j.w.lynch portfolio
DESCRIPTION
j.w.lynch portfolioTRANSCRIPT
STUDIO DESIGN W O R K O F J . W A G N E RL Y N C HU N I V E R S I T Y A T B U F F A L OS C H O O L O F A R C H I T E C T U R E A N D P L A N N I N G
4
0
4
J . W a g n e r L y n c hU N I V E R S I T Y A T B U F F A L O
P o r t f o l i o C o n t e n t s
P r o j e c t 1the living wall
P r o j e c t 3s o c i e t y o f r o o m s
P r o j e c t 4b i g a r t m u s e u m
P r o j e c t 2f a c a d e s y s t e m s
P a g e 4
P a g e 8
P a g e 1 2
P a g e 1 6
P r o j e c t 5o f f i c e b u i l d i n g r e n o v a t i o n
P a g e 2 0
The Living Wall -
the Spring 2010 semester examines full-scale production in relation to site and neighboring strategies. Spatial decisions are the results of a set of cubic cuts and shifts while recognizing parti-wall conditions. Upon completion of design and fabrication, project is installed at Griffis Sculpture Park.
proposed model investigating modularity. each component allowing for on-site assembly
In refining models, students are tocreate strategies to divide or breakdown their model into modular pieces.This process is to allow for on siteassembly, as well as a more effectivemeans of transport.
Modular Components Of Final Models Are Structurally FramedFor Configuration. Connections Between Modular Pieces AndStructural Details of The Model Are Planned.
Groups are to investigateways in structurally detailing theirmodel. In doing so, additionalrequirements such as a pitch roof fordrainage and configuring parti-walltolerance are introduced.
Final modular pieces are to be boltedto each unit, as well as neighboringbuildings and railroad ties foranchoring models.
Model is secured at the 400 acreGriffis Sculpture Park located at6902 Mill Valley Road, East Otto,NY 14729.
Facade Systems -
the main building project for the semester is the design of a market and office building on a site located in the Strip District in Pittsburgh, PA. incorporating a multi-use building system of an envelope, structure and egress. the general program is to include 15,000 sqf. of market space at ground level, and 20,000 sqf. of office space on upper levels. all floors are required elevator access and two enclosed stair towers for emergency exiting.
WALL DESIGN MATERIAL PATTERN
GLASS PATERN PANEL PATERN
STRUCTURAL FRAME FINAL WALL DESIGN
constructing a wall which will replace the existing double envelope of the Occidental Chemical Building located in Niagara Falls. the completed project should consider issues such as air movement, light, shade and shadow as well as mediation of views from both interior and exterior. develop a secondary and tertiary structure to transfer loads on to the building's structural frame.
a. precast litracon concreteb. insolated clear glazing
c. solid panel
2. steel framing system3. office wall section
1. module group
1.
a. b.
c.
2.
3.
axonometricdetail
buildingsystem EGRESS STAIRSELEVATORS
STRUCTURAL ELEMENTS
5
10
15
20feet
penn ave.
mulberry way
22nd s
t.
23rd s
t.
A.
N
completing a digital model of the exterior envelope and resultant interior space developed in project 2. a luminance false color perspective is rendered of the space from an occupant's point of view. observe the passage and distribution of light and manipulation of heat through materiality.
Society of Rooms -
design for an Islamic center while making cultural and innovative decisions. investigates the manipulation of light through a ceiling condition whichestablishes a distinct relationship between ciruclation and program. the quality of light through materiality, pattern and form is used as amedium to develope unique spatial conditions.
Individual Ceiling Condition
Individual room circulation
Room 1 Room 2 Room 3 Room 4 Society
Room 1 Room 2 Room 3 Room 4 Society
Room Configuration
creating a strategy in distinguishing a society of rooms individually as well as explaining its functioning as a society. Through descriptive, diagramatic and axonometric drawings, the relationship modeled is illustrated into further detail. Drawings explain matter of configuration, circulation and ceiling condition.
Site and Plan
North
Mecca
System of Ramps Axonometric
Multifunction
Prayer
Courtyard
Reading Kitchen
ShoeRestroom
Ramps1:20’
SOCI
ETY
Mergin
g o
fVie
ws
StudySociety Design
Creating
Cir
culation
StudySociety Design
Ceilin
gConditio
n
StudySociety Design
project produces a louver light-wellsystem influenced by primary modelsand by investigations of traditional Mosque precedents. Design intends to funnel and filter light through its form and materiality.
harmonizing initial ideas with Mosque analysis to produce a final conceptual design.
Big Art Museum -
comprehensive studio project; designing with the intention of providing residential rooms in conjunction with a unique assembly space. project must solve for accessibility, egress, construction and structural methods. building considers code requirements and parameters in the proposal.
12’
24’
36’
48’
E l m w o o d / B r y a n t D e s i g nS t u d i o A r t C e n t e rstudio bedroom
1. Exhibit Space
2. Open Gallery
3. Atrium
4. Living Cube
5. Balcony Space
1.2.
3.
4.
5. 5.
massing model which creates positive and negative moments througha cubic push and pull. this resultant facade system allows for interior living as well as balcony spaces connecting to the urban environment.
A. B.
unit 1 unit 2 unit 3 unit 4
unit 1
A. B.
double load bearing wall
13’- 0”prefabricated sections
ecotect model analysis of natural light exposure and conditions
two bedroom unit
single bedroom unit
fire rating
ground floor plan
building egress
building program
instances of light
Shared Circulation
Private Terrace
Emergency Egress
Wheel Chair Turning Radius
Refuge Area
Accessible Elevator
natural ventilation
office building renovation -
transformation of 7811 Rapids Gun Shop, Buffaloave. into a private office space. building designed inaffiliation with the city of Niagara Falls’ restoration grant program.
building conditions before design phase. design requirements seek one main office with three smaller offices partitioned to allow openess of plan while providing work privacy.
27'-0
"
40'-6"
15'-6"
7811 BUFFALO AVENUE
DRAFT 1 1" = 1'
FIRST FLOOR PLAN
MAIN OFFICEOFFICE
OFFICE
OFFICE
COMMUNAL WORK SPACE
project introduces new wall framing, drop ceiling for implementing modern electrical, water, and plumbing conduits, tinted facade glass, laser cut carbon steel signage and energy efficient lighting. open building plan and restroom accomodates for disabled accessibility and code regulations.