kick out supplymentry
TRANSCRIPT
-
7/26/2019 Kick Out Supplymentry
1/3
Case 1: (Assumed 1m high water in stream)
Extent of area to be considered in thecalculation of the Kick-out.
-
7/26/2019 Kick Out Supplymentry
2/3
+52.5mPD
+49.0mPD
+41.0mPD
100 kPa
Ee!ti"e #tress $ (#%i& densit' ater densit') * Deth %, #%i&$ (20 kg-m 10 kg-m) * Deth %, #%i&
/here,%re the ressure in assi"e side w%u&d e in!reased.
Case 2: (Assumed dr' stream water &e"e& at g%und)
Ee!ti"e #tress $ (#%i& densit' ater densit') * Deth %, #%i&$ (20 kg-m 10 kg-m) * Deth %, #%i&
/here,%re the ressure in assi"e side w%u&d e redu!ed.
ConcreteBacklling
For simplication slope in front of pipepile !ill not be considered
"roposed "ipe
#urcharge #oil"ressure
#oil"ressure
$ater"ressure
$ater"ressure
ConcreteBacklling
For simplication slope in front of pipepile !ill not be considered
-
7/26/2019 Kick Out Supplymentry
3/3
100 kPa
ater Pressure#%i& Pressure#%i& Pressureater Pressure #ur!harge
+52.5mPD
+49.0mPD
+41.0mPD
"roposed "ipe
"roposed "ipe