keyston install last 90 days
TRANSCRIPT
Keyston Installs last 90 days
Finished work
Tight Schedules½ tile removal 1/8 mastic machine removal removal procedure was changed from Husqvarna 820 to the El Diablo. Keyston finished ahead of schedule with no challenges. Keyston did isolation , Negative air flow and constant monitor to ensure safety
Difference is in the Details and quality
PharmaceuticalMarking of patches Blue by Customer additional done by Keyston
Whole area done instead of 100 patches customer very pleased new standard
Pharmaceutical
Preparation done with Husqvarna 820 Epoxy Grout coat prior to polishing steps due to the poor quality of concrete.
DetailsCove adhesive on walls prior to Keyston start up
Cove after cut out new steel Cleaned walls
CovingCondition start- Keyston requested corners to be finished and in fill t Response no time in schedule Keyston suggested a 45% Hospital cove instead of a radius cove. Customer issued a change order for material and labor difference and a new plant standard established.
Custom Coving Borders and walkways
Expert Project ManagementConcrete elevations off ½” to ¾ over 3’ coves recessed ¾ to 1 “ Finished Floor
Food Manufacturing
Food
Tough Conditions
Husqvarna Prep Urethane with Aluminum oxide
Containment pit
r
Finished Pit- job was stopped due to steel structure above being unsafe. TM, Plant Manager and Project Manager appreciated the PM brought in a team o support the structure with Steel Cables.
Thank You
Containment Pit Heavy Duty Flooring with Line Striping