Page 2: Kaizen Costing

FLOW Kaizen Kaizen Costing Important Points Steps Choice of Perspective Customer Value Kaizen Costing v/s Standard Costing Concerns Benefits

Page 3: Kaizen Costing

KAIZEN“improvements in small steps”.

A Japanese term for making improvements to a process through

small, incremental amounts rather than through large

innovations.

Page 4: Kaizen Costing

KAIZEN COSTING Developed by Yashuhiro Monden in Japan.

Can be translated as “enhancement estimation”.

Most consistent with the saying “slow and steady wins the race”.

Page 5: Kaizen Costing

KAIZEN COSTING

Page 6: Kaizen Costing

KAIZEN COSTING A process of cost reduction during

the manufacturing phase of an existing product. It refers to continual and gradual improvement through small betterment activities, rather than large or radical improvement made through innovation or large investments in technology.

Page 7: Kaizen Costing

KAIZEN COSTING

ManufacturingCycle

RD&E Cycle

Post ServiceCycleKaizen Costing

Page 8: Kaizen Costing

IMPORTANT POINTS

Kaizen costing’s goal is to ensure that actual production costs are less than the prior year costs.

Similar to target costing in its cost-reduction mission.

However, it focuses on reducing costs during the manufacturing stage of the total life cycle of a product.

Investment estimates are available in advance. It is tied to the profit-planning system.

Page 9: Kaizen Costing
Page 10: Kaizen Costing

IMPORTANT POINTS

The time prior to kaizen costing is called Target costing, which involves searching for a target cost for a product before it reaches the market.

Together these two concepts make up lifecycle costing.

Page 11: Kaizen Costing
Page 12: Kaizen Costing

IMPORTANT POINTS

The target-reduction rate is the ratio of the target reduction amount to the cost base.

Cost sustaining period allows employees to learn new procedures before Kaizen targets are imposed.

As much as 80% of lifecycle costs are determined when production begins.

Page 13: Kaizen Costing
Page 14: Kaizen Costing

STEPS When planning, a cost target is set and a gap occurs. Establish why the goal was set and what are the

possibilities of reaching the target. Cost reductions are broken down into smaller

reductions. New cost applies on the day of activity. Each activity bears its own investment estimate

prepared in advance. Finally resources are allocated.

Page 15: Kaizen Costing
Page 16: Kaizen Costing

CHOICE OF PERSPECTIVE

Commonality, i.e., is economies of scale possible? Suppliers and their added value? Technology, logistics, packaging, investment? Can improvements be made in purchasing function? What about production, maintenance, planning? Can the work be organized differently? Do we have the right customers?

Page 17: Kaizen Costing
Page 18: Kaizen Costing

CUSTOMER VALUE Keep in mind the customer value.

Page 19: Kaizen Costing

STANDARD COSTING V/S KAIZEN COSTING

Page 20: Kaizen Costing

STANDARD COSTING V/S KAIZEN COSTING

Standard Costing

1. Cost-control system concept.2. Assumes stability in current manufacturing process.3. Goal is to meet cost performance standards.

Kaizen Costing

1. Cost-reduction system concept.2. Assumes continuous improvements in manufacturing.3. Goal is to achieve cost reduction standards.

Page 21: Kaizen Costing

STANDARD COSTING V/S KAIZEN COSTING

Standard CostingTechniques1. Standards are set annually or semi- annually.2. Variance analysis involves comparing actual to standard costs.3. Investigation occurs when standards are not met.

Kaizen CostingTechniques1. Cost reduction targets are set and applied monthly.2. Variance analysis involves target Kaizen costs versus actual cost reduction amounts.3. Investigation occurs when target reductions are not attained.

Page 22: Kaizen Costing

STANDARD COSTING V/S KAIZEN COSTING

Who has the best knowledge to reduce costs?

Standard CostingManagers andengineers developStandards.

Kaizen CostingWorkers are closestto the process andthus know best.

Page 23: Kaizen Costing

CONCERNS Often viewed as reactionary not value adding. The system places enormous pressure on employees

to reduce every conceivable cost. The product is already in the manufacturing

process, thus it is difficult and costly to make large changes to reduce costs.

The cost of disruptions to production may be greater than the savings.

Page 24: Kaizen Costing

BENEFITS Competence development is long term. Result is ability to survive in short run. Every activity is supported by work team that

shares the result. Rewards the group working with cost

rationalization.