k-kem piping circuitization

Upload: qaisarabbas9002

Post on 07-Aug-2018

241 views

Category:

Documents


1 download

TRANSCRIPT

  • 8/20/2019 K-KEM Piping Circuitization

    1/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    by

    Saudi K-KEM NDT & Inspection Services

    Saudi K-KEMNDT & Inspection Services

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    2/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    To create a comprehensive database for the newly

    constructed piping system.

    The database created will be able to have a good and

    efficient inspection program in order to monitor the

    piping integrity and finally to help the maintenance

    department for its preventive and support RBI program

    maintenance schedule effectively.

    By having this program it perhaps will reduce the

    unplanned shutdown.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    3/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Document Review

    Develop Line List &

    System Numbering.

    Visual Inspection.

    Sketching & Photo

    Mapping.

    Determine injection

    point, soil/air

    interface, deadleg,TML and CUI.

    Predetermine

    Circuit & Spool.

    Isometric Drawing

    Physical TML

    marking on site.

    Data entry into

    database.

    Print all document

    and compilation on

    hard file.

    Damage Mechanism

    as per API 571 &

    Client

    specificatiaon.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    4/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Document Review.

    Collect the following document/data from client for review;

    1. Isometric as builtdrawing

    2. Piping and InstrumentDiagram (P&ID)

    3. Mechanical FlowDiagram (MFD)

    4. Line List 

    5. Piping Specification

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    5/30

  • 8/20/2019 K-KEM Piping Circuitization

    6/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Develop Line List & System Numbering.

    To classify all piping. Production group input isrequired.

    Determine if the line falls within the scope ofAPI 570.

    To initiate any changes or correction to theline class, however this shall be made uponclient approval.

    Develop a Line List which is start from the main

    streams and end with other streams, based on theirdesign condition i.e pressure and temperature.

    Assign a system number for each line.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    7/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    8/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Document Review

    Develop Line List &

    System Numbering.

    Visual Inspection.

    Sketching & Photo

    Mapping.

    Determine injection

    point, soil/air

    interface, deadleg,TML and CUI.

    Predetermine

    Circuit & Spool.

    Isometric Drawing

    Physical TML

    marking on site.

    Data entry into

    database.

    Print all document

    and compilation on

    hard file.

    Damage Mechanism

    as per API 571 &

    Client

    specificatiaon.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    9/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Visual Inspection.

    To carry outvisual

    inspection forthe designated

    line. Theinspector is

    responsible tophysically

    visualize the

    line against theas built

    isometricdrawing.

    LC-4”-7511-D1101-H(N20A)

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    10/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Document Review

    Develop Line List &

    System Numbering.

    Visual Inspection.

    Sketching & Photo

    Mapping.

    Determine injection

    point, soil/air

    interface, deadleg,TML and CUI.

    Predetermine

    Circuit & Spool.

    Isometric Drawing

    Physical TML

    marking on site.

    Data entry into

    database.

    Print all document

    and compilation on

    hard file.

    Damage Mechanism

    as per API 571 &

    Client

    specificatiaon.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    11/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Damage Mechanism as per API 571

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    12/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Document Review

    Develop Line List &

    System Numbering.

    Visual Inspection.

    Sketching & Photo

    Mapping.

    Determine injection

    point, soil/air

    interface, deadleg,TML and CUI.

    Predetermine

    Circuit & Spool.

    Isometric Drawing

    Physical TML

    marking on site.

    Data entry into

    database.

    Print all document

    and compilation on

    hard file.

    Damage Mechanism

    as per API 571 &

    Client

    specificatiaon.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    13/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Sketching and Photo Mapping.

    To manually sketch for thecorrosion isometric.

    During the sketch, theinspector to indicate the

    line flow direction i.e fromequipment to equipment.

    This to ensure thecontinuity of the line

    system.

    The photo mappingis required in order

    to make the

    isometric drawingproduce can beeasily visualize.

    http://www.saudikkem.com/http://www.saudikkem.com/http://localhost/var/www/apps/conversion/tmp/scratch_7/SketchandPhoto.pdfhttp://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    14/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Document Review

    Develop Line List &

    System Numbering.

    Visual Inspection.

    Sketching & Photo

    Mapping.

    Determine injection

    point, soil/air

    interface, deadleg,TML and CUI.

    Predetermine

    Circuit & Spool.

    Isometric Drawing

    Physical TML

    marking on site.

    Data entry into

    database.

    Print all document

    and compilation on

    hard file.

    Damage Mechanism

    as per API 571 &

    Client specification.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    15/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    16/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Document Review

    Develop Line List &

    System Numbering.

    Visual Inspection.

    Sketching & Photo

    Mapping.

    Determine injection

    point, soil/air

    interface, deadleg,

    TML and CUI.

    Predetermine

    Circuit & Spool.

    Isometric Drawing

    Physical TML

    marking on site.

    Data entry into

    database.

    Print all document

    and compilation on

    hard file.

    Damage Mechanism

    as per API 571 &

    Client

    specificatiaon.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    17/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Determine injection point, soil/air interface,

    deadleg, TML and CUI

    To indicate the existentof injection point,

    soil/air interface, deadleg as well as to markup the MFD drawing

     for future references.

    To determine the pipingsusceptible to CUI as

    indicated by client. Criteriawill be shared. However,production group input is

    required.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    18/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Document Review

    Develop Line List &

    System Numbering.

    Visual Inspection.

    Sketching & Photo

    Mapping.

    Determine injection

    point, soil/air

    interface, deadleg,

    TML and CUI.

    Predetermine

    Circuit & Spool.

    Isometric Drawing

    Physical TML

    marking on site.

    Data entry into

    database.

    Print all document

    and compilation on

    hard file.

    Damage Mechanism

    as per API 571 &

    Client

    specificatiaon.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    19/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    3D Isometric Drawings

    To developCorrosionIsometricDrawing.

    The drawingshows Circuit

    Termination andContinuation,

    TML Point,Injection Point

    or dead leg andTechnical Data.

    To indicateTML on thecorrosionisometricdrawing.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    20/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Document Review

    Develop Line List &

    System Numbering.

    Visual Inspection.

    Sketching & Photo

    Mapping.

    Determine injection

    point, soil/air

    interface, deadleg,

    TML and CUI.

    Predetermine

    Circuit & Spool.

    Isometric Drawing

    Physical TML

    marking on site.

    Data entry into

    database.

    Print all document

    and compilation on

    hard file.

    Damage Mechanism

    as per API 571 &

    Client

    specificatiaon.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    21/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Physical TML marking on site

    To completethe TML

    numberdetermination Sheet foreach circuit.

    Tophysically

    identify andmarking onsite for the

    TML.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    22/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Document Review

    Develop Line List &

    System Numbering.

    Visual Inspection.

    Sketching & Photo

    Mapping.

    Determine injection

    point, soil/air

    interface, deadleg,

    TML and CUI.

    Predetermine

    Circuit & Spool.

    Isometric Drawing

    Physical TML

    marking on site.

    Data entry into

    database.

    Print all document

    and compilation on

    hard file.

    Damage Mechanism

    as per API 571 &

    Client

    specificatiaon.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    23/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Data entry into database.

    Data entry to be filled up bydocumentscontroller.

    The data consisting of PipingClass, CUI, Inspection SystemNumber, Corrosion Isometric

    Number, Reason Fox Exclusion,Line's System Description,

    Injection Points, Soil/AirInterfaces, Design Data (e.g.

    Pressure, Temperature,Material of Construction,Service, Diameter, Pipe

    Schedule, Nominal Thickness,Required Thick, etc), External

    Inspection Interval, andCorrosion Monitoring

    Inspection Interval.

    Filling up the necessarytechnical information for

    review by inspectionsupervisor.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    24/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Data entry into database (cont.)

    To set the externalinspection interval

     for each system andit should be carry outin accordance to API570. Shorten interval

    should beconsidered for

    system with potentialexternal corrosion

    problem.

    Those system that

     fall under class # 4,the interval shall be

    suggested, reviewedand approved by the

    contractor and finally, again to be

    reviewed andapproved by client.

    To assess each systemto determine if

    corrosion monitoring isrequired. If corrosion

    monitoring is notrequired for the system

    therefore it shall bedocument for the reason for excluding the system

    on the corrosionmonitoring exclusion form. This shall be

    agreed by client.Production group inputis required.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    25/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    TYPICAL EXAMPLE DATA BASE

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    26/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    TYPICAL EXAMPLE  – PIPING/EQUIPMENT MERIDIUM TEMPLATE.

    In addition to the above, we are currently engaged with SAHARA

    reliability Dept. in development of their corrosion circuit as per

    API570/571, i,e. to produce 3D ISO Drawing, TML identification,

    Dead Leg, circuit termination, spool as well as filing up all the data

    governed into the MERIDIUM Template.

    Our team as for this project consisting of K-KEM for the corrosion

    circuit development + MERIDIUM for the software.

    The piping thickness base reading had been carried out using adata logger UT machine which is in complying to the MERIDIUM

    software. The machine used was OLYMPUS Panametric DL37 plus

    as recommended by MERIDIUM.

    http://www.saudikkem.com/http://www.saudikkem.com/http://localhost/var/www/apps/conversion/tmp/scratch_7/MERIDIUM%20TEMPLATE.xlshttp://localhost/var/www/apps/conversion/tmp/scratch_7/MERIDIUM%20TEMPLATE.xlshttp://localhost/var/www/apps/conversion/tmp/scratch_7/MERIDIUM%20TEMPLATE.xlshttp://localhost/var/www/apps/conversion/tmp/scratch_7/MERIDIUM%20TEMPLATE.xlshttp://localhost/var/www/apps/conversion/tmp/scratch_7/MERIDIUM%20TEMPLATE.xlshttp://localhost/var/www/apps/conversion/tmp/scratch_7/MERIDIUM%20TEMPLATE.xlshttp://localhost/var/www/apps/conversion/tmp/scratch_7/MERIDIUM%20TEMPLATE.xlshttp://localhost/var/www/apps/conversion/tmp/scratch_7/MERIDIUM%20TEMPLATE.xlshttp://localhost/var/www/apps/conversion/tmp/scratch_7/MERIDIUM%20TEMPLATE.xlshttp://localhost/var/www/apps/conversion/tmp/scratch_7/MERIDIUM%20TEMPLATE.xlshttp://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    27/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Document Review

    Develop Line List &

    System Numbering.

    Visual Inspection.

    Sketching & Photo

    Mapping.

    Determine injection

    point, soil/air

    interface, deadleg,

    TML and CUI.

    Predetermine

    Circuit & Spool.

    Isometric Drawing

    Physical TML

    marking on site.

    Data entry into

    database.

    Print all document

    and compilation on

    hard file.

    Damage Mechanism

    as per API 571 &

    Client

    specificatiaon.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    28/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    Printing all document and compilation on hard file

    To provide the hard file for finalizing all

    document prepared.

    Printing all documentand compilation of

    piping inspection set-up plan prior to

    submission to client.

    Also to provide soft

    copy of all requireddocument.

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    29/30

    Saudi K-KEMNDT & Inspection Services

    K-KEM Engineering Services Co. Ltd, Malaysiawww.saudikkem.com

    OUR REQUIREMENTS

    To provide the hard file for finalizing all

    document prepared.

    ●Printing all document and compilation ofpiping inspection set-up plan prior to

    submission to client.

    ●  Also to provide soft copy of all

    required document.

    To provide the hard file for finalizing all

    document prepared.

    ●Printing all document and compilation ofpiping inspection set-up plan prior to

    submission to client.

    ●  Also to provide soft copy of all

    required document.

    PIPINGLINE

    LIST

    AS-BUILTISOMETRICDRAWING

    MFD P & IDDRAWINGS

    http://www.saudikkem.com/http://www.saudikkem.com/http://www.saudikkem.com/

  • 8/20/2019 K-KEM Piping Circuitization

    30/30

    Saudi K-KEMNDT & Inspection Services

    K KEM Engineering Services Co Ltd Malaysia

    Q & A

    SESSION.

    http://www.saudikkem.com/