khaled hse

8
Curriculum Vita Position: PROJECT HSE MANAGER Mobile: 002 01284466693 Name: Nationality: Date of Birth: KHALED AHMED Egyptian 1969 Qualifications: B.A of Archaeology – 1991, Alexandria University, Egypt. Experience and responsibilities: Project HSE Manager with over 22 years of safety related experience with increasingly responsible positions. Qualifications: Safety and Health Legal Industrial Certificate. Advanced Safety and Health Legal industrial Certificate Participated in qualification by company in obtaining ISO Certificate. (ISO 9001 / ISO 14001 / ISO OHSAS 18001) OSHA 10 Hours Scaffolding Course OHSA 30 Hours General Industry and Constructions Course Internal Auditor certificate (Course from BVQI Company) NEBOSH – IGC Certificate NEBOSH Environmental Management course 14001(EMS) NASP Training Course the national associations of safety professional IOSH Training Course (institution of Occupational safety and health) Leadership Training Organizer by BECTHEL Fire / Emergency Drill Organizer by MIDMAC Internal Audit of the HSE Management System Organizer by INTERTEK International Ltd OHSAS 18001 / 2007, ISO 14001 / 2004 and ISO 9001 / 2008 Scaffolding Inspector training Course Defensive Driving Course Advanced Defensive Driving Course Safety Course (Diploma from Arabian Academy) Page 1

Upload: khaled-ahmed

Post on 08-Feb-2017

66 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Khaled HSE

Curriculum VitaPosition:

PROJECT HSE MANAGER Mobile: 002 01284466693

Name: Nationality: Date of Birth:KHALED AHMED Egyptian 1969

Qualifications: B.A of Archaeology – 1991, Alexandria University, Egypt.

Experience and responsibilities:Project HSE Manager with over 22 years of safety related experience with increasingly responsible positions.

Qualifications:

Safety and Health Legal Industrial Certificate. Advanced Safety and Health Legal industrial Certificate Participated in qualification by company in obtaining ISO Certificate. (ISO 9001 / ISO 14001 / ISO

OHSAS 18001) OSHA 10 Hours Scaffolding Course OHSA 30 Hours General Industry and Constructions Course Internal Auditor certificate (Course from BVQI Company) NEBOSH – IGC Certificate NEBOSH Environmental Management course 14001(EMS) NASP Training Course the national associations of safety professional IOSH Training Course (institution of Occupational safety and health) Leadership Training Organizer by BECTHEL Fire / Emergency Drill Organizer by MIDMAC Internal Audit of the HSE Management System Organizer by INTERTEK International Ltd

OHSAS 18001 / 2007, ISO 14001 / 2004 and ISO 9001 / 2008 Scaffolding Inspector training Course Defensive Driving Course Advanced Defensive Driving Course Safety Course (Diploma from Arabian Academy) Safety Course (First Aid) Safety Course (Fire Fighting) Knowledge Safety Course (American Institute) Elements of HSE Program Risk Assessment Area Classification Analysis of work permit Refinery Safe Design Chemical Hazard

Page 1

Page 2: Khaled HSE

Tool Box Talk Near Misses Report

Work Responsibilities on various projects:

1. Responsible for implementing and administering all aspects of accident, prevention, fire protection and control, motor fleet accident prevention and the control of equipment and property damage.

2. Conduct accident investigation, analyze and formulate recommendations for corrective and preventive actions.

3. Conduct supervisory safety meetings; participate in weekly planning and scheduling of meetings.

4. Conduct daily inspections in the work area to ensure the health of the worker’s and the protection of the environment are properly taken care of

5. Prepare job safety bulletins and subjects for toolbox meetings. Review and monitor such meeting to ensure effectiveness.

6. Conduct daily safety orientations classes for newly hired employees/workers.7. Conduct daily surveys of construction operations to ensure compliance with client/government

safety standards and regulations. Identify safety defects and initiate corrective measures by responsible supervision.

8. Prepare injury reports, maintain required record keeping system and provide adequate documentation on occupational activities.

9. Keep up to date with recommended codes of practice and safety literature and circulate information applicable to each level of employees.

10. Determine the required minimum Personal Protective Equipment applicable in the project and ensure its proper use at all times.

11. Implement the existing Company Audit applications12. Implement the existing Company Safety Programs as well as the Client’s Rules and

Regulations.

Current time I’m Leading Mega project as a HSE Managers under PROJACS international organization Company

Project Name: Sharm El sheikh City stars City in Egypt ( Mega Project )

The project considered as the largest artificial lake in the world under 7000000 square meters

Start Date: August 2014

Finish Date: Up to date

Previous Experience:

I am working under MIDMAC contracting Management company in Qatar as a HSE Manager I lead several Projects as follow:

(Package 2 of T.J. Pearl Mansion & Doha Convention center and Tower – BP- 02 A & B)

03/2008-To Date : MIDMAC CONTRACTING CO. W.L.L., QATAR

Page 2

Page 3: Khaled HSE

30 / 03 / 2014: PROJECT HSE MANAGERDoha Convention center and Tower – BP- 02 A & B

The works comprise of completion of the Doha Convention center and Tower – BP- 02 A&B. This fast track project will be completed in 36 months.

The project achieved 20,000,000 Man hours without LWDS on 20 Sept. 2013

Enclosed hereunder the projects quantities and activities:

1- Concrete 19,602 M3 2- Reinforcement 3,783 Tons3- Tapered columns units concreted 114 UNITS4- Pre cast manufacture 3,189 UNITS5- Pre cast Placing 3,181 UNITS6- Structural Steel Installed 9,723 Tons7- MEP Activities8- Pre commissioning and commissioning activities9- All the Finishing activities (paint, Marble, Cladding, Carpet, etc…)

PROJECT HSE MANAGER01/2010 – 10/2010: New Doha International Airport – Airside/Landside Roadways &

Parking

The project comprises the design and construction of the roadways network connecting the “Airside” and “Landside” facilities of the New Doha International Airport, providing access to the Terminal, Commercial and Midfield areas of the airport. The scope includes three grade separated interchanges and a total of 19 box-girder bridge structures, five of which crossing shallow lagoon water leading to the Passenger and Emiri Terminals. In addition, the scope of works includes parking lots, airport security fencing, intrusion detection systems, surface water drainage systems, street lighting systems, and culvert protection to existing gas lines.

10/2009 – 1/2010: Education City Convention Centre ExtensionThe works comprise of completion of the Education City Convention Centre Extension. This fast track project will be completed in 18 months and is the first major LEED project in Qatar.

11/2008 – 10/2009: PROJECT HSE MANAGER Passenger Terminal Concourse ‘C’ Foundations

The works comprise the construction of the foundations for Concourse ‘C’ and North Node of the Passenger Terminal at the New Doha International Airport. The scope covers:

a) Geotechnical Site Investigation worksb) Design and installation of reinforced concrete bored piles (800 and

1000 mm diameter, 21 meters in length)

Page 3

Page 4: Khaled HSE

c) Reinforced concrete foundations for the Terminal Building and Passenger Loading Bridges mainly comprising pile-caps, tie beams perimeter walls and sundry foundations.

10/2008 – 11/2008 : PROJECT HSE MANAGERGEORGE TOWN UNIVERSITY

Construction of three storey building for the School of Foreign Service (Georgetown University) as a part of Education City project developed by Qatar Foundation.

The scope includes structural, architectural and electro-mechanical works with high grade finishes and modern audio-visual and information technology systems and external landscaping.

07/2008-10/2008 : HSE SUPERVISORCULTURAL VILLAGE PROJECT PHASE II

The site is located at the West Bay Area, Doha, Qatar. The works comprise the takeover and completion of works relating to the Cultural Village – Phase II project. The scope includes all structural, architectural, and electromechanical elements, including extensive landscaping and stone cladding to the Amphitheatre building.

03/2008-06/2008 : SAFETY ENGINEERNew Doha International Airport – Airside/Landside Roadways & Parking

The project comprises the design and construction of the roadways network connecting the “Airside” and “Landside” facilities of the New Doha International Airport, providing access to the Terminal, Commercial and Midfield areas of the airport. The scope includes three grade separated interchanges and a total of 19 box-girder bridge structures, five of which crossing shallow lagoon water leading to the Passenger and Emiri Terminals. In addition, the scope of works includes parking lots, airport security fencing, intrusion detection systems, surface water drainage systems, street lighting systems, and culvert protection to existing gas lines.

03/2005 – 02/2008 : HSE District Area Manager Egyptian Maintenance Co.

LNG Plant at New Damietta( SEGAS) / UGDC / Ha,py project

Egyptian Maintenance Company are Global maintenance working as

subcontractor from SEGAS, UGDC and Ha,py (GABCOU) Company

Job Responsibilities:

Presenter for Risk Assessment and Process Units, responsible for daily training sessions, weekly report, HSE program & site inspection.

Page 4

Page 5: Khaled HSE

10/2002 – 02/2005 : HSE SUPERVISOREgyptian Maintenance Co.MIDOR Oil Refinery (Free Zone – Elamerya- Alexandria)

Job Responsibility : Presenter for Risk AssessmentPresenter for Process UnitsResponsible for daily training sessionsResponsible for weekly reportResponsible for monthly reportHSE ProgramHSE Automotive InspectionHSE Site InspectionTraining for Fire FightingTool Box TalkAnalysis for Work Permit

Analysis for Near Misses

05/2001 – 09/2002 : HSE MANAGERDSD COMPANY

Job Responsibilities:

Responsible for Hydrogen Crack Units, Gas Testing, Tool Box Talk, Daily report, Weekly report, Rigging Study etc.

Responsible for Hydrogen Crack UnitsResponsible for following Permit to work systemResponsible for (Gas Testing)Responsible for Tool Box TalkResponsible for Injured and accident reportDaily ReportWeekly reportEmergency procedure

Rigging Study

12/1999-04/2001 : HSE MANAGER RODIO COMPANY

PROJECT: QUAY WALL PORTLOCATION: PRT SAID CITY

Job Responsibilities:

Orientation of all workers, coordination between RODIO And AIC Company,

Responsible for consortium safety plane, toolbox talk and emergency plan.

Responsible for all infrastructure works Such as ( Sewer activities, water pipe line, electrical foundations and all the tower lighting)

02/1999-11/1999 : HSE PROFESSIONAL

Page 5

Page 6: Khaled HSE

TECHNIP / TTIL SNC CO. TTIL Was a Consultant for the Project

Project: construction for the Middle East Refinery In charge of DEALIM company (one of the two main contractors)

Job Responsibilities:Coordinate between TTIL and DEALIM Company, responsible for ID Card Program, Site inspection, infrastructure works, Tool Box meeting, Trainer for New Employees.

02/1997-01/1999 : HSE SUPERVISOR BALFOUR BEATTY JOINT VENTURE

PROJECT: ALEXANDRIA LIBRARY PHASE 02Structural and finishing work

Job Responsibilities:

Coordination between Balfour Beatty and Arab Contractors, responsible for safety plan, emergency plan. Weekly and monthly report. Trainer for all employees.

12/1995-01/1997 : HSE SUPERVISORRODIO COMPANY

PROJECT: ALEXANDRIA LIBRARY PHASE 01 (Diaphragm Wall and concrete raft)

Job Responsibilities:

Coordination between Balfour Beatty and Arab Contractors, responsible for safety plan, emergency plan. Trainer for all employees. Weekly and monthly report.

11/1993-11-1995 : HSE OFFICER DILLINGHAM ABB SUZA JOINT VENTURE PROJECT: GANAKLIS AIR FORCE PROJECT

Job Responsibilities:

Responsible for construction inspection at Ran and Taxiway. All the infrastructure activities Emergency plan and for weekly and monthly report.

Personal Information:

Khaled Ahmed

Mobile: 002 01284466693

Page 6

Page 7: Khaled HSE

Email: [email protected]

Page 7