Key Projects
May 8, 2013
![Page 2: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/2.jpg)
Columbia St. PD • 126-‐room, 6-‐story Hampton Inn & Suites (hotel)
• surface parking lot
• 102,300 sq. ft., 10-‐story medical office building
• limited ground-‐level parking and 4 floors of structured parking
![Page 3: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/3.jpg)
Site Plan
![Page 4: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/4.jpg)
![Page 5: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/5.jpg)
Sligh Blvd. and Columbia St. Roadway Improvements � Scope • Resurfacing, restora@on and rehabilita@on of the roadway. • Opera@onal improvements at the intersec@ons to accommodate future poten@al BRT expansion, bus routes and freight delivery.
� Schedule • Procurement – Current, Tenta@ve Council Date 6/17 • Design – 2013/2014 • Construc@on – 2014/2015
� Funding • $4,033,440 from FDOT
![Page 6: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/6.jpg)
![Page 7: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/7.jpg)
Columbia Street -‐ Proposed
![Page 8: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/8.jpg)
Sligh Boulevard -‐ Proposed
![Page 9: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/9.jpg)
Amtrak Sta@on
• historic rehabilitation project • will rectify a lot of deferred maintenance and correct ADA issues. • the HVAC will be relocated to the roof so as not to be visible. • New lighting fixtures, water fountain, gutters
![Page 10: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/10.jpg)
Amtrak
![Page 11: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/11.jpg)
![Page 12: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/12.jpg)
Orlando Health projects � A new bed tower extending west from the corner of ORMC � 345,000 sq. ft. � • 196ft. High (11 stories) � • 192 hospital beds
� An expansion of the core ORMC building, including an addition onto the existing Emergency Department � 90,000 sq. ft. addition � • 70ft. 8 in. to highest point of structure (four stories)
![Page 13: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/13.jpg)
Orlando Health
![Page 14: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/14.jpg)
![Page 15: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/15.jpg)
Orlando Medical Plaza
![Page 16: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/16.jpg)
� Phase 1: � new 8 story hotel between the two existing medical office buildings (1315 and 1405 S. Orange Avenue).
� New ground floor entrance lobby and plaza and 60 hotel rooms
� Phase 2: � add 12 hotel rooms to 2nd level of 1315 S. Orange building
� add 13 hotel rooms to the 3rd level of that building and cosmetic renovations to the exterior of the building.
![Page 17: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/17.jpg)
![Page 18: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/18.jpg)
![Page 19: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/19.jpg)
Wendy’s
![Page 20: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/20.jpg)
Wal-‐Mart Neighborhood Market
47,635 sq. ft.
Open June 26
![Page 21: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/21.jpg)
Noodles
![Page 22: KeyProjects$ May8,2013$Orlando)Health)projects)! Anewbedtowerextendingwestfromthecornerof$ ORMC! 345,000sq.ft.$! •196ft.High(11stories)$! •192hospitalbeds$](https://reader035.vdocuments.us/reader035/viewer/2022071013/5fcbadf732828a60503df4c3/html5/thumbnails/22.jpg)
Wawa