july 30, 2015 technical advisory committee (tac) update to rms kathy scott august 4, 2015 tac update...
TRANSCRIPT
July 30, 2015 July 30, 2015 Technical Advisory Committee Technical Advisory Committee (TAC) Update to RMS(TAC) Update to RMS
Kathy Scott
August 4, 2015 TAC Update to RMS 1
ERCOT Board UpdateERCOT Board UpdateJune 9, 2015 Board Meeting:
◦There was no Board meeting this month, but during the June Board meeting the Board approved all revision requests submitted by TAC.
◦TAC leadership provided an update to
Board concerning status of NPRR638 : Additional analysis and review in progress by the
Wholesale Market Subcommittee (WMS). More recent status updates will be provided to the Board during their August 11th meeting.
August 4, 2015 TAC Update to RMS 2
PRS Initiatives and VotesPRS Initiatives and Votes
Nodal Protocol Revision Requests (NPRRs) ◦ NPRR684, Remove Annual RUC Impact Report
Requirement: TAC Unanimously Approved ◦ NPRR692, Removal of MIS Posting Requirement of DAM
Credit Parameters: TAC Unanimously Approved ◦ NPRR693, Incorporation of “Threshold Values for
Competitive Constraint Test” into the Protocols: TAC Unanimously Approved
◦ NPRR694, Non-Spin Schedule Requirements: TAC Unanimously Approved
◦ NPRR695, Posting and Notice Requirements for Notifications of Suspension of Operations and Notifications of Change of Generation Resource Designation: TAC Unanimously Approved
August 4, 2015 TAC Update to RMS 3
PRS Initiatives and VotesPRS Initiatives and VotesNodal Protocol Revision Requests
(NPRRs) ◦ NPRR699, Energy Offer Curve Caps for Make-Whole
Calculations for Resource Type Other: TAC Unanimously Approved
◦ NPRR700, Utilizing Actual Fuel Costs in Startup Offer Caps: TAC Unanimously Approved
◦ NPRR701, As-Built Clarification of NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market: TAC Unanimously Approved
◦ NPRR703, Clarification of Disclosure Requirements for GINR Study Information: TAC Unanimously Approved
◦ NPRR706, Restore the ability to use Physical Responsive Reserve Capability as an Indicator of Available Frequency-Responsive Capacity: TAC Unanimously Approved
August 4, 2015 TAC Update to RMS 4
PRS Initiatives and VotesPRS Initiatives and VotesNodal Protocol Revision Requests (NPRRs)
◦ NPRR710, Removal of ORDC Phase 2 Language and Modification to HASL Calculation: TAC Unanimously Approved Other Binding Document – Methodology for Implementing
Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder NOTE: When TAC Approved NPRR710 also included this Unanimous
Approval of this Other Binding Document
Project Review Discussion (Possible Vote): What is the proper process for addressing Aging
Projects? Spurred a lot of discussion, comments and suggestions.
Action Item: PRS Leadership will develop formal process for TAC’s review and possible approval in the next few months.
August 4, 2015 TAC Update to RMS 5
Tabled and/or Withdrawn Tabled and/or Withdrawn RevisionsRevisions
Request Previously Tabled at TAC (Possible Vote):◦RMGRR129, Revision to Customer
Rescission Completion Timeline RMGRR129 will continue to be “Tabled” at TAC
since RMS didn’t meet in July to address and approve MarkeTrak Taskforce’s recommendation for a delayed implementation date as requested by MPs during the May 28, 2015 TAC meeting.
7/30/15: TAC Unanimously Approved to continue to Table RMGRR129 awaiting RMS’ recommendation for an implementation timeline. The RMS recommendation is expected for the August 27th TAC meeting.
August 4, 2015 TAC Update to RMS 6
Reliability Operations Subcommittee (ROS)◦ NOGRR144, Incorporation of “Manual Deployment and
Recall of Responsive Reserve Service during Scarcity Conditions” into the Nodal Operating Guides (Vote) TAC Unanimously Approved with ERCOT’s July 23, 2015
comments
◦ PGRR043, FIS Scoping Amendment (Vote) TAC Unanimously Approved as submitted by ROS
◦ PGRR044, MIS Classification of GINR Study Information (Vote) TAC Unanimously Approved as submitted by ROS
◦ Voltage Reduction Task Force (VRTF) Update:
Scope of VRTF will be reviewed by ROS during their next meeting
August 4, 2015 TAC Update to RMS 7
ROS Initiatives and Votes: ROS Initiatives and Votes:
Microsoft PowerPoint Presentation
16.11.4.1, Determination of Total Potential Exposure for a Counter-Party – Request to Modify Value of Parameter T5 (Possible Vote)◦ The way NPRR639 was implemented unintentionally
increased the MCE for counter-parties that have both generation and load since it treats all counter-parties that have any load the same. Luminant requested that TAC approve a new value for the T5 Parameters.
◦ Majority of the responses from TAC membership were against making this type of change on the fly without understanding possible long term ramifications created with this change.
◦ Roll Call Voting requested on the Motion to Remand to WMS which includes a request for WMS to consider Luminant’s long term solution. Vote 25 (Yes), 3 (No), 2 (Abstentions)- Motion Carried
August 4, 2015 TAC Update to RMS 8
Determination of Total Potential Exposure
Wholesale Market Subcommittee (WMS) VCMRR007, Alignment with NPRR699, Energy
Offer Curve Caps for Make-Whole Calculations for Resource Type Other (Vote) Motion to Table VCMRR007 pending Board Approval of
NPRR699 was unanimous
VCMRR008, Alignment with NPRR700, Utilizing Actual Fuel Cost in Startup Offer Caps (Vote) Motion to Table VCMRR008 pending Board Approval of
NPRR700 was unanimous
Commercial Operations Subcommittee Update Only
http://www.ercot.com/content/wcm/key_documents_lists/72257/10._COPS_UPDATE_TO_TAC_073015.ppt
August 4, 2015 TAC Update to RMS 9
WMS/COPS Initiatives and Votes WMS/COPS Initiatives and Votes
Retail Market Subcommittee (RMS):◦ RMGRR130, Alignment of Section 7, Market
Processes, with TDSP Terms & Conditions Tariff Effective 01/15/2015, and Adds New Appendix D3, TDSP’s Discretionary Services Timelines Matrix to Section 9, Appendices (Vote) Motion to Approve RMGRR130 with Just Energy’s July
28, 2015 comments was unanimously approved by TAC http://www.ercot.com/content/wcm/
key_documents_lists/58023/130RMGRR_13_Just_Energy_Comments_072815.doc
These changes were implemented and effective on Monday, August 3, 2015.
August 4, 2015 TAC Update to RMS 10
RMS Initiatives and Votes: RMS Initiatives and Votes:
Ancillary Services Re-design Ancillary Services Re-design Update Update
FAS (NPRR 667)◦Brattle provided information about their
assumptions for the cost benefit analysis.
◦TAC Leadership suggested as more information is made available to TAC concerning the CBA will require a follow-up workshop or meeting to give Market Participants an opportunity for Q&A. http://www.ercot.com/content/wcm/
key_documents_lists/72257/11._Ancillary_Service_Redesign_Update.zip
August 4, 2015 TAC Update to RMS 11
DREAM Taskforce Update DREAM Taskforce Update Distributed Resource Energy and
Ancillaries Market Taskforce (DREAM) ◦ Dream Taskforce Leadership (Vote)
Greg Thurnher (Shell) – Chair Jim Lee (AEP) – Co-Vice Chair Lance Cunningham (Denton Municipal) – Co-Vice Chair
TAC Unanimously Approved DREAM TF Leadership◦ DREAM Scope (Vote)
TAC unanimously approved the Scope of Work as revised by TAC.
ERCOT will make all the corrections to change DER TF to DREAM Taskforce offline and create DREAM Taskforce listserv.
◦ DREAM Taskforce Update: http://www.ercot.com/content/wcm/key_documents_lists/
72257/12._DREAM_TF.zip
August 4, 2015 TAC Update to RMS 12
Operations, Planning and IT Operations, Planning and IT Report Report A MP reported a EMS system problem on June
22, 2015, ERCOT immediately started their investigation and identified an EMS Coding Issue.
The shift factors being sent to SCED were different than what ERCOT anticipated. This resulted in a different dispatch and pricing. This coding has been in ERCOT’s EMS systems since December 2010
◦ TAC Leadership voiced concerns that there were no market notices provided by ERCOT reporting this EMS Coding issue.
Brad Jones stated ERCOT had not planned a market notice, but will consider it going forward. ERCOT planned to provide updates to TAC next month and will discuss technical questions at WMS.
August 4 , 2015 TAC Update to RMS 13
Other BusinessOther BusinessWorking Group/Task Force Leadership Election
Discussion◦ There are no rules around how to conduct elections for
Taskforce level leadership voting. ◦ TAC Leadership stated that TAC Procedures would be the
appropriate place to formalize the process. TAC should have draft redlined process ready for review for the August TAC meeting.
TAC Subcommittee Structural and Procedural Review and TAC Goals Review
August 27, 2015 TAC meeting will include Subcommittee Structural and Procedural and Goals Review following TAC meeting.
Revision Request Alignment with 2015 TAC Goals: http://www.ercot.com/content/wcm/key_documents_lists/
72257/14._Revision_Request_Alignment_with_2015_TAC_Goals.xls
August 4, 2015 TAC Update to RMS 14
Other BusinessOther Business
ERCOT is considering the addition of a new “Valley Weather Zone”: ◦ ERCOT will need to provide more information to the
market on why any new Weather Zone is necessary and provide more market wide visibility into their thought processes.
◦ Market wide communications on this type ERCOT change should include Retail, Commercial and Wholesale Subcommittees since all would be impacted. These subcommittees will need to be involved into the approval process and, if approved, revision request(s) implementation scheduling.
August 4, 2015 TAC Update to RMS 15
Questions?Questions?
16August 4, 2015 TAC update to RMS