Kappa Group Meeting - September 2009 1
BL13 — XALOC
Guifré CuníJordi Juanhuix
on behalf of the XALOC team
Kappa Group Meeting - September 2009 2
BL13 Current StatusLead hutches:
installed
Electrical power, fluids and cable trays:
installed
Personal safety system: installed
OHRemaining optics
End 2009
Beamline commissioning:End 2010EH
Undulator: Sep 2010
End station elements: Beginning 2010
Monochromator and mirrors: installed
BL13-XALOC – Status
Kappa Group Meeting - September 2009 3
DetectorStatus: Deadline CFT 15 Sep
DiffractometerStatus: DDR approved
Delivery: Jan 2010
Beam conditioning el’sStatus: Designing
Diffractometer tableStatus: Manufacturing
Delivery: Jan 2010Sample changerStatus: DDR
Delivery: Jan 2010
Detector tableStatus: Manufacturing
Delivery: Jan 2010
in-house
commercial
mixed
BL13-XALOC – Status End Station
Kappa Group Meeting - September 2009 4
ISPyBLaboratory Information Management System
mxCuBE GUIExperiment
Management
EDNAOn Line data
AnalysisEdna project
ESRF
ESRF/spineeHTPX
mxCuBE
Framework 4
Control objectsALBA implementation
Pool andMacroserver
ALBA ESRF
Device Servers
Control objectsESRF implementation
SpecDevice Servers
BL13-XALOC – Control arquitecture
?
STAC
Kappa Group Meeting - September 2009 5
• Optics: Standard TAU widgets Macros (monitoring, alignment, etc)
• End Station:– Special Device Servers
• Automatic Sample Changer (CATS-Irelec-FIP)• Diffractometer MD2M (Maatel-Bruker-EMBL) ??
– Spec Macros• Monitoring, alignment, data collection, etc • Implement Macros in our MacroServer
– mxCuBE (Bliss Framework 4)• Adapt and extend to our experiment requirements
in collaboration with the ESRF
BL13-XALOC – Status of BL Control