CURRICULUM VITAE Kevin Manson NATIONALITY British QUALIFICATIONS NVQ Level 3 in Nuclear Decommissioning - Supervision ( 2009) NEBOSH Construction (2009) IOSH Managing Safely (BNFL) Construction (2008) (12 day) NEBOSH Level 3 in Occupational Health and Safety (2008) NEBOSH General (2008) IOSH Managing Safely (2005) (5 day) O grades in Woodwork, Metalwork, Modern Studies, Arithmetic & Engineering drawing City & Guilds in Carpentry and Joinery City & Guilds in Communication KEY SKILLS Classified Worker SC cleared Radiological Material Controller Radiation Protection Supervisor (2013) British Red Cross First Aider (2013) (3 day) Manual Handling PVC suit trained Pressurised Air Line Suit Overhead crane operator Rigging & lifting ( basic slinging ) Abrasive wheels Forward Control Point Liaison Officer Powered respirator ( Proflow & Sari ) Confined Spaces Trained Safe Work in Confined Spaces Permit Issuer Work Permit Issuer BA trained (GE Healthcare) Building controller PASMA scaffolding MEWP trained IPAF 3b (cherry picker) Harness trained ECITB Supervisory qualified ECITB SMSTS ( Site Mangers Safety Training Scheme ) (2013) PROFILE 13 year’s experience in the Decommissioning Nuclear field. Appointed RPS (Radiation Protection Supervisor) & RMC ( Radioactive Materials Controller) NEBOSH General & NEBOSH Construction

Upload: kevin-manson

Post on 21-Aug-2015

22 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Kevin M CV

Kevin MansonCURRICULUM VITAE

NATIONALITYBritish

QUALIFICATIONS NVQ Level 3 in Nuclear Decommissioning - Supervision ( 2009) NEBOSH Construction (2009) IOSH Managing Safely (BNFL) Construction (2008) (12 day) NEBOSH Level 3 in Occupational Health and Safety (2008) NEBOSH General (2008) IOSH Managing Safely (2005) (5 day) O grades in Woodwork, Metalwork, Modern Studies, Arithmetic & Engineering drawing City & Guilds in Carpentry and Joinery City & Guilds in Communication

KEY SKILLS Classified Worker SC cleared Radiological Material Controller Radiation Protection Supervisor (2013) British Red Cross First Aider (2013) (3 day) Manual Handling PVC suit trained Pressurised Air Line Suit Overhead crane operator Rigging & lifting ( basic slinging ) Abrasive wheels Forward Control Point Liaison Officer Powered respirator ( Proflow & Sari ) Confined Spaces Trained Safe Work in Confined Spaces Permit Issuer Work Permit Issuer BA trained (GE Healthcare) Building controller PASMA scaffolding MEWP trained IPAF 3b (cherry picker) Harness trained ECITB Supervisory qualified ECITB SMSTS ( Site Mangers Safety Training Scheme ) (2013)

PROFILE13 year’s experience in the Decommissioning Nuclear field.Appointed RPS (Radiation Protection Supervisor) & RMC ( Radioactive Materials Controller) NEBOSH General & NEBOSH Construction

CURRENT POSITION

Site Supervisor - Studsvik UK Working on various site projects around the country

EXPERIENCE August 2013 – Present

Berkely Nuclear Plant : the installation of new ventilation system in the AWVR building

Page 2: Kevin M CV

May 2013 – July 2013 Tioxcide Chemical Plant (Hartlepool): the site removal of redundant radioactive iron ore filter cloth’s (Radon contamination) from the Chemical Plant Complex.

Oct 2012-May 2013 Berkeley Nuclear Plant: The Removal of 15 redundant heat exchangers (Boilers) each weighing approx. 300t each.

April 2012 – Oct 2012 Studsvik UK Metal Recycling Facility (Workington); Updating COSHH paperwork and the Health & Safety files for the day to day production of the Recycling Facility.

March 2011 – April 2012GE Healthcare (Cardiff): Decommissioning redundant labs, full strip out including all the fume hoods and ventilation systems. Also the removal of all RP1,CD1 & RP2 effluent pipework from the GE Healthcare building. (Including writing the decommissioning methodology for the project).

LLWR (Drigg): Writing Decommissioning Methodology for removing 3 Forklifts from the Active Magazine buildings for LLWR.

Sept 2010- March 2011NDSL (Dounreay)D1204 : The removal of High contaminated Trough liners & redundant services from the cell faces in airline suits.D2670: Working in the Redundant Labs removing Alpha contaminated materials (off scale) from the redundant Lab Glove box’s. (Airline suits)

Aug 2009 - Aug 2010Mitsui Babcock Engineering (Dounreay)D2900:Size reduction of redundant PunNit Flasks, Moducon entries wearing airline suits to size reduce highly contaminated waste and materials, on a regular basis.

March 2007 – Aug 2009Site Supervisor for Studsvik UK LimitedSellafield Nuclear Site; Supervising personal and work at the BNFL Sellafield Nuclear Site in building D204 building.Also Based at Devonport Naval Base processing waste stream documents for the removal of the Submarine Nuclear Reactors from the SRC.

2002 – Feb 2007Decommissioning Charge hand forMitsui Babcock EngineeringBased at Dounreay Nuclear Power Plant

D1217: Working with machical manipulators within the cave facility, size reducing highly radioactive waste items, also weekly removal of broken/ redundant manipulators, Moducon entries wearing airline suits to size reduce highly contaminated waste and materials, on a regular basis.

DMTR: Camera and radiation survey in a reactor vessel (first in UK) and also assisting (German) Studsvik Engineers in the first successful dry coring of a nuclear reactor. RPS for this building, and the other outlying buildings.

D1313: Decontaminate the walls and floors of the building. D8550: Redundant criticality building, airline suite entries to decontaminate the fuel preparation

Room, Alpha (Plutonium). D1254: Decontaminate the floor and walls, where highly enriched Uranium was stored. D1200 Labs: Decommissioning redundant laboratory glove boxes, where there was Alpha, Beta and

Gamma radiation present. Cementation Building: High contaminated particles was pumped out of a drain and cemented into ‘c'

bins. SILO: Risk Assessments and Method Statements, Permit to work Issuer and RPS for

Decommissioning of the large Silo building.

1984 – 2002 Joiner/Carpenter

Page 3: Kevin M CV

Various companiesTime served joiner and carpenter.