Stadium Nasional Electrical Tender Drawings Comments. No Drawing No Comments 1 General 1. To submit maximum demand estimation calculation. 2. Missing cable containment layout. 3. Missing single line diagram for new DB for new VIP areas/suites etc. 4. Where’s electrical services to be diverted/relocated due to cutting of Level 3 Slab? 5. Missing electrical layout for new boulevard. 6. JPKT has included floodlight design c/w with qty in this draft M&E tender drawings. Please omit as the design by others. JPKT only to design provisions for it. However, please submit to us your floodlights calculation for our info only. 7. To provide earthing and bonding strategy for new electrical installation (eg. Where to tap the earthing and bonding etc.) 2 JPKT/1803/SITE/E- 002 1. To update with latest masterplan. 2. To highlight new boulevard and canopy location. 3 JPKT/1803/NAS/E- 201-213 1. All types of light fittings to be used to must be agreed with architect. 2. To coordinate with architect to hide all DBs/Panel. 3. Lighting layout to be coordinated with reflected ceiling plan. 4. To do final circuit numbering. 5. To have more details of type of lighting fixtures to be used. Eg. Diffuser/grille, suspended/recessed etc. 4 JPKT/1803/NAS/E/ 003 1. Please show lighting and small power design for canopy. 2. Missing lighting and small power Page 1 of 4

Upload: fadhil-nawawi

Post on 10-Apr-2016

217 views

Category:

Documents


4 download

DESCRIPTION

sadasd

TRANSCRIPT

Page 1: JPKT Electrical Comments.docx

Stadium Nasional Electrical Tender Drawings Comments.

No Drawing No Comments1 General 1. To submit maximum demand estimation calculation.

2. Missing cable containment layout.3. Missing single line diagram for new DB for new VIP

areas/suites etc.4. Where’s electrical services to be diverted/relocated

due to cutting of Level 3 Slab?5. Missing electrical layout for new boulevard.6. JPKT has included floodlight design c/w with qty in this

draft M&E tender drawings. Please omit as the design by others. JPKT only to design provisions for it. However, please submit to us your floodlights calculation for our info only.

7. To provide earthing and bonding strategy for new electrical installation (eg. Where to tap the earthing and bonding etc.)

2 JPKT/1803/SITE/E-002 1. To update with latest masterplan.2. To highlight new boulevard and canopy location.

3 JPKT/1803/NAS/E-201-213

1. All types of light fittings to be used to must be agreed with architect.

2. To coordinate with architect to hide all DBs/Panel.3. Lighting layout to be coordinated with reflected ceiling

plan.4. To do final circuit numbering.5. To have more details of type of lighting fixtures to be

used. Eg. Diffuser/grille, suspended/recessed etc.4 JPKT/1803/NAS/E/003 1. Please show lighting and small power design for

canopy.2. Missing lighting and small power design for boulevard

landscape area.

5 JPKT/1803/NAS/E-220-222

1. No red area?? Who’s others? This drawing is very confusing.

2. This drawings seems intended for façade contractor???3. To coordinate with architect to hide all SSB/DBs for

façade lighting.

6 JPKT/1803/NAS/E-224 1. To show existing equipment location so spaceproofing can be justified.

7 JPKT/1803/NAS/SLD-500 1. The work scope here very ambiguous. Please label more clearly what is the equipment to be upgraded.

2. Please justify capbank size. Seems too large.3. Please check whether interfacing (ie. Dry contact,

sensor etc.) to BAS/BMS to included for all new

Page 1 of 3

Page 2: JPKT Electrical Comments.docx

equipment proposed. Existing BAS/BMS equipment in the stadium is presently not working.

4. Why this R.E.F relay connected to this MSB??

8 JPKT/1803/NAS/SLD-502 1. Why not use these spares for additional floodlights?2. Why is the additional floodlights require genset

supply? Please omit.3. Wrong incoming annotation for MSB-3.

9 JPKT/1803/NAS/SLD-603 1. Why single phase load is TP?? Please rectify.2. Has these DB incorporated JKR comments during

presentation to JKR? JKR requested column type DB. Suggest all DBs to be busbar type also with standardized way and dimension.

10 JPKT/1803/NAS/SLD-710 1. This floodlight design is not agreed. To omit all indications of floodlight design and qty.

2. 16A MCB for all floodlights final circuit is oversized. 10A is enough.

3. Please omit indication to all floodlights control schedule. Control schedule by others.

Stadium Putra Electrical Tender Drawings Comments.

No Drawing No Comments1 General 1. To submit maximum demand estimation calculation.

2. How about additional cable laid on floor by event organizer? Is it still an issue related for fire safety upgrade? Please coordinate with Fire engineers.

3. JPKT to coordinate with PECE on the design of new MCC panels for new Putra’s chiller. Currently PECE’s drawings do not include SLD for the MCCs.

4. PKT has included floodlight design c/w with qty in this draft M&E tender drawings. Please omit as the design by others. JPKT only to design provisions for it. However, please submit to us your floodlights calculation for our info only.

5. To provide earthing and bonding strategy for new electrical installation (eg. Where to tap the earthing and bonding etc.)

2 JPKT/1803/PUT/E-200-204

1. All types of light fittings to be used to must be agreed with architect.

2. To coordinate with architect to hide all DBs/Panel.3. Lighting layout to be coordinated with reflected ceiling

plan.4. To have more details of type of lighting fixtures to be

Page 2 of 3

Page 3: JPKT Electrical Comments.docx

used. Eg. Diffuser/grille, suspended/recessed etc.3 JPKT/1803/PUT/E-205-

2061. No red area?? Who’s others? This drawing is very

confusing.2. This drawings seems intended for façade contractor???3. To coordinate with architect to hide all SSB/DBs for

façade lighting.4 JPKT/1803/PUT/FL-SLD-

5001. The work scope here very ambiguous. Please label

more clearly what is the equipment to be upgraded.

5 JPKT/1803/PUT/FL-SLD-501

1. Why is the additional floodlights require genset supply? Please omit.

Aquatic Centre Electrical Tender Drawings Comments.

No Drawing No Comments1 General 1. Floodlight replacement at aquatic centre is not

included in the scope of the project. Please omit all provisions for floodlighting upgrade.

Hockey Stadium 1 and 2 Electrical Tender Drawings Comments.

No Drawing No Comments1 General 1. JPKT has included floodlight design c/w with qty in this

draft M&E tender drawings. Please omit as the design by others. JPKT only to design provisions for it. However, please submit to us your floodlights calculation for our info only.