![Page 1: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/1.jpg)
Kansas Levee Certifications –
Assessments, Findings and Challenges
APWA Congress – Denver, Co - Sept 18, 2011
![Page 2: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/2.jpg)
Introductions
Presenters
Doug Danaher, PE, CFM – Wilson and Company
Joe File, PE, CFM – AMEC
Brian Clennan, PE – City of Hutchinson
Kansas Municipal Levee Owners Consortium
Augusta, Dodge City, El Dorado, Florence, Gypsum,
Hutchinson, Manhattan, Marion, Osawatomie, Ottawa,
Salina, Topeka, Wichita
![Page 3: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/3.jpg)
Presentation Outline
Background & Importance of Certification
Assessment Process
Findings
Challenges of Certification (Time and Funding)
![Page 4: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/4.jpg)
History
NFIP Program – 1974
44 CFR 65.10 – 1986
Map Modernization – 2003
Provisionally Accredited Levee Agreements
– 2007
Risk Map – 2010
Background
![Page 5: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/5.jpg)
Background
If the levee is certified by a professional engineer as meeting the criteria in 44 CFR 65.10:
The levee is accredited and mapped.
Area behind the levee is mapped as moderate risk (zone X).
If the levee does not meet 65.10 criteria:
Levee shown on effective maps is de-accredited.
Area behind the levee is mapped as high risk (zone AE or A).
Flood Insurance policies will be required for properties with federally backed or insured mortgages.
5
![Page 6: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/6.jpg)
Background – Certification Impacts
![Page 7: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/7.jpg)
FEMA Levee Certification Program
Consultant Certifies
FEMA Accredits
Process is for Flood Insurance Purposes
COE Programs (Other Purposes)
Background
![Page 8: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/8.jpg)
Those Impacted by
Certification:
•Mayor Jones
•Mr. Jones
•Councilman’s Brother
•Senators Mom
•Floodplain Manager
•FEMA Employee
•Retired General
•Your Son’s Kindergarten
Teacher
•Public Works Director
•Your Wife’s Best Friend
•Your Mother-in-Law
Background
![Page 9: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/9.jpg)
Assessment Process
Freeboard
Closures
Seepage and Stability
Settlement
Embankment Protection
Interior Drainage Analysis
Operation & Maintenance Manual
As Built – As Is
![Page 10: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/10.jpg)
Assessment Process
Phase I – Discovery Phase
Phase II – Analysis Phase
Phase III – Construction & Certification
![Page 11: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/11.jpg)
Assessment Process
Freeboard– Requires 3’ throughout; 3.5’ at upstream end; 4’ at constrictions (bridges)
– Updated river hydrology; river hydraulic model / water surface profiles
– Survey current top of levee profiles
– Compare profiles & identify deficiencies
![Page 12: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/12.jpg)
Assessment Process
Closures– Requires closures for all openings that are structural
parts of the system, designed according to sound
engineering practices.
– Road / rail closures (sandbag, stop log, gates, etc.)
– Conduits (gated and un-gated)
– Considers river timing
![Page 13: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/13.jpg)
Assessment Process
Seepage, Stability and Settlement– Requires Engineering analysis to evaluate seepage during loading
conditions and demonstrate that seepage into or through the foundation
and embankment will not jeopardize stability. Engineering analysis to
assess future settlement and demonstrate freeboard will be maintained.
– Geotechnical science evolved in 1970’s
– Borings to characterize soils
– Analyze for seepage, stability and settlement
– Validate with historical performance and top of levee profile
– Considers river timing
![Page 14: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/14.jpg)
Assessment Process
Embankment Protection– Requires Engineering analysis that demonstrates no appreciable erosion
can be expected, and that expected erosion will not result in failure of levee.
– Considers flow depths and velocities from updated river modeling
– Validated with historical performance (review historical photos)
![Page 15: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/15.jpg)
Assessment Process
Interior Drainage Analysis– Requires analysis to identify flooding sources and the extent of the area
flooded and if the avg depth > 1’, determine water surface elevations.
Based on joint probability and capacity of interior drainage facilities.
– Updated hydrology
– Utilize USACE coincidental peak analysis method
– Utilize updated ground surface elevation data (2-ft contours)
– Complete reservoir routing to minimize ponding surface areas
– Likely to be Zone A on updated FEMA maps
![Page 16: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/16.jpg)
Assessment Process
Operation & Maintenance Manual– Requires Operation & maintenance per current manual, under
jurisdiction of federal, state or community in NFIP. Requires
flood warning system; plan of operation; periodic operation
of closures; backup provisions.
– Update USACE O & M manual; develop detailed operation plan
![Page 17: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/17.jpg)
Assessment Process
As-Built (As-Is) Drawings– Requires certified as-built plans of the levee system.
– Update As-Builts to Reflect Current Conditions
– Can Use Current Ground Surface, Aerials, Profiles, BFE’s, Soil
Borings, GIS Data, Utilities, etc.
![Page 18: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/18.jpg)
Findings
Systems Generally Well Maintained– Review Original Agreement & O & M Manual
– Reporting Requirements, Access Control, Modifications (USACE Approval
and update documents), Detailed Operation Plan, Practice Operation,
Video Inspection of Conduits
![Page 19: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/19.jpg)
Findings
Wichita Valley Center Flood Control System– Constructed from 1950 through 1963
– 97 miles earthen levee embankment
– 4 diversion structure
– 14 floodwalls
– 6 pump stations
– 120 interior drainage structures
– 96 ponding areas
– 11 miles training levees
![Page 20: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/20.jpg)
Findings
Developed Phased Assessment Approach– Phase 1
– LiDar
– Historical Documentation
– Visual Assessment
– Phase 2 - Certification Analysis
(COE completed part of hydrology)
– Phase 3 – Design and Construction
![Page 21: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/21.jpg)
Findings
• “Worst First” Approach– Four Projects Identified
– Plans & Specs parallel to
analysis
• Additional Construction Projects
![Page 22: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/22.jpg)
Findings
City of Manhattan Levee Project– Five Mile Levee System
– Two Closures
– Two Pump Stations
– 19 Drainage Structures
![Page 23: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/23.jpg)
Findings
Required Levee Modifications
– Additional freeboard for one mile of levee (BFE’s went up)
– Decommission two interior drainage structures
![Page 24: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/24.jpg)
Shaded Relief Map
Hutchinson
S. Hutchinson
![Page 25: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/25.jpg)
Hutchinson 1929 Flood
![Page 26: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/26.jpg)
Hutchinson Levees
Levee C: Protects
Reno Co.
Levee F: Protects
Willowbrook
Levees A, D, E
Protect Hutch
Levee B: Protects
S. Hutch
![Page 27: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/27.jpg)
Hutchinson: 2011 vs 2007
![Page 28: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/28.jpg)
Hutchinson: 2011 vs 2007
![Page 29: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/29.jpg)
Hutchinson: 2011 vs 2007
![Page 30: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/30.jpg)
Floodplain w/o Levees
Hutchinson
S. Hutch
![Page 31: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/31.jpg)
Floodplain w/ Levees
Hutchinson
S. Hutch
![Page 32: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/32.jpg)
Findings
Hutchinson Levee System– Lacks freeboard in a few areas
– Additional underseepage control needed
– Update operation & maintenance manual; develop detailed operation plan
![Page 33: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/33.jpg)
Findings
Hutchinson Levee System, Cont.– Corroded conduits
– Additional embankment protection needed
– Large interior drainage areas, potential pump station
![Page 34: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/34.jpg)
Findings
Dodge City Levee System– Insufficient freeboard due to sedimentation in river channel
– Operation challenges for sandbag closures
8 closures require 135 people (8 hrs), 22k bags, 200 cu yd sand, 8 trucks
– Embankment protection improvement & alternative analysis
– Update operation & maintenance manual; develop detailed operation plan
![Page 35: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/35.jpg)
Certification Challenges
Each System Differs
Hydrology
Hydraulics
Geography
Geology
Definition of “System”
Lack of Time
Lack of Funding
![Page 36: Kansas Levee Certifications Assessments, Findings and ...Introductions Presenters Doug Danaher, PE, CFM –Wilson and Company Joe File, PE, CFM –AMEC Brian Clennan, PE –City of](https://reader034.vdocuments.us/reader034/viewer/2022051811/6026320e7ea68e7c466ff94b/html5/thumbnails/36.jpg)
Certification Challenges
13 Municipalities Throughout Kansas
Populations range from 400 to 400,000
Primary Functions Include:
– Unified Voice to Rule Makers (Federal and State)
– Share Lessons Learned
Kansas Municipal Levee Owners ConsortiumAugusta, Dodge City, El Dorado, Florence, Gypsum, Hutchinson,
Manhattan, Marion, Osawatomie, Ottawa, Salina, Topeka, Wichita