JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
JIMCOL RESOURCES LIMITED
Eddy Current Examination Procedure
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL
PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 2 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
Document Approval
The following signatures are required prior to issue of this document.
Role Name Signature Date
Author Festus Osigheghe 01/11/2014
Reviewer
Gilbert Jeremiah
01/11/2014
Document Owner Josiah Agwere
01/11/2014
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL
PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 3 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
Procedure Usage
Procedure Revision
This Nondestructive Examination Procedure is a controlled document. Suggestions for revision are to be submitted in writing to JIMCOL RESOURCES LIMITED. Attention Mr. Josiah Agwere,
[email protected], Km 3, Olu Obasanjo Drive, Eliozu, Port Harcourt, and Rivers State, Nigeria.
Procedure Storage
To ensure you have the most recent version of this procedure, contact JIMCOL RESOURCESLIMITED at +234 (0) 805 636 0145. This document is not to be issued in electronic form.
Availability
This procedure is available upon request to clients and jurisdictions for review. Formal requests are to be in writing.
This document is intended for the sole use/purpose of JIMCOL RESOURCES. Propriety
information is contained within and is to be considered confidential. Release of this
document does not constitute written permission or consent to copy (in any format) for
distribute.
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL
PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 4 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
Table of Contents
1.0 Purpose............................................................................................. 5
2.0 Scope............................................................................................... 5
3.0 References......................................................................................... 5
4.0 Qualification of Personnel..................................................................... 5
5.0 Equipments……………………………….……………………………………………………………………… 5
5.1 Eddy current instrument……………….………………………………………………………………… 5
5.2 Probes………………………………………………..…………………………………………………………… 6
5.3 Calibration block……………………………………..……………………………………………………… 6
6.0 Calibration......................................................................................... 6
7.0 Sensitivity…………………………................................................................... 6
8.0 Alarm gate……………………………………………………………….……………………………………… 6
9.0 Surface condition................................................................................ 7
10.0 Material Check……………....................................................................... 7
10.1 Equipment Required………………………...................................................... 7
10.2 Connections…………. ........................................................................... 8
10.3 Initial Setting…………………………………………………………………………………………………… 8
10.4 Material check procedure………………………………………………………………………………. 8
11.0 Coating thickness assessment……………………………………………… ……………………. 9
12.0 Weld Inspection………………………………………………………………………… …………………. 10
12.0 Weld Inspection……………………………………………………………………………………………… 10
12.1 Equipment required……………………………………………………………………………………….. 10
12.2 Connections…………………………………………………………………………………………..……….. 10
12.3 Initial setting…………………………………………………………………………………………………… 10
12.4 Calibration procedure…………………………………………………………………………….……….. 10
12.5 Scanning procedure……………………………………………………………………………………….. 11
13.0 Reporting…………………………………………………………………………………………………………. 12
FIG-01 Scanning pattern of heat affected zone……………………………………………… 13
FIG-02 Optimum angle for varying surface conditions…………………………… ……. 14
FIG-03 Transverse/Longitudinal scanning………………………………………………,……… 15
FIG-04 Scanning of stiffener………………………………………………………………….………. 16
FIG-05 Scanning of rat hole………………………………………………………………….………… 17
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL
PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 5 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
1. PURPOSE
This procedure describes how JIMCOL RESOURCES Group technicians perform eddy
current inspections.
2. SCOPE
The techniques specified are related to applications where flaws break the surface of
materials that can be interrogated by eddy currents.
3. REFERENCES
ASME Boiler and Pressure Vessel Code, Section V Nondestructive Examination (2002 Edition) i. Article 1, General Requirements ii. Article 8, Eddy Current Examination iii. Article 26, Eddy Current Standards.
4. PERSONNEL
All personnel qualifications shall meet the minimum requirements stated by the client,
and shall demonstrate their competence in any given technique, if required. If no specific
qualifications are required, personnel considered appropriately qualified by the
Department Manager are used.
Level I personnel shall be supervised by Level 2 personnel. The equipment will be both
amplitude and phase sensitive.
5. EQUIPMENT
The probes used shall be pencil probe types and will be held normal to the surface of the
test piece.
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL
PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 6 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
5.1 Eddy Current Instrument
NORTEC 500 Portable Eddy Current Instrument or other applicable
instrument. The equipment shall have a current, valid calibration certificate
issued by the manufacturers and/or their official agent(s). This calibration
process shall be carried out on an annual basis as a minimum.
5.2 Probes
Weld Inspection
NORTEC 500 probe type WLD-8-55/7L or other applicable probe shall be used.
5.3
Surface Coating Assessment
These probes shall be capable of providing a lift-off signal for the sample at a
frequency of 10 kHz which enables a full screen deflection for 0-2mm coating
thickness to be obtained.
NORTECH 500 probe type NEC-2236/7L shall be used.
5.4 Calibration Block
A standard test block shall be of representative material, and have spark eroded
slots of 0.5, 1.0 and 2.0mm depth, together with simulated surface coatings of
0.5, 1.0 and 1.5mm thickness.
6. CALIBRATION
Calibration shall be carried out immediately prior to and after the inspection, after change of
any equipment, and on observation of a suspected crack indication.
7. SENSITIVITY
As per specification. In the absence of a written specification from the client, sensitivity will
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL
PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 7 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
be such that a reference defect 1mm in depth will produce a vertical defect signal to full
screen height after allowance has been made for surface coating thickness and
composition. The frequency shall be set at 10 kHz or 100 kHz for the coating thickness or
weld inspection respectively. The sensitivity level shall be set to 20dB.
8. ALARM GATE
As per specification. In the absence of a written specification from the client, the alarm will
be switched off, and potential defect signals assessed by the operator as they are
observed.
9. SURFACE CONDITION
Before inspection, the operator will find out the following, where possible:
a. Material specification
b. Weld specification
c. Post weld heat treatment
d. Details of any repairs
e. Coating specification
f. Details of any previous MPI inspection
g. Access and work environment.
9. MATERIAL CHECK
9.1 Equipment Required
NORTECH 500 Portable Eddy Current Unit or other applicable instrument
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL
PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 8 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
Probe type : WLD-8-55/7L or other applicable probe.
Load type : 5A003
Probe Lead : CL/SC/6 or other applicable lead.
Calibration block : NORTECH 500 SRSM61020S/WLD (steel)
with 3 off 0.5mm non-conductive material samples
9.2 Connect splitter lead, load, probe and probe lead. Make sure the batteries in the instrument are charged or that the instrument is connected via a charger to a power supply. Switch on and wait a few minutes for the equipment to warm up.
9.3 Initial Settings Frequency selection control : 10 kHz
Alarm control : OFF
Sensitivity level : 20 dB
Horizontal : 0
Vertical : 0
A.C. coupling : OFF
D.C. coupling : ON
9.4 Material Check Procedure
Hold the probe away from the calibration block or any other or any other ferrous material, and push the balance control. The equipment is electronical1y balanced for air and a cross is displayed on the C.R.T.
Clear the screens by pushing the erase control. A spot should appear on the screen. If the spot does not appear, re-balance and press the erase control again.
Position the spot in the centre of the screen using the horizontal and vertical controls. Lift the probe on and off the (bare) calibration block, and adjust the phase angle control until the movement of the spot is vertical.
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL
PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 9 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
Clear the screen by pushing the erase control. Place the probe on the calibration block in order to obtain a reference signal, and then place it on the material to be inspected. The angle between the signals displayed on the screen for the calibration block and the test material must not exceed 10° for subsequent weld or material inspection to be considered valid.
A calibration block which more closely matches the material or metallurgical condition of the component to be tested is required if the angle between the displayed signals exceeds 10°.
10. COATING THICKNESS ASSESSMENT
10.1 Equipment Required
NORTECH 500 Portable Eddy Current Unit
10.2 Connect lead, load, probe and probe lead. Make sure that the batteries in the instrument are charged or that the Instrument is connected via a charger to a power supply. Switch on and wait a few minutes for the equipment to warm up.
10.3 Initial Settings
Frequency selection control : 10 kHz Alarm control : OFF Sensitivity level : +20 dB Horizontal : -40 Vertical : -32 A.C. coupling : OFF D.C. coupling : ON
10.4 Calibration Procedure
Place the probe on the calibration block and push the balance control. The equipment is electronically balanced for the steel specimen and a spot displayed on the C.R.T.
Clear the screen by pushing the erase control. A spot should re-appear on the screen. If the spot does not appear, re-balance and press the erase control again.
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL
PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 10 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
Using the horizontal and vertical controls adjust the position of the spot until it is on the left hand side of the screen. Lift the probe on and off the calibration block, and adjust the phase angle control until the movement of the spot is vertical.
The screen is cleared by pushing the erase control. The probe is then placed on the 0.5mm, 1.0mm and 1.5mm thick non-conductive layers positioned over the block in turn. The spot should be moved horizontally between changes in layer thickness.
10.5 The thickness of the coating on the area to be examined can be estimated by interpolation between the signal amplitudes for the known thicknesses. The average and maximum coating thickness will be noted.
10.6 The maximum coating thickness through which inspection will be carried out is 2.5mm.
10.7 System gain will be increased by 6dB for each millimeter of paint coating.
11. WELD INSPECTION (if applicable)
11.1 Equipment Required
NORTECH 500 Portable Eddy Current Unit
Probe type : WLD-8-55/7L Calibration block : NORTECH 500 SRSM61020S/WLD (steel) with 3 off 0.5mm thick non-conductive material samples
11.2 Connect probe and probe lead. Make sure that the batteries in the instrument are charged or tat the instrument is connected via a charger to a power supply. Switch on and wait a few minutes for the equipment to warm up.
11.3 Initial Settings
Frequency selection control : 100 KHz Alarm Control : OFF Horizontal : 0 Vertical : -21 A.C. coupling : ON
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL
PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 11 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
11.4 Calibration Procedure With the settings detailed in 11.2, place the probe on the calibration block ensuring that it is some distance from any of the slots, and push the balance control. The equipment is electronically balanced for the steel specimen, and a cross is displayed on the screen. Clear the screen by pushing the erase control. A spot should appear on the screen. If the spot does not appear, re-balance and press the erase control again.
Run the probe over the 2mm deep slot. Care should be taken to ensure that the longitudinal axis of the probe is kept parallel to the slot and that the scanning direction is at right angles to the slot. The phase angle control is adjusted until the indication from the slot is in the upward vertical direction. The sensitivity level is adjusted to meet the client’s specification or, in the absence of a client specification, in accordance with paragraph 5 above, i.e. 1mm defect signal to full screen height after allowance has been made for surface coating thickness.
11.5 Scanning Procedure - the inspection consists of the following stages which will be carried out in the given order for full coverage of the weld and adjacent material.
11.5.1 Parent Material - the probe is placed on the component surface in an area 3 times the material thickness from the weld, and the equipment is balanced by pushing the balance control. The material is then scanned using a zig-zag pattern which must touch the weld toe (see Figure 1). This scan is performed on both sides of the weld. Note: The probe has directional sensitivity, and its long edge must be kept parallel to the line of the weld.
11.5.2 Heat Affected Zone - the equipment is balanced with the probe on an area free of defects in the HAZ to establish the normal condition. As a preliminary examination, the weld toe is investigated by a longitudinal scan (see Figure 2a). The area should be re-examined using a zig-zag scan (see Figure 2b). This scan is performed on both sides of the weld.
11.5.3 Weld Metal - the equipment is balanced with the probe on an area free of defects on the weld metal to establish the normal condition. The weld is the scanned using a zig-zag pattern (see figure 3a). Pronounced weld runs may produce an unacceptable noise level if scanned traversely. In this case, each weld must be scanned individually (see Figure 3b). Inter-
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL
PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 12 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
run boundaries are inspected by longitudinal movement of the probe. (See figure 3c).
11.5.4 Rat Holes/Stiffener Tip – Inspection of the weld is as detailed in steps 1 to 3. A second scan is carried out on the rat hole/stiffener tip as shown in figures 4 and 5.
11.5.5 Scanning for Transverse Defects – as with the parent plate scan, the equipment is balanced on an area free from defects on the parent plate. After the initial scans, the weld is then scanned with the weld probe turned 90o to detect transverse defects along the HAZ and weld cap.
11.5.6 Any areas giving defect indications should be cleaned to a suitable surface finish and re-examined using an appropriate MPI method for confirmation of a defect prior to reporting, unless otherwise specified by Freidi Goldman.
12. REPORTING The operator will record at least the following information in addition to that required by paragraph 8 of this procedure using the current revision of controlled form SG-nnn:
a. Customer
b. Contract
c. Order Number
d. Date
e. Job Description
f. Drawing and Line Numbers (if applicable)
g. Weld and Welders Numbers (if applicable)
h. Location, orientation and length of all defects detected
i. Measured average and maximum coating thickness
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL
PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 13 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
Figure 1: Scanning pattern of Heat Affected Zone
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL
PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 14 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
Figure 2: Optimum Angle for Varying Surface Conditions
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL
PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 15 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
Figure 3: Transverse/Longitudinal Scanning
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL
PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 16 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
Figure 5: Scanning of Rat Hole
Figure 4: Scanning of Stiffner
Tip
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL
PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 17 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
Revision History
The following is the latest revision record for this document.
Revision Date Description of changes Requested By
00 08/09/2008 Initial issue Management
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 18 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001- EDDY CURRENT EXAMINATION
JRL-QAP-INS-NDT-0001
JOB STEPS
HAZARD INITIAL RISK CONTROLS RESIDUAL RISK
Hazard Description
and Effect
People, Property or
Environment at Risk
Hazard
Consequence
Chance of
Occurrence
Risk
Rating List All Controls Required
Controlled
Hazard
Consequence
Controlled
Chance of
Occurrence
Residual
Risk
Rating
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 19 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
JRL-QAP-INS-NDT-0001
JOB STEPS
HAZARD INITIAL RISK CONTROLS RESIDUAL RISK
Hazard Description
and Effect
People, Property or
Environment at Risk
Hazard
Consequence
Chance of
Occurrence
Risk
Rating List All Controls Required
Controlled
Hazard
Consequence
Controlled
Chance of
Occurrence
Residual
Risk
Rating
Task
Preparation Injury or damage due to lack of control
Workforce and site
personnel Major
Possible Medium
Become familiar with company procedures for Rope
Access operations
Review generic risk assessment
Pre-job site survey where appropriate
Project specific risk assessment
Adequate assessment of tasks
Consideration of work methods and equipment and
safer/more appropriate alternatives
Consideration of contractual relationships and
interfaces between organizations involved.
Major Unlikely Medium
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 20 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
JRL-QAP-INS-NDT-0001
JOB STEPS
HAZARD INITIAL RISK CONTROLS RESIDUAL RISK
Hazard Description
and Effect
People, Property or
Environment at Risk
Hazard
Consequence
Chance of
Occurrence
Risk
Rating List All Controls Required
Controlled
Hazard
Consequence
Controlled
Chance of
Occurrence
Residual
Risk
Rating
Arrival on
Site Unfamiliar surroundings
Workforce Major Possible
Medium
Client PTW Training
Site Induction
Walk the line – identify response locations; eye wash
station, first aid, GPA etc
Major Remote Low
Task
Preparation Excessive wear Equipment Major
Possible Medium
All equipment to be inspected prior to use.
Equipment to conform to equipment inspection and
maintenance procedure
Major Remote Low
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 21 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
JRL-QAP-INS-NDT-0001
JOB STEPS
HAZARD INITIAL RISK CONTROLS RESIDUAL RISK
Hazard Description
and Effect
People, Property or
Environment at Risk
Hazard
Consequence
Chance of
Occurrence
Risk
Rating List All Controls Required
Controlled
Hazard
Consequence
Controlled
Chance of
Occurrence
Residual
Risk
Rating
Operating
Wind/weather
affecting operations
Operator and site
personnel/pre-rigged
equipment
Major Possible High
Observe weather forecast and do not start unless
conditions are acceptable in line with company and
client guidelines.
Secure equipment and materials to reduce effect of
wind.
Safety watch to monitor weather conditions.
Major Remote Low
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 22 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
JRL-QAP-INS-NDT-0001
JOB STEPS
HAZARD INITIAL RISK CONTROLS RESIDUAL RISK
Hazard Description
and Effect
People, Property or
Environment at Risk
Hazard
Consequence
Chance of
Occurrence
Risk
Rating List All Controls Required
Controlled
Hazard
Consequence
Controlled
Chance of
Occurrence
Residual
Risk
Rating
Operating Falling from worksite
Operator and site
personnel Serious Possible High
Observe company rope access procedures
Use suitable trained in date personnel
For newly qualified technicians: gradually introduce
work, work under direct control of supervisor and once
satisfied capable, work under close supervision of
experienced worker. Check all items of suspension
equipment is secured prior to starting work.
If lead /belay climbing is utilized. Please refer to
company procedures.
Serious Remote Low
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 23 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
JRL-QAP-INS-NDT-0001
JOB STEPS
HAZARD INITIAL RISK CONTROLS RESIDUAL RISK
Hazard Description
and Effect
People, Property or
Environment at Risk
Hazard
Consequence
Chance of
Occurrence
Risk
Rating List All Controls Required
Controlled
Hazard
Consequence
Controlled
Chance of
Occurrence
Residual
Risk
Rating
Operating
Dropped Objects by
technicians
Site Personnel/plant
& equipment Serious Possible High
Barrier areas off below worksite and at maximum
deflected landing radius.
All tools below 8kg to be secured by lanyard
attachment to harness or utility bag.
All items above 8kg to be separate work line attached.
All pockets to be empty, all utility bags to be securely
shut.
Use of man aloft inventory where appropriate
Serious Remote Low
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 24 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
JRL-QAP-INS-NDT-0001
JOB STEPS
HAZARD INITIAL RISK CONTROLS RESIDUAL RISK
Hazard Description
and Effect
People, Property or
Environment at Risk
Hazard
Consequence
Chance of
Occurrence
Risk
Rating List All Controls Required
Controlled
Hazard
Consequence
Controlled
Chance of
Occurrence
Residual
Risk
Rating
Operating Failure of anchor system
Operator and site
personnel Serious Unlikely Medium
An independent anchor system for each rope
deployed is to be installed Serious Remote Low
Operating Abseiling off end of rope
Operator Serious Possible High Knots are to be tied above end of rope to prevent
accelerated descent onto deck level or off end of rope. Serious Remote
Low
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 25 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
JRL-QAP-INS-NDT-0001
JOB STEPS
HAZARD INITIAL RISK CONTROLS RESIDUAL RISK
Hazard Description
and Effect
People, Property or
Environment at Risk
Hazard
Consequence
Chance of
Occurrence
Risk
Rating List All Controls Required
Controlled
Hazard
Consequence
Controlled
Chance of
Occurrence
Residual
Risk
Rating
Operating Reduced visibility
Operator and site
personnel Major Possible High
Appropriate positioning of personnel monitoring
operator.
Adequate lighting.
Primary and agreed secondary means of
communication
Major Remote Low
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 26 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
JRL-QAP-INS-NDT-0001
JOB STEPS
HAZARD INITIAL RISK CONTROLS RESIDUAL RISK
Hazard Description
and Effect
People, Property or
Environment at Risk
Hazard
Consequence
Chance of
Occurrence
Risk
Rating List All Controls Required
Controlled
Hazard
Consequence
Controlled
Chance of
Occurrence
Residual
Risk
Rating
Operating
over water Falling into water
Operator and site
personnel Serious Possible High
Minimum 3 man rope access team.
Buoyancy aids to be worn.
Recovery vessel on station.
Safety watch posted.
Good communication between all parties.
Life belt at hand.
Serious Remote Low
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 27 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
JRL-QAP-INS-NDT-0001
JOB STEPS
HAZARD INITIAL RISK CONTROLS RESIDUAL RISK
Hazard Description
and Effect
People, Property or
Environment at Risk
Hazard
Consequence
Chance of
Occurrence
Risk
Rating List All Controls Required
Controlled
Hazard
Consequence
Controlled
Chance of
Occurrence
Residual
Risk
Rating
Work
positioning
Injury caused by operator unstable work position
Operator and site
personnel Fatal Possible High
Secure position prior to commencing work.
Consider use of access platform aids i.e. seats, MAP.
Major Remote Low
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 28 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
JRL-QAP-INS-NDT-0001
JOB STEPS
HAZARD INITIAL RISK CONTROLS RESIDUAL RISK
Hazard Description
and Effect
People, Property or
Environment at Risk
Hazard
Consequence
Chance of
Occurrence
Risk
Rating List All Controls Required
Controlled
Hazard
Consequence
Controlled
Chance of
Occurrence
Residual
Risk
Rating
Work
positioning
using Rope
Access
Techniques
Rope cut/abrasion Work party Fatal Possible High
Observe specified job procedures and specific risk
assessments.
Deviate ropes away from hot surfaces, open edges,
rough surfaces.
Use of edge rollers.
Use of rope protectors as last option.
Serious Remote Low
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 29 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
JRL-QAP-INS-NDT-0001
JOB STEPS
HAZARD INITIAL RISK CONTROLS RESIDUAL RISK
Hazard Description
and Effect
People, Property or
Environment at Risk
Hazard
Consequence
Chance of
Occurrence
Risk
Rating List All Controls Required
Controlled
Hazard
Consequence
Controlled
Chance of
Occurrence
Residual
Risk
Rating
General
Worksite
Control
Personal Injury
Workforce and site
personnel Fatal Possible High
Use work area barriers and signs.
No personnel allowed within specified area.
Keep worksite tidy. Good housekeeping.
Use of sufficient personnel to adequately monitor
worksite.
Provision of first aid cover/facilities.
Use of minimum PPE requirements.
Major Remote Low
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 30 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
JRL-QAP-INS-NDT-0001
JOB STEPS
HAZARD INITIAL RISK CONTROLS RESIDUAL RISK
Hazard Description
and Effect
People, Property or
Environment at Risk
Hazard
Consequence
Chance of
Occurrence
Risk
Rating List All Controls Required
Controlled
Hazard
Consequence
Controlled
Chance of
Occurrence
Residual
Risk
Rating
General
Worksite
Control
Dropped objects from worksites aloft
Workforce and site
personnel Major Possible Medium
Ensure all deck personnel are aware of under deck
operations (Tannoys and barriers).
Barrier off area above worksite if required.
Work permit system in place to ensure no conflicting
operations where required.
All tools, utility bags and materials required at worksite
are secured to prevent dropped object and trip risk.
(look at securing at waist height).
All tools and materials secured within utility bags.
All utility bags to be kept shut.
Consider use of dropped object netting or matting.
Major Remote Low
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 31 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
JRL-QAP-INS-NDT-0001
JOB STEPS
HAZARD INITIAL RISK CONTROLS RESIDUAL RISK
Hazard Description
and Effect
People, Property or
Environment at Risk
Hazard
Consequence
Chance of
Occurrence
Risk
Rating List All Controls Required
Controlled
Hazard
Consequence
Controlled
Chance of
Occurrence
Residual
Risk
Rating
Maintenance Excessive Wear
Operator and site
personnel Major Possible Medium
A daily user check of all equipment to be conducted
by operators prior to use.
Failed items to be quarantined and returned to base
operations.
Major Remote Low
Ultrasonic
inspection Personal injury Operator Major Possible Medium
Full PPE to be worn and MSDS of all substances
must be in place with permit to work
Continous gas monitoring while inspection is ongoing
Minor Remote Low
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 32 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
JRL-QAP-INS-NDT-0001
JOB STEPS
HAZARD INITIAL RISK CONTROLS RESIDUAL RISK
Hazard Description
and Effect
People, Property or
Environment at Risk
Hazard
Consequence
Chance of
Occurrence
Risk
Rating List All Controls Required
Controlled
Hazard
Consequence
Controlled
Chance of
Occurrence
Residual
Risk
Rating
MPI
inspection Personal injury Operator Minor Probable Medium
Complete PPE to be worn and MSDS of all
substances must be in place and understood by
operator
Minor Remote Low
Eddy current
inspection Personal injury Operator and site Major Possible Medium
Wearing of appropriate PPE,
Prior and ongoing gas monitoring while inspection is
ongoing
Minor Remote Low
ISO 9001:2008
OPERTIONS MANAGEMENT SYSTEM MANUAL PROCEDURES
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
Page 33 of 34
Prepared by: FO
Reviewed By: GJ
Approve by : JA
Rev 0 Revision Date: 01/11/2014
JRL-QAP-INS-NDT-0001 EDDY CURRENT EXAMINATION
JRL-QAP-INS-NDT-0001
JOB STEPS
HAZARD INITIAL RISK CONTROLS RESIDUAL RISK
Hazard Description
and Effect
People, Property or
Environment at Risk
Hazard
Consequence
Chance of
Occurrence
Risk
Rating List All Controls Required
Controlled
Hazard
Consequence
Controlled
Chance of
Occurrence
Residual
Risk
Rating
House
keeping Personal injury
Operator and site
personnel Major Probable Medium
Wearing of appropriate PPE,
Always call for help when there is a need to carry
excessive load or use mechanical means
Cables to be arranged of the floor so no trip hazard
caused all couplants to be cleaned up after use
Major Remote Low