kelley square improvement project worcester | project file
TRANSCRIPT
Kelley Square
Improvement Project
Worcester | Project File No. 609226
PUBLIC INFORMATION MEETING
Worcester Academy Performance CenterMay 22, 2019 | 6:00pm
Kelley Square Improvement ProjectWorcester | Project File No.609226
Project Team
• MassDOT Highway Division
• Federal Highway Administration
• City of Worcester
• VHB – Design Consultant
• RVA – Public Outreach Consultant
Agenda
• 100% Design Updates
• Construction Staging and Sequencing
Kelley Square Improvement ProjectWorcester | Project File No.609226
Project Limits
Kelley Square Improvement ProjectWorcester | Project File No.609226
.
Public Outreach• Outreach to date
– Numerous meetings with community/business/stakeholder groups– MassDOT 1st Public Workshop – Oct 10, 2018– MassDOT 2nd Public Workshop – Oct 24, 2018– MassDOT Public Information Meeting – Dec 5, 2018– MassDOT 3nd Public Workshop – Jan 23, 2019– MassDOT 25% Design Public Hearing – February 27, 2019– City of Worcester sponsored Landscape meeting – May 6, 2019– MassDOT Public Information Meeting - May 22, 2019
• Additional community/business/stakeholder meetings continuing
• Additional public meetings continuing through Construction
Kelley Square Improvement ProjectWorcester | Project File No.609226
Refinement since 25% Design
Kelley Square Improvement ProjectWorcester | Project File No.609226
• Parking on Madison St
• Pattern of SUP
• Landscaping
• Street Lighting
• Bicycle treatments
• Bike route wayfinding signage
varies
Hybrid Roundabout
Kelley Square Improvement ProjectWorcester | Project File No.609226
Green Street
2’12’ 4’ 12’
2’4’ 10’varies4’ 12’
2’12’10’ 4’
2’
Madison Street
• Additional Parking on Madison St (northside)
• Landscaping along roadways
• Scoring of Shared-Use Path• Street Lighting
Kelley Square Improvement ProjectWorcester | Project File No.609226
Gol
d St
reet
Green Island Blvd
Future Ballpark Site
Future Mixed-Use Development Site
S S
11’ 11’ 11’ 8’ 6’ 10’11’2’6’10’
6’
Madison Street
• Landscaping along roadways• Scoring of Shared-Use Path• Street Lighting
Kelley Square Improvement ProjectWorcester | Project File No.609226
Green StreetTable Talk Pies
Washington Street
10’ 4’ 2’ 11’ 11’2’
11’ 11’2’ 2’ 10’
2’
Green Street
• Landscaping along roadways• Scoring of Shared-Use Path• Street Lighting
Kelley Square Improvement ProjectWorcester | Project File No.609226
Green Street
Varies 2’ 5’ 11’ 11’ 5’ 7’ Varies
Harding St (North of Kelley Sq)
• Landscaping along roadways• Scoring of Shared-Use Path• Street Lighting• Bicycle connection along Harding St
Kelley Square Improvement ProjectWorcester | Project File No.609226
Harding Street
Harrison Street
varies 2’ 8’ 6’ 12’ 7’ 3’ 5’ varies
Arwick Ave/Millbury St/ Harding St
Kelley Square Improvement ProjectWorcester | Project File No.609226
• Location of Mini-Roundabout• Street Lighting
Millbury Street
Kelley Square Improvement ProjectWorcester | Project File No.609226
Traffic Impacts• Construction documents will provide a suggested
construction staging and sequencing plan• Construction documents:
– Verify project can be built
– For bidding purposes
– Focus on safety and operations
• Contractor can submit an alternate staging/sequencing plan for review and approval by MassDOT/City
Traffic ImpactsDuring Majority of Construction:
• Pedestrian, bicycle and motor vehicle access will be maintained
• A minimum of 1-lane of travel in each direction will be maintained
• Roadway closures and detours will be limited to short durations (overnight & weekends)
• Night work is anticipated
Kelley Square Improvement ProjectWorcester | Project File No.609226
Traffic Impacts – Key Details• Permanent parking removal implemented at onset of
construction
• Pedestrian facilities will be provided on
• 1 side of street during construction (at a minimum) and
• 2 north/south crossings will be maintained in vicinity of Water/Millbury & Harding/Green
• Abutter access/egress will be maintained
• Existing bike lanes along Green, Water and Millbury Streets will be restored as quickly as possible
• Work hours will be set by MassDOT and City of Worcester, but anticipate some activities will take place 24/7
Kelley Square Improvement ProjectWorcester | Project File No.609226
Stage 1 - Kelley Square
Description of Work: Existing Island Removal; Road, Curb & SW Construction
Focus Areas: Harding North/Green; Harding South; Madison (btw K Sq and Wash.); I-290 WB off/on ramp and EB off-ramp/Ward Street; Millbury Street intersections
Kelley Square Improvement ProjectWorcester | Project File No.609226
Stage 1 – Millbury & Harding Streets
Description of Work: Road, Curb & SW Construction; Portion of Mini-Roundabout
Focus Areas: Millbury at Sigel and Endicott; Millbury/Harding South/Arwick
Kelley Square Improvement ProjectWorcester | Project File No.609226
Millbury/ Harding Reversal
Overnight and/or weekend closure/detour(s) – Signal Modifications at Endicott Street; Striping & Signage; Police & Message board Reinforcement
Contractor to submit hour by hour plan for reversal implementation
Kelley Square Improvement ProjectWorcester | Project File No.609226
Stage 2 – Kelley Square
Description of Work: Implement Hybrid; Construct interior of Hybrid, including truck aprons; Road, Curb & SW Construction; Traffic Signal installation
Focus Areas: Hybrid; Harding North/Harrison; Madison (btw K Sq and Wash); Harding South; I-290 WB on/off ramp and EB off-ramp/Ward Street
Kelley Square Improvement ProjectWorcester | Project File No.609226
Stage 2 – Millbury St & Harding St
Description of Work: Completion of Mini-Roundabout
Focus Areas: Millbury/Harding South/Arwick
Kelley Square Improvement ProjectWorcester | Project File No.609226
Stage 3 - Kelley Square
Description of Work: Road, Curb & SW Construction; Traffic Signal installation
Focus Areas: Northside Hybrid, btw Harding North, Water and Vernon; Harding North/Harrison; I-290 WB off-ramp
Kelley Square Improvement ProjectWorcester | Project File No.609226
Stage 4 - Kelley Square
Description of Work: Construct splitter and median islands; final paving & striping; plantings and landscape details
Focus Areas: Islands and landscape areas
Kelley Square Improvement ProjectWorcester | Project File No.609226
Stage 5 – Madison St (west of Washington St)
Description of Work: Road & temp SW Construction, short-term/weekend closures for intersection work at Washington & Gold Streets (including traffic signal upgrade)
Focus Areas: Southside of Madison & Washington/Gold intersections
Kelley Square Improvement ProjectWorcester | Project File No.609226
1 lane of traffic/direction on Madison; Pedestrians maintained on northside
Stage 6 – Madison St (west of Washington St)
Description of Work: Road, Curb & SW Construction, overnight & weekend closures for intersection work at Washington & Gold Streets (including traffic signal upgrade)
Focus Areas: Northside of Madison & Washington/Gold intersections
Kelley Square Improvement ProjectWorcester | Project File No.609226
1 lane of traffic/direction on Madison; Pedestrians maintained on southside
Stage 7 – Madison St (west of Washington St)
Description of Work: SW Construction, overnight & weekend closures for intersection work at Washington & Gold Streets (including traffic signal upgrade)
Focus Areas: Southside of Madison & Washington/Gold intersections
Kelley Square Improvement ProjectWorcester | Project File No.609226
1 lane of traffic/direction on Madison; Pedestrians maintained on northside
Project Schedule
25% Design Submittal Feb 8 2019
25% Design Public Hearing
Feb 27, 2019
100% Design SubmittalMay 2019
Construction Starts Oct 2019
Kelley Square Improvement ProjectWorcester | Project File No.609226
We Want To Hear From You…
- Comment sheets
- Project Email Address: [email protected]
– Project website: https://www.mass.gov/worcester-kelley-square-improvement-project
Kelley Square Improvement ProjectWorcester | Project File No.609226
100% Design
Kelley Square Improvement ProjectWorcester | Project File No.609226
• Parking on Madison• Pattern of SUP• Landscaping• Lighting• Bike treatment• Bike route wayfinding signage
Gold Street
Washington Street
Green Street
Harding Street North
Water Street
Harding Street South