kharg ngl recovery project - world bank group

37
Associated Gas Gathering Projects Associated Gas Gathering Projects (No Flaring Projects) (No Flaring Projects) N.I.O.C National Iranian Oil Company

Upload: others

Post on 03-Feb-2022

6 views

Category:

Documents


0 download

TRANSCRIPT

Associated Gas Gathering ProjectsAssociated Gas Gathering Projects

(No Flaring Projects)(No Flaring Projects)

N.I.O.CNational Iranian Oil Company

Mohammad javad GholipourOn be half of Mr. Bahram Rezaie

• Graduations: BS in Mechanical Eng. & MS in Industrial Eng.• Main experinces : Project Management and Project control

4 years as a project valuator in NIOC Corporate planning

Supply & Demand gas Table in IRANDescription Today

2004Med. TermEarly 2010

L. TermEarly 2015

Demand for Gas(MMscf/d) (Associated & non-associated gas) 9758 20978 36448

Main users:

Power plant sector 5202 7310Industry(Including Petrochemical industry- feedstock & fuel) 7276 11900Other (Transpotation & Residential/Commercial) 6358 8568Export

Pipeline 340 1802 3332LNG 0 340 5338

Supply(MMscf/d) (Associated & non-associated gas) 10302 19720 36278

Gross Production(Associated and Non-associated) 13838 27268 46308Flared and vented 1360 374 68Re-injected 2720 7752 10540Net Gas Production(Gas supplied to the market) 9758 19142 35700

Import 544 578 578

Pipeline 544 578 578

LNG 0 0 0Balance 544 -1258 -170Oversupply 544Overdemand 1258 170Note: Without considering NIOC consumption (including delivered gas to NPC, GTL plants)

9418

The most important Associated Gas Gathering Projects in NIOC

No. Project Associated Gas (MMcf/d)

CostsMMUSD

Location

30 Khoozestan

Khoozestan

Khoozestan

Khoozestan

Khoozestan

Khoozestan

Khoozestan

Persian Gulf

Persian Gulf

5.5

531

4

12.2

24.4

85.5

8 KHARG & BAHREGAN 541 1357 2007 In Tender

9 SIRI 132 300 2007 ~ 40% Completed

2349.6

13

4

241

11

19

18

19

998

Finish year Project Status

1 BINAK 2004 100% Completed

2 RAMSHIR 2004 100% Completed

3 AMAK 2005 ~ 90% Completed

4 GHALE NAR 2007 In Tender

5 NARGESI 2007 In Tender

6 LAB SEFID 2007 Basic Engineering

7 MASJED SOLEIMAN - Feasibility Study

Tot. - -

ProjectAMAK

Problem:

Production UnitOil Prod.

(bpd)Sour Ass. Gas

(MMSCFD)Ahwaz1 53.3

Ahwaz2 43.5

Ahwaz3 15.3

Maroon3 14,890 25.3

Mansuri 47,270 43.5

Ab-Teymoor 40,180 19.8

Kupal 42,980 40.3

Total 292,880 241

147,560

ProjectAMAK

Problems:

ProjectAMAK

Solution :

Gathering, compressing, dehydrating & sweetening of the sour associated gases

in seven productionflaredwhich are being units and transfer of the sweet gas to NGL plants (NGL700,800) and the acid gas to the petrochemical complex (RAZI).

ProjectAMAK

Environmental Aspects:

• Stop flaring and wasting 241 MMSCFD of associated gases which contain 18,400 ppm of Hydrogen Sulfide

• Stop emission of 18,000 ton/day as polluting material

• Stop wasting of 640,000 m3 /hr of the atmospheric oxygen

ProjectAMAK

Opportunities :

Product Unit Total

Lean Gas MMSCFD 182

Propane b/d 9450

butane b/d 6560

Naphta b/d 5280

sulfur Ton/d 180

ProjectAMAK

Opportunities :

Product Unit Amount

Yearly Product Value MMUSD 210

I.R.R % 28

P.B.P month 30

NPV @ 6% MMUSD 687.7

ProjectAMAK

Cost Estimate:

Total = 531 Million USD

ProjectAMAK

Gas Treatment Plant

ProjectAMAK

AMAK - Gas Compression Station

Assoc. Gas Gathering & Bahregansarand KhargNGL Recovery Project

Problems:Offshore Flaring

Assoc. Gas Gathering & Bahregansarand KhargNGL Recovery Project

Field Oil Production,

bpd

Associated Gas, MMSCFD

Bahregansar (Offshore)

60,000 40

Soroosh 100,000 13

Aboozar (Offshore)

200,000 56

Nowrooz 90,000 38

Foroozan 100,000 150

Total 550,000 297

Assoc. Gas Gathering & Bahregansarand KhargNGL Recovery Project

Onshore FlaringProblems:

Prod. Unit Oil Production,

bpd

Associated Gas, MMSCFD

Dorood -1 100,000 265 Aboozar (Onshore) (Included) Foroozan (Onshore) (Included) Dorood - II 110,000 249 Gas to NPC (Deduct) (150) Gas to Injection Plant (120)* Total 210,000 244

* After commissioning the NGL Plant sales gas will be delivered to injection plant

Assoc. Gas Gathering & Bahregansarand KhargNGL Recovery Project

Dorood Foroozan and Aboozar63%

Soroosh 0%

Foroozan 10%

Aboozar2%

Dorood 224%

Norooz and Bahregansar

1%

SOx Emission - Flares

Problems:

Assoc. Gas Gathering & Bahregansarand KhargNGL Recovery Project

Problems:

Foroozan57%

Onshore 19%

Norooz and Bahregan

14%

Soroosh3%

Aboozar7%

NOx Emission – Flares

Assoc. Gas Gathering & Bahregansarand KhargNGL Recovery Project

Opportunities:

Product Unit Tot.Income

MMUSD/Yr

Sales Gas MMSCFD 262

2250

2195.8

1251.8

2443

4811

66.941

Ethane ton/day 54.093

Propane ton/day 324.594

Butane ton/day 185.504

Pentane b/day 26.750

Condensate b/day 61.640

Total , MMUSD/yr 719.343

Assoc. Gas Gathering & Bahregansarand KhargNGL Recovery Project

Bahreganser

Nowrooz

Aboozar(AB)

Foroozan

Kharg Island

Soroosh

40 MMSCFD

38 MMSCFD

13 MMSCFD

56 MMSCFD

150 MMSCFD

147 MMSCFD

150 MMSCFD

20 “

26”

8”16”

AAAC12”

14”

Solution :

Assoc. Gas Gathering & Bahregansarand KhargNGL Recovery Project

Solution :

Project elements:1 - Offshore Gas Gathering2 - Onshore Gas Gathering3 - Feed Gas Compression4 - Acid Gas Removal 5 - Acid Gas Injection6 - Gas Dehydration 7 - NGL Plant 8 - Product Sweetening9 - LPG Storage

10 - LPG Loading

Propane

Disposal Well

Condensate

Acid Gas Injection

Condensate

Ethane

Offshore

Sto

rage

and

Loa

ding

Dehydration

Refrigeration(1 x 100%)

Pentane

Butane

Sales Gas

NGL Recovery

Refrigeration(1 x 100%)

Gas

Pentane

Compression (2 x 50%) DehydrationReception

Facilities NGL RecoveryAcid Gas Removal

Mercury Removal

Propane

Sales Gas

OnshoreGas Butane

Compression (2 x 50%)

Ethane

Acid Gas Removal

Mercury Removal

NGL Plant Facilities

Solution :

Assoc. Gas Gathering & Bahregansarand KhargNGL Recovery Project

Solution :

Assoc. Gas Gathering & Bahregansarand KhargNGL Recovery Project

Cost Estimate:

Onshore Facilities : 1200 MMUSDOffshore Gas Compression Platforms: 66.72 MMUSDOffshore Pipeline: 89.77 MMUSD

Total: 1356.49 Million USD

Assoc. Gas Gathering & Bahregansarand KhargNGL Recovery Project

Project Scheduling:

Offshore Pipeline Project : 28 Months - Ongoing

Offshore Gas Compression Platforms :36 Months - Ongoing

Kharg Onshore NGL Plant :38 Months – (In Tender)

Assoc. Gas Gathering & Bahregansarand KhargNGL Recovery Project

Project environmental result:

Assoc. Gas Gathering & NGL Recovery ProjectSiri

Nasr Oil Production Unit

Esfand Oil Production Unit

Assoc. Gas Gathering & NGL Recovery ProjectSiri

Problems:

Field Oil Production bpd

Associated Gas,

MMSCFD Nasr (Offshore) 75,000 21.5

Sirri-E (Offshore) 100,000 87

Nasr (Onshore) 10.5

Esfand (Onshore) 13

Total 175,000 132

Assoc. Gas Gathering & NGL Recovery ProjectSiri

0

2000

4000

6000

8000

10000

12000

14000

16000

0 1000 2000 3000 4000 5000Distance from Flare (m)

NO

x(p

pm)

)

)) Nasr Offshore Flare

CalmW

20%

SW

30%

S

10%

34.00%

NW

N

SE

E

20%

10%

30%

NE

Scale 10%1-3 m/s11-16 m/s 7-10 m/s 4-6 m/s

LP & MP Onshore FlareHP Onshore Flare

Problems:

NOx Emission

Assoc. Gas Gathering & NGL Recovery ProjectSiri

Opportunities:

Product Unit Tot.Income

MMUSD/Yr

Sales Gas MMSCFD 86.5

541.9

328.8

1364

1250

21.87

Propane ton/day 80.106

Butane ton/day 48.724

Pentane b/day 14.935

Condensate b/day 15.968

Total , MMUSD/yr 181.603

Assoc. Gas Gathering & NGL Recovery ProjectSiri

Solution:

Sirri Island

Nasr-PP Sirri-E

OIL, 16”

75,000 bpd

GAS, 16” (Existing)

87 MMSCFD

OIL, 18”

100,000 bpd

GAS, 10” (Existing)

21.5 MMSCFD

OFFSHOREGAS 108.5 MMSCFDOIL 175,000 bpd

Assoc. Gas Gathering & NGL Recovery ProjectSiri

Solution:

Project elements:1- Offshore Gas Gathering2- Onshore Gas Gathering 3- Acid Gas Removal and Acid Gas Incineration4- NGL Plant5- LPG, Pentane & Condensate Storage and Loading6- Residue Gas Export to Kish and Qeshm Island

The Solution - NGL Plant Facilities

Compression(1 x 100%)

Residue Gas Export

Acid Gas Incineration

Dehydration Mercury Removal

NGL Recovery

Refrigeration(1 x 100%)

Acid Gas Removal

Propane

Butane

Condensate

Residue Gas

Pentane

Assoc. Gas Gathering & NGL Recovery ProjectSiri

Cost Estimate:

Siri to Qeshm Pipe line Project: 35 MMUSDSiri to Kish Pipe line Project: 37 MMUSDSiri NGL Plant Project: 216 MMUSDKish Compression Station Project 12 MMUSD

Total: 300 Million USD

Assoc. Gas Gathering & NGL Recovery ProjectSiri

Project Scheduling:

Siri to Kish Pipe line Project : Executed

Siri to Qeshm Pipe line Project : Executed

Siri NGL Plant Project : 40 Month - Ongoing

Kish Compression Station Project : 12 Month - Ongoing

Assoc. Gas Gathering & NGL Recovery ProjectSiri

155

4

020406080

100120140160

NO

x(g

r/sec

)

Befor After

Project environmental result:

THE END