Kanban Overview and Experience Report
David JoyceBBC Worldwide
1
![Page 2: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/2.jpg)
Kanban Overview
Kanban is a transparent, work-limited, value pulling system.
Eric Willeke - Kanbandev Yahoo! group
2
![Page 3: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/3.jpg)
Use a transparent method for viewing work, and organising the
team
Limit WIP and pull work when the team has capacity.
Stop Starting - Start Finishing!
Evolve from there by recognising bottlenecks, waste and variability that affect
performance
Start with what you do now.
Modify it slightly to implement pull
David Anderson3
![Page 4: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/4.jpg)
Work in Process
Because we want to deliver new value quickly, we want to limit the amount of work that we take on at one time
We want to finish items before starting others
4
![Page 5: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/5.jpg)
Pull Work not Push
There is a queue of work, which goes through a number of stages until its done.
5
![Page 6: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/6.jpg)
Kanban Pull
Step 1 DoneStep 2 Step nBacklogIn
ProcessIn
ProcessIn
Process
Flow
6
![Page 7: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/7.jpg)
Kanban Pull With Limits
That looks very like a typical Agile Task Board.
However, there is one more important element which really defines a Kanban system - limits.
There are two basic limitsWIP limits and Queue limits
7
![Page 8: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/8.jpg)
WIP Limits
Governs the maximum number of work items that can be in that state at any instant
8
![Page 9: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/9.jpg)
Queues and Queue Limits
A queue distinguishes work that is eligible to be pulled, from work that is still in process.
The queue allows for slack
9
![Page 10: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/10.jpg)
Queues and Limits
…
Step 1 DoneStep 2 Step n…BacklogQueue In
Process QueueIn
Process QueueIn
Process(3) (2)
10
![Page 11: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/11.jpg)
Leading Indicators
Agile development has long rallied around “inspect and adapt”.
Early agile methods built their feedback around velocity.
This is a trailing indicator.
With the regulating power of limits, it tells you about problems in your process, while you are experiencing the problem!
11
![Page 12: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/12.jpg)
Bottlenecks - Stall
12
![Page 13: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/13.jpg)
Bottlenecks - Vacant Space
13
![Page 14: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/14.jpg)
Kanban Workflow
We ensure the right work is done at the right time, rather than who is doing the work.
14
![Page 15: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/15.jpg)
New Kind of Standup
15
![Page 16: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/16.jpg)
A New Kind of Planning
Planning can be ‘de-coupled’
16
![Page 17: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/17.jpg)
Releasing
Releasing can be ‘de-coupled’
17
![Page 18: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/18.jpg)
Iterations
Iterative Development Without Iterations
18
length
time
![Page 19: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/19.jpg)
Retrospectives
We have more choice on when and how to reflect and improve
19
![Page 20: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/20.jpg)
De-Coupling
20
![Page 21: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/21.jpg)
Metrics
21
Metrics are a tool for everybody
The team is responsible for its metrics
Metrics allow for continuous improvement
Red, Amber, Green is not enough.
![Page 22: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/22.jpg)
Cumulative Flow
22
![Page 23: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/23.jpg)
Work Breakdown
23
![Page 24: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/24.jpg)
Kanban for Everyone
24
![Page 25: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/25.jpg)
25
Lean Decision Filter
1. Value trumps flow
Expedite at the expense of flow to maximise value
2. Flow trumps waste elimination
Increase WIP, if required to maintain flow, even though it may add waste
3. Eliminate waste to improve efficiency
![Page 26: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/26.jpg)
Kanban Usage
26
![Page 27: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/27.jpg)
Kanban
John Seddon - Freedom from Command & Control
Summary
27
![Page 28: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/28.jpg)
Experience Report
Eric Willeke - Kanbandev Yahoo! group
28
![Page 29: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/29.jpg)
Continually evolving...
Kanban began in one product
team in mid 2008
29
![Page 30: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/30.jpg)
Continually evolving...
Kanban began in one product
team in mid 2008
30
![Page 31: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/31.jpg)
Application Support
The Kanban “flu”soon spreads to
other teams
![Page 32: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/32.jpg)
Application Support
Product Teams
The Kanban “flu”soon spreads to
other teams
32
![Page 33: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/33.jpg)
Application Support
Product Teams
Design Team
The Kanban “flu”soon spreads to
other teams
33
![Page 34: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/34.jpg)
Application Support
Product Teams
Design Team
COTS Team
The Kanban “flu”soon spreads to
other teams
34
![Page 35: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/35.jpg)
Had looked at Agile before
small team sizes didn’t fit
specialisation
constant mix of new development & support
irregular release cadence
Now entering newterritory
35
![Page 36: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/36.jpg)
Future Media & Technology!
!"#$%&'(')*#+,#-'#&+'
.*+%*-/0'1.&2&,.,3'
"45*.6%4%&78'
Future Media & Technology!
!"#$%&'()*
36
![Page 37: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/37.jpg)
No Single Solution
Based on a set of principles
Better practice NOT best practice
Focus on Quality
Reduce WIP, Deliver Often
Balance Demand against Throughput
Prioritise
Recipe for success
David Anderson
Coupled with sound engineering practices and a team willing to reflect, adapt and
improve
Reduce variability
Statistical Control
Let the data tell you,what to do with the data
37
![Page 38: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/38.jpg)
Lead Time
Mean reduced from 22 to 14 days (33%)50% drop in the spread in variation.Each of the outliers were proved to be special cause.
Data split at financial year end and in July38
![Page 39: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/39.jpg)
Development Time
Mean reduced from 9 to 3 days (67%)77% drop in the spread in variation.The major reduction factor has been to limit work in process.
Data split at financial year end and in July39
![Page 40: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/40.jpg)
# Live Defects
Reduction in lead and cycle times, and increase in throughput are not at the expense of quality. Number of live bugs is within statistical control, and seeing a reduction since July.
Data split at end and in July40
![Page 41: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/41.jpg)
# Days Blocked
Mean reduced from 25 to 5 days (81%)Large drop in the spread in variation.The outliers was proved to be special cause, waiting for a 3rd party. # blockers actually increased.
Data split at financial year end and in July41
![Page 42: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/42.jpg)
Throughput
Upward trend. Rising to almost every working day.Expected as code base is decoupled, work items broken into MMFs, and cycle time reduces.
![Page 43: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/43.jpg)
Scrum to Kanban
Engineering Time
Mean reduced from 10 to 4 days (60%)64% drop in the spread in variation.
Data split at end and in July
43
![Page 44: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/44.jpg)
Kanban
John Seddon - Freedom from Command & Control
Summary
![Page 45: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/45.jpg)
Scrumban
45
Scrumban is useful for existing Scrum teams, who are looking to improve their
scale or capability
![Page 46: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/46.jpg)
46
More information on Kanban
My blog http://leanandkanban.wordpress.com/
Kanban community site http://www.limitedwipsociety.org
Kanban for Software Engineering http://bit.ly/hz9Ju
Soon to be published academic paper on BBCW and Kanban case study
![Page 47: Kanban Overview And Experience Report Export](https://reader033.vdocuments.us/reader033/viewer/2022061105/5414204f7bef0a130d8b7e56/html5/thumbnails/47.jpg)
Thank you
John Seddon - Freedom from Command & Control
Questions?