Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Upload: maximillian-lee

Post on 25-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Kick-off meetingInformation for a good start

Mr Petri BACKMANResearch Programme Officer

REA Unit S2- Space Research

Page 2: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

1. Where to find documents 2. Reporting 3. Auditing4. Amendments to the Grant Agreement5. Publication issues

Table of content

Page 3: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Table of content

1. Where to find documents

2. Reporting 3. Auditing4. Amendments to the Grant Agreement5. Publication issues

Page 4: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Most important!FIND A DOCUMENT ORGUIDELINES

CORDIS

http://cordis.europa.eu/fp7/

Page 5: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Key documents

The coordinator and/ or the person in charge of the administrative and financial issues in the coordinating organisation must read at least the following documents: Guide to Financial Issues

Guidance Notes on Project Reporting

Amendments Guide for FP7 Grant Agreements

Page 6: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Additional information on Participant Portal on the online User Manual

http://ec.europa.eu/research/participants/portal/page/home

Log on to theParticipant Portal

Participant Portal (1/2)

Page 7: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Once connected to the Participant Portal, select the tab "My Projects"

The list of the projects you are involved will be displayed.

For any of your projects in the "Active" phase, you can access: - the technical ones (deliverables) - the financial ones (Form C).

Once you have clicked on the link, you will be redirected to the right supporting application.

Participant Portal (2/2)

Page 8: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

1. Where to find documents

2. Reporting 3. Auditing4. Amendments to the Grant Agreement5. Publication issues

Table of content

Page 9: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Guidance Notes on Project Reporting

ftp://ftp.cordis.europa.eu/pub/fp7/docs/project_reporting_en.pdf

Page 10: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Deliverables and Periodic Reports

During the course of the project, the consortium submits:

Deliverables according to the timetable specified in the DoW / Deliverables List

A Periodic Report within 60 days of the end of each reporting period (including the final reporting period)

Page 11: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

At the end of the project, the consortium submits:

A Final Report, within 60 days after project’s end, comprising:• A final publishable summary report covering results,

conclusions and socio-economic impact of the project • A plan for the use and dissemination of the foreground, to

spread awareness• A report covering the wider societal implications of the

project, in the form of a questionnaire (gender equality actions, ethical issues, etc.)

After receiving the final EU payment, within 30 days, the coordinator shall submit a Report on the distribution of the Community financial contribution between beneficiaries.

Final Report

Page 12: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

In addition to formal reporting requirements, the Coordinator should also send a quarterly e-mail (roughly one page) to the Project Officer giving:

• Overview on status of the activities, progress made, problems encountered or foreseen(if any), way ahead

• Confirmation that the deliverables are in line with the work plan. And if not, elaborate on reasons and suggest corrective actions.

NB! Be pro-active!

In case of problems/ questions do not hesitate to contact the Project Officer!

Additional Reporting

Page 13: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

SESAM

Deliverables, Reports, etc are submitted on-line through the IT application SESAM

Access through the Participant Portal:http://ec.europa.eu/research/participants/portal/appmanager/participants/portal

What information should be submitted:

Deliverables Periodic and Final reports Publications Patents (if applicable)

SESAM

NB! Due to the fact that Polar Ice negotiations were conducted using a pilot IT tool, deliverables submission not necessarily through SESAM. TBC!!!

Page 14: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

In SESAM Both the Coordinator and the beneficiaries can upload the

deliverables, whereas only the Coordinator can submit the deliverables at due dates

Upon the electronic submission, the Coordinator receives a short generic, automated ‘acknowledgment of receipt’

NB! Submit only final version of deliverables as once submitted the

deliverable(s) cannot be modified To change a deliverable, the Project Officer has to “reject” it

and the Coordinator has to resubmit the updated deliverable

SESAM is an “archive” not to be used as a storage space for working documents

SESAM (cont.)

Page 15: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

FORCE

Financial Statements (Form Cs) are submitted on-line through the IT application FORCE

Access through the Participant Portal:http://ec.europa.eu/research/participants/portal/appmanager/participants/portal

FORCE

Page 16: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Explanation on the use of resources: The new procedure, step by step

FR

Logging in on the Participant Portal

Financial Reporting

Entering the explanation

on the use of resources

Accessing the reporting tools

Page 17: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

TEST PROJECT1 999991

TEST PROJECT2 999992

TEST PROJECT3 999993

TEST PROJECT4 999994

DEMO ACCOUNT

TEST PROJECT5 999995= Access Amendment

= Financial Reporting

= Periodic Reporting

= Reporting & Deliverables

FRPRRD

AA

Page 18: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Explanation on the use of resources: The new procedure, step by step

FR

Logging in on the Participant Portal

Financial Reporting

Entering the explanation

on the use of resources

Accessing the reporting tools

Page 19: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Upon clicking on a cell of a cost table, the following pop-up is shown:

Entering the explanations on the use of resources

Page 20: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Type of activity of the selected cell

Cost type of the selected cell

Entering the explanations on the use of resources

Page 21: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Entering the explanations on the use of resources

You must fill in at least one

major “Cost” item

The “Total” cost is automatically calculated on the basis

of the individual cost items.

Page 22: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Entering the explanations on the use of resources

“Explanation” for this cost item

Mandatory part of the reportsbut not checked by the IT tool

“Work package” for this cost item

(optional)

More work packages can be linked to one cost item

Page 23: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Entering the explanations on the use of resources

Delete a cost item Add a cost item

Page 24: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Entering the explanations on the use of resources

Delete all cost details for this cell of the Form C

Page 25: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Upon clicking the “Done” button, the total sum is copied to the corresponding field of the form C.

Entering the explanations on the use of resources

Page 26: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Actual indirect costs are directly editable (without details).

Page 27: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

The Coordinator can create a “Use of Resources” report (in PDF), either categorized per Activity or per Cost Type.

PDF summary reports

Summary reports can be accessed through the icon in the Form C screen

Page 28: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

By electronic means:

1. Deliverables, Periodic and Final reports via the web-based tool SESAM in the Participant Portal

2. Form Cs via web-based tool FORCE in the Participant Portal

3. Any additional reports, quartely email (etc.) should be sent directly to the Project Officer by email

By post:

1. Certificates on financial statements or on the methodology, Fom Ds (only if applicable!).

NB! By post to the mail address indicated in article 8 of the GA in parallel with the electronic submission.

SESAM (cont.)

Page 29: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Helpdesk for IT related questions:

[email protected]

Tel: +32 2 29 87288 (08:30 – 16:30 CET)

IT problems

Page 30: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Periodic Report – Closer look

An overview (incl. publishable summary) of the work progress towards the objectives including reached milestones and submitted deliverables. It should also discuss the differences between work expected to be carried out and work that actually was carried out

A high level description on the use of the resources

A Financial Statement (Form C) from each beneficiary and summary financial report for the whole consortium

Financial Statements should be accompanied by Certificates (Form D) when appropriate.

NB! Be consistent with the figures and explain any deviations from the DoW!

Page 31: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Periodic Report - Use of resources

How did you spend your budget? Any deviations from the DoW? • PersonnelThe person-months should indicate the individual input of the experts and their position / qualification (not the identity/name). KEEP TIMESHEETS!• Other direct costsThe travel costs should include in a consistent manner: destination, number of persons travelling, amount and explanation (including dates). Durable Equipment (e.g. computer)? Consumables? NB! Full price and the depreciation value should be stated. Durable equipment is subject to depreciation, according to the national accounting rules of each partner• SubcontractingAs per the DoW except for minor subcontracts.

Page 32: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Periodic Report - Use of resources (cont.)

Travel - Participation in conferences, WS and other events etc.• The participation can be charged to a project ONLY if justified

by a presentation of the project activities and results• The participation "just to listen and network" cannot be

charged to a project• The participation of several project partners and/or

several representatives of the same partner has to be clearly justified

• Be prepared to provide the Project Officer with a copy of the submitted paper and/or the presentation and the event agenda (as supporting documents to the Periodic Report)

Page 33: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Periodic Report - Use of resources (cont.)

NB! Interests generated by the pre-financing (if any) must be identified by the Coordinator (at the end of the RP1)

NB! Please see the Financial Guidelines at: ftp://ftp.cordis.europa.eu/pub/fp7/docs/financialguide_en.pdf

Page 34: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Project Review

The REA may initiate a (techical) Project Review at any time during the implementation of the project but usually the reviews are held following the end of each reporting period

• Usually the review takes place ca 3 weeks after the submission of the Periodic Report

• Participation TBD on a case-by-case basis; usually at least the Coordinator and the WP leaders

• REA is assisted by independent external reviewer(s)• The external reviewer(s):

- gives external advice to the REA on the project for the period in question

- assists the REA by recommending any reorientation that may be required

Page 35: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Project Review (cont.)

The external reviewer(s) assess:

- the degree of fulfilment of the project work plan and the related deliverables;- the beneficiaries’ contributions and integration within the project etc.- the continued relevance of the objectives;- the resources utilised in relation to the achieved progress;- the management procedures of the project;

The Coordinator will be informed on the outcome in the form of a Review Report. See templates: ftp://ftp.cordis.europa.eu/pub/fp7/docs/project_review_en.pdf

Page 36: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Project Review (cont.)

Following the receipt of Reports and Deliverables and the Review the REA may:

Approve the reports and deliverables: REA disburses the corresponding payments within 105 days of their receipt unless the time-limit, the payment or the project has been suspended.

Suspend the time limit if reports/deliverables have not been supplied, are incomplete, unclear or raise doubts concerning the eligibility of costs claimed.

Suspend the payment at any time for the amount intended for the beneficiary(ies) concerned: for details see Article II.5 of Annex II (General conditions) to the grant agreement.

Reject the reports and/or deliverables by giving an appropriate justification and, if appropriate, start the procedure for termination of the GA.

Page 37: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Interim Payments are linked to submission of:

• A complete and correct Periodic Report;• Deliverables; and• Electronic (and signed) Form Cs

One the Reports and Deliverables are approved, the REA will disburse the corresponding payments within 105 days

Payments

Page 38: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Payments are linked to the actual costs incurred by the beneficiaries

No proof of costs has to be given to REA, "just" detailed explanation

If one partner overspends, the consortium agrees how much this partner can claim as EU contribution, i.e. - full amount if the overspending is due to anticipated work, OR- only the budget share agreed for the reporting period and lower than the amount which could be claimed.

Payments to the beneficiaries are at the responsibility of coordinator.

The coordinator does not have to provide any proof of transfer to beneficiaries during the life-time of the project (shall only submit a report on the distribution of the financial contribution between beneficiaries within 30 days after receipt of the final payment).

Payments (cont.)

Page 39: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

and

REPORT, DELIVERABLES

and FORM C’s

Correction of Report and

submission of v2

Technical review

Payment

submitted through the Participant Portal

Assessment by the financial officer

ALL documents received, correct

and accepted

Comments fromProject officer

More than 1 iteration may be

necessary

Payments (cont.)

Page 40: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Prefinancing• If 2 reporting periods: 60% of EU contribution• If 3 reporting periods: 160% of the average EU

contribution per period• Paid to the coordinator within 45 days following the date

of entry into force of the Grant Agreement

Guarantee Fund• 5% of maximum EU contribution• At the final payment, the amount contributed to this Fund

shall be returned to the beneficiaries via the Coordinator • NB! No collective financial responsibility in FP7 as was the

case in FP6 (still collective scientific responsibility)

Prefinancing and Guarantee Fund

Page 41: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Table of content

1. Where to find documents 2. Reporting

3. Auditing4. Amendments to the Grant Agreement5. Publication issues

Page 42: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

The Commission/ REA may, at any time during the implementation of the project and up to five years after the end of the project, arrange for financial audits to be carried out, by external auditors or by the Commission/ REA services themselves including European Anti-Fraud Office OLAF.

The beneficiaries shall keep the originals or, in exceptional cases, duly authenticated copies – including electronic copies - of all documents relating to the Grant Agreement for up to five years from the end of the project.

Financial audits

Page 43: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Table of content

1. Where to find documents 2. Reporting 3. Auditing

4. Amendments to the Grant Agreement

5. Publication issues

Page 44: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

See: ftp://ftp.cordis.europa.eu/pub/fp7/docs/amendments-ga_en.pdf

Amendments

An amendment allows the parties to modify the Grant Agreement (GA) during its lifetime.

An amendment to GA is a legal act modifying the commitments initially accepted by the parties and which may create:

new rights, impose new obligations on the; or modify significant parts of the GA

(incl DoW).

Page 45: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

When should the Coordinator submit an Amendment request?• If any GA provision needs to be modified and / or• In case of major/ significant modification to the DoW

When is an Information Letter sufficient?• Changes to contact point/ authorised representative, legal

address/ name• In this case the LEAR of the concerned beneficiary should

update the information in the Participant PortalNB!

Beneficiaries are allowed to transfer budget between different activities and between themselves without an amendment, if:

- the amounts are minor and the needs are clearly justified - the work is carried out as planned in the DoW(i.e. output and max EU contribution remain)

- the Project Officer agrees upfront

Amendments vs Information Letters

Page 46: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Table of content

1. Where to find documents 2. Reporting 3. Auditing4. Amendments to the Grant Agreement

5. Publication issues

Page 47: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

The beneficiaries shall, throughout the duration of the project, take appropriate measures to engage with the public and the media about the project and to highlight the EC financial support.

Any publicity, including at a conference or seminar or any type of information or promotional material must specify that the project has received EC research funding and display the European emblem.

Any publicity made by the beneficiaries in respect of the project must specify that it reflects only the author’s views and that the Community is not liable for any use that may be made of the information contained therein.

Publications issues

Page 48: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

All publications shall include the following statement: The research leading to these results has received funding from the European Community's Seventh Framework Programme ([FP7/2007-2013]) under grant agreement n° [123456] (see Article II.30. of the Grant Agreement).

During and after the project, the coordinator shall provide references and an abstract of all scientific publications relating to foreground at the latest two months following publication (see Article II.30. of the Grant Agreement).

As part of the Final Report, the coordinator will be required to submit a full list of publications relating to foreground of the project.

Publications issues (cont.)

Page 49: Kick-off meeting Information for a good start Mr Petri BACKMAN Research Programme Officer REA Unit S2- Space Research

Mr Petri BACKMANResearch Programme OfficerREA – Research Executive Agencyhttp://ec.europa.eu/research/rea @ [email protected] COV2 17/089▪ 1049 Brussels ▪ Belgiumsite 16 Place Rogier ▪ 1210 Brussels +32-2-299 42 85 +32-2-297 96 46