN CASEWORK CABINETS06 40 20 PL-6 PLASTIC LAMINATE WILSONART STANDARD LAMINATE REFER TO SPECIFICATIONS D92-20 DOVE GREY CASEWORK COUNTERTOPS06 40 20 PL-7 PLASTIC LAMINATE WILSONART LOW LINE REFER TO SPECIFICATIONS LINEARITY FINISH WITH AEON 7998K-18 DESK MATERIAL06 40 20 PL-9 PLASTIC LAMINATE WILSONART HIGH LINE REFER TO SPECIFICATIONS LINEARITY FINISH WITH AEON 7970K-18 LEARNING COMMON CASEWORK BASE CABINETS06 40 20 PL-10 PLASTIC LAMINATE WILSONART WALLABY REFER TO SPECIFICATIONS MATTE FINISH D439-60 LEARNING COMMON CASEWORK COUNTERTOPS06 40 20 PL-11 PLASTIC LAMINATE FORMICA COLORCORE2 REFER TO SPECIFICATIONS 8844-WR AGED ASH WOODBRUSH FINISH CASEWORK06 40 20 SB-1 STAINLESS STEEL BASE MOZ METALS NEUTRAL COLLECTION/ GRAIN - LINEN 18 GA CLEAR / POLYCOAT GLOSS FINISH AT MILLWORK AS DETAILED06 40 20 SP-1 RESIN LIGHT BLOCKS PALETTE 0.5 THICKNESS LAGOON DESK MATERIAL LEARNING COMMONS06 40 20 SP-2 RESIN LIGHT BLOCKS PALETTE 0.5 THICKNESS NEW LEAF DESK MATERIAL KO ADMIN06 40 20 SP-3 RESIN LIGHT BLOCKS PALETTE 0.5 THICKNESS CAROLINA DESK MATERIAL CSUS ADMIN06 40 20 SP-4 RESIN LIGHT BLOCKS PALETTE 0.5 THICKNESS METALLIC HYDRANGEA DESK MATERIAL POOL06 40 20 SS-1 SOLID SURFACE CEASERSTONE SUPERNATURAL QUARTZ SURFACES 3/4" THICKNESS 1111 VIVID WHITE06 40 20 SS-2 SOLID SURFACE CEASERSTONE CLASSICO QUARTZ SURFACES 3/4" THICKNESS 6141 OCEAN FOAM064020/064200/123550

WD-1 SOLID WOOD N/A SOLID MAPLE VARIES CLEAR

064020/064200/123550

WD-2 VENEER WOOD N/A VENEER MAPLE PANELS VARIES CLEAR

CEILINGS09 81 20 ACS-1 ACOUSTICAL SPRAYED INT. CELLULOSE CORP. SONASPRAY "FC" ACOUSTICAL FINISH .75 THICKNESS ARTIC WHITE, U.N.O. REFER TO CEILING PLAN FOR COLORS OTHER THAN WHITE09 81 20 ACS-2 ACOUSTICAL SPRAYED INT. CELLULOSE CORP. K-13 SPRAY-ON 1.5 THICKNESS WHITE09 81 20 ACS-3 ACOUSTICAL SPRAYED INT. CELLULOSE CORP. K-13 SPRAY-ON HIGH-R R-30 WHITE09 51 00 ACT-1 ACOUSTICAL CEILING TILE, GENERAL ARMSTRONG ULTIMA #1912HRC 2'X2' WHITE SUPRAFINE XL 9/16" GRID / NRC 0.75 / CAC 35 / LR 9009 51 00 ACT-2 ACOUSTICAL CEILING TILE ARMSTRONG CALLA # HL79342 / 2823 1'X4' WHITE SUPRAFINE XL 9/16" GRID / NRC 0.85 / CAC 35 / LR 9009 51 00 ACT-3 ACOUSTIC CEILING TILE, BACK OF HOUSE ARMSTRONG FINE FISSURED SCHOOL ZONE #1717 2'X2' WHITE PRELUDE XL 15/16" GRID / NRC 0.70 / CAC 40 / LR 8509 51 00 ACT-4 ACOUSTICAL CEILING TILE, KITCHEN ARMSTRONG KITCHEN ZONE #673 2'X2' WHITE SUPRAFINE XL 9/16" GRID / CAC 33 / LR 8909 51 00 ACT-5 ACOUSTICAL CEILING TILE, MUSIC ROOMS USG GEOMETRIX 2'X2' FLAT WHITE SUPRAFINE XL 9/16" GRID. REFER TO CEILING PLAN FOR LOCATION

OF PERFORATED TILES09 51 00 ACT-6 ACOUSTICAL CEILING TILE, HIGH NRC ARMSTRONG OPTIMA PB #3251PB 2'X2' WHITE SUPRAFINE XL 9/16" GRID / NRC 0.95 / LR 9009 51 00 ACT-7 ACOUSTICAL CEILING TILE, BLACK ARMSTRONG ULTIMA #1912 2'X2' BLACK PRELUDE XL 15/16" BLACK GRID / NRC 0.75 / CAC 3509 51 00 AMC-1 PREFORATED METAL CEILING ARMSTRONG METALWORKS#6461M2 WITH CHANNEL MOLDING 2'X2' CUSTOM TO MATCH PT-38 PRELUDE XL 15/16" GRID09 51 00 AMC-2 PREFORATED METAL CEILING ARMSTRONG METALWORKS DH700 SIZED TO MATCH RADIENT

PANEL L,W,H,DPAINTED TO MATCH ACOUSTICAL DECK PRELUDE XL 15/16" GRID

09 51 00 AMC-3 LINEAR METAL CEILING ARMSTRONG METALWORKS TEGULAR 12" X 96" ANNODIZED ALUM. CURVED EDGE TRIM; REFER TP DETAILS06 20 10 AWC-1 WOOD PLANK CEILING ATLANTIC WHITE CEDAR - 3" PLANKS ON PLYWOOD CLEAR09 51 00 AWC-2 ACOUSTICAL WOOD SLAT CEILING ARMSTRONG CUSTOM WOODWORKS GRILLE 2.25"X5/8"X96" W/ 8 BLADE/FT CUSTOM STAIN PROVIDE BIOACOUSTIC INFILL PANEL 6657 / PRELUDE MATTE BLACK

GRID09 90 00 OTS OPEN TO STRUCTURE - - - PAINT FIRE PROOFING AND ALL EXPOSED PIPING, CONDUIT, CABLE,

DECK AND DUCTS09 51 00 XMC-1 EXTERIOR/INTERIOR METAL CEILING ARMSTRONG STANDARD METALWORKS LINEAR 5490,

UNPERFORATED4” x 96” & CUSTOM EFFECTS WOOD LOOKS ARCHITECT TO

SELECT FROM MFR STANDARDCARRIER ASSEMBLY #7177 W/ CARRIER MOLDING #5574

09 51 00 XMC-2 EXTERIOR METAL CEILING ARMSTRONG CUSTOM DIRECT ATTACHED METALWORKS LINEAR5490, UNPERFORATED

4” x 96” & CUSTOM EFFECTS WOOD LOOKS ARCHITECT TOSELECT FROM MFR STANDARD

FLEX CARRIER #5498

09 51 00 XMC-3 EXTERIOR METAL CEILING ARMSTRONG CUSTOM DIRECT ATTACHED METALWORKS LINEAR 12” x 96” & 8” x 96” EFFECTS WOOD LOOKS ARCHITECT TOSELECT FROM MFR STANDARD

FLEX CARRIER #5498 OR CARRIER ASSEMBLY #7177 AS INDICATEDON DRAWINGS

FLOORING09 68 10 CPT-1 CARPET TILE J&J FLOORING GROUP INDEX DEMI-PLANK 12"X48" 1831 TABLE NEXUS PLANK BACKING / HERRINGBONE & ASHLAR INSTALLATION

SEE FLOOR FINISH PLANS09 68 10 CPT-2 CARPET TILE J&J FLOORING GROUP INDEX DEMI-PLANK 12"X28" 1832 CATALOG NEXUS PLANK BACKING / BASKET WEAVE09 68 10 CPT-3 CARPET TILE SHAW CONTRACT CONFIGURE BASE HEXAGON 5T159 HEXAGON PROGRESSION 59580 ECOWORX TILE BACKING / RANDOM INSTILLATION09 68 10 CPT-4 CARPET TILE SHAW CONTRACT CONFIGURE CONTACT HEXAGON 5T160 HEXAGON AERIAL PROGRESSION 59580 ECOWORX TILE BACKING / RANDOM INSTILLATION09 68 10 CPT-5 CARPET TILE SHAW CONTRACT CONFIGURE COLOR SHIFT HEXAGON 5T161 HEXAGON AERIAL 59327 ECOWORX TILE BACKING / RANDOM INSTILLATION09 68 10 CPT-6 CARPET TILE SHAW CONTRACT CONFIGURE CONTACT HEXAGON 5T160 HEXAGON SUBLIME SHIFT 59104 ECOWORX TILE BACKING / RANDOM INSTILLATION09 68 10 CPT-7 CARPET TILE SHAW CONTRACT CONFIGURE COLOR SHIFT HEXAGON 5T161 HEXAGON SUBLIME 59325 ECOWORX TILE BACKING / RANDOM INSTILLATION09 68 10 CPT-8 CARPET TILE SHAW CONTRACT TINGE TILE 5T156 9"X36" 56536 ECOWORX TILE BACKING / BRICK INSTILLATION METHOD09 68 10 CPT-9 CARPET TILE SHAW CONTRACT TINGE TILE 5T156 9"X36" 56483 ECOWORX TILE BACKING / BRICK INSTILLATION METHOD09 68 10 CPT-10 CARPET TILE SHAW CONTRACT EXPLORE 5T143 9"x36" 38535 DWELL ECOWORX TILE BACKING / ASHLAR INSTILLATION METHOD09 68 20 CPT-12 SHEET CARPET BENTLEY IMPASTO 81P22 BROADLOOM RESIST 8070100 HIGH PERFORMANCE PC BACKING09 68 10 CPT-13 CARPET TILE J&J FLOORING GROUP CHROMA DEMI-PLANK 12"X48" 1972 CLEAR NEXUS PLANK BACKING / ASHLAR INSTALLATION09 67 10 EP-1 EPOXY FLOORING STONHARD STONCLAD G2 W/ STONKOTE HT4 TOPCOAT 3/16" THICKNESS SILVER GREY09 67 10 EP-2 EPOXY FLOORING STONHARD STONCLAD G2 W/ STONKOTE HT4 TOPCOAT 3/16" THICKNESS CHARCOAL09 30 00 FT-1 FLOOR TILE DALTILE IMAGICA IG9712241P 12"X24" IG97 HAZE VALENTE BATHROOM TILE09 65 00 LIN-1 LINOLEUM PLANK FORBO MARMOLEUM STRATIO 100cmX25cm PLANK PASCIFC BEACHES OVERALL CORRIDOR/CLASSROOM LINOLEUM09 65 00 LIN-2 LINOLEUM PLANK FORBO MARMOLEUM STRATIO 100cmX24cm PLANK CORN ISLAND OVERALL CORRIDOR/CLASSROOM LINOLEUM09 65 00 LIN-3 LINOLEUM TILE FORBO MARMOLEUM MODULAR 20"x20" T3255 PINE FOREST ACCENT09 65 00 LIN-4 LINOLEUM TILE FORBO MARMOLEUM MODULAR 20"x20" SPRING BUDS ACCENT09 65 00 LIN-5 LINOLEUM TILE FORBO MARMOLEUM MODULAR 20"x20" LAGUNA ACCENT09 65 00 LIN-6 LINOLEUM TILE FORBO MARMOLEUM MODULAR 20"x20" T3242 ADRIATICA ACCENT09 65 00 LIN-7 LINOLEUM TILE FORBO MARMOLEUM MODULAR 20"x20" T3242 STUCCO ROSE ACCENT09 65 00 LIN-8 LINOLEUM TILE FORBO MARMOLEUM MODULAR 20"x20" T3030 BLUE ACCENT09 65 00 LIN-9 LINOLEUM PLANK FORBO MARMOLEUM MODULAR TEXTURA - SAW CUT 100cm X 25cm T3575 WHITE CLIFFS CPS09 65 00 LIN-10 LINOLEUM TILE FORBO MARMOLEUM MODULAR 20"x20" T3251 LEMON ZEST ACCENT09 65 00 LIN-11 LINOLEUM TILE FORBO MARMOLEUM MODULAR 20"x20" T3882 RELAXING LAGOON ACCENT09 65 00 LIN-12 LINOLEUM TILE FORBO MARMOLEUM MODULAR 20"x20" T3219 SPA ACCENT09 65 00 LIN-13 LINOLEUM TILE FORBO MARMOLEUM LINES 20"x20" GREY GRANITE09 65 00 LIN-14 LINOLEUM PLANK FORBO MARMOLEUM MODULAR TEXTURA - SAW CUT 100cm X 25cm TE3573 TRACE OF NATURE CPS09 65 00 LIN-15 LINOLEUM TILE FORBO MARMOLEUM MODULAR 20"x20" PASCIFC BEACHES09 65 00 LIN-16 LINOLEUM TILE FORBO MARMOLEUM MODULAR 20"x20" 3146 SERENE GREY VALENTE09 65 00 RF-1 RUBBER FLOOR & TREAD/RISER AMERICAN BILTRITE MARATHON / ONE PIECE SHEET / ROUND MRC-137 CARRIAGE GREY PROVIDE VISUALLY IMPAIRED STRIP IN WHITE AT TREADS09 65 00 RF-2 RUBBER FLOOR & TREAD/RISER AMERICAN BILTRITE MARATHON / ONE PIECE SHEET / ROUND CUSTOM TO MATCH PT-21 PROVIDE VISUALLY IMPAIRED STRIP IN WHITE AT TREADS09 65 00 RT-1 RESILIENT CARPET TILE FORBO FLOTEX CALGARY 20"x20" APPLE TS9001609 65 00 RT-2 RESILIENT CARPET TILE FORBO FLOTEX CALGARY 20"x20" LIME T59001409 65 00 RT-3 RESILIENT CARPET TILE FORBO FLOTEX CALGARY 20"x20" AQUA T59002109 65 00 RT-4 RESILIENT CARPET TILE FORBO FLOTEX CALGARY 20"x20" SKY TS9000109 65 00 RT-5 RESILIENT CARPET TILE FORBO FLOTEX CALGARY 20"x20" SAFFRON T59000809 65 00 RT-6 RESILIENT CARPET TILE FORBO FLOTEX CALGARY 20"x20" ASH T59001009 65 00 RT-7 RESILIENT CARPET TILE FORBO FLOTEX CALGARY 20"x20" METHONAL T59000409 65 00 RT-8 RESILIENT CARPET TILE FORBO FLOTEX COMPLEXITY TILE 20"x20" NAVY 55000409 65 00 RT-9 RESILIENT CARPET TILE FORBO FLOTEX COMPLEXITY TILE 20"x20" COGNAC 55000509 65 00 RT-10 RESILIENT CARPET TILE FORBO FLOTEX COMPLEXITY TILE 20"x20" GREY SS000109 65 00 RT-11 RESILIENT CARPET TILE FORBO FLOTEX COMPLEXITY TILE 20"x20" BLUE SS000703 30 00 SC-1 SEALED CONCRETE N/A N/A N/A N/A09 65 00 SF-1 SPORTS FLOOR TARKETT SPORTS DROPZONE COMFORT 10.5 mm THICKNESS STEEL DZ15 FITNESS, OT/PT09 30 00 ST-1 STONE FLOORING LIMESTONE QUARRA

STONEHUNGARIAN GOLDEN CREAM LIMESTONE REFER TO DETAILS / 1/2" THICK C320 HONED FINISH VALENTE ENTRY / GROUT COLOR TO BE SELECTED

09 66 20 TER-1 TERRAZZO KEY RESIN COMPANY KEY EPOXY TERRAZZO GREEN 3/8" 40% CHINA WHITE #1, 40% CHINA WHITE #2,5% KCI WHITE GLASS #2, 5% KCI CLEARGLASS #2, 10% GA WHITE #2, 100% KEY RESINPOXY #001 WHITE W/ OX WHITE

PROVIDE METAL TRANSITION STRIPS AT CHANGES IN COLOR

09 66 20 TER-2 TERRAZZO KEY RESIN COMPANY KEY EPOXY TERRAZZO GREEN 3/8" 40% CHINA WHITE #0, 25% CHINA WHITE #2,20% CHINA WHITE #1, 5% KCI WHITE GLASS#1, 5% KCI CLEAR GLASS #1, 5% GA WHITE #0,100% KEY RESIN EPOXY #001 WHITE W/ OXWHITE

PROVIDE METAL TRANSITION STRIPS AT CHANGES IN COLOR

09 64 60 WF-1 ATHLETIC WOOD FLOOR CONNOR FLOORING CONNOR FOCUS SYSTEM WITHOUT SLEEPERS SEE ASSEMBLY MAPLE GYM FLOORING09 64 00 WF-2 AUDITORIUM STAGE CUSTOM MASONITE 96X48 BLACK MASONITE FLOOR09 64 00 WF-3 WOOD FLOOR ARMSTRONG FLOORING SOLID HARDWOOD MAPLE NATURAL APM3400 3 1/4" PLANK, 3/4" TH CLEAR STAIN MEDIUM GLOSS VALENTE

ISSUE DATE REVISION

0 07/28/17 BID SET1 09/01/17 ADDENDUM 12 09/15/17 ADDENDUM 4