Page 1: Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 20011 Endcap Alignment Status of Offline Software Alignment Workshop @ CERN 17, 18 May 2001

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 2001 1

Endcap AlignmentEndcap AlignmentEndcap AlignmentEndcap Alignment

Status of Offline Software

Alignment Workshop @ CERN

17, 18 May 2001

http://home.fnal.gov/~maeshima/alignment/alignment.html

Page 2: Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 20011 Endcap Alignment Status of Offline Software Alignment Workshop @ CERN 17, 18 May 2001

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 2001 2

June - Sept 2000 at CERN ISR Tunnel

Goal : • Setup and monitor “chambers” with resolution of < 200 m• Demonstrate System RedundancyTest Setup :• 1 SLM Line (2 Laser Redundancy, L302 & L303)• 1 Transfer Line (Single Laser, L301)• 1 Transfer Plate• Analog Sensors (Temp, Proximity)

ISR Prototype System TestISR Prototype System Test ISR Prototype System TestISR Prototype System Test

Page 3: Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 20011 Endcap Alignment Status of Offline Software Alignment Workshop @ CERN 17, 18 May 2001

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 2001 3

ISR Prototype System TestISR Prototype System TestISR Prototype System TestISR Prototype System Test

Data:• 1500+ Events Reconstructed• 3 Test Periods (July, Aug, Sept 2000)

Test DAQ (http://home.fnal.gov/~maeshima/alignment/daq/daq.html):

• custom programmed, C++, Window98, using 3 serial ports 1. SLM line DCOPS sensors, 2. Transfer line DCOPS sensors, 3. Agilent34970A for analog sensors and laser on/off control.

• No DSP centroid finding for this test. Each pixcel was read out.

Analysis Software:• Flap (First Level Analysis Program) written in C++: find centroid

of each DCOPS sensor, and do the first level analysis (stability of the laser centroids, etc.)

• CMS Object oriented Code for Optical Alignment (COCOA) is used to reconstruct positions of DCOPS sensors

Page 4: Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 20011 Endcap Alignment Status of Offline Software Alignment Workshop @ CERN 17, 18 May 2001

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 2001 4

ISR Test LayoutISR Test LayoutISR Test LayoutISR Test Layout

Page 5: Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 20011 Endcap Alignment Status of Offline Software Alignment Workshop @ CERN 17, 18 May 2001

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 2001 5

ISR Test GeometryISR Test GeometryISR Test GeometryISR Test Geometry

• Sensor locations for et2, et3, and es10 are given by the photogrammetry survey

• es9 was used due to survey errors in es10

• Transfer plate geometry was fixed by machining

• Sensors et1 es1 were located on the transfer plate• Provides link between Transfer and SLM lines

• Rotations of sensors are known within error limits of photogrammetry

Page 6: Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 20011 Endcap Alignment Status of Offline Software Alignment Workshop @ CERN 17, 18 May 2001

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 2001 6

Comments on ISR TestComments on ISR TestComments on ISR TestComments on ISR Test

Uncertainties:• Estimated Survey Errors

• 60 m local 120 m global

• Errors in COCOA Reconstruction• 220 m Systematic Errors < 15 m Statistical Errors (1500 Events)

General Remarks • Good reconstruction requires all 4 CCDs on MABS

and Transfer Plate SLM sensors• 3 CCDs required for all other sensors• Reconstruction is roughly independent of laser

direction• Reconstruction is independent of laser motions

• Laser ‘Jumps’ Do Not Affect Us

Page 7: Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 20011 Endcap Alignment Status of Offline Software Alignment Workshop @ CERN 17, 18 May 2001

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 2001 7

ISR Test ReconstructionISR Test ReconstructionISR Test ReconstructionISR Test ReconstructionTitle:

Creator:ROOT Version2.24/04Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Final ISR Results of COCOA reconstruction for July/August and September runs using es9 as the final reference sensor

Page 8: Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 20011 Endcap Alignment Status of Offline Software Alignment Workshop @ CERN 17, 18 May 2001

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 2001 8

ISR ResultsISR ResultsISR ResultsISR Results

Final Results :• System = 130 m

• Typical Reconstructions within 300 m of expected survey location

• Sensors outside 300 m range have understood errors

Page 9: Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 20011 Endcap Alignment Status of Offline Software Alignment Workshop @ CERN 17, 18 May 2001

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 2001 9

COCOA Simulation GoalsCOCOA Simulation GoalsCOCOA Simulation GoalsCOCOA Simulation Goals

Create Model CMS EMU Alignment System• DCOPS + Analog Sensors

• Integrate with Link and Barrel alignment

Evaluate Intrinsic System Errors• Chamber construction

• System design

Evaluate System Performance• Intrinsic Resolution

• Correlation of System Components

• Effects from component failure

Provide ‘First Draft’ of Reconstruction Software

Integration of Results into General Physics Simulation

Page 10: Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 20011 Endcap Alignment Status of Offline Software Alignment Workshop @ CERN 17, 18 May 2001

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 2001 10

Current Status (May 2001) (Robert Lee)

• Substantial Software Improvements• Extraction of Component Data from Endcap Muon

Production Drawings (Complete)

• SLM Lines and Endcap CSC Stations have been modeled

COCOA SimulationCOCOA SimulationCOCOA SimulationCOCOA Simulation

ME2/3/4 COCOA ModelSimulated COCOA SLM Line