Facilities Management Monthly Report
July 2019
Monthly Report
2
Our DFM Management Team
KEN BRANCH
DIRECTOR ANGIE JACKSON
FISCAL SERVICES
MANAGER
JENNIFER MCLEOD
HUMAN RESOURCE
MANAGER
KYLE DAVENPORT
GROUNDS
MANAGER
MARK ALLEN
ENERGY
MANAGER
GERALD BELCHER
ENVIRONMENTAL
SERVICES
MANAGER
RANDALL FARRIS
HRL OPERATIONS
MANAGER
RAY MURILLO
HRL
MANAGER
DAN UHLS
MAINTENANCE
MANAGER
TIM SALLOUM
TRAINING
MANAGER
RAFAEL HUGHES
DIRECTOR OF
ENVIRONMENTAL
SERVICES
3
Training & Development The Safety training in July was on Compressed Gas Cylinder and Gas Leaks. Employees learned
the how to recognize gas leaks and what to do and what not to do when there is a gas leak.
Supervisors focused on customer service with training on the topic of “Greet with a Smile”. An
important part of customer service is the first interaction we have with our customer. This month
we talked about how a simple smile can make a great impression on the customer.
Annual Prevention of Sexual Harassment training conducted this month. Employees refreshed on
what is considered Sexual harassment and Sexual Misconduct/Assault and what to do if you or
others are being sexually harassed.
Job specific training methods of the week covered cleaning on ceilings, doors, lobbies, and win-
dows. Supervisors trained their employees on these topics to enhance their skills on job specific
tasks.
The following was the training for the month of July.
Training Course # of Partici-pants
# of hours Total Training hours
Monthly Safety Training (Gas Leaks) 238 .25 59.5
HR Training (Great with a Smile) 208 .25 52
HR Training (Prevention of Sexual Harassment) 238 .75 178.5
New Hire Orientation (Safety & HR) 1 4 4
Weekly Safety Messages 315 .25 78.75
Methods of the Week 208 .25 52
VFA FCA database Training 9 6 54
Total 478.75
Safety Incentive Project Winner
Team DSU
3 Checks for Safety Poster
4
Work Order Statistics
Work Order Summary:
Routine work orders completed: 86.2%
Total Work Orders and PMs received: 3,928
Work Load by Shops
5
Driving Performance Vehicle PM’s
Diddle, Academic, Kelly Thompson Hall VFD PM’s
HRL generator and Switch gear PM’s
CEC – JCI project: upgraded controls on AHU, 10 VAV’s and 10 FPT’s, removed and replaced mercury contactors on 4 FPT’s and installed an MSTP BACnet utility meter
Gordon Wilson – JCI has removed and installed valve and actuators in classrooms 307-308 and 311-312
Health Services – replaced cold deck actuator on AHU #1. Replaced cold deck actuator in Bedroom 309
DSU – replaced DP sensor and bypass actuator on AHU 303
Bemis – removed NAE and NCE prior to demo
Snell – coordinated server upgrade with Air Equipment for fume hoods
MMTH – replaced display board for Onicon Meter
WAB room 216 – replaced EP controller
Grise Hall – assisted contractors with VFD startup on AHU #2, the project is now complete
Repaired pole lights
South Campus – Replaced discharge air sensor and UNT controller on AHU #8
Cravens – Replaced VMA controller in 705 Study Room
FAC: The piping project is complete
EST: Replaced Air compressor.
HVAC and water treatment completed 39pm’s and 37w/o
July was a cleanup month for HVAC to repair for August PM’S
6
Driving Performance Maintenance Services
HILTS – Ramp Coating
What: Recoating of the HILTS (east) ramps.
Issue Addressed: The old coating system was worn and had failed in sections. This presented aesthetic, structural (water intrusion), and safety concerns. This is part two of a two year project. This is a condition based renewal.
Funding: $114,165 (320204/Project 191440) - $234K total.
Method: Outsource (Silliman)
PS2 – LED Modifications
What: Replacement of all existing fixtures with LED equivalents.
Issue Addressed: Existing lights were becoming problematic and required considerable maintenance. In addition – the lot was considered dark – this opportunity was taken to significantly increase lumens. This project managed by PDC. This is a time/condition based renewal.
Funding: $4698 (P&T) – Labor only.
Method: Insource (AT2)
7
HILTS – Concrete Repairs
What: Miscellaneous Concrete Repairs.
Issue Addressed: Annual address of concrete spalling issues within HILTS. Scope of annual repairs depends on damage observed during the post winter stadium walks. Damage has been decreasing year-to-year. Global warming? This is a condition based renewal.
Funding: $7874 (320204)
Method: Outsource (Silliman)
KTH - AT4 Renewal
What: KTH (Area Team) Renewal.
Issue Addressed: Floors G-3 of KTH were left largely unaddressed as part of the KTH renewal. This portion included LED modifications, restroom refurbishment and some electrical advancements. This is one part of a 3 part project (KTH (Paint), KTH (CT) and KTH (AT4). This is a condition based renewal.
Funding: $75,010 (320204)
Method: Insource/Outsource (AT4/Pro Plumbers, D&M Electric, Evapar, Wimpees)
8
Resource Conservation (Surplus, Recycling and Waste Management)
WKU Students & Staff Visit
Recycling Facility
In July, WKU students and Facilities staff traveled to Louisville,
Kentucky to visit West Rock, WKU’s contracted recycling compa-
ny. Whereas most recycling facilities manage only one step in
the life-cycle managing recyclable materials, West Rock is an in-
tegrated recycling company and manages multiple steps and pro-
cesses from sorting co-mingled recyclables to marketing new
products made from these materials. West Rock’s facility in Lou-
isville is a Materials Recovery Facility and is where all of WKU’s Single-Stream recyclables are sorted, baled, and
shipped to downstream vendors. Throughout the tour of the facility, students and staff learned and gained a
deeper understanding of the recycling process and industry and observed how different materials are sorted.
Quarterly Surplus Auction Generates $65,167
Surplus holds four quarterly auctions throughout the year. In July, Sur-
plus’s first quarterly auction for FY20 achieved the following:
$65,167 - Net revenue generated
○ $27,104 of the $65,167 will be returned to other departments, pending
approval by the Chief Facilities Officer
1,991 - Items sold
○ 430 Computers,○ 113 Printers,○ 183 Monitors,○ 68 Bicycles,○ 5 Vehi-
cles,○ SKY Teach Trailers
$7,210 - Disposal fees avoided
9
10
Driving Performance Housing and Residence Life Completed Projects:
Maintenance Projects
Continued replacement of upgraded air filters for distribution and room HVAC units; Room fan-coil units: Work underway in McCormack and Gilbert; Recruiting for open positions across all shifts. Addition of two new technicians during July, add-
ing two technicians in August; Summer Projects underway: Barnes Hallway FCUs: Project completed, punch list items submitted; Minton Hall Remediation: All remediation work completed. Final clean underway; Barnes Hall Remediation: All remediation work completed. Final clean underway; First Year Village: New building construction is underway; Bemis Hall: Salvage of re-usable components completed. Demolition company scheduled to ar-
rive 8/5/2019;. Installation of aluminum vent registers. Current issue with steel registers in moisture and corro-
sion. Aluminum registers more resistant to corrosion – NE and SW Halls. Housekeeping Projects Summer cleaning and floor waxing under across all Halls; Seasonal crew projects: Sweep of all Halls for repair / removal of broken or damaged furniture; Storage room cleaning / organization across all Halls; Completion of pre-camp setup at designated Halls (delivering camp supplies, stocking a camp –
required amenities, etc.); Researching / Trialing new style room signage; cost / labor savings initiative. Relocation of ESports campus group to McCormack Hall for upcoming semester. Other: Continue to look for ways to improve customer service and quality of work;
Review housekeeping equipment needs for 2019 and obtain cost estimates;
Review and challenge staffing levels to improve cleaning quality.
Challenging vendors to show us new innovations on equipment, chemicals, and techniques to improve efficiency and quality.
We will be working with a new QA inspection program SSF. A new program that is getting rolled
out to Sodexo units. We will be rolling it in early 2019
11
Driving Performance in Housing Operations Housing and Residence Life
12
Driving Performance in Housing Operations Housing and Residence Life
13
Driving Performance in Housing Operations Housing and Residence Life
14
Driving Performance Grounds
The department spent the month completing summer projects in preparation for the return of
students at the end of August.
Drainage Project: Installing a trench drain in front of McCormack Hall. When heavy rains oc-
cur, the first floor of the building is prone to flooding. Water runs down the hill toward the
front doors and begins to back up causing a pond in front of the entrance. We installed a 12”
trench drain to divert the water away from the front door.
In coordination with Housing and Resident Life, the department was able to have all the com-
pactor locations switched from key access to push button. The department coordinated the
PM’s of all resident hall compactors over the month; change hydraulic fluids, repair hoses,
clean filters, etc. We were able to pressure wash all the compactor bays as the units were
pulled for maintenance. compactors now that all of them have been PM and are ready to op-
erate. The push buttons will allow the grounds crew to opportunity to keep the areas around
the residence halls cleaner as we can access/use all compactors.
15
Driving Performance Grounds
Designed and remediated two different locations on campus during July. The Office of Sustain-
ability and Parking and Transportation. Both location were in dire need of a makeover. With
the wishes of the personnel at both locations, the department designed a bee friendly, flower-
ing landscape. July is not the ideal time to remediate beds, however with the university sched-
ule it’s the only time of the year we can have these areas ready for the return of student, facul-
ty, staff, and guest.
Athletic Fields: Soccer field was in need of some new sod around the goal areas. The depart-
ment over seeds the Bermuda based fields with ryegrass in the fall every year. This summer
we decided to remove the rye grass instead of letting is die out on its own. The field was 80%
rye and we needed to reestablish the Bermuda. The field was cut and Bermuda was sodded
on 31 July. The first soccer game is 14 August.
16
The Sodexo Experience
Team huddles held on a weekly basis to further develop and nourish employee’s job
satisfaction and feeling connected and valued
Safety Training provided to all staff
Monthly Department meetings held
Employee of the month awarded
Nominations for the Sodexo Experience submitted
Monthly Safety Award s
17
Our Mission:
Guided by our shared value, each one of us is fully empowered to
consistently exceed the expectations of the university to insure a
safe, clean and stimulating learning, working and living environ-
ment for all involved. To this end, we will provide the most effi-
cient and effective routine and preventative maintenance services
needed to support the educational goals of Western Kentucky
University.