Kansas Renewable EnergyKDHE Geology Seminar
September 05, 2013
TAKING RENEWABLE ENERGY TO HEART.
Taking renewable energy to heart.
![Page 2: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/2.jpg)
TAKING RENEWABLE ENERGY TO HEART. 2
US Electric Generation
![Page 3: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/3.jpg)
TAKING RENEWABLE ENERGY TO HEART. 3
US Generation By Fuel Type
![Page 4: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/4.jpg)
TAKING RENEWABLE ENERGY TO HEART.
Westar’s Energy Centers
Jeffrey Energy CenterCapacity Share: 1,857 MW Fuel: Coal
Lawrence Energy Center Capacity: 539 MW Fuel: Coal
Tecumseh Energy Center Capacity: 242 MW Fuel: Coal
Wolf Creek Generating Station Capacity Share: 548 MW Fuel: Uranium
Stateline Combined Cycle Capacity Share: 200 MW Fuel: Natural Gas / Waste Heat
Murray Gill EC Capacity: 317 MW Fuel: Natural Gas
Gordon Evans EC Capacity: 831 MW Fuel: Natural Gas
Hutchinson Energy CenterCapacity: 476 MWFuel: Natural Gas
LaCygne ECCapacity Share: 681 MWFuel: Coal
Emporia Energy CenterCapacity: 600 MWFuel: Natural Gas
Spring Creek ECLogan County, OKCapacity: 300 MWFuel: Natural Gas
Flat Ridge WFCapacity: 100 MW
Ironwood Wind FarmCapacity: 168 MW
Central Plains Wind FarmCapacity: 99 MW
Meridian WayWind FarmCapacity: 96 MW
Post RockWind FarmCapacity: 201 MW
Rolling MeadowsCapacity: 6 MWFuel: Landfill Gas
![Page 5: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/5.jpg)
TAKING RENEWABLE ENERGY TO HEART. 5
Levelized Cost of New Generation
![Page 6: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/6.jpg)
TAKING RENEWABLE ENERGY TO HEART. 6
US Installed Wind Capacity
US Wind Power Capacities (MW)
Existing Under construction60,009 1281
AWEA 2nd Quarter 2013 Market Report
Kansas: 2nd in Nation for Wind Power Capability9th in Nation for Installed Capacity
![Page 7: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/7.jpg)
TAKING RENEWABLE ENERGY TO HEART. 7
US Avg. Annual Wind Speed at 80 m
![Page 8: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/8.jpg)
TAKING RENEWABLE ENERGY TO HEART. 8
Kansas Wind Projects
![Page 9: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/9.jpg)
TAKING RENEWABLE ENERGY TO HEART. 9
US Solar Resource
![Page 10: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/10.jpg)
TAKING RENEWABLE ENERGY TO HEART. 10
Kansas Solar Resource Map
![Page 11: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/11.jpg)
TAKING RENEWABLE ENERGY TO HEART. 11
Solar in Kansas
![Page 12: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/12.jpg)
TAKING RENEWABLE ENERGY TO HEART. 12
Wastewater Plant Gas Potential
![Page 13: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/13.jpg)
TAKING RENEWABLE ENERGY TO HEART. 13
Manure Gas Potential
![Page 14: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/14.jpg)
TAKING RENEWABLE ENERGY TO HEART. 14
Landfill Gas Potential
![Page 15: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/15.jpg)
TAKING RENEWABLE ENERGY TO HEART. 15
Landfill Gas Kansas Electric Projects
• Rolling Meadows (5.6MW)• Oak Grove Landfill (1.6MW)
![Page 16: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/16.jpg)
TAKING RENEWABLE ENERGY TO HEART. 16
Crop Residue Potential
![Page 17: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/17.jpg)
TAKING RENEWABLE ENERGY TO HEART. 17
Hydro Power
•Existing•Bowersock Mills, Lawrence – 7 MW
•Potential•Existing Corp of Engineers Dams•Run of River•Small Hydro•Estimated to be as much as 300 MW
![Page 18: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/18.jpg)
TAKING RENEWABLE ENERGY TO HEART. 18
Kansas Transmission
![Page 19: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/19.jpg)
TAKING RENEWABLE ENERGY TO HEART. 19
New Kansas Transmission
![Page 20: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/20.jpg)
TAKING RENEWABLE ENERGY TO HEART. 20
Westar’s Renewables
Rolling Meadows Landfill Net Metering – 1690 kW Meridian Way Wind Farm Central Plains Wind Farm Flat Ridge 1 Wind Farm Ironwood Wind Farm Post Rock Wind Project
![Page 21: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/21.jpg)
TAKING RENEWABLE ENERGY TO HEART. 21
Rolling Meadows Landfill
• Location: North of Topeka• Owner: Waste Management• Structure: PPA on 5.6 MW’s• Annual Gen: 44,000 MWh’s• COD: January, 2010• Engine: Caterpillar CG-132
![Page 22: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/22.jpg)
TAKING RENEWABLE ENERGY TO HEART. 22
Distributed Generation• Distributed generation is on-site generation
used to offset a portion or all of a customer’s electric load
• Typically PV and small wind
• 845 kW Solar
• 845 kW Wind
• 2,000 MWh’s \ year
• 118 kW system in Lenexa• 19 kW system in Mayetta
• 5.2 kW system in Lawrence
![Page 23: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/23.jpg)
TAKING RENEWABLE ENERGY TO HEART. 23
Meridian Way Wind Farm
• Location: 12,000 acres in Cloud County near Concordia
• Developer/Owner: Horizon Wind Energy• Structure: Purchase power agreement on 96 MW’s• Projected Annual Generation: Over 290,000 MWh’s• Generation Began 10-23-2008• COD Attained: 12-29-2008• Turbine Type: Vestas V90 3MW• Turbine Hub Height: 262 ft.• Rotor Diameter: 295 ft.
• Location: 12,000 acres in Cloud County near Concordia
• Developer/Owner: Horizon Wind Energy• Structure: Purchase power agreement on 96 MW’s• Projected Annual Generation: Over 290,000 MWh’s• Generation Began 10-23-2008• COD Attained: 12-29-2008• Turbine Type: Vestas V90 3MW• Turbine Hub Height: 262 ft.• Rotor Diameter: 295 ft.
![Page 24: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/24.jpg)
TAKING RENEWABLE ENERGY TO HEART. 24
Central Plains Wind Farm
• Location: 6,000 acres in Wichita County between Leoti & Scott City
• Developer: RES America Development Inc.• Structure: Westar Ownership of 99 MW wind farm• Projected Annual Generation: Over 310,000 MWh’s• In Service: March 31, 2009• Turbine type: Vestas 3MW
• Turbine Hub Height: 262 ft.• Rotor Diameter: 295 ft.
![Page 25: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/25.jpg)
TAKING RENEWABLE ENERGY TO HEART. 25
Flat Ridge 1 Wind Farm
• Location: 5,000 acres in Barber County near Medicine Lodge
• Developer: BP Alternative Energy North America• Structure: PPA on 50 MW’s, Westar Owns 50 MW’s• Projected Annual Generation: Over 360,000 MWh’s• In Service:
– Owned: Feb. 11, 2009– PPA: Mar. 16, 2009
• Turbine: Clipper 2.5 MW• Turbines Height: 262 ft.• Rotor Diameter: 315 ft.
![Page 26: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/26.jpg)
TAKING RENEWABLE ENERGY TO HEART. 26
Ironwood Wind Farm
• Location: 7,450 acres in Ford County near Spearville• Developer: Infinity / Duke Energy• Structure: Purchase power agreement on 167.9 MW’s• Projected Annual Generation: Over 700,000 MWh’s• In Service: Aug. 31, 2012• Turbine: Siemens 2.3 MW• Turbines Height: 262 ft.• Rotor Diameter: 331 ft.
![Page 27: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/27.jpg)
TAKING RENEWABLE ENERGY TO HEART. 27
Post Rock Wind Farm
• Location: 5,000 acres in Barber County near Medicine Lodge
• Developer: Wind Capital• Structure: Purchase power agreement on 96 MW’s• Projected Annual Generation: Over 845,000 MWh’s• In Service: Oct. 4, 2012• Turbine: GE 1.5 MW• Turbines Height: 262 ft.• Rotor Diameter: 270 ft.
![Page 28: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/28.jpg)
TAKING RENEWABLE ENERGY TO HEART.
Details - Foundations
• Base Diameter: 55’• Pedestal Diameter: 18’• Base Height: 6’• Pedestal Height: 5’• Base Concrete per WTG: 452 cu. Yds.• Pedestal Concrete per WTG: 47.1 cu. Yds.• Rebar per WTG: 88277 lbs.• Concrete Strength: Base: 5000 psi; Pedestal: 6000 psi• Grout Strength: 12,000 psi• Anchor Bolts: Number, length: 144, 11’-3”
Post tension: 134 KIP
• Base Diameter: 55’• Pedestal Diameter: 18’• Base Height: 6’• Pedestal Height: 5’• Base Concrete per WTG: 452 cu. Yds.• Pedestal Concrete per WTG: 47.1 cu. Yds.• Rebar per WTG: 88277 lbs.• Concrete Strength: Base: 5000 psi; Pedestal: 6000 psi• Grout Strength: 12,000 psi• Anchor Bolts: Number, length: 144, 11’-3”
Post tension: 134 KIP
![Page 29: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/29.jpg)
TAKING RENEWABLE ENERGY TO HEART. 29
Typical Foundation
![Page 30: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/30.jpg)
TAKING RENEWABLE ENERGY TO HEART. 30
Cable Trenching
![Page 31: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/31.jpg)
TAKING RENEWABLE ENERGY TO HEART. 31
Vestas V-90 Turbine Details
• Hub Height: 262’• Rotor Diameter: 295’• Blade Length: 144’–4.5”• Tower Weight: 176 ton• Tower Diameter: Base, Top: 11’–11.7”, 7’-6.6”• Cut in wind speed: 7.8 MPH• Cut out wind speed: 56 MPH• Design wind speed: 22.4 MPH• Extreme wind speed (10 min. avg.): 112 MPH• Survival wind speed (3 sec. gust): 156 MPH• Design rotor speed: 16.1 RPM• Operational rotor speed: 8.6 – 18.4 RPM• Generator rated speed: 1755 RPM
• Hub Height: 262’• Rotor Diameter: 295’• Blade Length: 144’–4.5”• Tower Weight: 176 ton• Tower Diameter: Base, Top: 11’–11.7”, 7’-6.6”• Cut in wind speed: 7.8 MPH• Cut out wind speed: 56 MPH• Design wind speed: 22.4 MPH• Extreme wind speed (10 min. avg.): 112 MPH• Survival wind speed (3 sec. gust): 156 MPH• Design rotor speed: 16.1 RPM• Operational rotor speed: 8.6 – 18.4 RPM• Generator rated speed: 1755 RPM
![Page 32: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/32.jpg)
TAKING RENEWABLE ENERGY TO HEART. 32
Nacelle Delivery
![Page 33: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/33.jpg)
TAKING RENEWABLE ENERGY TO HEART. 33
Rotor Fly
![Page 34: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/34.jpg)
TAKING RENEWABLE ENERGY TO HEART. 34
Vestas V-90
![Page 35: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/35.jpg)
TAKING RENEWABLE ENERGY TO HEART. 35
Ironwood Crop Duster
![Page 36: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/36.jpg)
TAKING RENEWABLE ENERGY TO HEART. 36
Old and New
![Page 37: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/37.jpg)
TAKING RENEWABLE ENERGY TO HEART. 37
Flat Ridge Wind Farm
![Page 38: Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e0b5503460f94af310e/html5/thumbnails/38.jpg)
TAKING RENEWABLE ENERGY TO HEART.