keeping london moving - transport for london - guidance ... · web viewplant protection national...

25
1 Section 50 Applicatio

Upload: others

Post on 25-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

1

Section 50ApplicationNew Roads and Streetworks Act 1991

Page 2: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

Guidance Notes for Section 50 Applicants

1. Requirement for a Licence1.1 Section 50 of the New Roads and Street Works Act 1991 (“the Act”)

requires that any person, body or organisation (other than those bodies or organisations who have the benefit of specific statutory rights) must apply for a licence in order to place or retain apparatus in the street and thereafter inspect, maintain, adjust, repair, alter, renew, reconfigure/relocate or remove such apparatus from the street.

1.2 The term apparatus includes a sewer, drain or tunnel and any structure for the lodging or access to them. It also includes cables, ducts and water and gas pipes.

1.3 The licence may authorise the placing of the apparatus and the carrying out of any works incidental to it (for instance, the breaking up or opening of the street or any sewer, drain, tunnel under it, or tunnelling or boring under the street). Applicants should note that the grant of a licence does not dispense with need for the applicant to obtain any other consents, licences or permission that may be required. If in doubt about what consents may be required, applicants are strongly advised to seek professional advice.

1.4 Any work undertaken in the street in breach of this requirement constitutes a criminal offence under section 51 of the Act and the offending person, body or organisation may be liable on summary conviction to a fine of up to £5,000.

2. Terms of the Licence2.1 A licence may be granted to the applicant on terms permitting or prohibiting its

assignment to another party. Exceptionally a licence may be granted to the owner of the land and its successors in title.

2.2 An applicant granted a licence becomes an undertaker for the purposes of the Act, any secondary legislation, and codes of practice. This means that the applicant must comply with certain duties and responsibilities. For example, the applicant will be required to issue street works notices and/or pay charges pursuant to section 74 and/or s74A of the Act for occupation of the street. Applicants not familiar with the requirements of this legislation are strongly advised to seek professional advice and to appoint a contractor with the appropriate knowledge to help complete this application and to conduct the

2

Page 3: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

works on their behalf. Non-compliance with any requirement of the Act may result in penalties and future applications being rejected. Applicants cannot delegate this liability to any other person or organisation.

2.3 During and upon completion of the proposed works, TfL will require access to the works in order to carry out inspections.

2.4 The proposed works must conform to all current codes of practice and legislation. The needs of vulnerable road users and disabled people must be met.

2.5 The works must be carried out and completed without delay and in accordance with a schedule of work agreed with TfL.

2.6 TfL must be indemnified by the applicant against any claims for injury, damage or loss arising out of the placing or the presence of the apparatus or the execution of any works authorised by the licence.

2.7 In addition, TfL may stipulate in the licence any conditions that they consider appropriate in the interests of safety, to minimise the inconvenience to persons using the street or to protect the structure of the street and integrity of the apparatus in it.

2.8 For the purposes of protecting and maintaining the condition of the highway asset TfL requires a deposit that is held on account for use in the event that the licensee fails to respond and take the required remedial action to a defect notification in respect of the works undertaken. This deposit will be held until the relevant guarantee period has elapsed and the applicant has requested the return of any residue sum using the form provisioned within Appendix E.

2.9 The owner of the apparatus has a statutory duty to ensure the apparatus is properly maintained at all times.

2.10Where the applicant to the licence proposes to cease using the apparatus or dispose of its interest in the apparatus, six weeks advance notice must be given to TfL. If the licence is for the benefit of the owner and its successors in title then advance notice must be given to TfL of any transfer of the interest. Failure to comply with this requirement commits an offence and may be liable on summary conviction to a fine.

2.11If a licence expires or is withdrawn or surrendered then TfL may remove the apparatus from the street or alter it in such a manner as it thinks fit and reinstate the street. The costs of these works may be recovered from the applicant. Alternatively TfL may require that the applicant remove or alter the apparatus at its own cost.

2.12A record of the works and apparatus will be kept by TfL.

3

Page 4: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

3. Application for a Licence3.1 All enquiries relating to the completion of the licence application, the issue and

progress of the licence, and all associated NRSWA notifications should be directed to the:Roadworks Intelligence & Enforcement TeamTelephone: (020) 3054 8472Email: [email protected] TM enquiries should also be directed to the above contact details.

3.2 In order for TfL to comply with its statutory duties, all applications for a licence must be submitted three months in advance of the proposed works start date for works that require a traffic order, are 11 days or more in duration, or where the traffic management for the works will impact the carriageway. All other types of works must be submitted one month in advance of the proposed works start date.

3.3 In urgent or emergency situations a shorter period may be agreed.

Information Required:3.4 All applicants for a licence must submit to TfL a completed application form

(see Appendix A).

3.5 Two copies of a scale location plan at 1:1250 showing the proposed location and depth of the relevant apparatus marked by a red broken line;

3.6 A copy of a Traffic Management Drawing;3.7 Evidence of Public Liability Insurance to a minimum of £10,000,000 in respect

of any one claim;3.8 A payment of £1099.00; made by credit/debit card, BACS made payable to

“Transport for London” (a breakdown of this fee is set out at paragraph 5.1 below)

3.9 A deposit for the sum stated in section 7 of the application form – payable by BACS or card made payable to “Transport for London” and posted to the address at the bottom of this document.

3.10Confirmation that the applicant has written to all statutory undertakers who may have apparatus in the street which may be affected (a list of relevant undertakers is provided as Appendix E of this document);

3.11Copies of street works qualifications (badges/certificates) obtained by operatives and supervisors who will carry out works on behalf of the applicant.

4

Page 5: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

3.12Works involving the use of portable light signals and/or a traffic order to prohibit traffic will require separate approvals. Copies of these applications/approvals must be submitted with the s50 application.

4. Other Required NRSWA Activity Notifications4.1 Under NRSWA works promoters are required to provide the following notices

once the works have commenced. Failure to provide these notices in a timely manner could result in a fixed penalty notice (FPN) being given for each offence committed.

4.2 In order to comply with s74 of NRSWA, the applicant must provide an ‘actual start’ notice (as provided in Appendix B) to the street authority to inform them that the works have actually began. This notice must be received by the street authority before 10.00am the day after the works commenced.

4.3 In order to comply with s74 of NRSWA, the applicant must provide an ‘works closed’ notice (as provided in Appendix C) to the street authority once the street has been permanently reinstated and all spoil, materials, signing, lighting and guarding has been removed from site. The works closed notice must be received by the street authority by the end of the next working day following the day on which the activity was closed.

4.4 In order to comply with s70 of NRSWA, the applicant must provide a ‘registration of reinstatement’ notice (as provided in Appendix D) to the street authority following the completion of permanent reinstatement and the sending of a works closed notice. The registration of reinstatement must be received by the street authority within 10 working days of completing the reinstatement. An As Built drawing must be supplied with the Reinstatement Registration document.

5. Licence Charges/Fees5.1 The total fee to be included with the application is £1099.00. This comprises of

the following:

Charge/Fee Description Fee

TfL’s administration costs (this fee is non refundable) £367.00

Capitalised payment in lieu of the annual fee for administering the licence

£532.00

4 x Site Inspections of the works by TfL, undertaken as follows: Pre-site Inspection to determine the condition of the

highway asset prior to works commencing during the progress of the works within 6 months following reinstatement

£200.00

5

Page 6: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

within 3 months preceding the end of guarantee period (normally 2 years)

TOTAL £1099.00

5.2 As identified in sections 2.8 and 3.9 above , a deposit is also required which will be held on account for the duration of the guarantee period determined by the New Roads and Streetworks Act 1991. The licensee will be required to rectify any defects associated with the works in a timely manner. Should the licensee fail to respond to any defect inspection notices in an appropriate manner TfL may take reasonable remedial action and deduct all reasonable costs incurred from the deposit received. Any costs incurred that exceed the deposit amount will be reclaimed from the licensee

This deposit will be taken as separate payment to the Section 50 fee and will be fully refundable to the applicant upon receipt of a request to refund and satisfactory completion of a final inspection of the works before the applicable guarantee period expires.

Deposit Amount

Carriageway - £1500, or £150 per Square Meter; whichever is greater

Cycleway - £750, or £100 per Square Meter; whichever is greater

Footway/Verge - £500, or £75 per Square Meter; whichever is greater

5.3 The applicant may also be required to pay the following additional costs if these are incurred, which may be deducted from the deposit in the event that payment not being received:

Charge/Fee Type Amount

a) Lane Rental Charges (s74A) ● £800/day – Low Charge Segment● £2500/day – High Charge Segment● £2500/day – High Charge Pinch Point

b) Overrunning Work Charges (s74)

● Up to £5000 each day for the first 3 days; and up to £10,000/day thereafter.

c) Requests to process promoter initiated

● £45 per request

6

Page 7: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

variations to the scope of the works specified within the original application

d) Costs for processing registerable work requests to undertake future maintenance to apparatus or remedial works to the street

● £240 per request for Major Works● £130 per request for Standard Works● £65 per request for Minor Works● £60 per request for Immediate Works

e) Additional Inspection Fees for Works

● £50 for each additional unit of inspection

● £50 for each Defect Site Visit inspection undertaken

● £50 for each Defect Follow Up inspection undertaken

● £50 for each Defect Follow Up Completion inspection undertaken

f) Cost of any remedial or repair works to the apparatus or highway undertaken by TfL

● All reasonable costs incurred by TfL to make safe or rectify a defect to the highway or apparatus associated with the s50 licence, including the removal of apparatus.

g) Legal Fees or Expenses ● £80-£120 Fixed Penalty Notice● Up to £3000 Court Prosecution● Plus and associated expenses or costs

awarded

h) Refunds You will be entitled to a partial refund if you decide to cancel the application. The following conditions will apply:

a. Application submitted, payment made, no permit raised to coordination – amount to be refunded £650

b. Permit has been raised for coordination check – amount to be refunded ^00

c. Permit Granted, licence approved – amount to be refunded £500

7

Page 8: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

5.4 a) Section 74A – Lane Rental ChargesThe Department for Transport approved a scheme that enables TfL to apply lane rental charges if traffic management equipment is impacting the carriageway at traffic sensitive times and at locations of the road network that have been designated as particularly disruptive.The scheme commenced on 11th June 2012. The nature of the scheme encourages street and road works to be undertaken at less disruptive times and completed without delay. Further information relating to the scheme can be found at:www.tfl.gov.uk/lanerental

It is the responsibility of the Section 50 applicant to familiarise themselves with TfL’s Lane Rental scheme and plan work proposals to avoid incurring a lane rental charge if the works are taking place at a lane rental location.

5.5 Section 74 – Overrunning Works ChargesUnder NRSWA street authorities can charge Section 50 Licensee’s if street works take longer than previously agreed. A daily charge is applicable for each working day that the works exceed the longer of the prescribed or reasonable periods. The daily charge varies according to the road category, whether the street is traffic sensitive, and whether or not the works affect the carriageway at any time during the period of overrun. Applicants must ensure that they are familiar with the rules, regulations and fees associated with overrunning works. Further information can be found at:http://www.dft.gov.uk/publications/street-works-overrun-charges/

Variation RequestsAny requirement that fundamentally changes the scope of the works originally specified within the application will require the street authority to process and reassess these proposals for impact to the road network and check for any conflicts with other works where any changes to dates are requested. These requests must be submitted at least 2 (two) days before the original end date.

5.6 Future Maintenance CostsAny future maintenance works required to the apparatus placed as part of the granted s50 licence, or any remedial measures to the reinstatement of the street that qualify as registerable works under the Act will need to be processed and evaluated by the street authority. The charge applicable is determined by the registerable works activity categorisation for the proposed works.Further information on registerable works can be found within section 7.3 of the Code of Practice for Coordination:

8

Page 9: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

http://assets.dft.gov.uk/publications/street-works-co-ordination/cop3rdedition.pdf

5.7 Additional Inspection FeesUnder NRSWA, street authorities are permitted to recover the costs of inspections undertaken, as set-out in the Department for Transport’s Code of Practice for Inspections.The Licence application fee includes a payment for undertaking a minimum of three inspections. Further Information can be found at:http://www.dft.gov.uk/publications/street-works-inspections/http://www.legislation.gov.uk/uksi/2009/104/contents/made

5.8 Remedial Works Undertaken by the Street AuthorityUnder NRSWA, street authorities can undertake remedial works where works promoters perform unsatisfactorily in responding to defect notifications issued by the authority, and charge their reasonable costs to the Licensee.Further Information can be found within section 4.2 of the following document:http://assets.dft.gov.uk/publications/street-works/codeofpracticeforinspections.pdf

5.9 Legal Fees and ExpensesPart 3 of NRSWA details a range of statutory duties and obligations placed on works promoters and the offences associated with failing to comply with them. A street authority has the power prosecute a works promoter in the Magistrates Court for an alleged failure to comply with legislation. The maximum fine that can be imposed by a Magistrate for an offence is £3000.00.In addition, a street authority may choose to give a fixed penalty notice (FPN) to a works promoter for failing to comply with legislation. An FPN offers a works promoter the opportunity to discharge any liability to conviction for a fixed penalty offence, by payment of a penalty. However, the street authority retains the power to take an alleged offender to the Magistrates Courts instead of giving an FPN.The penalty is £120.00, which must be paid within 36 calendar days. A discounted amount of £80.00 will apply if payment is made within 29 calendar days.Further information can be found at: http://www.dft.gov.uk/publications/street-works-co-ordination

6. Refused Applications6.1 Where an application is made in respect of apparatus to be placed or retained in a line crossing the street and not along the line of the street, a person aggrieved by:

a) Refusal by TfL to grant a licence,

9

Page 10: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

b) Refusal by TfL to grant a licence except on terms prohibiting its assignment; or

c) Any terms or conditions of the licence granted may appeal to the Secretary of State.

7. Lead Times6.1 The following timelines should be considered when applying for a Section 50a. Minor Works – 1 to 3 days duration. Please ensure your application is submitted at least 14 working days prior to your anticipated works start

b. Standard Works – 4 to 10 days duration. Please ensure your application is submitted at least 22 working days prior to your anticipated works start.

c. Major Works – 11+ days duration. Please ensure your application is submitted at least 3months and 12 working days prior to your anticipated works start

10

Page 11: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

Appendix A -Section 50 Application FormPlease ensure ALL fields are completed to avoid incurring a delay with processing your application

1. Applicant & Promoter Contact DetailsDate of Application:      Applicant Name (Owner of Apparatus):      Company Registration Number:      Contact Email Address:       Contact Telephone No:      Full Postal Address:      Site Supervisor Contact Name & number /Contractor Name:      Contact Email Address:       Contact Telephone No:      2. Work DetailsInstallation of New Apparatus: Maintenance of Existing Apparatus: Description of Apparatus being placed/maintained, including materials and size of apparatus(e.g. Install and lay 8m of 100mm diameter polyethylene gas pipe from the boundary of the domestic dwelling to the existing 24inch low pressure gas mains located in the main carriageway)     

Description of Works:      Works Category Major Standard Minor Urgent Emergency

Estimated Works Start Date:       Estimated Works End Date:      

Proposed Working Times on Site:       Proposed Times Traffic Management will Impact the Carriageway:      

Highway Restrictions:

Lane Closure Stop/Go Boards Contra-Flow

Road Closure Portable Light Signals Footway Closure

Is a Temporary Traffic Regulation Order/Notice (TTRO/N) Required?

Yes Provide Details

No

Is the suspension of bus lane(s), parking bay(s) and/or loading bay(s) required?

Yes Provide Details

No

Traffic Management Plan(s) Provided Surface: C/W Cycle F/W VergeIf working in more than Estimated Site Length: Estimated Site Width:      

11

Page 12: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

one surface, please provide estimated measurements for each ie C/W 2m, F/W 4m

     

Specify proposed measures to mitigate potential disruption on road users:      

3. Vehicle Parking and Access RequirementsVehicle Parking within Works Site Vehicle Parking Dispensation RequiredConstruction Traffic Access Maintain Property/Frontage AccessAny Other Access Requirements (please specify):      4. Works Location(s)

NSG USRN Street Name

Street Location(E.g. O/S 71, Opp 27, J/W Cross Road)

London Borough

Asset Location*C/W

F/WWith C/W Incursion

F/WNo

C/W Incursion

V

                                                                                                                   

*Asset Location Key: C/W – Carriageway; F/W – Footway; V – VergeSpatial Location of Works

Easting (X) Coordinates:       Northing (Y) Coordinates:      

5. Stakeholder Notification

Stakeholder Agreement, Objections, Conditions, Comments Date

Evidence

Enclosed

Statutory Undertakers with Apparatus in Street

           

Police            Adjoining Authority(s)            Transport Operators            

Frontages /            12

Page 13: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

Property OwnersOther Parties            6. Insurance Cover

I understand that I am required to indemnify TfL against any claims for which I am obliged to indemnify TfL under section 8 of Schedule 3 to the New Roads and Street Works Act 1991 and for this purpose to maintain an insurance policy to cover any liability up to £10,000,000 for any such claim and to produce the policy to TfL upon demand together with the receipt for the last premium. The relevant insurance details applicable to this application are provided below.Name of Insurance Company:       Insurance Policy Number:      Amount of Insurance Cover:       Insurance Policy Expiration Date:      7. Payment Details

Description Charge Applicants Estimate of Other Charges

Charge

S50 Licence Application Fee £1099.00 s74A Lane Rental Charges £     

Fee Paid BACS – Credit Card Reference:       Deposit £     

8. Supplementary Information Checklist

Location Plan (1:1250) Traffic Management Plan Evidence of Stakeholder Engagement

Details of TTRO/N Application

Details of Suspension Request Deposit Payment

Copies of Operatives and Supervisors Qualification ID

Copy of Public Liability Insurance Policy

BACS or Credit Card payment for the sum of £1099.00

9. DeclarationI confirm that the foregoing details are correct, and acknowledge that the works referred to above must be conducted in accordance with the requirements of the New Road & Street Work Acts 1991 and associated legislation and codes of practice, together with any other conditions imposed by TfL as the Street Authority in the relevant Licence.I acknowledge the statutory requirement to pay the prescribed fees which will be imposed by TfL, including any of the additional charges identified in section 5.0 (Licence Charges/Fees) of the guidance notes.I hereby indemnify TfL against any claims for which I am obliged to indemnify TfL under section 8 of Schedule 3 to the New Roads and Street Works Act 1991 and for this purpose to maintain an insurance policy to cover any liability up to £10,000,000.I acknowledge that I have read and understood the information for applicants contained within these guidance notes.I agree that I will complete and return the required Deposit Refund Request Form within 3 months of the expiry of the relevant guarantee period, and accept that Transport for London reserve the right to reinvest any unclaimed excess deposit to

13

Page 14: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

develop and implement safe, integrated, efficient and economic transport facilities and services.I confirm that I agree with the terms and conditions of the licence and will advise in writing within 7 days of receipt of the licence of any objections.Name:       Signature: Date:      

Completed forms should be returned to: [email protected]

Appendix B – NRSWA Actual Start Notice

Section 50 Applicant Contact DetailsDate of Notice:       Time of Notice:      s50 Application Reference:       Activity Works Reference: YG104     Contractor (Supervisor on site):      Contact Email Address:       Contact Telephone No:      Work DetailsDescription of Works:      Estimated Works Start Date:       Estimated Works End Date:      Actual Works Start Date:       Actual Works Start Time:      Works Location(s)

NSG USRN Street Name

Street Location(E.g. O/S 71, Opp 27, J/W Cross Road)

London Borough

Asset Location*C/W

F/WWith C/W Incursion

F/WNo

C/W Incursion

V

                       *Asset Location Key: C/W – Carriageway; F/W – Footway; V – Verge

Spatial Location of Works

Easting (X) Coordinates:       Northing (Y) Coordinates:      

14

Page 15: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

Declaration

I confirm that the foregoing details are correct.

Name:       Signature: Date:      

Completed forms should be returned to: [email protected]

Appendix C – NRSWA Works Closed NoticeNote : One works closed notice is required for each works location

Section 50 Applicant Contact DetailsDate of Notice:       Time of Notice:      s50 Application Reference:       Activity Works Reference: YG104     Contractor Name (Supervisor on Site):      Contact Email Address:       Contact Telephone No:      Work DetailsDescription of Works:      Estimated Works Start Date:       Estimated Works End Date:      Actual Works Start Date:       Actual Works End Date:      Works Location(s)

NSG USRN Street Name

Street Location(E.g. O/S 71, Opp 27, J/W Cross Road)

London Borough

Asset Location*C/W

F/WWith C/W Incursion

F/WNo

C/W Incursion

V

                       

15

Page 16: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

*Asset Location Key: C/W – Carriageway; F/W – Footway; V – VergeSpatial Location of Works

Easting (X) Coordinates:       Northing (Y) Coordinates:      

Declaration

I confirm that the foregoing details are correct.

Name:       Signature: Date:      

Completed forms should be returned to: [email protected]

Appendix D – NRSWA Section 70 Registration NoticeNote : One registration notice is required for each works location

1. Section 50 Applicant Contact DetailsDate of Notice:       Time of Notice:      s50 Application Reference:       Activity Works Reference: YG104     Applicant Name (Owner of Apparatus):      Contact Email Address:       Contact Telephone No:      Full Postal Address:      Works Promoter/Contractor Name:      Contact Email Address:       Contact Telephone No:      Full Postal Address:      2. Work DetailsDescription of Works:      Estimated Works Start Date:       Estimated Works End Date:      Actual Works Start Date:       Actual Works End Date:      3. Works Location(s)

NSG USRN Street Name

Street Location(E.g. O/S 71, Opp 27, J/W Cross Road)

London Boroug

h

Asset Location*C/W

F/W V D

16

Page 17: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

                       *Asset Location Key: C/W – Carriageway; F/W – Footway; V – Verge; D – Deep Excavation (greater than 1.5m)Spatial Location of Works

Easting (X) Coordinates:       Northing (Y) Coordinates:      

4. Reinstatement Details

Site

No

Location Code*Location Description

Reinstatement Type

(Interim/Perm)

Reinstatement Date

Length

Width

Deep Exc >1.5m

F/W

C/W V Cy/

W

     

                             

Spatial Location of Works

Easting (X) Coordinates:       Northing (Y) Coordinates:      

Site

No

Location Code*Location Description

Reinstatement Type

(Interim/Perm)

Reinstatement Date

Length

Width

Deep Exc >1.5m

F/W

C/W V Cy/

W

     

                             

Spatial Location of Works

Easting (X) Coordinates:       Northing (Y) Coordinates:      

Site

No

Location Code*Location Description

Reinstatement Type

(Interim/Perm)

Reinstatement Date

Length

Width

Deep Exc >1.5m

F/W

C/W V Cy/

W

     

                             

Spatial Location of Works

Easting (X) Coordinates:       Northing (Y) Coordinates:      

Site

No

Location Code*Location Description

Reinstatement Type

(Interim/Perm)

Reinstatement Date

Length

Width

Deep Exc >1.5m

F/W

C/W V Cy/

W

     

                             

Spatial Location of

Easting (X) Coordinates:       Northing (Y) Coordinates:      

17

Page 18: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

Works

Site

No

Location Code*Location Description

Reinstatement Type

(Interim/Perm)

Reinstatement Date

Length

Width

Deep Exc >1.5m

F/W

C/W V Cy/

W

     

                             

Spatial Location of Works

Easting (X) Coordinates:       Northing (Y) Coordinates:      

Site

No

Location Code*Location Description

Reinstatement Type

(Interim/Perm)

Reinstatement Date

Length

Width

Deep Exc >1.5m

F/W

C/W V Cy/

W

     

                             

Spatial Location of Works

Easting (X) Coordinates:       Northing (Y) Coordinates:      

5. Declaration

I confirm that the foregoing details are correct.

Name:       Signature: Date:      

Completed forms should be returned to: [email protected]

Appendix E – Section 50 Deposit Refund Request FormNote : A completed form must be returned to Transport for London within 3 months of the expiry of the guarantee period (24 months after permanent reinstatement or 36 months for deep excavations)

1. Applicant Contact DetailsApplicant Name (Owner of Apparatus):      Company Registration Number:      Contact Email Address:       Contact Telephone No:      Full Postal Address:      

18

Page 19: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

2. Section 50 Works DetailsSection 50 Licence Reference:      Works Completion Date:       End of Guarantee Period:      3. Refund DetailsAmount of Refund Requested: £      (less any deductions for other additional

charges)Bank Account Name:      Bank Account Sort Code:       Bank Account Name:      4. Declaration:

I, the applicant, confirm that the foregoing details are correct and hereby request reimbursement of the residue deposit stated above

Company Name: Company Address:Name:       Position: Signature: Date:      

Completed forms should be returned to [email protected]

Appendix F - List of Undertakers List of Undertakers whose Apparatus may be Affected

Thames Water Utilities

Plant RequestsProperty Insight

PO Box 3189Slough

SL1 4WW

T. 0118 925 1504F. 0118 923 [email protected]

National GridPlant Protection

National Grid, Block 1 Floor 2

Brick Kiln Street Hinckley LE10 0NA

T. 0800 688 588plantprotection@uk

.ngrid.com

EDF EnergyFore Hamlet

IpswichSuffolkIP3 8AQ

OpenreachBritish TelecomIncoming Notices

PP3ww18 Telecom House

Trinity StreetHanley

Stoke-On-TrentST1 5ND

T. 0800 800 [email protected]

o.uk

Transport for Transport for Transport for Network Rail19

Page 20: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

List of Undertakers whose Apparatus may be Affected

LondonPlanned

InterventionsTraffic

Directorate5th Floor, Zone

5Y8Palestra

197 Blackfriars Road

LondonSE1 8NJ

LondonLondon

Undergroundc/o EDF Energy

HV Cable RecordsCAD Office

Unit 7, Bush Industrial Estate

Station RoadTufnell Park

LondonN19 5UW

LondonLondon Bus

Services LimitedProjects Planner

Infrastructure Development

172 Buckingham Palace Road

LondonSW1W 9TN

NRSWA TeamCP2 Floor 1

Suite 2General Office

Waterloo StationLondon

SE1 8SW

Union Railways (North) Limited

2 Ossulton StreetLondon

NW1 1HT

J.C. Decaux Limited

991 Great West Road

BrentfordMiddlesexTWA 9DN

Virgin MediaNetwork Operations

Support CentreUnit 1A

Scimitar ParkCourtauld Road

BasildonSS13 1ND

Cable & Wireless Worldwide(Thus, Your

Communications, Norweb

Communications, Energis and

Mercury Communications)

Plant Enquiries Team

Atkins GlobalPO Box 290

500 Aztec WestAlmondsbury

Bristol, BS32 4RZCOLT Plant

Protection Centrec/o Mc Nicholas Construction

(COLT Managing Agents)

117 Bushey Mill Lane

WatfordHertfordshire

WD24 7UN

Level 3 Communications

Operations Manager, UK Field

Operations6 Braham St

London E1 8EE

m: 07880 506 477f: 0207 864 0353

[email protected]

Verizon UK LtdRoom 3.31

2-6 St Pancras WayLondon NW1 0QG

Global Crossing (Fibernet)

Plant EnquiriesInstalcom Ltd

Instalcom HouseManor Way

BorehamwoodHerts

WD6 1QHPlantenquiries@inst

alcom.co.uk

AboveNet Communications

(UK) LtdCenturion House

51 DegreesTelecom's Centre of

ExcellenceEDF Energy

HNS Network Enquiriesc/o Futjitsu

Telecommunication

FibreSpan LimitedThe Quay

Channel Way20

Page 21: Keeping London moving - Transport for London - Guidance ... · Web viewPlant Protection National Grid, Block 1 Floor 2 Brick Kiln Street Hinckley LE10 0NA T. 0800 688 588 plantprotection@uk.ngrid.com

List of Undertakers whose Apparatus may be Affected24 Monument

StreetLondon

EC3R 8AJ

Network Ltd255 BroadwayBexleyheath

DA6 8ET

s Europe LtdSolihull Parkway

Birmingham Business ParkBirmingham

West MidlandsB37 7YU

Ocean VillageSouthampton

SO14 3TG

Easynet Telecommunicati

ons Limited70 Buckingham

AvenueSlough

SL1 4PN

Hutchison 3G UK Limited

Star House20 Grenfell Road

MaidenheadBerkshireSL6 1EH

Spectrum InteractiveParker House

Maylands AvenueHemel Hempstead

HertsHP2 4WA

InterphoneThe White HouseLichfield Street

TamworthStaffs

B79 7QF

O2c/o Alfred Mc

Alpine Infrastructure

ServicesMr Ivan

ChurchmanEastlea Road

Bury St EdmundsSuffolk

IP32 7BY

Orange Personal Communication

ServicesTudor House

55 Victoria RoadLondon

NW10 6NF

21

ContactStatutory Approvals and Licensing OfficerPlanned Interventions, Road Space ManagementTransport for LondonPalestra197 Blackfriars RoadLondon SE1 8NJ

Email [email protected] 0203 054 8472