jurby skaidrintuvas skrajute a4 en · e-mail: [email protected] holland jurby watertech...

2
High-rate clarifier A-stream SD ® A-stream SD ® is a high-rate clarifier, which guarantees the effective and low cost water pretreatment.It has proved its efficiency at sedimentation velocity 6-8 m/h. Operation principle Operation is based on water pulsations, created by the reactor. Unique pulse profile, created by the external air pressure, enables effective sedimentation of suspended particles. Raw water is supplied to the reactor from which it is gradually pushed out to the clarifiers using air blower. At the end of this process, air release valve at the top of the reactor is opened, and this gives a sudden fall of water level in the clarifiers so providing kinetic power to the sludge, forcing it to the bottom, where it is further lead out. Construction principle Clarifiers are made of polypropylene shell enclosed by the steel frame. Clarifier shell contains case of three lamella shelves, water inlet/outlet and sludge outlet distributors. Block of lamella shelves is an individual component which can be easy taken out from the clarifier for cleaning. Clarifier Jurby A-Stream ® www.jurby.com

Upload: others

Post on 04-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Jurby skaidrintuvas skrajute A4 EN · E-mail: jurby.ukr@jurby.com Holland Jurby WaterTech International B.V. Saturnus Building 4th Floor Saturnusstraat 25-J 2132 HB Hoofddorp The

High-rate clarifi er A-stream SD®

A-stream SD® is a high-rate clarifi er, which guarantees the effective and low cost water pretreatment.It has proved its effi ciency at sedimentation velocity 6-8 m/h.

Operation principle

Operation is based on water pulsations, created by the reactor.

Unique pulse profi le, created by the external air pressure, enables effective sedimentation of suspended particles.

Raw water is supplied to the reactor from which it is gradually pushed out to the clarifi ers using air blower. At the end of this process, air release valve at the top of the reactor is opened, and this gives a sudden fall of water level in the clarifi ers so providing kinetic power to the sludge, forcing it to the bottom, where it is further lead out.

Construction principle

Clarifi ers are made of polypropylene shell enclosed by the steel frame.

Clarifi er shell contains case of three lamella shelves, water inlet/outlet and sludge outlet distributors.

Block of lamella shelves is an individual component which can be easy taken out from the clarifi er for cleaning.

Clarifi er Jurby A-Stream®

www.jurby.com

Page 2: Jurby skaidrintuvas skrajute A4 EN · E-mail: jurby.ukr@jurby.com Holland Jurby WaterTech International B.V. Saturnus Building 4th Floor Saturnusstraat 25-J 2132 HB Hoofddorp The

Application fi eld

Effective surface water pretreatment for downstream treatment.

Advantages • Low investment cost on equipment. • Low operation cost.• Easy maintenance and operation.• Long service life ensured by corrosion

resistant materials.

United KingdomJurby WaterTech International (UK) Ltd1st Floor, 1 St. Andrew’s HillLondon EC4V 5BYTel. +44 20 7822 7390Fax: +44 20 7248 1555E-mail: [email protected]

LithuaniaJurby Water TechEuropos pr. 23LT-46329 Kaunas, LithuaniaTel.:+370 37 421401, 421402, 421403Fax:+ 370 37 421400E-mail: [email protected]

RussiaJurby WaterTechMoscow area 140053, Liuberetsky districtKotelniki, Silicate microdistrict,No 43/26 PromzoneTel.:/Fax: +7 495 708 40 80 E-mail: [email protected]

UkraineJurby WaterTechEnergetikov 1, KhotovKiev-Svyatoshinsky District08171 Kiev Region, UkraineTel./fax: +380 44 406 05 10,406 05 20, 406 05 30 E-mail: [email protected]

HollandJurby WaterTech International B.V.Saturnus Building 4th FloorSaturnusstraat 25-J2132 HB HoofddorpThe NetherlandsTel.: +31 23 5543 430Fax: +31 23 5543 433E-mail: [email protected]