Page 1: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Building and Grounds Report

June 4, 2012

Page 2: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Classroom Building

Location between U. Hall and Hamilton Hall

Estimate cost $19.2M + site costs includes $1M for technology

Classrooms 4 Scale-Up style classrooms

(1x180, 2x126, 1x90 seat rooms) 1 tiered classroom (225 seat) No traditional classrooms planned

Tunnel access from U. Hall

Page 3: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Classroom Building

Will incorporate “Student Success Center” University College advising services

(moving from U. Hall) Math Academy (moving from M&M Bldg) Tutoring Service (moving from basement

Dunbar) Adequate lounge space Vending machines

Page 4: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Classroom Building

Concerns raised by UBGC Future tunnel connections – student

housing? Food service (coffee shop)? Classroom instructional equipment? Covered drop-off?

Page 5: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Neuroscience & Engineering Collaboration (NEC) Building

Located between Health Sciences and Russ

Approximate cost $37M ($12M State, $20M local, $5M donors)

Incorporates Research lab space Tunnel access to LAR Graduate student bullpen Auditorium (~120 seat) Conference rooms (small sizes)

Page 6: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

NEC Building

Concerns raise by UBGC No enclosed/covered disability access to

building No analysis of increased parking

requirements Shared (Registrar scheduled / NEC

scheduled) 120 seat conference room may not be practical

Process for selecting art

Page 7: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Enrollment Services

One-Stop Facility in 1st floor Student Union

Estimated cost $2.6M Supports student centered service

model using “counselors” Includes a ~50 seat presentation

area Front-of-the-house located on 1st

floor of Student Union Back-of-the house operations moving

to 2nd floor of Med. Sci.

Page 8: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Special Thanks

The following individuals were quick to provide information to UBGC, listened to suggestions for improvement and in general worked to improve conditions on campus for faculty, staff and students:

Registrar’s Office (Marian Brainerd, Mary Holland)

Parking and Transportation (Rob Kretzer)

CaTS (Mary Clem, Debbie Whisler)

Physical Plant (Jeff Trick)

Page 9: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Problem Area

Facilities and Planning Department (FPD) is a source of problems for UBGC.

The information provide by FPD to the UBGC

is not timely is not readily accessible (written form) to

others is, at times, inaccurate or biased

Page 10: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

The bottom line

FPD decisions are not fully aligned with the University’s academic and research mission

FPD has assumed a decision making role rather than serving as an aid to decision makers

Page 11: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Design Death Spiral

Decision is made to initiate a project Information flows to faculty and staff is limited and delayed FPD then makes decisions based on perceived needs Decisions not properly aligned with the academic mission End products don’t always meet faculty and staff needs Faculty and staff request changes to better fulfill mission Changes and modifications increase costs Reduces possibility of initiating new projects

Lack of communication and interaction Leads to poor decision making

Limits creativity and innovation

Page 12: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Typical Example --Russ Engineering Center Renovation

Decision was made to renovate the lobby of Russ

Approximate budget $500K Design Process

Dean appoints an ad hoc design review committee MSA Architecture holds a design cherrette MSA delivers initial design concept Committee solicits input from building occupants Committee made recommendations to the Dean

Page 13: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Process goes off the rails Staff member asks Chair of UBGC why the

CECS has to accept “art work” that the committee organized to provide input said was inappropriate and unnecessary.

Chair of UBGC contacts CECS Assoc. Dean who states FPD said the art is “mandated”

Chair of UBGC contacts VP Sweeney and asks what is the process for selection of State mandated art?

Page 14: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Russ Renovation -- Lobby

Page 15: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Cost Analysis

Art work (banner) -- estimated cost $30-35K

Portals – estimated cost $18-22K

Total cost for art and banners $48-57K Estimated cost of renovation $480K

Art plus portal cost 10% - 12% of budget!

Page 16: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Who approved these items?

Ad Hoc CECS Renovation Advisory Committee said don’t buy the art or the portal.

Ms. Vicky Davidson, Assoc. VP FPD stated in the UBGC meeting on May 25, 2012 the Dean authorized purchasing these items.

Page 17: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Subject: Russ Project--Additional FeedbackDate: Thu, 10 Nov 2011 15:58:08 -0500From: Tom Bazzoli <[email protected]>To: Robert A Thompson <[email protected]>

Rob,Dean Narayanan is very pleased with your aggressive timeline to get this project finished by Fall 2012. However, he wants to accommodate staff and faculty feedback and "tweak" the results of the charrette design within our time constraints. In addition to the feedback I provided at our meeting, there are two significant issues:

1. At our meeting, I mentioned concerns and push back over the art piece. I understated the feedback. We have pretty much universal feedback that the piece is disliked and will not add to the facility. Similarly there is near universal disapproval of the upper floor portals. We believe the budget set aside for this upper floor tie-in to the atrium remodel could be better used elsewhere. We are open to alternatives, but would like to drop the art piece.[…]

Thanks,Tom-- Thomas L. BazzoliAssistant DeanCollege of Engineering and Computer ScienceWright State University

Memo to FPD

Page 18: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Timeline

Nov 2011 The Dean said don’t spend funds on the art or portals

Feb 2012 Project went to bid June 2012 Construction begins August 2012 Project scheduled to

finished

As far as I can determine, the project still includes the art and portals, but no one in CECS has seen a final plan

Page 19: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

What is mandated art?

Ohio's Percent for Art Legislation became effective July 1, 1990. The law provides funds for the acquisition, commissioning and installation of works of art for new or renovated public buildings with appropriations of more than $4 million of state money per House Bill.

Page 20: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

For future projects

The only project the Ohio Percent for Art Program applies to on campus at this time is NEC Building

Senate needs to ask for more transparency and input into the art selection process

Page 21: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Contracting Agency’s (WSU) Role

It is the contracting agency's responsibility to: Prepare in writing details of the proposed project including budget,

site, timeline and architect. If those details are not known at time of notification by the Ohio Arts Council, the contracting agency should inform the Ohio Arts Council of the date when those details will become available.

Keep the Advisory Selection Committee apprised of the progress of each project.

Appoint a Percent for Art Advisory Selection Committee including an individual who will record meeting minutes.

Appoint an individual to facilitate contract processing and fiscal procedures.

Coordinate any public relations, marketing and dedication of the art work.

Assume any dedication, marketing and public relations expenses. Develop a plan and a budget for maintenance of the completed piece

in consultation with the Ohio Arts Council and the artist. Implement maintenance plan.

Page 22: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Art Selection Committee

A Contracting Agency may select up to two Core Group individuals to serve on the Percent for Art Advisory Selection Committee for their project. Core Group members lend expertise in the art selection process including appropriate site location for artwork and artist selection.  For each project, the Core Group will be joined by the committee established by the Contracting Agency consisting of: the project architect when the Contracting Agency is not a university or college, at least two

and no more than three voting members appointed by the Contracting Agency;

for universities and colleges, at least four and no more than five voting members appointed by the Contracting Agency.

The Ohio Arts Council urges the Percent for Art Advisory Selection Committee to be sensitive to the immediate community. Ideally, the ideas of the community will be carried to the committee through the appointments made by the contracting agency. At all times, artwork will be selected on the basis of artistic integrity, overall quality and appropriateness for the site.

Page 23: June 4, 2012.  Location between U. Hall and Hamilton Hall  Estimate cost $19.2M + site costs  includes $1M for technology  Classrooms  4 Scale-Up

Advisory Selection Committee’s Role

establish a working timeline for each project; determine the appropriate type of artwork for the site; determine the method of selecting artists for each project; serve as the jury for selecting the project artists; identify additional outside jurors when needed.

The Ohio Arts Council urges the Percent for Art Advisory Selection Committee to be sensitive to the immediate community. Ideally, the ideas of the community will be carried to the committee through the appointments made by the contracting agency. At all times, artwork will be selected on the basis of artistic integrity, overall quality and appropriateness for the site.

Visit Ohio Art’s Council website for details:http://www.oac.state.oh.us/grantsprogs/PercentforArt.asp