kelley square improvement project worcester | project file

28
Kelley Square Improvement Project Worcester | Project File No. 609226 PUBLIC INFORMATION MEETING Worcester Academy Performance Center May 22, 2019 | 6:00pm

Upload: others

Post on 16-Jan-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Kelley Square Improvement Project Worcester | Project File

Kelley Square

Improvement Project

Worcester | Project File No. 609226

PUBLIC INFORMATION MEETING

Worcester Academy Performance CenterMay 22, 2019 | 6:00pm

Page 2: Kelley Square Improvement Project Worcester | Project File

Kelley Square Improvement ProjectWorcester | Project File No.609226

Project Team

• MassDOT Highway Division

• Federal Highway Administration

• City of Worcester

• VHB – Design Consultant

• RVA – Public Outreach Consultant

Page 3: Kelley Square Improvement Project Worcester | Project File

Agenda

• 100% Design Updates

• Construction Staging and Sequencing

Kelley Square Improvement ProjectWorcester | Project File No.609226

Page 4: Kelley Square Improvement Project Worcester | Project File

Project Limits

Kelley Square Improvement ProjectWorcester | Project File No.609226

Page 5: Kelley Square Improvement Project Worcester | Project File

.

Public Outreach• Outreach to date

– Numerous meetings with community/business/stakeholder groups– MassDOT 1st Public Workshop – Oct 10, 2018– MassDOT 2nd Public Workshop – Oct 24, 2018– MassDOT Public Information Meeting – Dec 5, 2018– MassDOT 3nd Public Workshop – Jan 23, 2019– MassDOT 25% Design Public Hearing – February 27, 2019– City of Worcester sponsored Landscape meeting – May 6, 2019– MassDOT Public Information Meeting - May 22, 2019

• Additional community/business/stakeholder meetings continuing

• Additional public meetings continuing through Construction

Kelley Square Improvement ProjectWorcester | Project File No.609226

Page 6: Kelley Square Improvement Project Worcester | Project File

Refinement since 25% Design

Kelley Square Improvement ProjectWorcester | Project File No.609226

• Parking on Madison St

• Pattern of SUP

• Landscaping

• Street Lighting

• Bicycle treatments

• Bike route wayfinding signage

Page 7: Kelley Square Improvement Project Worcester | Project File

varies

Hybrid Roundabout

Kelley Square Improvement ProjectWorcester | Project File No.609226

Green Street

2’12’ 4’ 12’

2’4’ 10’varies4’ 12’

2’12’10’ 4’

2’

Page 8: Kelley Square Improvement Project Worcester | Project File

Madison Street

• Additional Parking on Madison St (northside)

• Landscaping along roadways

• Scoring of Shared-Use Path• Street Lighting

Kelley Square Improvement ProjectWorcester | Project File No.609226

Gol

d St

reet

Green Island Blvd

Future Ballpark Site

Future Mixed-Use Development Site

S S

11’ 11’ 11’ 8’ 6’ 10’11’2’6’10’

Page 9: Kelley Square Improvement Project Worcester | Project File

6’

Madison Street

• Landscaping along roadways• Scoring of Shared-Use Path• Street Lighting

Kelley Square Improvement ProjectWorcester | Project File No.609226

Green StreetTable Talk Pies

Washington Street

10’ 4’ 2’ 11’ 11’2’

11’ 11’2’ 2’ 10’

2’

Page 10: Kelley Square Improvement Project Worcester | Project File

Green Street

• Landscaping along roadways• Scoring of Shared-Use Path• Street Lighting

Kelley Square Improvement ProjectWorcester | Project File No.609226

Green Street

Varies 2’ 5’ 11’ 11’ 5’ 7’ Varies

Page 11: Kelley Square Improvement Project Worcester | Project File

Harding St (North of Kelley Sq)

• Landscaping along roadways• Scoring of Shared-Use Path• Street Lighting• Bicycle connection along Harding St

Kelley Square Improvement ProjectWorcester | Project File No.609226

Harding Street

Harrison Street

varies 2’ 8’ 6’ 12’ 7’ 3’ 5’ varies

Page 12: Kelley Square Improvement Project Worcester | Project File

Arwick Ave/Millbury St/ Harding St

Kelley Square Improvement ProjectWorcester | Project File No.609226

• Location of Mini-Roundabout• Street Lighting

Millbury Street

Page 13: Kelley Square Improvement Project Worcester | Project File

Kelley Square Improvement ProjectWorcester | Project File No.609226

Traffic Impacts• Construction documents will provide a suggested

construction staging and sequencing plan• Construction documents:

– Verify project can be built

– For bidding purposes

– Focus on safety and operations

• Contractor can submit an alternate staging/sequencing plan for review and approval by MassDOT/City

Page 14: Kelley Square Improvement Project Worcester | Project File

Traffic ImpactsDuring Majority of Construction:

• Pedestrian, bicycle and motor vehicle access will be maintained

• A minimum of 1-lane of travel in each direction will be maintained

• Roadway closures and detours will be limited to short durations (overnight & weekends)

• Night work is anticipated

Kelley Square Improvement ProjectWorcester | Project File No.609226

Page 15: Kelley Square Improvement Project Worcester | Project File

Traffic Impacts – Key Details• Permanent parking removal implemented at onset of

construction

• Pedestrian facilities will be provided on

• 1 side of street during construction (at a minimum) and

• 2 north/south crossings will be maintained in vicinity of Water/Millbury & Harding/Green

• Abutter access/egress will be maintained

• Existing bike lanes along Green, Water and Millbury Streets will be restored as quickly as possible

• Work hours will be set by MassDOT and City of Worcester, but anticipate some activities will take place 24/7

Kelley Square Improvement ProjectWorcester | Project File No.609226

Page 16: Kelley Square Improvement Project Worcester | Project File

Stage 1 - Kelley Square

Description of Work: Existing Island Removal; Road, Curb & SW Construction

Focus Areas: Harding North/Green; Harding South; Madison (btw K Sq and Wash.); I-290 WB off/on ramp and EB off-ramp/Ward Street; Millbury Street intersections

Kelley Square Improvement ProjectWorcester | Project File No.609226

Page 17: Kelley Square Improvement Project Worcester | Project File

Stage 1 – Millbury & Harding Streets

Description of Work: Road, Curb & SW Construction; Portion of Mini-Roundabout

Focus Areas: Millbury at Sigel and Endicott; Millbury/Harding South/Arwick

Kelley Square Improvement ProjectWorcester | Project File No.609226

Page 18: Kelley Square Improvement Project Worcester | Project File

Millbury/ Harding Reversal

Overnight and/or weekend closure/detour(s) – Signal Modifications at Endicott Street; Striping & Signage; Police & Message board Reinforcement

Contractor to submit hour by hour plan for reversal implementation

Kelley Square Improvement ProjectWorcester | Project File No.609226

Page 19: Kelley Square Improvement Project Worcester | Project File

Stage 2 – Kelley Square

Description of Work: Implement Hybrid; Construct interior of Hybrid, including truck aprons; Road, Curb & SW Construction; Traffic Signal installation

Focus Areas: Hybrid; Harding North/Harrison; Madison (btw K Sq and Wash); Harding South; I-290 WB on/off ramp and EB off-ramp/Ward Street

Kelley Square Improvement ProjectWorcester | Project File No.609226

Page 20: Kelley Square Improvement Project Worcester | Project File

Stage 2 – Millbury St & Harding St

Description of Work: Completion of Mini-Roundabout

Focus Areas: Millbury/Harding South/Arwick

Kelley Square Improvement ProjectWorcester | Project File No.609226

Page 21: Kelley Square Improvement Project Worcester | Project File

Stage 3 - Kelley Square

Description of Work: Road, Curb & SW Construction; Traffic Signal installation

Focus Areas: Northside Hybrid, btw Harding North, Water and Vernon; Harding North/Harrison; I-290 WB off-ramp

Kelley Square Improvement ProjectWorcester | Project File No.609226

Page 22: Kelley Square Improvement Project Worcester | Project File

Stage 4 - Kelley Square

Description of Work: Construct splitter and median islands; final paving & striping; plantings and landscape details

Focus Areas: Islands and landscape areas

Kelley Square Improvement ProjectWorcester | Project File No.609226

Page 23: Kelley Square Improvement Project Worcester | Project File

Stage 5 – Madison St (west of Washington St)

Description of Work: Road & temp SW Construction, short-term/weekend closures for intersection work at Washington & Gold Streets (including traffic signal upgrade)

Focus Areas: Southside of Madison & Washington/Gold intersections

Kelley Square Improvement ProjectWorcester | Project File No.609226

1 lane of traffic/direction on Madison; Pedestrians maintained on northside

Page 24: Kelley Square Improvement Project Worcester | Project File

Stage 6 – Madison St (west of Washington St)

Description of Work: Road, Curb & SW Construction, overnight & weekend closures for intersection work at Washington & Gold Streets (including traffic signal upgrade)

Focus Areas: Northside of Madison & Washington/Gold intersections

Kelley Square Improvement ProjectWorcester | Project File No.609226

1 lane of traffic/direction on Madison; Pedestrians maintained on southside

Page 25: Kelley Square Improvement Project Worcester | Project File

Stage 7 – Madison St (west of Washington St)

Description of Work: SW Construction, overnight & weekend closures for intersection work at Washington & Gold Streets (including traffic signal upgrade)

Focus Areas: Southside of Madison & Washington/Gold intersections

Kelley Square Improvement ProjectWorcester | Project File No.609226

1 lane of traffic/direction on Madison; Pedestrians maintained on northside

Page 26: Kelley Square Improvement Project Worcester | Project File

Project Schedule

25% Design Submittal Feb 8 2019

25% Design Public Hearing

Feb 27, 2019

100% Design SubmittalMay 2019

Construction Starts Oct 2019

Kelley Square Improvement ProjectWorcester | Project File No.609226

Page 27: Kelley Square Improvement Project Worcester | Project File

We Want To Hear From You…

- Comment sheets

- Project Email Address: [email protected]

– Project website: https://www.mass.gov/worcester-kelley-square-improvement-project

Kelley Square Improvement ProjectWorcester | Project File No.609226

Page 28: Kelley Square Improvement Project Worcester | Project File

100% Design

Kelley Square Improvement ProjectWorcester | Project File No.609226

• Parking on Madison• Pattern of SUP• Landscaping• Lighting• Bike treatment• Bike route wayfinding signage

Gold Street

Washington Street

Green Street

Harding Street North

Water Street