Key Aspects of Long Railroad Tunnels

Johannes KlebergerMay 28th 2012 Ankara

(e.g. Semmering Base Tunnel alignment selection process)

2© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

Key Aspects of Long Railroad Tunnels

Appropriate Alignment selection process Geological investigation and ground modelling Definition of maximum longitidinal gradient Definition of minimum horizontal radius Design speed selection/aerodynamic design Tunnel system selection (passenger trains only or mixed

traffic, maintenance concept for railroad line) Tunnel Safety lnfrastructure according to Internat.

Standards Tunnel construction method(s) selection Construction contract selection/ fair risk share Construction budget availability Realistic construction time scenario

3© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

OVERVIEW

SEMMERING BASE TUNNEL

KORALM TUNNEL

4© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

GHEGA-LINE

5© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

GHEGA-LINE (UNESCO WORLD HERITAGE)

built from 1848 - 1854 by Carl Ritter von Ghega 41.8 km length from Gloggnitz to Mürzzuschlag (linear

distance: 21 km) more than 20.000 workers 15 tunnels (total length 5.420 m) and 16 viaducts max. gradient 28 ‰ (25 km >20 ‰) original speed 6 km/h, today max. speed 70 km/h 2 lokomotives for heavy cargo trains

6© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

DESIGN PARAMETER FOR BASE TUNNEL new

maximum gradient 0,85 % minimum horizontal radius 3.000 m design speed 230 km/h 2 parallel single-track tubes emergency stop in the middle of the tunnel minimum inner clearance of 41 m2 cross passages every 500 m „short construction time“ and „high flexibility in

construction“ intermediate construction accesses, use of TBM

7© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

• Definition of criteria and weighting• Evaluation of alignment alternatives• Selection of recommended alignment

• Development of alignment alternatives• Consideration of recommendations

from „outside groups“

1st Step: Development of Corridors

2nd Step: Alignment Selection

3rd Step: Preliminary Design for Selected Alignment• Design of tunnel, shafts, adits, cross passages, portals

and auxiliary structures• Environmental impact assessment• Application of statutory approval

PLANNING PROCESS

8© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

PLANNING AREA

300 km2

9© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

STUDIED CORRIDORS FOR SBTnew

Existing Ghega Railway Line

SBT „old“

10© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

SURFACE GEOLOGICAL MAP

11© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

• Definition of criteria and weighting• Evaluation of alignment alternatives• Selection of recommended alignment

• Development of alignment alternatives• Consideration of recommendations

from „outside groups“

1st Step: Development of Corridors

2nd Step: Alignment Selection

3rd Step: Preliminary Design for Selected Alignment• Design of tunnel, shafts, adits, cross passages, portals

and auxiliary structures• Environmental impact assessment• Application of statutory approval

PLANNING PROCESS

12© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

Technical Evaluation of Alignment Alternatives Weighting of Criteria

Combination of Evaluation Results and Weighting Factors

SELECTION OF ALIGNMENT

Definition of Criteria Presentation of Criteria

DESIGN TEAM ADVISORY GROUP

2nd Step: Alignment Selection

PLANNING PROCESS

CLIENT

13© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

Use of excavation materialConstruction logistics

Railway technology - infrastructureRailway technology – regular operationRailway technology – operation under special conditionsTRANSPORT

+TECHNOLOGY Ground conditions

Ground water and mountain water, protection of drinking waterSurface water

Transport infrastructure

Development of settlementsSettlement areas, emissionsLandscape and tourism

Natural environment and ecology

SPACE+

ENVIROMENT

CostsRisks of implementation

COSTS +RISKS

S U

B C

R I

T E

R I

A

CATALOGUE OF CRITERIA

14© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

Use of excavation material

Construction logistics

Railway technology -infrastructure

Railway technology –regular operation

Railway technology –operation under special conditions (e.g.emergency)

Transport+

Technology

Design parametersAdaptation of techn. infrastructureTunnel equipment

Construction periodmaterial supply and muck disposal

Route capacityEnergy consumptionTravel times

Impacts of maintenance activitiesTunnel safetyTunnel ventilation (emergency)

Main criteria Sub-criteriaSubject

Operation during construction

Balance of construction materialUse of muck material

Site installation areasPermanent use of construction accesses

Ground conditionsTectonic faultsSections in loose rockMountain waterAccuracy of geolog. prediction

Operation

CATALOGUE OF CRITERIA

15© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

Ground/mountain water, drinking water protection

Surface water

Transport infrastructure

Development of settlements

Settlement areas, pollution damage to settlements

Space+

Environment

Accessibility, portalsEconomic development

Surface water (floodwater)Water ecology

Proximity to settlement areasopportunities of local developmentCultural assetsNoise exposure to settlementsVibration exposure to settlements

Main criteria Sub-criteriaSubject

Amount of mountain water ingressImpact on drinking water supply

Landscape and tourismLandscapeRecreation Touristic development

Natural springsImpact on surface runoffsAccuracy of forcast

Natural environment and ecology

Nature reservesCultural landscape Biotopes and habitats preservingHumid habitatsWildlife ecologyFishery

16© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

Costs

Risks of implementation

Costs+

Risks

Investment costsMaintenance costs

Main criterion Sub-criteriaSubject

Integration of previous investmentsOperational costs

17© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

Use of excavation material

Construction logistics

Railway technology -infrastructure

Railway technology –regular operation

Railway technology –operation under special conditions (e.g. emergency)

Transport+

Technology

Design parametersAdaptation of techn. infrastructureTunnel equipment

Construction periodmaterial supply and muck disposal

Route capacityEnergy consumptionTravel times

Impacts of maintenance activitiesTunnel safetyTunnel ventilation (emergency)

Main criteria Sub-criteriaSubject

Operation during construction

Balance of construction materialUse of muck material

Site installation areasPermanent use of construction accesses

Ground conditionsTectonic faultsSections in loose rockMountain waterAccuracy of geolog. prediction

Operation

CATALOGUE OF CRITERIA

18© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

123456789

10

TBM

Emergency stope

ACCESS AUEPORTAL GLOGGNITZ ACCESS FRÖSCHNITZGRABEN ACCESS GRAUTSCHENHOF

PORTAL MÜRZ-ZUSCHLAG

BridgeSchwarza

INNER LINING, INSTALLATION OF EQUIPMENT

NATMPortal

Mürzz.

19© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

SUB-CRITERIA: CONSTRUCTION PERIOD

MAIN PARAMETER:

CONSTRUCTION TIME

CONSTRUCTION TIME

0123456789

10111213141516

KO

- H

B

KO

- P

W

KO

- LW

KO

- ZB

KO

- M

Zui

OH

- H

B

OH

- P

W

OH

- LW

PG

- H

B

PG

- P

W

PG

- LW

PG

- ZB

PF

- MZ

YEA

RS

Finishing Outer lining

4

3

2

1

5

R A

T I

N G

"co

nstr

uctio

n pe

riod"

20© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

RESULT OF CONSTRUCTION LOGISTICS

1

2

3

4

5 Corresponds completely to the project-goals

Corresponds to the project-goals in a high degree

Corresponds in the essential points to the project-goals

Fulfills substantial project-goals only insufficiently

Does not fulfil substantial project goals

RISKS IN IMPLEMENTATION!

GOOD

AVERAGE

BELOW AVERAGE

BAD

EXCELENT

KO-Hb KO-Pw KO-Lw KO-Zb KO-Mz OH-Hb OH-Pw OH-Lw PG-Hb PG-Pw PG-Lw PG-Zb PF-Mz

1.6 Baulogistik 3 3 2 3 3 2 2 2 1 1 1 1 3

1.6.1 Bauzeit 2 2 2 2 2 1 1 1 1 1 1 1 3

1.6.2 Baustellen Ver- und Entsorgung 3 3 3 3 3 3 3 3 1 1 1 1 3

1.6.3 Baustelleneinrichtungsflächen 4 3 2 4 3 4 4 4 4 3 2 3 4

Construction logistics1.6 Construction logistics

1.6.1 Construction period

1.6.2Material supply and muck disposal

1.6.2Permanent use of construction accesses

21© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

SELECTED ROUTE „PFAFFENSATTEL“

SBT „old“ 22,1 km

9,5 – 11,3 ‰

SBT „new“ 27,5 km

8,5 ‰

22© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

• Definition of criteria and weighting• Evaluation of alignment alternatives• Selection of recommended alignment

• Development of alignment alternatives• Consideration of recommendations

from „outside groups“

1st Step: Development of Corridors

2nd Step: Alignment Selection

3rd Step: Preliminary Design for Selected Alignment• Design of tunnel, shafts, adits, cross passages, portals

and auxiliary structures• Environmental impact assessment• Application of statutory approval

PLANNING PROCESS

23© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

CONSTRUCTION DETAIL NATM

Invert Slab

Sidew. Drainage

Cable Duct

Shotcrete Lining

Waterproofing System

~ 9,0 m

~ 9,

8 m

TUN

NE

L A

XIS

Inner Concrete Lining

24© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

CONSTRUCTION DETAIL TBM

Invert Slab

Sidew. Drainage

Cable Duct

Segmental Lining

Waterproofing System

TUN

NE

L A

XIS

~ 9,7 m

~ 9,

7 m

Tail Void

Inner Concrete Lining

25© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

SITE INVESTIGATION

(1) GROUND INVESTIGATION FOR 4 PROPOSED CORRIDORS- 75 core drillings (total length 10.900 m), max. depth of 350 m- Documentation and monitoring of 3.700 springs, wells, creeks

(2) GROUND INVESTIGATION FOR SELECTED ALIGNMENT- Additional 55 core drillings (total length 17.500 m), max. depth of

720 m- Geophysical and geoelectrical investigation (totally 15 profiles)- In-situ (borehole) testing (acoustic scan, sonic lock, vertical

seismic profiling, insitu stress measurements by hydro frac)- Laboratory testing

26© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

“SCHLAGL FAULT ZONE”

27© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

TBMEmergency stope

ACCESS GÖSTRITZPORTAL GLOGGNITZ ACCESS FRÖSCHNITZGRABEN ACCESS GRAUTSCHENHOF

PORTAL MÜRZ-ZUSCHLAG

BridgeSchwarza

INNER LINING, INSTALLATION OF EQUIPMENT

NATMPortal

Mürzz.TBMNATM

NATM

CONSTRUCTION CONCEPT

28© iC group. For copies, please contact +43 1 521 69-0 or [email protected].

Key Aspects of Long Railroad Tunnels, what typically can go wrong with long railroad tunnels

Construction cost estimates are much too optimistic(maybe for political reasons) bringing the project in jeopardy

Geological investigation and ground modelling areinsufficinet, too little time and budget (yielding troubleswith ground conditions during construction andusuallycreates great time and cost overruns) Reasons maybeselection process for site investigation company (thinkabout how you select your medical doctor or your lawyer)

Unsuitable construction methods were chosen as toinsufficient ground model, tunnel may be stopped toexcavation difficulties

Construction contract selection not optimal Construction budget tot available in time Unrealistic construction time assessments

NEW SEMMERING BASE TUNNEL

Johannes KlebergerMarch 28th, 2012

ALIGNMENT SELECTION PROCESS

C O M P A N Y P R E S E N T A T I O N

Ankara, March 28th, 2012 Dr. Johannes Kleberger iC consulenten 1

I N T E R N A T I O N A L

ALBANIA • AZERBAJAN • AUSTRALIA • AUSTRIA • BELGIUM • BOSNIA-HERZEGOVINA • BULGARIA • CANADA • CHILE • CHINA •

COLOMBIA • CROATIA • CZECH REPUBLIC • EGYPT • ESTONIA • FRANCE • GEORGIA • GERMANY • GREECE • HONG KONG • HUNGARY •

INDIA • INDONESIA • IRAN • IRAQ • IRELAND • ISRAEL • ITALY • JORDAN • KAZAKHSTAN • KOSOVO • KYRGYZSTAN • LATVIA •

LEBANON • LIBYEN • LITHUANIA • MACEDONIA • MALTA • MEXICO • MOLDOVA • MONTENEGRO • MOROCCO • NIGERIA • PERÚ •

POLAND • PORTUGAL • QATAR • ROMANIA • RUSSIA • SERBIA • SINGAPORE • SLOVAK REPUBLIC • SLOVENIA • SRI LANKA • SWEDEN •

SWITZERLAND • TAIWAN • TUNISIA • TURKEY • UKRAINE • UNITED ARABIAN EMIRATES • UNITED KINGDOM •

UNITED STATES OF AMERICA • VIETNAM • YEMEN

Projects in more than 60 countries worldwide

2

I N T U R K E Y

Melen Istanbul Water Supply Project • BC1 Marmaray Project • Bahce Nurdagi Tunnel • Gerede System Isikli Tunnel • Kargi Dam and HEP • Metro Market Istanbul Solar Cooling• Avali Dam • Bursa Metro • Dogancay HEP • Bandirma Gas Power Plant • Pembelik HEP • Yenikapi Turnback Tunnel • Polatli Tunnel • Ankara Metro Ulus Keciören • Ermenek HEP • Bursa Opel Environmental Audit • Konaktepe HEP and Dam • Esen II HEP • Cine RCC Dam • Bogazkoy GT Power Station • Bolu Tunnel after Düsce Quake • Niksar and Akinci HEPS • Erdemir Power Station • Obruk Baraj • Karacasu Dam • Mursal HEP

More than 25 design and/or consultancy contracts since the year 2000

3Ankara, March 28th, 2012 Dr. Johannes Kleberger iC consulenten

Floreasca City Centre Bucharest, Romania

Praterstern Railway Station Vienna, Austria

Vienna Airport – East and West Pier, Austria

Europlex Warsaw, Poland

Europeum Business Centre Bratislava, Slovakia

Extension of the Regional Railway Line S2, Austria

Project management, project control, project organisation and controlling,

construction contracts and award of contracts, cost management and scheduling,

”Turn Key Engineering” and ”Total Project Management”, BOT (Build-Operate-

Transfer) and PPP (Public-Private-Partnership), Due Diligence, feasibility studies,

services as experts and consultants and construction logistics

E N G I N E E R I N G

& E C O N O M I C S

Ankara, March 28th, 2012 Dr. Johannes Kleberger iC consulenten4

Office Building Zagreb Tower, Croatia

Building Physics Design Europlaza – Construction Phase 4, Austria

Raiffeisen Centrum Prague, Czech Republic

Iride Business Park, Romania

New IMBA-GMI Science Laboratory Building, Vienna, Austria

Millennium Tower III, Slovakia

Serious Crimes Court, General Contractor, Tirana, Albania

Design of buildings and industrial structures, site supervision, structural design of

buildings and supporting structures, concrete buildings, steel constructions,

composite constructions and timber constructions, building physics, general

contractor and construction management, expert statements in the fields of

building construction, Due Diligence

B U I L D I N G S

& S T R U C T U R E S

Ankara, March 28th, 2012 Dr. Johannes Kleberger iC consulenten

5

Palais Mollard, Rehabilitation, Vienna 1, Austria

Europe Business Centre, Belgrade, Serbia, Montenegro

Public Retirement and Nursing Home in Wallsee, Austria

HVB – Headquarters, Hungary

Monastery of Klosterneuburg, Austria

MIA Malta International Airport, Malta

Kaiserin Elisabeth Hospital, Austria

Design (preliminary design, concept, tender design, detailed design), site supervision,

building services engineering, including heating, air-conditioning, ventilation, sanitary

equipment, electrical engineering (low voltage and high voltage current), special facilities

(safety engineering, measuring and control technology, data line), building construction and

industrial construction, transport facilities, municipal utilities

M E C H A N I C A L & E L E C T R I C A L

E N G I N E E R I N G

Ankara, March 28th, 2012 Dr. Johannes Kleberger iC consulenten

6

Lainzer Tunnel, Austria

Wienerwald Tunnel, Austria

U2 Underground Vienna, U2/5 Section, Interconnecting Track, Austria

Sentvid Tunnel, Slovenia

Cine Dam Project, Turkey

Egnatia Odos Motorway, Greece

Investigation, design, project management and supervision for underground projects.

Geological, hydro-geological and geophysical investigations;

geotechnical and structural design of tunnels, caverns and shafts using

conventional (NATM) or mechanical (TBM) tunnelling methods;

environmental impact studies, risk analyses, geotechnical measurements;

studies und design of measures for air quality, noise and vibration protection

T U N N E L L I N G & G E O T E C H N I C S

Ankara, March 28th, 2012 Dr. Johannes Kleberger iC consulenten7

Waste to Energy in Koprivnica, Cost-Benefit-Analysis, Croatia

Energy Efficiency Audits for 4 Industries in Moldova, Kyrgyzstan, Georgia

Energy Efficiency, MIA Malta International Airport, Malta

Biomass Plant Göpfritz, Austria

Vienna Central Railway Station, Noise/ Air Quality / Vibrations, Austria

Vibration Engineering Koralm Railway, Austria

Building Physics Design Europlaza - Construction Phases 4 & 10, Austria

Biomass plants, district heating networks, solar energy, geothermal energy, co-generation, biofuels, alternative cooling systems, small hydropower plants.

Immission protection: noise, vibrations, air pollutants, electromagnetic fields, public approval,

environmental impact assessment, services during construction, commissioning, commercial

enterprises, industrial plants, shopping centres, road, rail.

Extensive measuring equipment: remote controlled immission monitoring, air quality measurement

container, VibroScan ®, acoustic camera etc.

E N E R G Y & E N V I R O N M E N T

Ankara, March 28th, 2012 Dr. Johannes Kleberger iC consulenten8

Development of the Water & Waste Water System in Eastern Latvia and Rezecne City, Latvia

Rehabilitation of Sewage System and Waste Water Treatment Plant Pascani, Romania

Water Supply System Gjirokaster, Albania

European Waste Management Cluster, Europe

Drava River Basin Project, Croatia

Water, Waste Water and Waste Management Konjic, Bosnia-Herzegovina

Studies, consulting, planning, project management and site supervision for water

supply installations and sewage disposal; special services such as leakage

analyses, water loss evaluation, water management concepts; waste analyses,

planning of waste management facilities.

Development of waste management concepts and development and optimisation

of logistics of waste management systems.

W A T E R & W A S T E M A N A G E M E N T

Ankara, March 28th, 2012 Dr. Johannes Kleberger iC consulenten

9

Sustainable Transport Infrastructure and Intermodal Transport Concepts

for Northern Central Europe

IMONET - Intermodal Cargo Transport Node Network - Central Europe

Optimisation of Local Traffic Westbahn, Austria

Qaf Thane – Pogradec Road, Conceptual Design, Albania

Development of Design Standards for Road Construction, Kosovo

Transport concepts, feasibility studies and master plans for public transport

and individual traffic, investment assessment, cost calculation and controlling

for transport projects, regional development, site analysis and optimisation,

transport telematics, airports, road and railways.

T R A N S P O R T & L O G I S T I C S

Ankara, March 28th, 2012 Dr. Johannes Kleberger iC consulenten

10

GO Tolling System for Bus and Truck, Austria

Science Centre Vienna – Network Consulting, Austria

Business and Economic Software Efficiency Analysis Based on Linking Sales Data and In-house Costs

Consulting, system analysis, concept development, network

infrastructure, licensing, (structured) cabling, project planning and

management, controlling, quality management;

IT security, firewalls, virus protection, VPN solutions, security audit,

maintenance, training, tailor-made software solutions.

I N F O R M A T I O N

& T E C H N O L O G Y

11Ankara, March 28th, 2012 Dr. Johannes Kleberger iC consulenten

Sector 3

Sector 2

Sector 1

D E V E L O P M E N T

Ankara, March 28th, 2012 Dr. Johannes Kleberger iC consulenten

12

iC group of companies_______________________________________________________________________________________________

iC consulenten, Vienna, Austria_______________________________________________________________________________________________

iC consulenten, Salzburg branch office, Austria_______________________________________________________________________________________________

iC consulenten, Lower Austria branch office, Austria_______________________________________________________________________________________________

iC consulenten, Athens office, Greece_______________________________________________________________________________________________

iC consulenten, Sofia office, Bulgaria_______________________________________________________________________________________________

Elea iC, Ljubljana, Slovenia___________________________________________________________________________________________________________________________________________________________

iC projekt d.o.o., Sarajevo, Bosnia-Herzegovina_______________________________________________________________________________________________

iC projecte, Vienna, Austria_______________________________________________________________________________________________

O R G A N I S A T I O N

13

_______________________________________________________________________________________________

LOB iC, Vienna, Austria_______________________________________________________________________________________________

iC clean energy solutions GesmbH, Vienna, Austria_______________________________________________________________________________________________

iC consulenten, Bratislava, Slovakia_______________________________________________________________________________________________

iC consulenten, Bucharest, Romania _______________________________________________________________________________________________

iC artprojekt, Zagreb, Croatia_______________________________________________________________________________________________

iC consulenten, Belgrade, Serbia_______________________________________________________________________________________________

iC consulenten, Tirana, Albania_______________________________________________________________________________________________

iC consulenten, Priština, Kosovo_______________________________________________________________________________________________

iC consulenten, Kiev project office, Ukraine_______________________________________________________________________________________________

O R G A N I S A T I O N

Ankara, March 28th, 2012 Dr. Johannes Kleberger iC consulenten14