Page 1: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

KALGOORLIE CCI24 OCTOBER 2013

John Baines

TORO ENERGY LIMITED

“What’s Down the Track?”

Page 2: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

2

Disclaimer

This presentation has been prepared by Toro Energy Limited (“Toro”). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived from third parties and though Toro has no reason to believe that it is not accurate, reliable or complete, it has not been independently audited or verified by Toro.

Any forward-looking statements included in this document involve subjective judgement and analysis and are subject to uncertainties, risks and contingencies, many of which are outside the control of, and maybe unknown to, Toro. In particular, they speak only as of the date of this document, they assume the success of Toro’s strategies, and they are subject to significant regulatory, business, competitive and economic uncertainties and risks. Actual future events may vary materially from the forward looking statements and the assumptions on which the forward looking statements are based. Recipients of this document (“Recipients”) are cautioned to not place undue reliance on such forward-looking statements.

Toro makes no representation or warranty as to the accuracy, reliability or completeness of information in this document and does not take responsibility for updating any information or correcting any error or omission which may become apparent after this document has been issued.

To the extent permitted by law, Toro and its officers, employees, related bodies corporate and agents (“Agents”) disclaim all liability, direct, indirect or consequential (and whether or not arising out of the negligence, default or lack of care of Toro and/or any of its Agents) for any loss or damage suffered by a Recipient or other persons arising out of, or in connection with, any use or reliance on this presentation or information. All amounts in A$ unless stated otherwise.

Page 3: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

3

Key Points

• Principal Development Asset: Wiluna Uranium Project– 74mlb (33,500 tonnes) U3O8 total regional JORC resource 1

– 100% of resources at Centipede and Lake Way are classified as Measured or Indicated. Both deposits are approved for development.

– 76% of Millipede is classified as Indicated.– Feasibility study planned for completion in 2014– One of the few projects globally capable of production from 2016

• Principal Exploration Asset: Theseus Uranium Project– Maiden resource reported December 2012 – 6.9mlb @ 1

– Potential acid ISR extraction => low capital development– Exploration target range (ETR) 28 – 40mlb (12,600 – 18,200t) U3O8 – Expected grade range of 450 – 520ppm U3O8

Refer to CP Statements on page 19

1 200 ppm cut-off grade

Page 4: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

4

Toro Energy

ASX announcement (ASX:TOE) 12 August: Toro acquires 22Mlb U3O8 Lake Maitland Uranium Project from Mega Uranium

Project Location

PerthAdelaide

Theseus

Wiluna

Capital Structure Post Acquisition

ASX Code TOE

Ordinary Shares on Issue1 m 1,481.9

Share Price (9 Aug) A$/share 0.089

Undiluted Market Capitalisation A$m 131.9

Pro-forma Cash2 A$m 14.7

Macquarie Bank facility A$m 12.0

Undiluted Enterprise Value3 A$m 129.1

Jan-12 Apr-12 Jul-12 Oct-12 Jan-13 Apr-13 Jul-130.00

0.02

0.04

0.06

0.08

0.10

0.12

0.14

0.16

Share Price History (A$/share)

Notes:1. Pro-forma for Acquisition and completion of share subscriptions from Pinetree and OZ Minerals2. TOE cash on hand 30 June 2013 plus cash from Acquisition and A$2.0m share subscriptions associated with the Acquisition3. Unlisted options on issue: 135.2M at various strike prices4. Source: Bloomberg as at 9 August 2013.

Wiluna Uranium Project (100%)

Theseus Uranium Project (100%)− (Initial resource 6.9Mlbs U3O8

established and follow up targets)

WA and NT are Australian States and Territories that allow uranium mining and enclose Toro’s

project and exploration footprint.

Page 5: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

The Wiluna Uranium ProjectOwned 100% Toro

5

Page 6: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

Wiluna Project

6

Location 520 km north of Kalgoorlie and 30 km south of Wiluna

Highlights 74Mlb JORC Resource 6 shallow calcrete-hosted carnotite deposits Centipede, Lake Way, Millipede, Nowthanna,

Dawson Hinkler and now Lake Maitland First class mining jurisdiction; 100+ years of

mining history Infrastructure and services available – power,

gas, transport, people All major environmental approvals for mining

in place 2013-2014: complete final feasibility studies

and arrange project finance

Status State & Federal Environmental approvals granted for Centipede and Lake Way

Pilot Plant completed 2011 PFS and Phase 1 DFS Engineering complete Trial mining completed Low technical risk – simple open cut mining

and proven process flow sheet

Page 7: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

7

Wiluna Regional Resource

# Refer to CP Statements on page 19

Page 8: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

8

Exploration and strategic acquisitions have grown the Wiluna Regional Resource base to a development scale

2009 2010 2011 2012 2013 Pro-forma0

10

20

30

40

50

60

70

80

90

100

Cont

aine

d U

3O8

(Mlb

s)1

Resource Development

30.6

53.650.1

74

24.4

1. Based on cut off grade of 200ppm U3O8.

CentipedeLake WayMillipede

NowthannaDawson Hinkler

CentipedeLake WayMillipede

NowthannaDawson HinklerLake Maitland

CentipedeLake Way

CentipedeLake Way

Dawson Hinkler

CentipedeLake WayMillipede

NowthannaDawson Hinkler

Proposed Lake Maitland acquisition

Drilling resulting in:• Upgrade

resource• Density

Increase

Drilling targeting:• Resource

Upgrade

Page 9: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

9

Project Economics – 2012 to 2013

Parameter November 2012 Wiluna Economics1 Targeted Wiluna improvementsNovember 2013

Processing Plant 1.3mtpa Opportunity to increase capacity (over time and subject to government approvals)

Head Grade 716 ppmU3O8 Increase as Lake Maitland ore is higher grade

Recovery Ramping to 86% No material impact as similar ore characteristics

C1 Cash Cost US$37/lb1,2 Reduction in C1 cash costs

Capital cost A$269m Minor change to up-front capital

Product (per annum) 780t U3O8 (1.7mlb) Increase from grade uplift and potential increase in processing rates, subject to existing approvals

Mining Duration 10-14 years Increase to 20+ years

1. First 10 years of production.2. Figures based on an exchange rate of AUD/USD: 0.90.

Page 10: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

The Global Uranium Industry

10

The worlds needs new primary supply Less than 1/3rd of 2030 reactor demand can

be met by current mines Existing mines are being depleted Secondary supplies running down By 2017, current mines and secondary supply

will not keep pace with reactor demand New mine developments have been slow

getting to market Uranium pricing and capital markets Permitting slow Fukushima sentiment

New supply now sought from stable jurisdictions: Australia is a tier 1 supplier

Australian market share has decreased as CIS countries expand production

Supply/Demand Forecast (‘000 T’s U3O8)

Source: Independent industry and broker reports.

Wiluna is the only Australian project permitted and capable of being brought into production during the forecast supply gap

Page 11: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

Community and Indigenous Engagement

Shire of Wiluna policy of support for uranium mining

4 formal public consultation opportunities

Information days – Wiluna, Leonora, Menzies, Kalgoorlie

Traditional Owner site visits: Beverly , Doral mineral sands mine, Wiluna

Agreed Project configuration

Independent advice provided

Specific Indigenous issues: Cultural Heritage Management Bush Tucker Radiation & Environmental Monitoring

11

Page 12: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

Proposed Transport Route

• Wiluna-Adelaide via national highway system

• 5 conventional ship containers per month (2 double trailers, 1 single)

• Up to 36 truck movements per year

• 2 drivers per truck, limited stops,re-fuelling points only

• Shipment from Port Adelaide and/or Darwin

• Ports are permitted for Class 7 vessels

• Allow co-shipping with other producers

12

Page 13: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

Ministerial Approvals

13

“The Liberal-National Government is committed to ensuring that uranium mining in WA will be subject to strict security provisions and world’s best practice safety and environmental standards.”

WA Government Minister Marmion; 10 October 2012

“My decision comes after a rigorous environmental assessment.”

Australian Government Minister Burke; 2 April 2013

Page 14: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

14

The Way Ahead for Toro

• The Wiluna Project:– Current focus on improving resource definition and mining engineering– Mining agreement with Traditional Owners– Submission of mining proposal– Progress approvals for next priority deposits– Complete feasibility engineering in 2014– Target commitment decision in late 2014 with first uranium sales in 2016– Dependent on financing and market

Page 15: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

15

2013-2014 Toro’s Development Plans

Implementing the approved Wiluna Project Integrating Lake Maitland and optimisation of economics Financing activities targeted to allow construction start late 2014

2013 2014 2015 2016 2017

July-Sep

Oct-Dec

Jan-Mar

Apr-Jun

Jul-Sep

Oct-Dec

Jan-Mar

Apr-Jun

Jul-Sep

Oct-Dec

Jan-Mar

Apr-Jun

Jul-Sep

Oct-Dec

Jan-Mar

Millipede & Lake Maitland Approvals Process

Wiluna Project Resource Upgrade

Wiluna & Lake Maitland Mining Studies

Expanded Wiluna Project DFS

Project Finance

Target FID

Mine Construction

First Sales

Page 16: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

16

Toro Energy Limited

John BainesProcessing ManagerToro Energy LimitedL2 35 Ventnor Ave WEST PERTH WA 6005 Telephone: +61 8 9214 2100 Email: [email protected]: www.toroenergy.com.au

Page 17: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

Appendix

17

Page 18: KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”

Competent Person StatementThe information presented here that relates to Mineral Resources of the Centipede, Lake Way, Millipede and Nowthanna deposits is based on information compiled by Dr Greg Shirtliff of Toro Energy Limited and Mr Robin Simpson and Mr Daniel Guibal of SRK Consulting (Australasia) Pty Ltd.Mr Guibal takes overall responsibility for the Resource Estimate, and Dr Shirtliff takes responsibility for the integrity of the data supplied for the estimation. Dr Shirtliff is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM), Mr Guibal is a Fellow of the AusIMM and Mr Simpson is a Member of the Australian Institute of Geoscientists (AIG) and they have sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity they are undertaking to qualify as Competent Persons as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012)’. The Competent Persons consent to the inclusion in this release of the matters based on the information in the form and context in which it appears.The information presented here that relates to Mineral Resources of the Dawson Hinkler deposit is based on information compiled by Dr Katrin Karner of Reptile Uranium Namibia Pty. Ltd. (formerly of Toro Energy Limited at the time of the estimation) and Mr Robin Simpson and Mr Daniel Guibal of SRK Consulting (Australasia) Pty Ltd. Mr Guibal takes overall responsibility for the Resource Estimate, and Dr Karner takes responsibility for the integrity of the data supplied for the estimation. Mr Guibal is a Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM), Dr Karner is a Member and CP (Geo) of the AusIMM and Mr Simpson is a Member of the Australian Institute of Geoscientists (AIG) and they have sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity they are undertaking to qualify as Competent Persons as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2004)’. The Competent Persons consent to the inclusion in this release of the matters based on the information in the form and context in which it appears.The information presented here that relates to Mineral Resources of the Lake Maitland Deposit is based on information compiled by Mr Stewart Taylor and Mr Matthew Wheeler of Mega Uranium Limited, and Mr Peter Gleeson and Mr Daniel Guibal of SRK Consulting (Australasia) Pty Ltd. Mr Guibal takes overall responsibility for the Resource Estimate, and Mr Taylor and Mr Wheeler take responsibility for the integrity of the data supplied for the estimation. Mr Taylor is a Fellow of the Australian Institute of Mining and Metallurgy (AusIMM), Mr Guibal is a Member of the AusIMM and Mr Wheeler and Mr Gleeson are Members of the Australian Institute of Geoscientists (AIG), all have sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity they are undertaking to qualify as qualified persons as defined by the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2004). The Qualified Persons consent to the inclusion in this release of the matters based on the information in the form and context in which it appears

. 18