RESUME KHURSHID ANSARI Mob. No. : +91- 9823768633, 7720097571. Engineer ( I & C) E- mail : [email protected] Job Objective To work in a place, where there is scope for me to constantly improve my curriculum skills and potential for the betterment and growth of the Organization. SUMMARY:- B.E. - (Electronics & Telecommunication Engineering) Diploma –( Electronics & Communication Engineering) Having 7+ years of Experience in Erection, Commissioning and Maintenance of DCS, PLC & field of instrument in Turbine, Boiler and Balance of Plant. Potential Skills in Control and Instrumentation and Manpower Management. Working Experience :- Present Employment : Gupta Energy Pvt. Ltd, Chandrapur (M.S.) ( 120 MW ) 2 X 60 MW Thermal Power Plant 2X250 TPH ThyssenKrupp Boiler(CFBC), 2X60 MW NTC Turbine, DCS GE Energy / L&T make (OC4000) Position : I & C Engineer. Period : August 2015 to till date. Work Profile In Operation & Maintenance:- Knowledge of Turbine & Boiler control systems, DCS systems and protection systems related to Power generation systems.

Upload: khurshid-ansari

Post on 20-Jan-2017

211 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Khurshid Resume22

RESUME

KHURSHID ANSARI Mob. No. : +91- 9823768633, 7720097571.Engineer ( I & C) E-mail : [email protected]

Job Objective

To work in a place, where there is scope for me to constantly improve my curriculum skills and

potential for the betterment and growth of the Organization.

SUMMARY:-

B.E. - (Electronics & Telecommunication Engineering)Diploma –( Electronics & Communication Engineering)

Having 7+ years of Experience in Erection, Commissioning and Maintenance of DCS, PLC & field of instrument in Turbine, Boiler and Balance of Plant. Potential Skills in Control and Instrumentation and Manpower Management.

Working Experience :-

Present Employment : Gupta Energy Pvt. Ltd, Chandrapur (M.S.) ( 120 MW ) 2 X 60 MW Thermal Power Plant

2X250 TPH ThyssenKrupp Boiler(CFBC), 2X60 MW NTC Turbine, DCS GE Energy / L&T make (OC4000)

Position : I & C Engineer.

Period : August 2015 to till date.

Work Profile In Operation & Maintenance:-

Knowledge of Turbine & Boiler control systems, DCS systems and protection systems

related to Power generation systems.

Handle critical conditions of control system upsets and related operating problems

including investigations and equipment failure / trip analysis in order to identify the root

cause.

Responsibility for complete Maintenance Management for all the instrument and control

system, equipment including DCS, PLC, Analyzers, Field instruments, equipment with a

team of I&C foreman and technician used in large steam turbine power plant.

Responsibility for periodically checking of all the Field Instruments and if required

calibrate then calibrate online.

Responsibility for Maintenance of PLC panels of AHP, DMP and CHP systems.

Responsibility for Development & Modification of Logics in DCS & PLC as per the

requirement of system.

Page 2: Khurshid Resume22

Responsibility for Development & Modification of Screen in SCADA per the

requirement of system.

Involved in routine, Preventive and shutdown maintenance of various kinds of

Pneumatic and Electronic instruments and maintaining of data sheets as per the ISO

standards.

Participation in various maintenance activities like initial preparation, fault analysis.

Prepare the breakdown, preventive & predictive maintenance schedule.

Prepare modification report, Incident report & Trouble report.

Responsible for time and cost based maintenance and co-ordination with other

department personnel for minimum shutdown time.

Documentation of plant including Equipments, Spares, Tools, Test Records, Routine

Inspection Record and Spare parts management and inventory control.

Work Done In Erection & Commissioning:-

Review drawings submitted by the contractor for modification in the existing Control

system or addition of new control equipment as per site requirement.

Erection and commissioning of control instrument like control valve, motorized valve,

pneumatic damper, various Transmitter, Temperature element, LT Feeder, Pressure

Switches used in Turbine, Boiler, DM plant and CHP.

Analysis of P&I, Hook-up and Control Loop Diagram.

Understanding of wiring drawings and loop schemes.

Erection and commissioning of different Analyzers like O2,CO,CEMS,SWAS and

SPM.

Onsite modification of erection as well as commissioning activities in Turbine, Boiler,

DM Plant & CHP.

Planning daily activities carried out in site and executive accordingly.

Calibration of Smart Transmitters, Control Valve and Analyzer.

Analysis of P&I, Hook-up and Control Loop Diagram.

Understanding of wiring drawings and loop schemes.

Interacting with contractor engineer for smooth and fast execution of undergoing

project.

Page 3: Khurshid Resume22

Previous Employment Details:

Name of Concern : Power Mech Projects Ltd. 2 X 200MW TPP , 2X800 TPH Boiler(PF) BHEL, DCS MAX DNA R & M Works

UPRVNL ,OBRA SITE SONEBHADRA.Position : I&C Engineer

Period : December 2013 to July 2015.

Name of Concern : Gupta Energy Pvt. Ltd, Chandrapur (M.S) 2 X 60 MW Thermal Power Plant

2X250 TPH ThyssenKrupp Boiler(CFBC), 2X60 MW NTC Turbine, DCS GE Energy / L&T make (OC4000)

Usegaon Phata, ChandrapurPosition : From GET to Instrument Engineer.

Period : July 2009 to November 2013.

Proficiency in Computer:-

Working knowledge of Ms-Word, Ms-Excel and Power Point. Basic Programming knowledge on C.

Personal Profile:-

Date of Birth : 01 Dec 1984

Sex : Male

Marital Status : Married

Nationality : Indian

Languages Known : English, Hindi

Salary Expected : NegotiablePassport No. : G7234709

Place: Khurshid Ansari Date: