Kathryn Flood Damage Reduction tud North Dakota State Water Commission SWC Project No. L264 February 1987

Upload: others

Post on 03-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 2: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

KTIITIRn{

FLOOD DAI{AGE REDUCTION

SruDY

February, 1987

North Dakota State Water ConmissionState Office Building

900 East BoulevardBisnarck, North Dakota 58505-0187

Prepared by:

SubnÍtted by:

A.Director of

Approved by:

VERNON FAHY, PState Engineer

PRed

Prepared for the Barnes County hlaterResource District

g.

Page 3: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

TABLE OF CONTENTS

INTRODUCTION..

STATEMEMT OF PROBLEM

iIYDROLOGY AND HYDRAULICS

ALTERNATIVES

Alternative 1Alternative 2Alternative lAlternative 4Alternative !Alternative 6

SUMMARY AND CONCLUSIONS

Tables

Table 1 - Preliminary Cost Estinate, Alternative 2Table 2 - Prelininary Cost Estimate, Alternative 3Table 3 - Preliminary Cost Estimate, Alternative 4...Table 4 - Preliminary Cost Estimate, Alternative 5.

Figures

Figure 1 - General Location...Figure 2 - Looking l{est Fron Bridge on 2nd Street....Figure 3 - Looking South Fron Bridge on 2nd Street.Figure 4 - Looking Northwest Fron Bridge on Main Street

Plates

Page

1

3

7

B

1111137576t7

t9

13t51,6L7

232425262728

2456

PlatePIatePlatePlatePIatePlate

1 - Project Location...

I - Alternative 2....2 Bridge Removal

4 - Alternative 1.,.5 - Alternative 46 - Alternative I

Page 4: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

INIRODUCTION

In a January 6, 7987 letter, the Barnes County Water Resource Board

requested technical assistance from the North Dakota State Water Comnission instudying the flood problen at the City of Kathryn. As shown in Figure 1,

Kathryn is located in southeastern Barnes County, approxinately 16 niles south

of Val1ey City.

Specifically, the Poard was interested in inproving the channel conditions

of Spring Creek near the downstream end of the city. Vegetative growth and

sedinent has further decreased the linited capacity of the channel.

Information used for this study included the foltowing: the 1980 Flood

Insurance Study for the City of Kathryn, the 1986 pfanning report prepared by

the Soil Conservation Service, entitled: "Kathryn Flood Prevention, South

Central Dakota RC&D,'i 7 1/2 minute USGS quadrangle naps, and discussions withthe Barnes County Road Department. Additional cross-sections were obtained by

the State !,later Commission survey crer,{ on January 13 and 14, 79BT . These were

added to the existing cross-sections obtained from the previous studies.

Several alternative channel inprovements were looked at for this study. A

hydraulic analysis was performed to deternine the affects of each alternative.The results of that analysis and a cost estinate of each alternative is provided

within this report.

-1-

Page 5: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

S A. S K.A EWAN M A.N I TTCHTU MT1*

!

L

I

o8a

I

I

I

\I

lI

I

o2ntÀ

II

IIE

!IIL

II

zi

-?I

tI -rcñvrllG

Olrrc t

t-IlIl*o,r¡

IIr. LO

t- FevOl¡a¡

ò.tr,dht I

Pc Ãa^ita

q/%ooa/CENTR

Towner

ll rnloñ

i

J

1-.l{.

I'ì

'CRo

,l

_i

7

2

z

}Ìord l'rrtCa-T'

Ê

l-I I=ll --'--ry SOURI

rrl

U'

o

-tjlct

Marcat

Go

ol_t'lit'

I

IILI

I

I siurr.nn-l

I.a 'II

I

I

d

09.tå,ttli - -

PROI

Stôr¡t,||llri

M1'

Orcl c

Htlt ìI

AdonI

. s' o u

6ront

L

Forn4aI t_ Rrclrlo^d

T'. H DAKOTA

?F D,¡o U)

Þ6¡

(,

¡ If̂n

€(2

ATE

to.ê

LA

N

{-

on

{I

DAþ(

r

iII

I

i

Ronsoñ

OTAE PLA

Forne¡ *

I

FIGURE 1 - Generaf Location

Srou¡

ar ¡trtl

ftl c

lModit¡cd ltom Ctolloî'1962,.J¿^La

Page 6: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

STATEMM{T OF PROBLEM

Spring Creek, with a channel length of approximately 23.5 mi1es, flows

southeasterly through Kathryn before entering the Sheyenne River, approximately

1, 1,/2 miles further downstream. At Kathryn, Spring Creek has a total drainage

area of approxinately 73 square niles. About 63 square miles of this isconsidered to be contributing area. Clausen Springs Dam is located upstream on

Spring Creek. This structure has limited flood storage capability and so has

little affect on the peak flows of najor floods.

Between June 26 and JuIy 2, 7975, a rainfall ranging between 2 a¡d 12

inches occurred in the watershed. A peak flow of approximately 1!00 cubic feetper second (cfs) caused fl-ood danage in Kathryn. (Figures 2-4 are photos taken

of that event. )

Plate 1 shows the channef alignnent and cross-section locations withinKathryn. According to previous studies, at least 13 buildings in Kathryn appear

to be located within the 100-year floodplain. Seepage nay also cause problens

to other buildings. Some buildings are located close to the channel,

restricting possible channel widening.

A fairly steep slope exists on Lhe channel through Kathryn. High

velocities, possibly causing erosion, exist in certain areas. Sediment and

vegetation appear to be building up in the channel near the lower end of the

city. The chanrrel slopes in the wrong direction for a short distance both

upstrean and downstrean of the bridge on the school road.

-3-

Page 7: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

IAI

FIGURE 2 - Looking west from bridge on 2 nd Street

Page 8: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

It¡I

FIGURE 3 Looking south from bridge on 2 Street

Page 9: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

IoìI

FIGURE 4 Looking northwest from bridge on Main Street

Page 10: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

ITYDROLOGY A¡TD HÐBAI]LICS

Prior studies had deterníned the following flows f'or the comesponding

frequency event:

Event Flow (cfs)

10-¡zear25-year5O-year

100-year

For purposes of the cha¡nel design, a flow of 15O0 cfs was used. The Corps

of Engineers HElC-z conputer model reas used' to qnalyze the exísting channel

conditions a¡ld the effects of any possible improvêments. Most of the cha¡rnel

sross-sections inserted into this nodel were obtaíned fron previous studies.The additional eross-sections obtained by the State I'later Conmission hrere

located at the downstreem end. of Kathryn. Ttrís is the area that the tsoard ismost inte'rest in inproving. The results obtained should be considered

prelininary ín nature.

66a9lCI

11501450

-7-

Page 11: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

ALTERNATIVES

Various fl-ows were looked at when studying the alternatives. Unless stated

otherwise, all discussion on the water conditions refers to the design flow of1100 cfs.

Six alternatives are presented for review. Alternative l- consists ofnaintaining the channel in good condition. Alternative 2 consists of channel

excavation starting /l! feet downstream of the bridge on the school road and

continuing 300 feet upstream of the bridge. Essentially, the channel bottom

would be restored to the level to remove the sedinent near the bridge.Alternative 3 is exactly the same as Alternative 2, but extends 1,000 feetfurther upstream. Channel improvements proposed for Alternative 4 starts 540

feet further downstream but ends at the sâme upstream location as Alternative2. The channel botton would be lower than the elevation proposed forAlternative 2, natching the lowest elevat,ion on the existing channel.

Alternative I includes the channel improvenents proposed for Alternative 4 and

also proceeds 1,000 feet further upstream. The upstream end would be aL the

same location as proposed for Alternative 3. Alternative 6 consists ofimproving the channel through the entire city limits of Kathryn.

Velocities within areas of the existing channel are high enough to cause

erosion problems. At cross-section J.0, velocities exceed / feet per second, ata flow of 1100 cfs. Erosion is evident for a short section within this area.

The velocity does not decrease much for smaller rates of flow. By improving the

downstream conditions, velocities may be increased further upstream. The

increase in velocity would not continue for an extended distance upstream of the

improved area, as the flow conditions gradually return to the original

-B-

Page 12: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

conditions. Except possibly for Alternative l, any noted increase in velocityupstream of the channel improvements did not seem significant. This problem

should be looked into further before the project is constructed.

The junction between the existing channel and the improved channel isanother area where high velocities coufd develop. A snooth transition area,

gradually increasing the channel dinensions fron the existing condition to the

inproved condition, is necessary to prevent unstable flow condítions.

For all alternatives, it was assumed that the spoil material could be

spread on both sides of the channel for the area below the bridge on the school

road. The dimensions of the proposed channel are 2O-foot bottom width and 4U:tV

side slopes. Sone alternatives include dikes. In these cases, a bern of atleast 10 feet should rernain between the edge of the channel and the toe of the

dike. For the area upstream ofl the bridge, all the material should be deposited

on the left side of the channel. for Alternative 3, the spoil material upstream

of the bridge is recommended to be conpacted to form a dike. l{íthin this area,

water could then be contained closer to the channel and further away from any

buildings. The right bank should not be filled in, allowing it to act as an

overflow area during extrenely high flows.

In preparing cost estimates for all alternatives, it was assumed that blackdirt would be stripped from the construction area and respread over the

completed area. Fron prior discussions, excavation was assumed to be done by

dragline or backhoe. Water conditions nay nake this necessary. It nay be

possible to remove the naterial with a dozer or other equipment, although sone

dewatering may be necessary.

-9-

Page 13: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

For Alternatives 2 and 3, rock riprap was felt to be required below the

bridge on the school road. The velocity through the bridge was calculated to be

around 12 fps for these alternatives. This is slightly lower than the velocitycalculated to occur under existing conditions. Velocities at the bridge would

also be very high with Alternatives 4 and 5. Erosion protection is provided

with the proposed bridge improvements for these alternatives.

The three existing bridges within the study area are not adequate to handle

the design flow. The limited cross-sectional- area of the opening causes a stage

increase on the upstream side of the structure. Although not stated as a

separate alternative, conditions would be nuch improved if these bridges were

replaced or removed. Plate 2 shows the decrease in water elevation if the

bridges Lrere not in place. The briclge on the school road is not as critical,although still not ad.equate, because the buildings upstreâm of the bridge are afair distance from the cha¡neI.

If acceptable to the conmunity, any of these structures could be replaced

by 1ow water crossings. This could be a cheaper alternative than replacing them

with new bridges of sufficient waterway opening.

A water line apparently is buried withj-n the vicinity of the bridge on nain

street. The exact location should be obtained before any excavation of the

area, or modification to this bridge is attempted.

-10-

Page 14: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

A]-ternative 1

This alternative consists of naintainíng the channel in good

condition. The channel vegetation would be controlled, possiblyBrush and other obstructions would be removed from the channel.

operating

by mowing.

For the nost part, the channel conditions within the city linits, are inrelatively good condition. An rn' value, channel roughness, of 0.040 was used

for the existing conditions. This value vùas red.uced to 0.035 to deternine the

affects of this alternative.

For the more frequent floods, this alternative would reduce the water

elevation by up to O.2 feet. Floods larger than the 1O-year event start tobreak out of the channel and onto the unimproved overbank area. Therefore, the

decrease in water elevation would becone less than 0.2 feet, as the magnitude ofthe flood increased.

Ttris alternative alone would not cause any significant reductj-on in floodda-nage. It is recommended, however, that proper channel naintenance should be

incorporated with any channel improvenent. An average annual cost of $250 isestinated for thi-s alternative.

Alternative 2

A thick vegetative growth is present both upstrean and downstream of the

bridge on the roadway tp the school. Also, and. perhaps because of this, itappears that sedinent has been deposited in this area. The channel slopes inthe wrong direction for a short distance just upstrean of the bridge, with a

similar condition located downstrean of the bridge.

-11-

Page 15: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

According to the infornation provided through the Barnes County Road

Department, the bridge on the school road was replaced after L}:e t975 flood. Itwas designed with the channel bottom 10 feet below the low bean of the bridge.If the channel Ìvere to be deepened below this elevation, horizontal supports

$rouId be necessary for the bridge.

The 10-foot clearance below the bridge would be maintained for thisalternative. The proposed channel bottom, along with the new water elevation,is shown on Plate l.

The water elevation aL cross-section 4.0 would be reduced by about 2.8

feet, at a flow of 1500 cfs. Proceeding upstream, the v'¡ater elevation would

eventually approach the hrater elevatÍon deternined fron existing conditions.Under the proposed condition, the channel at cross-section 4.0 could contain the

entire flow of a 2J-year event. The channel at cross-section !.0 could containa lO-year event, while a lO-year event would break out of the channel aL

cross-section 5.5. The width of flooding would be red.uced. along the channel

reach where the elevation would be reduced. The buildings that are closest tothe channel, between cross-section 4.0 and 5.5 would benefit from thisalternative. It t¡ou1d appear that buildings 2I and 24, as nurnber on Plate 2,

would be removed from the design floodplain.

As shown in Table 1, approximately 9,000 cubic yards of excavation would be

required for this alternative. The total cost, not including cost to obtain fee

title or easements to land., are estinûated to be $32,000.

-12-

Page 16: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

Table 1 - Prelimínary Cost EstimateAlternative 2

ItenMobilizationStripping, Stockpiling andSpreading Topsoil

ExcavationRock RiprapRock Riprap FilterSeeding

Unit Unit Price Tota1

L.S. $5,000.00 $ 5,000.00

u,5006, ooo

7O35

5

S.Y.c.Y.c.Y.c.Y.

.20

.50

.00

.00

.00

0L

30T2

350

.00

.00

.00

.00

.00

500000100

$21 ,770.004 , 620. oo3 ,500.002,200.00

392

IAcres204

7

SubtotalContingenciesEngineeringContract Administration

TOTAL $32,000.00

Note: This anount does not include cost to acquire fee title or easements forland.

Alternative 3

This alternative is identical to Alternative 2 except that the excavation

continues from cross-section 4.0 to cross-section 6.0, as shown on Plate 4.

Therefore, benefits due to flood elevation reduction are extended furtherupstrean. A 2J-year event could be contained within the channel atcross-section 4.0, lO-year event at cross-section !.0, nearLy a 2J-year event atcross-section 5.5, and less than a 1O-year event at cross-section 6.0. The

design flood would not extend as far beyond its banks and towards the town

within this area. Íiithout considering any dikes, the distance the water would

extend frorn the left bank would be reduced by 185 feet at cross-section 4.0, 50

feet at cross-section 5.0, L55 feet at cross-section 5.5, and 95 feet aL

cross-section 6.0. Buildings apparently removed. from the design floodplainwould include buildings 2I, 24 and 25, as shown on Plate 1.

-13-

Page 17: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

This alternative would increase the velocity of flow in the area around

cross-section /.0, by about 0.6 feet per second. This is the area that appears

to have velocities capable of causing erosion under existing conditions. Before

this alternative was to be constructed, that potential problem area should be

investigated nore thoroughly.

Approxinately 14,000 CY of excavation would be required for thisalternative. Although the buildings between cross-sections 4.0 an¿ 6.0 appear

to be renoved from the design flood area, they could possibly still be affectedby groundhrater. To reduce the likelihood of this occurring, the spoil materialthat would be placed along the left bank could be formed into a dike. Water

would be contained closer to the channel and further a\,vay from the buildings.To do this properly, conpaction of the dike would be required. The dike would

also have to be tied into high ground. As shown in Table 2, the total cost forthis alternative, including the dike, is estinated to be $68,000. This does notinclude the cost to acquire fee title and easenents to land.

Until the improvement is extended further upstream, the O.3% slope isrecommended from cross-sections 4.0 to 6.0. This will minimize any increase ínvelocities further upstream. Some slight modifications may be necessary, ifconstruction lvas later continued further upstream frorn this alternative. Inorder to obtain the required depth, the 0,3'/" slope fron cross-section 4.0 to6.0, nay have to be changed at that tine to a O.2% slope. This would consist ofa maximum cut of about I.5 feet at cross-section 6.0, tapering off to no

additional excavation at cross-section 4.0.

-14-

Page 18: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

ItenMobilizationStripping, Stockpiling andSpreading Topsoil

ExcavationEmbankmentl8-inch Cl¡tPFlap GateRock RiprapRock Riprap Fi1lerSeeding

Table 2 - Prelininary Cost EstinateAJ-ternative lQuantity Unit Unit Price

40, ooo14,0005,600

461

7o3510

SubtotalContingenciesEngineeringContract Adrninistration

L.S. $5,000.00 $ 5,000.00

Total

8I

B2L

5

2

S.Y.c.Y.c.Y.L.F.L.S.c.Y.c.Y.

,490,520,000,000

46

0.201.501.00

10.004oo. oo30.0012.00

350.00

00000000000000

00000000

0000006004604oo1004zo

3,500.00Acres

$

5

TOTAL $68 ,000.00

Note: This amount does not include cost to acquire fee title or easements forland.

Alternative 4

As shown in Plate 5, this alternative would start at cross-section 1.0 and

continue upstrea-n to cross-section 4.0. The channel el-evations are identical,as proposed by the Soil Conservation Service within their report. This would

require a deeper cut than proposed with Alternative 2. The cut would provide an

11.4-foot clearance below the bridge located on the school road. As stated by

the consultant for the Barnes County Road Departnent, horizontal supports would

be required if the cut provided a clearance of nore than 10 feet below the low

bean. A rough cost estimate to do this, would be between $10,000 to $15,000.

The water elevation for this proposal is also shown in Plate l. The design

flow can be completely contained within the channel at cross-section 4.0.

-$-

Page 19: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

Upstream fron that point, however, the results are nearly identical to that ofAlternative 2.

A total of 13,000 CY of excavation is required for this alternative, as

shor,vn in Table 3. An estinated cost of $67,000, not including cost to obtain

fee title or easements to land, was calculated for this alternative.

Table J - PrelininarSr Cost Esti-mateA].ternative 4

ItenMobilizationStrippingExcavationBridge ImproveuentsSeeding

ri

29,00013,000

7

L. S.S.Y.c.Y.L.S.

t Unit Price

$ 5,

15

002050o000

00001

000350

Tota]-

$ 5,000.005 ,800 .00

19,500.0015,000.002,450. O0Acres

SubtotalContingenciesEngineeringContract Administration

TOTAL

Note: This anount does not include cost to acquire fee title or easements forland.

Alternative 5

This is a continuation of Alternative 4. The excavation continued beyond

cross-section 4.0 to cross-section 6.0. The proposed channel botton a¡rd

resulting lt¡ater surface are shown in Plate 6. Extending upstream from the

bridge, the entire design flow would be contained. within the channel up tocross-section 1.0. 0n1y ! cfs is out of the left bank at cross-section l.!.Upstrean fron the construction limit, the r4¡ater elevation graduatly approaches

the water elevation encountered with the existing conditions. The 1O-year event

$47 ,750 .007 ,350.007, 100.004 ,8oo. oo

$67,ooo.oo

-16-

Page 20: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

will overflow its banks at cross-section 6.0. Buildings 21, 24 and 26, appear

to be renoved from the design flood area.

This alternative will cause increased velocities between cross-section 6.0

and cross-section /.0. The possible erosion problen is nore serious with thisalternative than with the other alternatives.

With 56,000 CY of excavation, this alternative is estimated to cost about

$115,000, as shown in Table 4. This does not include the cost to acquire fee

title and easements for land, or any required erosion protection between

cross-section 6.0 and /.0.

Table 4 - Prelininary Cost EstimateAJ-ternative I

Iten Quantity Unit Unit Price Tota-l

MobilizationStrippingExcavationBridge ImprovenentsSeeding

56, ooo30,000

14

L. S.S.Y.c.Y.L. S.

s 5,000.00o.201 .50

15 ,000.00350.00

$ 5,000.0011,200.0045 , ooo. oo15 ,000.004. qoo. ooAcres

SubtotalContingenciesEngineeringContract AdninistrationTOTAL $115,000.00

Alternative 6

This includes cha¡rneI improvement through the entire linits of Kathryn. As

discussed by the Soil Conservation Servíce in their report, 68,400 CY ofexcavation would be required. Another major expense of the project are the Reno

100.00500.00200.00200.00

$811372I

-I7-

Page 21: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

nattresses. Ttrese are required to protect the cha¡rnel. In thêse areas, the

buildíngs are located very close to the channel. This restricts the possibilityof excavating the channel to dínensions that would reduce the velocity to a

level that would not require erosion protection.

This alternative would provide benefits fron flood danage reduction for the

entire City of Kathryn. The alternative w¡rs estinated to cost a total of$306,000, of which $50,000 was estimated for acquisition of easements and fee

title.

ThiS alternative is the conplete project for the entire city. -The cityshould consider providing this project ín phases, as funds become avai.1ab1e.

-18-

Page 22: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

STIMMARY AND CONCLUSIONS

The Board had requested technical assistance fron the State lrJater

Commission in order to reduce the flood danages to the City of Kathryn. They

wished to concentrate their efforts on improving the channel conditions at the

downstream portion of the city. Sediment and steep slopes in the channel

further reduce the capacity within this area.

Sources of information for the study included the following: 19BO Flood

Insurance Study, the 1986 Kathryn Flood Prevention Planning Report prepared by

the Soil Conservation Service; / I/2 minute quadrangle maps, additionalcross-sections, and the Barnes County Road Departnent.

The HEC-2 computer program was used to ana1-yze several alternatives ofchannel improvenent. All results are prelininary in nature.

Six alternatives are presented. in this report. Several of the alternativeswere similar in that one alternative may have been an extension of another, orthe channel botton may be slightly deeper than another alternative. Alternative6 consisted of the entire project through Kathryn. The Board apparently wished

to concentrate on the lower end at this tine. In seeking alternatives for the

lower end, I attenpted to find solutions that could possibly be'continuedupstream through the entire city. The lower portion could be considered Phase 1

of the entire project.

Dinensions of the channel for Alternatives 2 through 5, were a 2O-foot

botton width and 4H:1V side slopes. Alternative 2 mainly removed the sedinent

fron near the bridge a¡rd eliminated most of the adverse slopes. Alternatives 2

-19-

Page 23: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

and 3, are identical except that the channel improvement for Alternative 3

extends further upstream. The elevation below the bridge on the school road was

proposed to be excavated to the same elevation as the previously designed

channel bottom, 10 feet below the low bean of the bridge. Channel inprovenents

extended in both directions fron the bridge.

Neither Alternative 2 or 3, can contain the entire flow of the largerfloods within the channel. T'I:e $rater elevation would be reduced startingupstream of the bridge and continuing upstream to cross-section 7.O forAlternative 2, and to cross-section 8.0 for Alternative 3. The reduction would

becone snaller as the distance upstream is increased. Two buildings would

apparently be renoved from the floodplain of the design flow for Alternative 2,

while three buildings would be renoved fron the floodplain with Alternative l.Estinated costs for the two alternatives was 532,000 and $68,000. This does notinclude the cost to acquire fee title or easements for land.

Alternatives 4 and 5, cover the same lengths as the previously nentioned

alternatives, but at a lower elevation. The bottom elevations are similar tothe downstream portion of the plan proposed by the Soil Conservation Service.

The entire design flow can be contained within the improved sections of the

channel. Alternative 4 would produce exactly the same hrater el-evation upstream

of cross-section 4.0 as Alternative 2 would. Two buildings would appear to be

removed fron the floodplain for the design flow with this alternative.Alternative I would provide a considerable reduction in water elevationthroughout the length of the channel improvement. Upstream of that point, the

elevation would gradually increase, until matching the existing water elevation

-20-

Page 24: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

around cross-section J.0. Three buildings would appear to be removed fron thefloodplain with this alternative.

Additional horizontal supports are required for the bridge at the schoolroad if either Alternative 4 or ! is selected. TLre consultant for the Barnes

County Road Department roughly estimated this to cost between $10,000 and

$15,000. Excluding land costs, these alternatives are estimated to cost $67,000

and $115,000.

Both Alternatives 3 a¡rd I cause an increase in velocities upstream of thechannel improvement area, near cross-section 7.O. The increase caused. by

Alternative 3 is very slight while that caused by Alternative 5 may be more

severe. Even und.er existing conditions, the area near cross-section 7.O

encounters velocities that nay cause erosion. Any additional increase invelocity could cause further problens.

Alternatives 2 and 4 provide identical results upstream of cross-section4.0. This is where all the buildings are located. Therefore, the benefitsreceived fron either of these alternatives would be nearly identical.

Although Alternative 3 cannot contain the entire design flow within theimproved channel, the water elevation is lowered enough to renove the buildingslocated between cross-section 4.0 and 6.0 fron the floodplain. A dike could be

constructed along the left bank between these cross-sections to contain thewater within a linited area near the channel. This could reduce any possíbilityof encountering seepage problems within this area. In conparison, Alternative !

-2L-

Page 25: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

could contain the entire flov¡ within the channel through this area. The water

elevation woul-d be at a lower level, providing less chance of seepage problems.

Alternatj.ve 5 could easily tie into a continuation of the upstream

project. Some slight modifications may be required to Alternative l, for theproject to be continued further upstream.

Alternative 1, continued. naintenarce of the channel, will ensure the besthydraulic conditions. This should be a part of any alternative.

Ït is recommended. that the Board select either Alternative 2 or 3.Alternative ] extends further upstream than Alternative 2. The decision between

these two is based on the availabil-ity of funds.

The possibility of continuing the project through the remainder of the cityshould be pursued when funds become available. The entire project could be

constructed in phases. Only when the entire project is conpleted will the cityrealize the most flood damage red.uction.

Replacernent or elinination of the bridges would also help to reduce theflood elevation. The limited area of the bridges cause the upstream waterelevation to increase. A structure such as a 1ow water crossing would notrequire such a stage increase.

-22-

Page 26: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

ÌY

Page 27: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

K.El

o.õr

l9Jg

.IHå'

Ëo1"

.io',o

,Iu.',

t^'*"

"t'47

070

0

I II

I

I

I I I I

¡ I I i i

lr ilI

I

I I

I

I

._i il

..¡

.-t-

..t.. iir

-r"l!'f

,--i :

.l,I

i.i ll "l tt

I 'l

I

I I 1 : I \

II + .J _

I I I ) # iIfl l

i

t

rl- Ì\ # \Ë ¡+ rt Þ¡ -l Ë Eì I : ['

+Lill I + :I.l ;.1' '

\

I t -t

>fr

\ \I

(t_

+ilt-

l. l )I +-t-_ L I

..1 J J _t -(

Hllt

I

fi- # :Fl

È ].il

a/t

U

ilo _ ¡\ f(

It: lt

+H-

t_t j.F+ I

-î o Ç'f ) _l -l€ :l t-

FÚ r{ Þ F3 tl I TE F H U C) td F trl t o Þ r{

I t\) È !hJ E4 Þ rJ td l\' I fú 1-

l P. p, (a o n o ) o pr ts

Page 28: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

I I

II i- l-

-t--+

-i ---

l-lrl

I

I I

t,

I I

tl'

r

I T

I I II -t 'i' -¡-

-. -

.t. I :t I i I

i

ii lr

I -',i

r'î lr ,|, _i

.

:i' ir

I I

+j+

I l-r-

!

-l-I I

) ) I

L T

-f- rf -r :r l

I

ì

I I + 't-

(

iË *-tt+

Jt-t-

l-t+ dË ll'F F

i I

\

I

-t-l-

t- \

-F F -r-I I I I t -L + I

I

I

ô) .¡¡< Þ 4r -ô -E I+ f

II ++ t-l

t-t+t

-

1l+t ilJ+

Page 29: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

Ll.S

l0

X l0

lO T

HE |N

CH.t0

x ls

lNcH

Es¡ì-

¡É

KEUF

FEL

6. E

SSER

CCl

. r^D

E tÈ

u,s

.^.

47 0

700

i: ii-iï

,ili ":. i .tT

:,ti ;-;':-

f

r ii

I l I

I 'i ¡ I ¡ .t Ii I I

-1. I I

I I I I I I I I I

I _t I i

ilÌt. :r 't .._L

.

I

! I I I ¡ I ì I

I ¡- t.

I I l- I I I f

l

¡ I I I ¡ I I ì- I I I

I I I

-t -fI

J I -t

I

I

+-k Þ -Jr -F -b E,

+ I

+l)' { :-

I

l" IF¿ P dr

h ÌL t-&.

l.EC Ë

) 2

IF

,-il-

I -L -1-

lt\

-T I j l t-

:HF È H -t+

,-l-- ):

lt t_ t_ I-lì \ t + l_. ,f,+È\\ :l t) 3 I )[. \0 -t..1 j _t _t -: -t -l +I)

o

J:ï]1

í

\_l I ,1 -l l+J+ -1

,J,

) \ ìï. I I I

u F-f -f (

##,tili

i I -r-I_t_ Il- I I I

J ) ) ) I I II I

I N Ol I

hd E{ Þ É flt È I Þ ts .+ o FJ 5 0, å P. o (,

Page 30: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

t ê^TfeuJefTV - ç g,lvT,{-/ 7-

r-j 1 _--

ï_¡_

l:i

,'r'

t-

,ifii.lî-i+€'---J_ -t- -t--t+i+- -ì- -'

i"'- J--" .,:-

iHl rl I

i '. l,N I ìid! llttttll I

lll i rrli!I | \l ',v itiì t¿fl Il¡{l ll

, ¡]:i*i lJ v/ I

;la¿. I lr, irrvY ¡¡?=

I I t¡itil itltl I I

I !rii I

I I lrilI i

----¡-l- -l1-I ttt ¡ II I l¡ I rtf ti

I I !|t ¡iI

¡ ti Ilttrtrlttt J !--T-iT-. +# I I-T-Î-

I I I tt¡

lrit -T-i-it!tl!r¡J V/\,!

iI

I

II

I i!ll1 i,-, I

¡I

'-T-T IL I

I

l:.41 +-r ¡ll¡llrtrttttr -1-1-î-T-rT-rllll¿f

lli+ ttt

!i:+

t,tt!littt

¡

I

-l.r-+ I II

r:lii tiilllt, I I I rlllllii!iilr ¡

I I I I

-T--:_

I I ¡

I -i II I I

I !tittt¡i! I itt I I I

v¡\¿u9!^rfi ¡l,lll¡lìôT -r l-l-L:l Ll-i I I I I

I I I I rtiitttlI

rl t: -t--.I

I

I+

¡tc !

I

I

li -Î-- ¡l,I,rl -î-:---î

nci

oMñÉçxno[¿S¡ OT5Fõt põEtr0-:ozxc3iz

o-nø

(

Þ\¡oNoo

Page 31: Kathryn Flood Damage Reductions 1987...FLOOD DAI{AGE REDUCTION SruDY February, 1987 North Dakota State Water Conmission State Office Building 900 East Boulevard Bisnarck, North Dakota

[/^e

t0 x

t0 T

o TH

E tN

cH.l0

x ls

tNcH

Esf\-

6 KE

UFFE

L &

EssE

R co

. r^D

E tt

u.s.

^47

070

0

I I I I I

I ¡ I

I

j

I I I I I

I i I I i ¡ I I I I

I I I -l I I i- I I

I

tl -l--t- !.i.

!l lr lt lt lr 'T-i I I I

ì I

I I II

I

¿

{.. ). l \ I I

\; E(o ) ) ?

t-

I I \I

-\ a\

\ \l$ t-t

--t+

+t

F

..t_ \l fii:þ

\HE

\\ \\ ì

d I o 3 I ) ) c AI

i I

a .-

L \

-\

I I\ à\ -l_l

a T Ð lol

il,

:1 .[

+

) (( \E I \1t. I

_l-_

i I_u

_-l_

_ttt

r+l- f'

j_ I t L I-t- + ++

1-þf

I ll'-l- + t I

-LL -H-

-1- +

) s(

I I P o I

rI t I ¡

TI

I !iì il--i

: _i

-lII: ll ;:i

E

! I I

I I I -t I I I i

-l

RIDG

E .-

.

lìr,'

1

-i'r'i

';'i:

rlt

It.-

i ti -Tt

IuN .:@ tl Fl l¡l O

l

I Þ ts rt o r-l Þ pr ù F. o ur