    Construction Schedule

    Name of Proposed Sub-Project : Construction of 0.60 x 0.80 x 100 ln.m drainage canal

    Actual Start of Work:

    Target Completion Date:

    Construction Duration (Calendar Days): 15 Calendar days

    Qty Unit Unit Price Amount % WT 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3

    0.015 0.015 0.015 0.015 0.015 0.015

    0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031

    0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045

    193 ,627 .50 100 .00% 100%

    Planned 1.48% 1.48% 1.48% 9.07% 9.07% 9.07% 7.59% 7.59% 7.59% 7.59% 7.59% 7.59% 7.59% 7.59% 7.59

    Actual

    Planned 1.48% 2.95% 4.43% 13.50% 22.57% 31.65% 39.24% 46.84% 54.43% 62.03% 69.62% 77.22% 84.81% 92.41% 100.00

    Actual

    Planned

    Prepared by:

    Location: Brgy. Salvacion, Palo Leyte

    0.37

    0.09

    0.54I II Masonry Works 100 .00

    Sr Construction Manager - CRS

    % Accomplishment

    Cummulative % Accomplishment

    Slippage (%)

    Ruel B. Bansali

    l n.m 1 ,050 .23 105 ,022 .50 54.24%

    II Concrete Works 100.00 ln.m 714.45 71,445.00 36.90%

    I Excavation 100.00 ln.m 171.60 17,160.00 8.86%

    W1 W2 W3

    July 4, 2016

    July 16, 2016

    Item No. Item DescriptionBill of Quantities

    ANNEX A page 1 of 1