june 21, 2011 (tuesday) 55th eoq · pdf filejune 21, 2011 (tuesday) 55th eoq congress...

18
June 21, 2011 (Tuesday) 55 th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest V. REGINA BALLROOM II. Tuesday 13:30 – 15:00 11.1. REPOSITIONING QUALITY FOR MANUFACTURING I. 13:30 – 15:00 Session Chair: Hans Dieter Seghezzi, University St. Gallen, Switzerland 13.30 Quality First – Zero Defect Strategy Willfried Heist, Knorr-Bremse Systeme für Nutzfahrzeuge GmbH, Germany Heist, Willfried (Germany) Willfried Heist is Vice President of Group Quality, Product Safety and HSE (Health & Safety Executive) Management and authorized representative at KNORR-BREMSE Systeme für Nutzfahrzeuge GmbH in Munich, Germany since 1997. Before that he was Head of Quality at Fichtel & Sachs AG, Chassis Division; at Zeppelin Metallwerke GmbH and Manager Quality Management at Daimler Benz AG in Germany and Overseas. Willfried Heist has comprehensive experience in creation, realization and further development of Quality Management and Product Safety Systems and QM/Product Safety Strategies.

Upload: vandan

Post on 06-Feb-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

June 21, 2011 (Tuesday) 55th EOQ Congress

CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest V.

REGINA BALLROOM II. Tuesday 13:30 – 15:00

11.1. REPOSITIONING QUALITY FOR MANUFACTURING I. 13:30 – 15:00

Session Chair: Hans Dieter Seghezzi, University St. Gallen, Switzerland

13.30 Quality First – Zero Defect Strategy Willfried Heist, Knorr-Bremse Systeme für Nutzfahrzeuge GmbH, Germany

Heist, Willfried (Germany)

Willfried Heist is Vice President of Group Quality, Product Safety and HSE (Health & Safety Executive)

Management and authorized representative at KNORR-BREMSE Systeme für Nutzfahrzeuge GmbH in

Munich, Germany since 1997. Before that he was Head of Quality at Fichtel & Sachs AG, Chassis Division; at

Zeppelin Metallwerke GmbH and Manager Quality Management at Daimler Benz AG in Germany and

Overseas. Willfried Heist has comprehensive experience in creation, realization and further development of

Quality Management and Product Safety Systems and QM/Product Safety Strategies.

Page 2: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

Quality First – Zero Defect Strategy

June, 2011

Knorr-Bremse Group

Content

Introduction Knorr-Bremse

Q-Strategy

Roadmap

Product Safety Audits

Q First KB Maturity ModelQ-First KB-Maturity Model

Knorr-Bremse Group Hier Dateiname eintragen 2

Page 3: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

Content

Introduction Knorr-Bremse

Q-Strategy

Roadmap

Product Safety Audits

Q First KB Maturity ModelQ-First KB-Maturity Model

Knorr-Bremse Group Hier Dateiname eintragen 3

Answers for a World of Mobility

Knorr-Bremse is the world's leading manufacturer of braking systems for rail and commercial vehicles

Metros Streetcars

TrucksBuses

Rail Vehicle Systems Commercial Vehicles

Multiple unitsHigh-speed trainsLocomotivesPassenger rail cars

EnginesSpecial vehicles

Knorr-Bremse Group Hier Dateiname eintragen 4

Passenger rail carsFreight cars

Page 4: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

The Group

Workforce acc. to divisions and regions

Workforce distribution 2009 *

Europe,Middle East AmericaMiddle East,Africa 22%

Asia,Australia

18%59%

Knorr-Bremse Group 14,43214,999Rail Vehicle Systems 8,2567,688

2008 2009

y ,,Commercial Vehicle Systems 6,0147,160

Knorr-Bremse Group Hier Dateiname eintragen 5

* Deviation from 100% results from rounding

Quality Policy

Quality Policy

Quality Is A Core Value and Product Safety is a critical success factor with Individual Responsibility And Ownership being Essential!

Q lit iWe are committed to continuously advance the quality of our products and services.We are a customer driven company providing the most beneficial solutions for ourQuality is a

Core Value!We are a customer driven company providing the most beneficial solutions for our customers.We comply with the requirements and continually improve the effectiveness of our Quality management system.We strive to design and produce products with Zero DefectsWe strive to design and produce products with Zero Defects through the entire supply chain, becoming the benchmark in quality and product safety .We are committed to be the technology and market leader for

Product Safety is a Critical

W i d d t i t f t i i t

We are committed to be the technology and market leader for product safety over the full product life cycle.We develop and provide products that enable our customers to operate vehicles safely to protect human life

SuccessFactor!

We engage everyone in process and product improvements fostering an environment for continuous learning and development.We accept that the responsibility and ownership for quality and product safety rests collectively with each and everyone one of us.

Individualresponsibilityand ownership

operate vehicles safely to protect human life.

Knorr-Bremse Group Hier Dateiname eintragen 6

We gain from individual knowledge, experience, and competencies across global businesses and cultures.

are essential!

Page 5: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

Knorr-Bremse Group Hier Dateiname eintragen 7

Quality Management

Quality Management

Without safety no Knorr-Bremse No safety without Quality

Also slight carelessness at the supplier, at development or production which are

d d ill h ll h

As manufacturer of safety systems for commercial vehicles and rail it is our bli i d li hi h d d d

Without safety no Knorr Bremse No safety without Quality

not detected will challenge the success of Knorr-Bremse.

obligation to deliver high standard products.

Quality its in your handQuality – its in your hand …..

Our Way – Zero Defect

Knorr-Bremse Group Hier Dateiname eintragen 8

Page 6: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

Content

Introduction Knorr-Bremse

Q-Strategy

Roadmap

Product Safety Audits

Q First KB Maturity ModelQ-First KB-Maturity Model

Knorr-Bremse Group Hier Dateiname eintragen 9

STRICTLY CONFIDENTIAL

STRAP 2011-15 Quality and Product Safety Management

Become worldwide Benchmark in Quality and Product Safety

Strategic Focus

STRICTLY CONFIDENTIAL

Establish “Zero Defect & Product Safety” awareness in the whole CVS group and through all layersEnsure that within our new ventures, JV and LCC operations the same high

GlobalQuality and Product Safety rules are appliedFully satisfy our customers by ensuring the reliability of our products in the field through systematic warranty analysis & integrating problem solving process and lessons learnedprocess and lessons learned.Reinforce our preventive Quality and Product Safety strategy by strictly following the PDC-APQP process throughout the complete CVS group and supply chainExecute global management system (KE CVS)Execute supplier quality management, with preventive quality planning and LCC supplier developmentDon’t repeat mistakes: Further implementation of the Problem SolvingDon t repeat mistakes: Further implementation of the Problem Solvingprocess and Claim Handling Process with a lessons learned, proactive/ preventative approach supported by SIX SIGMA methodologySupport BRIC locations during the implementation of KB standards

Knorr-Bremse Group Hier Dateiname eintragen 10

Page 7: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

STRAP 2011-15 Quality and Product Safety Management

Field actions Zero mileage

Worldwide Benchmark in Quality and Product Safety

PeopleManagement Field actions Zero mileage People

Strengthen the "Zero Defect & Product Safety" awareness in th h l

Management

Consequent focus onproduct safety andprogress controlling

2011 2015 2011 2015

Customer satis- Rate of Quality

the whole group

Design Supplier

progress controlling

Customer satis-faction index

Rate of QualityDesign

Focus on preventive actionin Engineering, robust design and Reliability Management

Supplier

Dramatic improvement of supplier quality w/ preventive quality planning LCC supplier

Warranty costsCustomer

and Reliability Management

Production

quality planning, LCC supplier development

Supplier ppm:Warranty costs

Global Application of the Problem Solving Process& Lessons learned

Zero Defect Production throughout the whole supply chain

Supplier ppm:Ready to assembly

Knorr-Bremse Group Hier Dateiname eintragen 11

chain

Content

Introduction Knorr-Bremse

Q-Strategy

Roadmap

Product Safety Audits

Q First KB Maturity ModelQ-First KB-Maturity Model

Knorr-Bremse Group Hier Dateiname eintragen 12

Page 8: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

Q10Q-First Roadmap 2011

Bloc ManagementWorld-wide realization of the1 Central QualityAccording to Board released planning

Responsible

World wide realization of thePSA audits1 Central Quality

Board

Regular Q-Review and TrackingRegular Follow up in Management Quality reviews P t2

Central QualityLocations

According to Board released planningNew audits and Re-Audits

Regular Q Review and Trackingof Main Q-Projects & Actions Paretos

Stringent follow up of actions2 Locations

CoCs

Regular control of Q-First by Q Fi t St i C itt M ti 8 k3 B dRegular control of Q First bythe Steering Committee Q-First Steering Committee Meetings every 8 weeks3 Board

Execution of the newRoll out and Communication campaignT i i f th li4

Central Quality CommunicationExecution of the new

CVS Quality Policy within Q-First Training of the new policyQ-First promotion material

4 CommunicationLocationsCoCs

Carry out of Q-First Assessments in Locations C t l Q litQ-First KB Maturity Modely Q

Deployment of actions5 Central Quality

Standardization of Lessons Data Base for Lessons LearnedCentral QualityT/BZ

Knorr-Bremse Group Hier Dateiname eintragen 13

Standardization of LessonsLearned? Roll out of identified Lessons Learned6

T/BZLocationsCoCs?

Q-First Roadmap 2011

5 Mains aspects to drive the achievement of Q-First Design targets

Secure …

Project Audits• Identification of potential risks• Definition of actions• Check following of PDP

Training & Awareness• Training on the job of the involved persons withinBP6 (R h &

Avoid …

processBP6 (Research &Development)

Clean up …FMEA & Control Plan• Use/improvement of methodology Safety parts • Use/improvement of methodology• Understanding of importance• Close loop to R&D in case of serious issues/claims

• Definition and Identification(old parts)

• Tracking of applicable specialcharacteristics within supply h i f i k d tichain for risk reduction

PDP process and projects• Further development and completion of BP6 processes

• Improvement of quality of

Knorr-Bremse Group Hier Dateiname eintragen 14

• Improvement of quality of PDP projects (APQP)

Page 9: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

Q-First Roadmap 2011

Global

Supplier Excellence Structure

Risk Management

GlobalSupplier Excellence

Process & ContractManagement

SupplierReduction

TrainingsQualityDevelopment

Selected Safety SuppliersFollow up results under 50%, QMPP Compl. Evaluation

ManagementOutsourcing C-part Managementdue to low volume

Supplier trainingsyearly training plan per location

PurchasingProcessesSPP 4.4.1, 4.4.2, 4.4.3 -KE, PDC integration,

pNew QMPP 2008 Compliance Evaluat., Feasibility AgreementClassificationQuality Perf. (QP)

Financial Risk ManagementPurchasing Risk Evaluation (PRE), D&B

d S h k R i

Phase Out projects due to low volume due to PAVE 3 statusdue to performance due to financial risk

g ,Change process

ContractsGeneral Contracts plus add-on modules, and XL Liability Insurance

Quality Perf. (QP)Delivery Perf. (DP)Productivity Perf. (PP)PAVE 1: Claim Mt.regular claim management by SQDPAVE 2 I P j and Schneck Rating

PAVE 3: High Risk ManagementNot capable suppliers, Not feasible parts

y

Target AgreementTrack the current Target Agreement with suppliers

PAVE 2: Imp. Proj.improvement plan neededAuditsVDA6.3, project PSA

Not feasible parts

Supplier training plan fulfillment

# of suppliersSupplier audits plan fulfillment

% signature rates of Q-contracts

Supplier PPM (raw & rfa)

Knorr-Bremse Group Hier Dateiname eintragen 15

Review by KPI system, Steering structureCommunication via integrated Database, PARIS and SourcingParts (SIS)

Content

Introduction Knorr-Bremse

Q-Strategy

Roadmap

Product Safety Audits

Q First KB Maturity ModelQ-First KB-Maturity Model

Knorr-Bremse Group Hier Dateiname eintragen 16

Page 10: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

Product Safety Management

Well structured approach to product safety in 4 elements…

Safety management- Clear documentation of product safety requirements

Product & process development- Identification & deployment of s/c and c/c parts during- Clear documentation of product safety requirements

- Intensive training of employees- Carry out of product safety audits to identify risks andsystematically deploy actions incl. stringent follow up

- 8D approach + risk analysis in case of safety related

- Identification & deployment of s/c and c/c parts duringdesign

- Robust product design- Consistent validation during design (DVP)- Focus on reliability8D approach risk analysis in case of safety related

issue/claims- Collection, analysis, monitoring of information aboutproduct safety issue/claims

Focus on reliability- Use of tools and methods (PDP, APQP, FMEA‘s, Design Reviews etc.)

- Regular agreement with customers

Manufacturing & assembly- Clear identification and visualization of s/c and c/c onproduction documents

- robust assembly & manufacturing process with strong

Supplier Chain Management-Product Safety audits at selected suppliers with consequent follow up of actions and regular feedbackreviews- robust assembly & manufacturing process with strong

technical securing on s/c and c/c characteristics (e. g.by Poka Yoke)

- monitoring of s/c and c/c during production- process capabilities

reviews- identification and development of safety parts suppliers- systematical approval of safety parts suppliers (PPAP,level 3, on site sign off)

- „safety guidelines agreement“ for suppliers

Knorr-Bremse Group Hier Dateiname eintragen 17

process capabilities „safety guidelines agreement for suppliers

Product Safety Management

Cross functional PSA helps to identify risks systematically

Improvement of PSA Scoring results over the yearImprovement of PSA Scoring results over the year

Exchange of experience and reciprocal learning

Increase of KB product safety awareness worldwide

Cross functional teams with product experts

Integration of the f nctional Safet ManagementIntegration of the functional Safety Management (FSM) according to the IEC 61508

Deployment of standards

Knorr-Bremse Group Hier Dateiname eintragen 18

Derivation of main projects

Page 11: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

Product Safety Management

A tool with escalation level and lessons learned for all locations helps to monitor necessary actions…

Knorr-Bremse Group Hier Dateiname eintragen 19

Product Safety Management

… and to define a clear structured list to manage actions!

Number of actions: 163

Knorr-Bremse Group Hier Dateiname eintragen 20

Page 12: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

Content

Introduction Knorr-Bremse

Q-Strategy

Roadmap

Product Safety Audits

Q First KB Maturity ModelQ-First KB-Maturity Model

Knorr-Bremse Group Hier Dateiname eintragen 21

Q-First Maturity Model

Focus of Q-First Maturity Assessment vs. Product Safety Audit

Deepness

ProductSafety

Deepnessof audit

approach

(focused onimplementation

details,safety

SafetyAudit

safetyrequirements,

safetyissues)

Quality First Maturity Assessment

(alternative to the sum of all 70 TMS audits)

Widenessf dit

focused on completeness,

Knorr-Bremse Group Hier Dateiname eintragen 22

of auditapproach

completeness,system requirements,

management system issues)

Page 13: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

Q-First Maturity Model

Quality First Maturity Model - complete overview

CompetencyM t

SupplierQuality

Control ofProduction &Management Design &

DevelopmentReview ofProduct

People Supplier ProductionManagement Design Customer

Management QualityManagement

Production &Control PlanResponsibility Development

Planning

SpecialKnowledge

PurchasingInformation

Validation &Monitoring ofManagement

Review

Design &Development

ProductRequirements

Corrective &PreventiveKnowledge Information g

ProcessesReview pInput

Product SafetyAwareness

IncomingProduct Logistics &

InventoryManagement

SystemDesign &

Development

Actions

RejectedProductAwareness Conformity InventorySystem Output

EmployeeMotivation &

E t

Supplier RiskManagement

ProductionSystem

InternalAudits

Design &Development

Review

Analysis

CustomerFeedbackEmpowerment a age e t Systeud ts Review

WorkEnvironment

SupplierMonitoring

Measuring &ProductionEquipment

ContinuousImprovement

Design &Development

Changes

IntercompanyClaim

Management

Knorr-Bremse Group Hier Dateiname eintragen 23

EquipmentChanges Management

Q-First Maturity Model

Quality First Maturity Model - 20 areas to assess

ManagementR ibilit

Management Area Area AreaArea

Product SafetyPolicy & Product Safety

R ibilitProduct SafetyC i ti

TargetDeployment &Responsibility

ManagementReview

Policy &Q-First Roadmap Responsibility CommunicationDeployment &

Review

QualityPerformance Risk

AnalysisQuality First

Action Database

ProcessManagementReview

ManagementSystem

Reviews Analysis Action DatabasegReviews

ProcessManagement

Document &Records PROGRESSAudit & Review

PlanningSystem

InternalAudits

Management ControlPlanning

Product SafetyAudits

VDA 6.3Process Audits

VDA 6.5Product Audits

ProjectAudits

ContinuousImprovement

SixSigma

FTFReduction

StatisticalMethods

KaizenTeams

Knorr-Bremse Group Hier Dateiname eintragen 24

Page 14: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

Q-First Maturity Model

Quality First Maturity Model - Maturity Levels

Performance &Effectiveness

Reviews &Improvement

Deployment Performance measurementsReviews

Deployment &RequirementsMaturity Level

Not Applicable

Not Started

p yis not applicable

to the assessed unit.

No evidence of deployment.Th ti i t f d

are not applicableto the assessed unit.

No effectiveness measurementsor poor performance

are not applicableto the assessed unit.

No reviewsor poor monitoring

Baseline

Not Started

Deployment of process.Risk that TS 16949/Customer

The practice is not foundor not yet started.

Low effectiveness. Targets or objectives not achieved.

or poor performance.No targets or objectives.

Process reviews or monitoring.Risks out of missing action plan

or poor monitoring.No action planning.

Baseline

Improving

Risk that TS 16949/Customerrequirements are not fulfilled.

Deployment of process.Requirements are fulfilled.I t

objectives not achieved.Risk of customer claims.

Effectiveness measurementsor performance indicators

h i t

s s out o ss g act o p aor of actions behind schedule.

Review of process deployment. Improvement Plan is defined.

A ti t k

Succeeding

Improvement necessary.

Deployment of processas proven practice and

requirements are fulfilled

show improvement.

Performance and effectivenessshow improvement

and targets are achieved

Actions are on track.

Review of process deployment. Improvement Plan is defined.

Actions are implemented.

Knorr-Bremse Group Hier Dateiname eintragen 25

requirements are fulfilled. and targets are achieved.Actions are implemented.

Q-First Maturity Model

Operative deepness of analysis supported through 9 How

process documentsrequirement matrix

id f i l t tievidence of implementation

frequence and meeting minutesfrequence and meeting minutesaction planning, schedulestimely action follow-up

any figure or performance indicatorperformance over the timetargets set and targets met

Knorr-Bremse Group Hier Dateiname eintragen 26

For each of the 140 areas the P-D-C-A cycle is checked to identify risks of low performance

Page 15: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

Q-First Maturity Model

Assessment Notes for the 6 blocs of Quality First Maturity Model

Knorr-Bremse Group Hier Dateiname eintragen 27

Q-First Maturity Model

Follow-up of actions at the Q-First Action Database

The identified 18 improvement opportunities at each location will be followed-upat the Quality First Action Database.

Knorr-Bremse Group Hier Dateiname eintragen 28

Actions will be stored under "Other Audits + Location + Bloc"

Page 16: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

Q-First Zero Defect Strategy

Continuous Improvement of Q-First

PA G l & TA i P

DefineImplement

A Goals & Targets& Action Plans

ActionExecution

Zero DefectStrategyZero Defect

StructureAssess

gy

DCProduct Safety

ManagementProduct Safety Audit

Maturity Assessment

Zero DefectStrategy

Maturity Model Maturity Assessment

Knorr-Bremse Group Hier Dateiname eintragen 29

Future perspectives

KE brings together ten Group-wide campaigns aimed at process optimization

Quality First: Measures to implement the “zero defects“ principle

Supply Chain Excellence: optimization of the entire chain from suppliers to customerschain from suppliers to customers

Competence in Product Engineering:Standardization of product development processes worldwide

Knorr-Bremse Production System: standardized processes across the global production networkGlobal Purchasing Excellence: Supplier managementGl b l P j t M t S t

Progress: introduction of SAP at all sites

Global Project Management System:Optimizing project management

People Excellence: Implementation of HR roadmap and further development of leadership cultureEfficient Cut of CO2: Campaign to conserve energy and resourcesFi & IT E ll D l t f b t i

Knorr-Bremse Group Hier Dateiname eintragen 30

Finance & IT Excellence: Development of „best in class“ finance and IT organization and processes

Page 17: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

Thank you for your attention!

Knorr-Bremse Group Hier Dateiname eintragen 31

Backup

Knorr-Bremse Group Hier Dateiname eintragen 32

Page 18: June 21, 2011 (Tuesday) 55th EOQ · PDF fileJune 21, 2011 (Tuesday) 55th EOQ Congress CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest

Q-First Maturity Model

Quality First Maturity Assessment to review Q-First and TEX implementation

1. Decision to replace Business ProcessAudits (1998 2009) through QFMA

Focus of Q-First Maturity Assessment vs. Product Safety Audit 2011:Audits (1998-2009) through QFMA- 50% resources saving to do the audits- complete system audit within 3 days- merge of TEX and Quality First initiative

(focused onimplementation

details,safety

requirements,safetyissues)

ProductSafetyAudit

Widenessof audit

h

Quality First Maturity Assessment

(alternative to the sum of all 70 TMS audits)

focused on completeness,

system requirements,

Deepnessof audit

approach

2011:

1. Surveillance Review at alllocations involved at QFMA in2010 (9 locations at Europe) to

2. Quality First Maturity Assessment at allEuropean locations in 2010

- check of requirements fulfillment

Maturity Model 2010 - Maturity Levels

Not Applicable

Performance &Effectiveness

Reviews &Improvement

Deploymentis not applicable

to the assessed unit.

Performance measurementsare not applicable

to the assessed unit.

Reviewsare not applicable

to the assessed unit.

Deployment &RequirementsMaturity Level

Knorr-Bremse Group 2

approach system requirements,management system issues) 2010 (9 locations at Europe) to

check execution and efficiency

2. Further roll-out to Pune and- check of action plan execution- check of effectiveness and efficiency

Knorr-Bremse Group 5

Baseline

Improving

Succeeding

Not Started

Deployment of process.Risk that TS 16949/Customer requirements are not fulfilled.

Deployment of process.Requirements are fulfilled.Improvement necessary.

Deployment of processas proven practice and

requirements are fulfilled.

No evidence of deployment.The practice is not found

or not yet started.

Low effectiveness. Targets or objectives not achieved.Risk of customer claims.

Effectiveness measurementsor performance indicators

show improvement.

Performance and effectivenessshow improvement

and targets are achieved.

No effectiveness measurementsor poor performance.

No targets or objectives.

Process reviews or monitoring.Risks out of missing action plan or of actions behind schedule.

Review of process deployment. Improvement Plan is defined.

Actions are on track.

Review of process deployment. Improvement Plan is defined.

Actions are implemented.

No reviewsor poor monitoring.No action planning. Bendix (Bowling Green)

3. Adaption of the global TEXdocuments to the Quality First

3. Follow-up of improvement actions atspecial section at the Q-First Database

- TOP 18 improvement areas (6 blocs)- monthly review of action execution

validation in 2011 at Surveillance Review

Q yMaturity Assessment

4. Update of the Maturity Modelto integrate new requirements- validation in 2011 at Surveillance Review to integrate new requirements

Knorr-Bremse Group Hier Dateiname eintragen 33

Further roll-out of the Quality First Maturity Assessment in 2011 + 2012 to America and Asia

Tasks & Responsibilities

Central function Quality Group Claim Management

Responsibilities for quality issues within KB organisation

Central function Quality GroupGuideline responsibilityQuality and Product Safety ManagementSystem and GuidelinesSt d d d th d t

Claim ManagementGuidelines Supplier QualityManagementQuality controlling and reportingAssessments AuditsStandards and methods, process mgt.

Customer Quality Representatives

CoC

Assessments, AuditsStrategic planning

Product quality and responsibility for corrective actionsQuality planning (APQP, PPAP), VDA 6.3. Audits PDPContinuous product and process improvementC di ti d i t d ti f t ti i t ti iti b d tCo-ordination and introduction of systematic improvement activities based on customer complaints and product checks as well as proof of the effectiveness of the introduced actions

LocationOperational product quality, Management of internal & external non-conformities (CAR, 8D)Supplier quality assurance VDA 6 3 Audits local and supplier

Knorr-Bremse Group Hier Dateiname eintragen 34

Supplier quality assurance,VDA 6.3 Audits local and supplierQuality service (acceptance, co-ordination, treatment) for own products and 1st findings for inter-company products