justin updated 3.1.15

Download Justin Updated 3.1.15

If you can't read please download the document

Upload: justin-carver

Post on 14-Apr-2017

81 views

Category:

Documents


1 download

TRANSCRIPT

Michael "Justin" Carver3228 Fall Branch RoadMountain City, Tennessee 37683(423)291-1554 - [email protected]

Detailed Project Experience as a Foreman Rock Remediation TechnicianforAmeritech Slope Constructors, Inc.21 Overland Industrial BoulevardAsheville, North Carolina 28806

August 2011Flat Rock, NC - Fill Slope Stabilization: US 25/I26 ConnectorTennessee DOTInstall soil nails, install wire mesh over rip-rap slopeSeptember 2011Weston, WV - Rockfall Protection System: US 19West Virginia DOT 140 hours rock scaling, 240 hours drilling with top hammer cage drill, install rolled cable net and SPIDER wire systemDecember 2011I40, NC - Rockfall Barrier: I40 EB, MM 16North Carolina DOT Install type 2 rockfall barrier, drill/grout micropiles and cable anchors, pour concrete foundation pads, hand ring net panels with mesh backingFebruary 2012Cocke County, TN - Landslide Remediation: I40, MM 451Tennessee DOT 45 hours rock scaling

March 2012Sevierville, TN - Birds Creek Road Widening ProjectTennessee DOT Install 700 LF type 2 rockfall barrierApril 2012Gatlinburg, TN - Slide Repair/Slope Stabilization: US 441Tennessee DOT83 hours rock scaling, install 1150 LF rock bolts, install 3631 SY of 3mm pinned drape

June 2012Fancy Gap, VA - Slope Remediation: I77 NB, MM 5Virginia DOT 371 hours rock scaling, 200 hours drilling for anchors and dynamiteJuly 2012Carthage, TN - Cordell Hull Hydroelectric Power PlantUS Army Corps of Engineers 760 hours rock scaling, tree cutting, brush clearing, 50 hours drilling for dynamite, plugger drilling for boulder busterOctober 2012Cabin Creek, WV - Right of Way Landslide RepairAmerican Electric Power Rock scaling, install 1200 LF rockfall barrier, install SPIDER wire system over rock outcropping, install/grout soil nails, install Tecco mesh over soil nails on 5 separate landslides, 775 hours drilling with Gardner-Denver top hammer wagon drill, TEI excavator drill, and TEI TD-50 drillMarch 2013Gatlinburg, TN - Rock Scaling/Pinned Drape ProjectTennessee DOT105 hours rock scaling, tree clearing, install Tecco mesh with crane, drilling 500 LF with TEI excavator drill and Word cage drillJune 2013South Richmond, VA - Maintenance ScalingLuckstone Quarry 60 hours rock scaling on quarry walls for maintenance and air baggingAugust 2013Bull Run, VA - Maintenance ScalingLuckstone Quarry 140 hours rock scaling, drilling for cable anchors, install double twist mesh systemConshohocken, PA - I76 Rock Wall RemediationPennDOT 361 hours rock scaling, tree clearingNovember 2013Martin, KY - Slope Stabilization and Slide RepairAmerican Electric Power Drilling, install tecco mesh

December 2013Hazard, KY - AEP Installation ProjectAmerican Electric Power 300 LF drilling, install Malone anchorsJanuary 2014Haleiwa, HI - Slide RepairWaimea Valley Adventure Park 180 hours rock scalingHendersonville, NC - Slide RepairNorth Carolina DOT 3000 LF drilling with TEI excavator drill and Marini wagon drill, install Tecco mesh system on 4 different slopesFebruary 2014Ocoee Gorge, TN - Ocoee Gorge Scaling Phase ITennessee Valley Authority 120 hours rock scaling, 50 LF drilling with plugger for Boulder BusterMarch 2014Montreat, NC - Geobrugg Tecco System with Pattern BoltingPrivate Party Install Geobrugg Tecco system with pattern boltingOcoee Gorge, TN - Drape SystemTennessee Valley Authority 10 hours rock scaling, install ring net drape system, drill epoxy anchorsApril 2014Lexington, VA - Rock Anchor Tecco Netting Drape Virginia Military Institute Install rock anchor Tecco netting drape, 200 LF drilling with Marini wagon drillMay 2014Knox County, TN - Raised Drape SystemTennessee DOT Rock scaling, tree clearing, 300 LF drilling with Marini wagon drill, install raised drape systemJune 2014Woburn, MA - Drape System and Rock BoltsHerley Group Install SPIDER Wire and rock anchors, 500 LF drilling with Marini wagon drillSeptember 2014Jericho, VT - Bridge Stabilization Project Phase IVermont Agency of Transportation Install tensioned rock bolt anchors, 240 LF drilling with Marini wagon drill above the riverto allow stable slope for bridge abutmentOctober 2014Princeton, WV - Norfolk Southern ProjectNorfolk Southern 160 LF drilling with Marini wagon drill and plugger, removing trees, rock scaling, trim blasting, netting, and ShotcreteJanuary 2015Knox County, TN - Raised Drape SystemTennessee DOT Drilling with Marini wagon drill, rock scaling, hanging meshApril 2015Mount Airy, NC - Geobrugg Rockfall BarrierNorth Carolina DOTRockfall barrier installation, 300 LF drilling with TEI excavator drillMay 2015(F)Jericho, VT - Bridge Stabilization Project Phase IIVermont Agency of TransportationInstall tensioned rock bolt anchors and rock dowels, 500 LF drilling with Marini wagon drill above the river to allow stable slope for bridge abutment

(F)Hibbing, MN - Scranton Barge ProtectionHibbing Taconite110 hours rock scaling, plugger drilling for Boulder Buster, drilling for rock splitter(F)Elizabethton, TN - Roadway ScalingAggregates USA40 hours rock scalingJune 2015(F)Princeton, NJ - Tecco Mesh Pinned Drape SystemNew Jersey DOTInstall 1000 LF Tecco mesh, install 200 LF rock bolts, 300 LF drilling with Marini wagondrill for cable anchors

July 2015(F)Philadelphia, PA - Slope Stabilization for Parking Lot IssuesCVS Pharmacies200 hours rock scaling, plugger drilling for Boulder Buster, splitting with rock splitter, air bagging(F)Harrisburg, PA - Tecco Mesh Drape/Pinned Drape SystemPennDOT120 hours tree cutting, 180 hours rock scaling, over 1000 LF drilling with Marini wagon drill, Marini pallet drill, and Word hydraulic platform drill, install over 3000 LF Tecco mesh, drill 40 Shotcrete dowels(F)Leesburg, VA - Tecco Pinned Drape SystemLuckstone Quarry60 hours rock scaling, 120 hours drilling with Marini pallet drill, install 720 LF Tecco mesh* (F) - Denotes Foreman position *

Total Career Rock Scaling Experience3,000+ hoursTotal Career Drilling Experience1,400+ hours and 7500+ LFTotal Career Rope Experience10,000+ hoursGeneral Equipment Operation ExperienceExcavator, Boom Lift, Materials Handler, Skid-steer Loader, Boulder Buster/Magnum Buster, Hydraulic Rock SplitterDown the Hole Hammer Drill Operation ExperienceMarini Pneumatic Pallet Drill, Marini Pneumatic Wagon Drill, TEI Hydraulic Excavator Drill, TEI Hydraulic TD-50 Drill, Word Hydraulic Platform Drill, Word Hydraulic Wagon Drill, Word Hydraulic Cage Drill, Skid-steer Hydraulic Drill Top Hammer Drill Operation ExperienceGardner-Denver Pneumatic Top Hammer Wagon Drill, Cage Pneumatic Top Hammer Drill, Platform Pneumatic Top Hammer Drill

Other Trade-Specific SkillsAbility to operate testing equipment and read dial gauges for rock bolt anchors, cable anchors, and tesioned rock bolt anchors.

Current Specialized Training- SPRAT Rope Access Technician: Level I- 30 Hour OSHA: Construction Safety and Health- CPR/AED and Standard First Aid from the American Heart Association- US Army Corps of Engineers and Naval Facility Engineering Command Training Course #784: Construction Quality Management for Contractors- Mine Safety and Health Administration Training (Pit Specific Certification)- Class 7 Rough Terrain Forklift Training- Aerial Work Platform - Boom Lift Training- Signal/Rigger Qualifying- Williams Hollow Bar Installation Training- Fall Protection Certification- Union Pacific Railroad Safety Training- Norfolk Southern Railroad Safety Training