king james construction cost estimating rob himler, ken coutain, david reger, ruoyu huang, bei...
TRANSCRIPT
![Page 1: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/1.jpg)
King JamesConstruction Cost Estimating
Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye
![Page 2: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/2.jpg)
Letter of Transmittal• Bid proposal for King James project
– 3-bedroom/2-bath/-1-car garage• Estimations broken down into several
categories• Proposed bid includes all materials, labor,
equipment, taxes and any other additional needed costs
![Page 3: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/3.jpg)
Division of Duties
![Page 4: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/4.jpg)
Breakdown of Bid by Components
![Page 5: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/5.jpg)
ConcreteAssumptions:• Use Earth as Forms• Use Chute to Pour
Concrete
![Page 6: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/6.jpg)
Woods & Plastics
The Floor•The floor system consists of joists covered with OSB or plywood sheathing and bears on sills, walls, or girders supported by posts.
![Page 7: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/7.jpg)
Walls•Walls consists of top and bottom plates, studs, headers, blockings, and sheathing. •Double top plate of untreated lumber, and one bottom plate of treated lumber.
Woods & Plastics
![Page 8: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/8.jpg)
The roofSales tax—6%Labor tax---25%OH & Profit---12%
Woods & Plastics
![Page 9: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/9.jpg)
![Page 10: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/10.jpg)
Thermal + Moisture
Waterproofing Insulation Batt Insulation in Wall R-30 Insulation above Ceiling Exterior Insulation Finish System
Building Paper and Vapor Barriers
Shingles Fiberglass roof shingle Metal Drip edge
![Page 11: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/11.jpg)
Thermal + Moisture
1. Waterproofing Film Vapor Barrier Underlayment Area = 1460SF
2. R-30 Insulation above Ceiling Area = 1460SF
![Page 12: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/12.jpg)
Thermal + Moisture
3. 3-1/2" Batt Insulation in Wall Exterior Wall 1052SF Interior Wall 313.31SF AreaWall = 1365.31 SF
![Page 13: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/13.jpg)
Thermal + Moisture
4. Exterior Insulation Finish System
AreaWall = 1052SF
![Page 14: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/14.jpg)
Thermal + Moisture5. Building Paper and Vapor Barriers (must be lapped to be effective)
To be lapped 12 inches on the ends 6 inches on the side
AreaBuilders paper = 3363.89SF
The Dormer
![Page 15: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/15.jpg)
6. Fiberglass Roof Shingles 5in exposure and 1in width Starter/Field/Hip&Valley/Cap Shingle Areashignles = 2053.27SF
7. Metal Drip Strip come in 11-foot length
need to be lapped 2 inches Length = 164.55LF Number = 16 each
Thermal + Moisture Hip Shingle
![Page 16: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/16.jpg)
Thermal + Moisture
![Page 17: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/17.jpg)
Plumbing
Plumbing (DWV)
Material cost priced through Home-Depot
Labor cost priced through RS-Means (Section 22)
Estimates broken up in the following sections:
Main Sewer Connection Central Bathroom Left Bathroom Garage and Kitchen
All PVC Schedule 40 for Sanitary
![Page 18: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/18.jpg)
Plumbing
Plumbing (Water Line) Material cost priced through
Home-Depot Labor cost priced through RS-
Means (Section 22) Estimates broken up in the
following sections: Garage (WM) Kitchen (SINK) Living Room Central Bathroom (LAV,
SHW, WC) Left Bathroom (LAV, WC,
TUB) Hot Water (HW) lines in house
are all ½” CPVC Cold Water (CW) lines in house
are ¾” in-wall and reduce to ½” for fixture connections.
![Page 19: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/19.jpg)
HVAC
![Page 20: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/20.jpg)
HVAC
![Page 21: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/21.jpg)
HVAC
![Page 22: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/22.jpg)
Electrical
Outlet:•12 GFI•2 Waterproof GFI Cover•1 J-Box•23 AFCI•35 GFI/AFCI Cover•3 220V Outlet•20 outlet•22 Outlet Box•2 Breaker for AC•3 Breaker for others•1 Electrical Panel
![Page 23: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/23.jpg)
Electrical
![Page 24: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/24.jpg)
4 Fans2 Exhaust Fan8 Lighting Fixtures13 Single Pole Switches2 Three Pole Switches4 Smoke Detector1 Co/smoke Detector
![Page 25: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/25.jpg)
8’6’ 6’6’
4’
2’
3’7’
6’ 6’8’6’
3’
4’
6’10’6’
40ft
Electrical
![Page 26: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/26.jpg)
Facilities:
•200ft #12 Electrical Wires•1 Washer•1 Dryer
Electrical
![Page 27: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/27.jpg)
Final Cost
Electrical
![Page 28: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/28.jpg)
Openings
![Page 29: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/29.jpg)
Finishes
Assumptions:• Paint Rolled On• Carpet in Bedrooms• Vinyl in Bathrooms and Kitchen• Laminate in Halls and Living/Dining Room
![Page 30: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/30.jpg)
Bid Summary
• Direct Costs
![Page 31: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/31.jpg)
Bid Summary
• Indirect Costs
![Page 32: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/32.jpg)
Bid Summary
• Total Cost Breakdown by Component
![Page 33: King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649dd15503460f94ac6fe0/html5/thumbnails/33.jpg)
Questions?