Metal Bulletin Iron Ore Conference 22 November 2005 Koolan Island Iron Ore Project

Upload: others

Post on 25-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Metal Bulletin Iron Ore Conference 22 November 2005

Koolan Island Iron Ore Project

Page 2: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Contents• Location

• Project Outline

• Project Schedule

• Corporate Overview

• History

• Equipment

• Geology

• Resource

• Development Data

Page 3: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Location

WA Map

Koolan Island Project

• Western Kimberley Region WA

• 2,000km NNE of Perth

• Nearest towns: Derby 150km S and Broome 320km SW

Page 4: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Koolan Island

Page 5: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Project Outline

• Brownfields development

• Based on Main orebody, supplemented by four satellites, Mullet, Acacia, Eastern and Barramundi

• Deepwater port able to accommodate panamax vessels to 75,000 dwt

• Resource sufficient to support 4Mta operation for 10+ years

Page 6: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Project Schedule

• BFS completed August 2005

• Environmental Recommendations in Approval stage• Land Access Agreement with Traditional Owners being

completed

• Mining Lease Grant expected early 2006

• Construction Commencement Q1, 2006

• Plant Commissioning Q2, 2006

• Wharf & Shiploader Completion Q3, 2006

• 1st Shipments Q3, 2006

(As Anticipated 14/11/2005)

Page 7: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

BFS Highlights• Bankable Feasibility Study (BFS) completed, with positive results, encouraging

the Company to proceed with mine development, subject to Government approvals, formalisation of off-take contracts and Board approval of funding arrangements

• Initial capital costs of A$108 million, inclusive of mine development costs of A$26 million

• Financial modeling of the Project has been based on a sales mix of fines (70%) and lump (30%), producing total revenues of A$1.4 billion over the nine year life of the mine

• Operating cash surplus of A$583 million (EBITDA) over the nine year life of the project

• The project returns, based on 29.1 million tonnes of saleable ore, a net present value (NPV) of A$217 million (before interest and tax) at a 10% discount rate, with an Internal Rate of Return (IRR) of 39.7%

• First shipment of iron ore scheduled to commence in second half of 2006• BFS takes no account of exploration upside of the Koolan Island Project

Page 8: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Corporate Overview

• Aztec Resources Limited is a public company listed on ASX and the London Stock Exchange’s AIM market

• Market Capitalisation: A$85,000,000

• 497,700,000 + shares

• Major Shareholders:

Cambrian Mining plc…………………………………...18.7%National Nominees Limited…………………………….6.3%ANZ Nominees Limited….…………………………..….5.3%CITIC Resources Australia Pty Ltd.………………..…3.4%HSBC Custody Nominees (Australia) Ltd……………3.1%

(10/10/2005)

Page 9: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

History – Pre BHP• Ore deposits on Koolan and Cockatoo Islands

discovered in 1880

• First mining leases granted, small scale mining commenced 1907

• First attempt at large scale mining in 1936 when Yampi Sound Mining Company (a consortium including Nippon Mining Co) announced intention to export to Japan

• Federal Government embargo on all iron ore export in 1938

• First ore mined on Koolan fed small charcoal-iron plant built by State Government in 1945

• BHP granted leases in 1951

Page 10: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

The BHP Years 1965 - 1993

• By the conclusion of mining in 1993, 68Mt ore had been produced

• Shipment grade declined from >67%Fe for the early Main pit production to 65% - 65.3%Fe for the final blend

• On closure, all infrastructure removed or buried, stockpiles and roads ‘moonscaped’ and the Main pit opened to allow ingress of the sea

Page 11: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

The Aztec Era

• Aztec granted tenements in 2003

• Notice of Intent approved January 2004, drilling commenced February 2004

• Camp established on Koolan Island August 2004

• Data collection for BFS completed February 2005

• Land Access Agreement negotiations commence with Traditional Owner’s March 2005

• BFS completed August 2005

Page 12: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Koolan Island Mine & Infrastructure Layout

Page 13: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Mining Operations

• Contractor-based operation

• Conventional open-pit operation, rotary drills, 200t hydraulic backhoes, FEL’s, rear dump trucks and ancillary plant

Page 14: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Transportation System

• Truck haulage to ROM pad, primary crusher and stockpiles

• Conveyor to shipping stockpile

• FEL reclaim from shipping stockpile

• Conveyor to sampling station, wharf and shiploader

Page 15: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Port Facilities

• Steel-pile wharf able to accept Panamax vessels up to 75,000 dwt

• Berth pocket 16m draft

• Fixed, luffing shiploader, capacity 3,000tph

• 20m minimum draft in departure channel - no dredging required

• Vessel berthing/departure assisted by tugs

Page 16: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Regional Geology

• Kimberley Basin is a large structural basin occupying most of the Kimberley region with sediments of Lower-Mid Proterozoic age dominant

• The Yampi ore bodies lie at the western end of the NW –SE trending King Leopold Mobile Zone which forms the south western border of the Kimberley Basin

• Hematite concentration occurs in the basal Yampi, member of the Pentecost Sandstone in the Kimberley group

Page 17: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Local Stratigraphy

Pentecost SandstoneWhite well sorted quartz sandstone, grey siltstone

Yampi MemberPink-brown arkose and feldspathic sandstone; minorsiltstone, hematitic quartz sandstone, glauconitic sandstone

Iron ore

Elgee SiltstoneRed-brown and grey sitstone and minor phyllite; thin sandstone interbeds

Basal boulder to pebble conglomerate

Warton SandstoneWhite well-sorted quartz sandstone and feldspathicsandstone; siltstone interbeds; andalusite granofelsin places.

• The Kimberley Group comprises essentially a succession of sandstones, quartzite's and siltstones, with some interbeddedphyllite, unconformably overlying the Speewah Group

• The stratigraphy on Koolan Island comprises the Warton sandstone, Elgee Siltstone and Yampi Member of the Pentecost Sandstone (distinguished by its hematite content)

Page 18: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Local Structure

Page 19: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Main Ore Body

Warton San

dstone

ElgeeSilts

tone

Yampi M

ember

Page 20: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Main Ore Body

Page 21: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Eastern-Barramundi Ore Body

Page 22: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Eastern-Barramundi Ore Body

Page 23: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Mullet-Acacia Ore Body

Page 24: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Mullet-Acacia Ore Body

Page 25: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Resource Drilling

Page 26: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Resource Estimates

0.73.366.335 600Main

1.15.664.653,400Total0.615.558.53,700Acacia-East

1.010.361.26 200Mullet-Acacia

2.97.660.97 900Eastern-Barramundi

%%%('000)

Al2O3SiO2FeTonnesOrebody

55% Fe cut off grade (as at 14 Oct 2005)

Page 27: KI Iron Ore Project Metal Bulletin ConfNov 05 · 11/22/2005  · Metal Bulletin Iron Ore Conference 22 November 2005 ... • Construction Commencement Q1, 2006 ... m p i M e m b e

Koolan Island

Complete mining Main Pit2014 / 2015

Complete mining Eastern and Mullet Pits2009 / 2010Waste stripping at Main pit reaches sea levelDecember 2009Full production 4mtpa2008 / 2009De-water Main pit lake and re-hab footwall2007 / 2008Seawall construction2006 / 2007First ore shipmentSeptember 2006Commence crushingAugust 2006

Mobilise remaining fleetCommence mining Mullet/EasternWaste stripping at MainCommence seawall construction

June 2006

Establish mining facilities and roads, initial clearingFeb - May 2006Mobilise first mining fleetJanuary 2006ActivityDate

KEY MINE DEVELOPMENT DATES (As Anticipated 14/11/2005)