1 Project Fact Sheet www.southtongasshighway.com AKSAS Project No. 67571/67685 Federal Project No. 0902031/0902039 Key Project Features » Highway widening at some locations, with rock cuts as needed » Removal or permitting of right of way encroachments » Reconstruction of the bike/pedestrian pathway » Extension of the pathway through Saxman » New sidewalks between Deermount Street and Community Connections » Drainage improvements (including new inlets, storm drains, ditches, and culverts) » Utility relocations » Bus stop turnouts in coordination with the Ketchikan Gateway Borough Transit Manager and the City of Saxman at Surf/Shoup Street, Dog Salmon Ave, Totem Row, and Forest Park Drive Project Background and Overview South Tongass Highway serves the Cities of Ketchikan and Saxman as well as the entire Ketchikan Gateway Borough. The roadway provides travel connections between the City of Ketchikan and communities to the south. The highway is an undivided, two-lane roadway with many private driveways, limited shoulders, and an adjacent multi-use pathway along most sections. This project would improve operations on South Tongass Highway, rehabilitate the roadway, reconstruct the existing multi-use pathway and extend it through Saxman, improve drainage, and relocate utilities. In some places, project engineers will examine the need for minor realignments of the roadway to improve sight distances. Replacement guardrails, handrails, and chain link fencing may also be a part of the project. The project team has completed the project’s required environmental documentation. Schedule This project is anticipated to begin in 2020. The Alaska Department of Transportation & Public Facilities (DOT&PF), is proposing to rehabilitate about three miles of South Tongass Highway and related non-motorized facilities from Deermount Street to Surf Street. The South Tongass Highway Rehabilitation project would improve operations and provide for improved movement of vehicle, bicycle, and pedestrian traffic. ` ! ` ! ` ! ` ! ` ! ` ! ` ! Revillagigedo Island Pennock Island Ketchikan Saxman Tongass Narrows (East Channel) Tongass Narrows (West Channel) South T ongass H ighw ay Deermount Street Saxman Transition Surf Street MP 2.5 MP 3 MP 3.5 MP 4 MP 4.5 MP 5 MP 5.5 PATH: Z:\07072 DOT&PF\267931 S. TONGASS DEERMONT NTP 2\MAP_DOCS\PI\FIG1_PROJECTAREAMAP.MXD - USER: TLILLY - DATE: 1/9/2018 SOUTH TONGASS HIGHWAY REHABILITATION PROJECTS SOUTH TONGASS HIGHWAY REHABILITATION PROJECT AREA Saxman to Surf St. Deermount St. to Saxman ` ! Mile Points 0 3,300 Feet O DATA SOURCE: DOT&PF, KGB ALASKA CANADA A Project Area

Upload: others

Post on 19-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Key Project Features - Alaskadot.alaska.gov/sereg/projects/southtongass/Documents/SOUTH_TO… · ALASKA CANADA RU SIA Project Area. AKSAS Project No. 6757/67685 2 Federal Project

1

Project Fact Sheet

www.southtongasshighway.comAKSAS Project No. 67571/67685 Federal Project No. 0902031/0902039

Key Project Features » Highway widening at some locations, with rock

cuts as needed » Removal or permitting of right of way

encroachments » Reconstruction of the bike/pedestrian pathway » Extension of the pathway through Saxman » New sidewalks between Deermount Street and

Community Connections » Drainage improvements (including new inlets,

storm drains, ditches, and culverts) » Utility relocations » Bus stop turnouts in coordination with the

Ketchikan Gateway Borough Transit Manager and the City of Saxman at Surf/Shoup Street, Dog Salmon Ave, Totem Row, and Forest Park Drive

Project Background and OverviewSouth Tongass Highway serves the Cities of Ketchikan and Saxman as well as the entire Ketchikan Gateway Borough. The roadway provides travel connections between the City of Ketchikan and communities to the south. The highway is an undivided, two-lane roadway with many private driveways, limited shoulders, and an adjacent multi-use pathway along most sections.

This project would improve operations on South Tongass Highway, rehabilitate the roadway, reconstruct the existing multi-use pathway and extend it through Saxman, improve drainage, and relocate utilities. In some places, project engineers will examine the need for minor realignments of the roadway to improve sight distances. Replacement guardrails, handrails, and chain link fencing may also be a part of the project. The project team has completed the project’s required environmental documentation.

ScheduleThis project is anticipated to begin in 2020.

The Alaska Department of Transportation & Public Facilities (DOT&PF), is proposing to rehabilitate about three miles of South Tongass Highway and related non-motorized facilities from Deermount Street to Surf Street. The South Tongass Highway Rehabilitation project would improve operations and provide for improved movement of vehicle, bicycle, and pedestrian traffic.

Revillagigedo Island

Pennock Island

Ketch ikan

Saxman

Tongass Narrows (Eas t Channe l )

Tongass Narrows (Wes t Channel )

SouthTongass

Highway

Deermount Street

SaxmanTransition

Surf Street

MP 2.5

MP 3

MP 3.5

MP 4

MP 4.5

MP 5

MP 5.5

PATH: Z:\07072 DOT&PF\267931 S. TONGASS DEERMONT NTP 2\MAP_DOCS\PI\FIG1_PROJECTAREAMAP.MXD - USER: TLILLY - DATE: 1/9/2018 SOUTH TONGASS HIGHWAY REHABILITATION PROJECTS

SOUTH TONGASS HIGHWAY REHABILITATIONPROJECT AREA

Saxman to Surf St.

Deermount St. to Saxman

!̀ Mile Points

0 3,300Feet

ODATA SOURCE: DOT&PF, KGB

ALASKACANADA

RUSSIA

Project Area

Page 2: Key Project Features - Alaskadot.alaska.gov/sereg/projects/southtongass/Documents/SOUTH_TO… · ALASKA CANADA RU SIA Project Area. AKSAS Project No. 6757/67685 2 Federal Project

2 www.southtongasshighway.comAKSAS Project No. 67571/67685 Federal Project No. 0902031/0902039

Get InvolvedDOT&PF wants to hear from you as we develop the project design and prepare for construction. We will keep the public informed of project progress via newsletters, and the website. To learn more about the project, sign up for the project e-mail list at www.southtongasshighway.com.

ContactIf you would like to request additional information or share your ideas, please contact:

David Pyeatt, P.E.Project ManagerDOT&PF

Email: [email protected]: 907-465-4490

Jim Scholl Project Environmental Coordinator DOT&PF

Email: [email protected]: 907-465-4498

Josie WilsonPublic Involvement LeadHDR Public Involvement

Email: [email protected]: 907-644-2000

South Tongass Highway Rehabilitation: Deermount to Surf

Year 2016 2017 2018 2019 2020Quarter 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Environmental ReviewPublic InvolvementPreliminary DesignPhase 1: Saxman to Surf - Final Design - Purchase Properties for ROW as necessary

- Construction*

Phase 2: Deermount to Saxman- Final Design - Purchase Properties for ROW as necessary

- Construction*

*Note: Construction timing will be based on funding availability and other factors.

PublicOpenHouse

PublicOpenHouse