kardó
TRANSCRIPT
-
8/6/2019 Kard
1/6
Surface mountedCeiling
level by bolts on theadjustment profile
Straight
By adjustment profile
put profile in positionfasten screws
put adj. profile in positionfasten screws
By adjustment profile click in top cover platescrew wall plate
use optional caliber tomark next fixing points
Surface mountedWall
mount profile and fastenbolts on adj. profile
level by bolts on theadjustment profile
kard
use optional caliber tomark next fixing points
90
1 2 5
max. 30
00 / pr o
f ile
mount protector / insertcable / mount plug
dimensions in mm
200
max. 10
00
90
1 2 5
4 , 2
max. 30
00 / pr o
f ile
mount profile and fastenbolts on adj. profile
mount protector / insertcable / mount plug
90
7,2
1 2 5
max. 3000
/ pr of ile
put adj. profile in positionfasten screws
mount protector / insertcable / mount plug
max. 30
00
1
2100
0
1 0 0 0
2
1
5 2 9 7 6
V 1 E 9 9 -
1 0 / 2 0 0 9
130
120
55max
.1000
4
312
1
3
2
1
3
2
-
8/6/2019 Kard
2/6
Suspendedwith uplight
By steel wires
click on cover plate ceilingrosette
instructions for re-openingceiling rosette
also see suspendedwithout uplight
click in top diffusor see suspended withoutuplight
>
click in top cover platemake earthing connection
electrical and earthingconnection / labeling
dimensions in mm
90
1 2 5
4 5
m a x .
1 2 5 0
max. 3000
/ pr of ile
position suspension steelwires
1
2
1
2 3
1
Suspended(without uplight)
By steel wires position ceiling attach-ments / fasten screws
position suspension steelwires
detail 1 insert flatcable / connectplug / secure flatcable
adjust steel wires adjust steel wires
90
1 2 5
m a x . 1
2 5 0
max. 30
00 / pr o
f ile
90
82
4 0
15018
3018+
max. 10
00
12
3
2
1
2 1
click
click
d e
t a
i l 1
max. 30
00
-
8/6/2019 Kard
3/6
> dimensions in mm
Recessed weight per meter pre-mount end piece andmain profile latches
maximum interdistancebetween brackets
turn profiles with mountedbrackets into the ceiling
detail 1
fix carrier profiles onceiling
mount extreme ceilingframe parts
adjust brackets to align toexact ceiling plane
insert main profile intodesired position
detail 2
click
mount protector / insertcable / mount plug
recess positions
required manoeuveringzone / put in position
unlatching from brackets(in case of detach)
mount + connect inter-mediate ceiling frame parts
detail 3
pre-mount brackets oncarrier profiles
d e
t a i l 1
ceiling thicknesslenght carrier profiles
1 2 5
5 0
d e
t a i l 2
0 mm = 3x
-20 mm = 4x
+20 mm = 2x
+40 mm = 1x
click
max.
kg/m
12,59,5 - 35
Lmax. = L - 3
0
1
3
2
9015
50
15 50
1 9 0
15
m a x
. 3 0 0
0
400
-
8/6/2019 Kard
4/6
System ceiling mount brackets onthreaded rods
weight per meter
Mount pre assembledbrackets
Fasten brackets, bothends will come together
180 connection(without uplight profile)
put profile in positionfasten screws
put profile in positionfasten screws
Mount pre assembledbrackets
T-connection(without uplight profile)
mount bracketmount and secure profile
>
position and mark usingtemplate + bore
180 connection(with uplight profile)
go to 3 rd page and finishin a similar way
Fasten brackets, bothends will come together
dimensions in mm
max. xx
x kg/m
1
2
3
1
2
T-connection(with uplight profile)
mount bracketmount and secure profile
position and mark usingtemplate + bore
1 3 m
m
4 m
m
1
2
1
3
2
1 3 m
m
4 m
m
1
2
1
3
2
-
8/6/2019 Kard
5/6
90 hor. connection(without uplight profile)
mount pre assembledbrackets
put profiles in positionfasten screws
fasten brackets, bothends will come together
mount lower corner piececover plates
put profile in positionfasten screws
mount pre assembledbrackets
mount lower corner piececover plates
>
90 hor. connection(with uplight profile)
fasten brackets, bothends will come together
90 connectionvertical
mount pre assembledbrackets
put profiles in positionfasten screws
22
11
fasten brackets, bothends will come together
2
1
2
1
1
2
3
1
2
3
1
12
dimensions in mm
-
8/6/2019 Kard
6/6
mount inner corner piececover plates
90 connectionvertical
90 connectionhorizontal
Recessed mountingceiling frame
>
T-connection
ETAP NV/SA - Antwerpsesteenweg 130 - 2390 Malle - Belgium - Tel. +32 (0) 3 310 0 211 - Fax +32 (0) 3 311 61 42 - www.etaplighting.com- Information is provided without obligation, and may be modified as a result of technical developments. -
13
2
1
2
1
2
1
1
1
1
22
1
1
1
22
2
Wiring control and electricalphase selection
click on cable connectors make plug-profileearth connection
connection to the mains(after complete installation)
click
click
4 5
document and labelmade connection
dimensions in mm