jpk-056-07-l-1754_rev 0
TRANSCRIPT
-
8/9/2019 JPK-056-07-L-1754_rev 0
1/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
2/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
REVISION DESCRIPTION SHEET
REV.
.
PARA.
REVISION DESCRIPTION
A Issued for Comment
0 Approved for construction
-
8/9/2019 JPK-056-07-L-1754_rev 0
3/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
TABLE of CONTENTS
1.0 SCOPE OF WORK
1.1 Introduction
1.2 Scope
1.3 Project Specific Requirements
1.4 Scaffolding
2.0 LIST OF REFERENCE DOCUMENTS
2.1 Equipment (Vessel, Pump, Compressor, Tank etc) Specif ications
2.2 Pipe Material Specifications
2.3 Pipe Fabrication and Installation Specifications
2.4 Testing and Inspection Requirements
2.5 Paint ing and Insulation Specifications
2.6 TCO Procedures
2.7 General
2.8 National Standards and Codes
-
8/9/2019 JPK-056-07-L-1754_rev 0
4/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
1.0 SCOPE OF WORK
1.1 INTRODUCTION
Tengizchevroil, a joint venture company between Chevron, Exxon-Mobil, Lukoil andKazakhstan government (hereinafter called as COMPANY), intend to upgrade theirexisting Fire Water Systems to make these compliant with current RoK regulationsand to overcome operational problems faced by TCO.
The existing Firewater (FW) System at Tengiz was originally designed, installed and
commissioned for KTL-1 in 1990/91. Although the original pumping and pipingsystems remain in service, the system has been expanded and modified toincorporate new on-plot and off-plot facilities. This FW system services variousfacilities in Tengiz complex and also meets the Utility Water (UW) requirements atthese facilities.
The scope of work of this job pack related to following piping item.
a) Installing all Piping in Pump House (to include coatings and insulation).b) Piping Tie Ins and relocation of existing and all new installation external to the
pump house (Utility Water System, Technical Water Storage and TechnicalWater Re-Cycle lines).
c) Testing of all new piping system.
The scope of work of the present job pack shall be carried out in conjunction withthe other UW supply lines piping Job Packs and with the works described in thefollowing Job Packs:
-
8/9/2019 JPK-056-07-L-1754_rev 0
5/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
order to ensure performance of works in accordance with all appropriate safetynorms.
1.2.1.3 CONTRACTOR shall develop the demolition work procedure in accordance withSafety Regulations. The procedure is subject to TCO approval.
1.2.1.4 CONTRACTOR shall comply with all TCO Safety measures and procedures
1.2.1.5 Before start of any specific work CONTRACTOR shall verify that the inspectionQA/QC plan is prepared according to the specific activity ready to be used by the
CONTRACTORduring each stage of the specific job. The work shall not be startedwithout COMPANY Site Representative (QA/QC Manager) confirms that theCONTRACTORcan proceed with the construction activities.
1.2.1.6 CONTRACTOR shall carry out the following preparatory and enabling works ateach location. All inspection packages and CQI Packages are to be prepared inadvance, prior to the start of the construction activities. A Request For Inspection(RFI) will be submitted 24 hrs in advance, to allow the TCO Inspectors to review theinspection package prior to the inspection hold point.
1.2.1.7 CONTRACTOR shall remove all remaining redundant materials from the site to thestorage area allocated by TCO.
1.2.1.8 CONTRACTOR shall erect temporary barriers around the construction site. Barriersaround excavations to be at least 1m from excavation edges, where the barriersrestrict access to equipment and stairways an alternative access shall be providedincluding scaffold stairways as necessary and agreed by TCO operations.
-
8/9/2019 JPK-056-07-L-1754_rev 0
6/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
Minimum Flow Recycle line shall be provided at tie-in PR05607-001 fromthe UW pumps(G-081A/B) discharge lines to connect to the Raw Water
supplied from Kulsary.
Line # 3000-WD-4004-2-150HDPE from existing 8 Potable Water(B1) at Tie-inPR05607-012 to New UW/TW Pump House.
Line # 3000-VI-4002-1-150H04 from existing 2 Instrument Air Line at Tie-insPR05607-019A/019B to Instrument Manifold in the New UW/TW Pump House.
Line # 3000-WP-4043-6-150H01-HCW5 from New Technical Water Pump(G-107A/B) to existing line#300-WBL-4000-6-150H03(Scot Cooler) at Tie-inPR05607-042A/B.
Line # O-000-WF-4022-8 from existing 8 Technical Water Header at Tie-inPR05607-3082A/B to Fire Reel Cabinets in New UW/TW Pump House. The lineshall be commissioned as soon as Pump House building is constructed.
Tie-ins PR05607-046(New 4 Process Water connection to OBH), Tie-insPR05607-047(New 10 Process Water connection to No.1 TW line to Train 5),Tie-ins PR05607-048(New 10 Process Water connection to No.2 TW line toTrain 5), Tie-ins PR05607-049(New 6 Process Water connection to ChemicalWater treatment shall be provided but those Tie-ins will not be commissioned.
Existing process water pumps G1/2/3/4 suction lines at Tie-ins PR05607-004/005,existing pump by pass line 3000-WP-4035-8-600H01 at Tie-inPR05607-006,existing line no 300-WBL-4000-6-150H03 to Scot cooler at Tie-insPR05607-045 and existing Pump House demolition work shall be conducted afterUtulity Water system is fully in operational.The demolishing work of existing
p mp ho se is co ered in job pack JPK 056 07 S 0335 Ne P mps ill be
-
8/9/2019 JPK-056-07-L-1754_rev 0
7/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
1.2.2.5 CONTRACTOR will be responsible for transportation of all the prefabricated pipespools, valves and equipments to site for erection. CONTRACTOR shall ensure that
all the nozzle flange faces are not damaged during transportation.
1.2.2.6 CONTRACTOR develop and provide lifting plans for all lifting activities for TCOConstruction approval, prior to start of any lifting activity. The Lifting work shall beperformed in accordance with RoK Document Cranes and Lifting Equipment, TCOSafety Instruction SI 119 and COPSULE Code of practice for Safe use of liftingEquipment.
1.2.2.7 CONTRACTOR shall provide all equipment and accessories for lifting (such ascranes, slings, shackles, lifting beams, temporary supporting, barricades signageetc) transportation and handling, to facilitate safe, efficient installation of identifiedmaterials from the jobsite.
1.2.2.8 CONTRACTOR shall pre-fabricate pipe spools as per Isometrics and PipingGeneral Arrangements listed in Attachment Aand standard pipe supports as perTCO Standard Drawings listed in Attachment B and in accordance with TCOSpecification L-ST-2004. The pre-fabricated pipe spools must be permanentlyidentified by means of line number and consecutive spool number. Pre-check of thedimensions on site shall be performed prior to fabrication.
1.2.2.9 CONTRACTOR shall ensure pre-fabricated pipe spools are protected againstcorrosion, damage or ingression of dirt/foreign matter. This applies especially toflange faces and weld ends. All uncovered outlets are to be sealed up withheavyweight paper or cardboard so that they can be removed easily.
1 2 2 10 D t t k h ll b i d t d t t P&ID i i l
-
8/9/2019 JPK-056-07-L-1754_rev 0
8/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
testing is pure and does not contain suspended solids or other substances.Chlorides shall not exceed 50 ppm. Hydro-test water temperature shall be +5C min.
to +40C max. The hydro test equipment must be provided with a safety valve of therelevant flow capacity and set pressure exceeding the hydro test pressure at notmore than 10%. Immediately after hydro test water shall be drained and the piping
shall be dried. Line instruments such as control valves, orifice plates,strainer,indicators,transmitters and flow meter shall be removed before hydrotest
1.2.2.17 CONTRACTOR on approval from TCO Construction Representative shall installinsulation on associated piping according to isometric drawings and in accordance
with TCO Specification N-ST-2001.
1.2.2.18 Existing pipe work shall be demolished as required to allow installation and tie-inof new piping. CONTRACTOR shall remove existing pipe work and install all newtie-in spools and valves as per attached drawings and in accordance with TCOSpec. L-ST-2004 and L-ST-2007. Work to be carried out after existing section of linehas been isolated.
1.2.3 REINSTATEMENT
Remove from site all temporary works and unused materials to locationsadvised by TCO Site Representative
Clear and make good site area
Any equipment or instrument removed or isolated during hydrostatic test
h ll b i t ll d
-
8/9/2019 JPK-056-07-L-1754_rev 0
9/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
1.3 PROJECT SPECIFIC REQUIREMENTS
1.3.1 NatureUse Permit (Emission Payments)
A) Unless otherwise notified during the bid process, TCO requests the Contractor touse his Republic of Kazakhstan (RoK) approved Nature Use Permit (NUP) coveringthe current calendar year estimated emissions. In compliance with this NUP, theContractor is responsible for payment of any fees associated with emissionsgenerated during the execution of a TCO project. All costs related to late paymentpenalties or interest is for Contractor's account.
B) Some TCO projects will require the Contractor to apply for a project specific RoKNUP. When applicable, the Contractor will be notified during the bidding process,either by specific instructions in the Job Packs, or other written communication, thata Project specific RoK NUP is required to execute the Project. In these instances,the Contractor shall submit documentation of their Project specific RoK NUP to theTCO Construction Engineer prior to the start of work. Contractor shall provide proofof fee payment(s) at the end of the project, and prior to submitting final invoice for
works completed. All costs related to late payment penalties or interest is forContractor's account.
1.3.2 Communication
Communication to TCO Projects Engineering or Construction EngineeringRepresentatives shall be:
-
8/9/2019 JPK-056-07-L-1754_rev 0
10/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
FE-A-JP-0001 Addendum to Standard Job Pack for All Disciplines Latest
2.1 EQUIPMENT (VESSEL, PUMP, COMPRESSOR, TANK ETC)SPECIFICATIONS
Specification No. Title Rev.
All TCO Safety Instructions Latest
2.2 PIPING MATERIAL SPECIFICATIONS
Specification No. Title Rev.
L-ST-2003 Piping Material Classes 9
L-ST-2003A Piping and Material Classes for SGP / SGI Plant and fieldfacilities
1
L-ST-2003B Vent, drain and instrument connection details for SGP / SGIPlant and field facilities.
0
2.3 PIPING FABRICATION AND INSTALLATION SPECIFICATIONS
Specification No. Title Rev.
L-ST-2004 Piping Fabrication 2
-
8/9/2019 JPK-056-07-L-1754_rev 0
11/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
2.6 TCO PROCEDURESSpecification No. Title Rev.
PRO-056-07-A-0215 PFU Mechanical Completion Checklist Procedure 0
PRO-056-07-A-0140 PFU Turnover Work Process Procedure 4
PRO-056-07-A-0182 PFU Red Line As-Built Procedure 1
PRO-056-07-A-0153 PFU Project Site Engineering Query Procedure (SEQ) 4
X-000-L-PRO-0001 Procedure for hydrostatic testing of piping system B
Q001 Documentation Requirements for welding ,PWHT andNDE of piping
0
Q002 Qualification of welders 0
Q003 Receipt Inspections, Storage, Handling and Control of
Project Material
1
_ _ _ _ TCO Welding Procedures Selection Spreadsheet ForKTL Pipe Classes
Feb2010
2.7 GENERAL
Specification No. Title Rev.
ASME B31.3 Chemical Plant and Petroleum Refinery Piping Latest
-
8/9/2019 JPK-056-07-L-1754_rev 0
12/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
SNIP RK 2.02-05-2009 Fire Safety of Buildings and Constructions Latest
VNTP 3-85 Norms for the Technical Design of Facilities for theCollection, Transport, and Treatment of Oil, Gas andWater at Oil Fields.
Latest
-
8/9/2019 JPK-056-07-L-1754_rev 0
13/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
3.0 ATTACHMENTSATTACHMENT "A"
Project Drawings (For Construction)
Drawing No. Rev. No. Drawing Title
O-3000-L-5329 0 PIPING MATERIAL TAKE OFF. PH.
O-3000-L-5301 PIPING MATERIAL TAKE OFF. SUPPLY LINES
O-3000-L-5186 0PIPING GENERAL ARRANGEMENT. UW &TW PUMPSG-081A/B, G-107A/B
O-3000-L-5187 0PIPING GENERAL ARRANGEMENT. UW &TW PUMPS-SECTIONS.
O-3000-L-5188 0 PIPING GENERAL ARRANGEMENT. UW &TW PUMPS-SECTIONS.
O-3000-L-5191 PIPING GENERAL ARRANGEMENT.TECHNICAL &UTILITY WATER LINES
O-3000-L-5193 PIPING GENERAL ARRANGEMENT.TECHNICALWATER LINES AND TIE-INS
PIPING GENERAL ARRANGEMENT TECHNICAL
-
8/9/2019 JPK-056-07-L-1754_rev 0
14/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
O-3000-L-5246 0 PIPING ISOMETRIC. 3000-WP-4044-8"-150H01-HCW5
O-3000-L-5247 PIPING ISOMETRIC. 3000-WP-4050-8"-150H01-HCW5
O-3000-L-5248 0 PIPING ISOMETRIC. 3000-WP-4053-8"-150H01-HCW5
O-3000-L-5249 0PIPING ISOMETRIC. 3000-WP-4050-10"-150H01-
HCW5/HDPE
O-3000-L-5250 0PIPING ISOMETRIC. 3000-WP-4050-10"-150H01-HCW5/HDPE
O-3000-L-5251 PIPING ISOMETRIC. 3000-WU-4004-8"-150H01-HCW5
O-3000-L-5252 PIPING ISOMETRIC. 3000-VI-4002-2"-150H04
O-3000-L-5254 PIPING ISOMETRIC. 3000-WP-4043-6"-150H01-HCW5
O-3000-L-5255 PIPING ISOMETRIC. 000-WF-4022-3"-150H04-HCW5
O 3000 L 5256 0 PIPING ISOMETRIC 3000 WP 4043 6" 150H01 HCW5
-
8/9/2019 JPK-056-07-L-1754_rev 0
15/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
O-3000-L-5273 0 PIPING ISOMETRIC. 3000-WP-4042-6"-150H01
O-3000-L-5274 0 PIPING ISOMETRIC. 3000-WU-4002-8"-150H01
O-3000-L-5275 0 PIPING ISOMETRIC. 3000-WU-4002-8"-150H01
O-3000-L-5276 0 PIPING ISOMETRIC. 3000-WU-4002-8"-150H01
O-3000-L-5277 0 PIPING ISOMETRIC. 3000-WU-4002-10"-150H01
O-3000-L-5278 0 PIPING ISOMETRIC. 3000-WU-4003-8"-150H01
O-3000-L-5279 0 PIPING ISOMETRIC. 3000-WP-4045-8"-150H01
O-3000-L-5280 0 PIPING ISOMETRIC. 3000-WP-4040-8"-150H01
O-3000-L-5281 0 PIPING ISOMETRIC. 3000-WP-4040-8"-150H01
O 3000 L 5282 0 PIPING ISOMETRIC 3000 WU 4005 8" 150H01
-
8/9/2019 JPK-056-07-L-1754_rev 0
16/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
Vendor Drawings (For Construction)
Drawing No. Rev. No. Drawing Title
Vendor Drawings (For information)
Drawing No.Rev. No.
Drawing Title
Reference Drawings (For Information)
Drawing No. Rev. No. Drawing Title
PLL-056-07-B-0028 0 LINE LIST - UTILITY WATER & TECHNICALWATER SYSTEM
PHL-056-07-B-0100 0 SWITCH OVER PHILOSOPHY
-
8/9/2019 JPK-056-07-L-1754_rev 0
17/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
ATTACHMENT "B"
TCO Standard Drawings (For Construction)
Drawing No. Rev. No. Drawing Title
L-ST-2010 ATT. ASheet A9
5 S3-10 Standard Clamped Shoe, pipe sizes 8- 24
L-ST-2010 ATT. ASheet A1
5 S1-8 Standard Length Welded Shoe
L-ST-2010 ATT. ASheet A9
5 S3-14 Standard Clamped Shoe, pipe sizes 8- 24
L-ST-2010 ATT. ASheet A8
5 S3-3 Standard Clamped Shoe, pipe sizes - 6
L-ST-2010 ATT. ASheet A8
5 S3-4 Standard Clamped Shoe, pipe sizes - 6
L-ST-2010 ATT. ASheet A8
5 S3-6 Standard Clamped Shoe, pipe sizes - 6
L-ST-2010 ATT. ASheet A8
5 S3-8 Standard Clamped Shoe, pipe sizes - 6
L-ST-2010 ATT. ASheet A1
5 S1-6 Standard Length Welded Shoe
L-ST-2010 ATT. ASheet A1
5 S1-3 Standard Length Welded Shoe
L-ST-2010 ATT. ASheet A1
5 S1-14 Standard Length Welded Shoe
-
8/9/2019 JPK-056-07-L-1754_rev 0
18/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
L-ST-2010 ATT. BSheet B1
5 DA1-8 Directional Anchor for Bare pipes
L-ST-2010 ATT. CSheet C6
5 BS2-8 Adjustable Base Supports
L-ST-2010 ATT. CSheet C6
5 BS2-6 Adjustable Base Supports
L-ST-2010 ATT. CSheet C5
5 BS1-6 Non-Adjustable Base Supports
L-ST-2010 ATT. CSheet C5
5 BS1-4 Non-Adjustable Base Supports
L-ST-2010 ATT. CSheet C5
5 BS1-2 Non-Adjustable Base Supports
L-ST-2010 ATT. CSheet C13
5 BG2-6 Base Guide for Adjustable Support
L-ST-2010 ATT. CSheet C12
5 BG1-8 Base Guide for Non-Adjustable Support
L-ST-2010 ATT. CSheet C10
5 BA1-4 Base Anchor for Non-Adjustable Support
L-ST-2010 ATT. BSheet B4
5 DA2-6 Directional Anchor for Insulated pipes sizes 6- 24
L-ST-2010 ATT. BSheet B4
5 DA2-8 Directional Anchor for Insulated pipes sizes 6- 24
L-ST-2010 ATT. GSheet G16
5F9-8 Pipe Support foundation for non paved areas for 8",10& 12" trunnions
L-ST-2010 ATT. BSheet B8
5 HG1-A Guides for Insulated Horizontal pipes
L ST 2010 ATT B 5 HG1 B G id f I l t d H i t l i
-
8/9/2019 JPK-056-07-L-1754_rev 0
19/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
TCO Standard Drawings (For Information)
Drawing No. Rev. No. Drawing Title
-
8/9/2019 JPK-056-07-L-1754_rev 0
20/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
ATTACHMENT "C"
Index for Scope of Work
(1) E-Existing / N-New / R-Refurb ished / -Modified / D-Disinvest
Mechanical Static Equipment
Rev. P&ID No Tag No Service N/R/M/D1)
Rotating Equipment
Rev. P&ID No Tag No Service N/R/M/D1)
Piping
Rev. P&ID No Title / Descr ipt ion System
Will be completed by Pre-
Comm/OPS
E/N
1)
0 O-3000-B-5037P&ID. NEW TECH.WATER PUMPS
N
-
8/9/2019 JPK-056-07-L-1754_rev 0
21/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
22/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
ATTACHMENT " E"
Purchase Orders / Material Requisi tions / MWRs
PO / MR No. Title / Descript ion Date in Tengiz
MR-056-07-L-69-1 Isolation Kits for Utility Water PumphouseMR-056-07-L-80-1 Valves for Utulity Water Pump House
MR-056-07-L-81-1LTCS gaskets and stud-bolts for Utility waterpumphouse
MR-056-07-L-82-1 LTCS Pipes, flanges and fittings for Utility WaterPump House
MR-056-07-L-83-1HDPE Pipes and fittings for areas Utility WaterPump House
MR-056-07-L-84-1 Pipe supports for Utility water PumphouseMR-056-07-L-85-1 Piping Insulation For Utulity Water Pumphouse
MR-056-07-L-86-1 Painting For Utulity Water Pumphouse
-
8/9/2019 JPK-056-07-L-1754_rev 0
23/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
ATTACHMENT " F"
Mechanical / Piping Datasheets
Data Sheet Number Rev No. Data Sheet Title
DS-SP-10153 B DATA SHEET FOR SWING TYPE CHECK VALVE SP-10153
-
8/9/2019 JPK-056-07-L-1754_rev 0
24/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
ATTACHMENT "G"
TCO CoatingSystem
-
8/9/2019 JPK-056-07-L-1754_rev 0
25/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
-
8/9/2019 JPK-056-07-L-1754_rev 0
26/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
1.0
1.1
1.2
1.3
1.4
2.0
2.1 ( ,, , .)
2.2
2.3
2.4
2.5
2.6
2.7
-
8/9/2019 JPK-056-07-L-1754_rev 0
27/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
1.0
1.1 , , , (- ), , .
() , -1 1990/1991 . , , . , .
:
) ( ).b) , ( , ).
-
8/9/2019 JPK-056-07-L-1754_rev 0
28/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
1.2.1 1.2.1.1
- .
1.2.1.2 , , . , , , - , .
1.2.1.3 . .
1.2.1.4 .
1.2.1.5 , , . ( /)
.
-
8/9/2019 JPK-056-07-L-1754_rev 0
29/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
1.2.2
1.2.2.1 , . , . ,
.
: , , .
PR05607-002/003 (G-107A/B,G-081A/B).
PR05607-001 (G-081A/B) , .
3000-WD-4004-2-150 8
-
8/9/2019 JPK-056-07-L-1754_rev 0
30/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
3000-WP-4035-8-600H01 PR05607-006, 300-WBL-4000-6-150H03 Scot
PR05607-045 . JPK-056-07-S-0335. , .
, , , JPK-056-07-L-1761.
c PHL-056-07-B-0100
.
1.2.2.2 , -, , . PRO-056-07-A-0215 PRO-056-07-A-0140
( ).
1.2.2.3 .
1.2.2.4 ,
-
8/9/2019 JPK-056-07-L-1754_rev 0
31/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
"" L-ST-2004. .
.
1.2.2.9 , , . . , .
1.2.2.10 , . O-3000-L-5399.
1.2.2.11 , ( ) .
1.2.2.12 W-ST-2000.
150H01 5%
1.2.2.13 ,
-
8/9/2019 JPK-056-07-L-1754_rev 0
32/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
33/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
1.3.
1.3.1 ( )
A) , , () () . , , ,
. , , .
B) . , ,
, , . , , . () , . ,
-
8/9/2019 JPK-056-07-L-1754_rev 0
34/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
2.0
FE-A-JP-0001
2.1 ( ,
, , .)
.
.
2.2
.
L-ST-2003 9
L-ST-2003A /
1
-
8/9/2019 JPK-056-07-L-1754_rev 0
35/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
W-ST-2025
0
2.5 ( )
.
X-ST-2000 6
N-ST-2001 , 2
2.6
.
PRO-056-07-A-0215
0
PRO-056-07-A-0140 4
PRO-056-07-A-0182
1
PRO-056-07-A-0153 (SEQ)
4
-
8/9/2019 JPK-056-07-L-1754_rev 0
36/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
O-ST-2011
0
056-07-PRG-A-0001 . 1 0
056-07-PRG-A-0002 . 2
0
056-07-PRG-A-0003 . 3
0
2.8
.
K 3.05-09-2002
.
K 1.03-05-2001
.
K RK 5.04-18-2002
.
K 2.02-05-2009 .
-
8/9/2019 JPK-056-07-L-1754_rev 0
37/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
3.0
"A"
( )
.
O-3000-L-5329 0 ..
O-3000-L-5301 .
O-3000-L-5186 0 . . G-081A/B, G-107A/B
O-3000-L-5187 0 . .
.
O-3000-L-5188 0 . . .
O-3000-L-5191 . .
O-3000-L-5193 .
-
8/9/2019 JPK-056-07-L-1754_rev 0
38/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
O-3000-L-5246 0 . 3000-WP-4044-8"-150H01-HCW5
O-3000-L-5247 . 3000-WP-4050-8"-150H01-HCW5
O-3000-L-5248 0 . 3000-WP-4053-8"-150H01-HCW5
O-3000-L-5249 0 . 3000-WP-4050-10"-150H01-HCW5/150HDPE
O-3000-L-5250 0 . 3000-WP-4050-10"-150H01-HCW5/150HDPE
O-3000-L-5251 . 3000-WU-4004-8"-150H01-HCW5
O-3000-L-5252 . 3000-VI-4002-2"-
150H04
O-3000-L-5254 . 3000-WP-4043-6"-150H01-HCW5
O-3000-L-5255 . 000-WF-4022-3"-150H04-HCW5
O-3000-L-5256 0 . 3000-WP-4043-6"-
-
8/9/2019 JPK-056-07-L-1754_rev 0
39/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
O-3000-L-5273 0 . 3000-WP-4042-6"-150H01
O-3000-L-5274 0 . 3000-WU-4002-8"-150H01
O-3000-L-5275 0 . 3000-WU-4002-8"-150HCW5
O-3000-L-5276 0 .. 3000-WU-4002-8"-150H01
O-3000-L-5277 0 . 3000-WU-4002-10"-150H01-HCW5
O-3000-L-5278 0 . 3000-WU-4003-8"-150H01
O-3000-L-5279 0 . 3000-WP-4045-8"-
150H01
O-3000-L-5280 0 . 3000-WP-4040-8"-150H01
O-3000-L-5281 0 . 3000-WP-4040-8"-150H01
O-3000-L-5282 0 . 3000-WU-4005-8"-
-
8/9/2019 JPK-056-07-L-1754_rev 0
40/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
( )
.
( )
.
( )
.
PLL-056-07-B-0028 0 - . .
PHL-056-07-B-0100 0
-
8/9/2019 JPK-056-07-L-1754_rev 0
41/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
"B"
( )
.
L-ST-2010 ATT. ASheet A9
5S3-10 , 8- 24
L-ST-2010 ATT. ASheet A1
5 S1-8
L-ST-2010 ATT. ASheet A9
5S3-14 , 8- 24
L-ST-2010 ATT. ASheet A8
5S3-3 , - 6
L-ST-2010 ATT. ASheet A8
5S3-4 , - 6
L-ST-2010 ATT. ASheet A8
5 S3-6 , - 6L-ST-2010 ATT. ASheet A8
5S3-8 , 8- 24
L-ST-2010 ATT. ASheet A1
5 S1-6
L-ST-2010 ATT. ASheet A1
5 S1-3
-
8/9/2019 JPK-056-07-L-1754_rev 0
42/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
L-ST-2010 ATT. BSheet B8
5HG1-14
L-ST-2010 ATT. BSheet B1 5 DA1-8
L-ST-2010 ATT. CSheet C6
5 BS2-8
L-ST-2010 ATT. CSheet C6
5 BS2-6
L-ST-2010 ATT. CSheet C5
5 BS1-6
L-ST-2010 ATT. CSheet C5 5 BS1-4
L-ST-2010 ATT. CSheet C5
5 BS1-2
L-ST-2010 ATT. CSheet C13
5BG2-6
L-ST-2010 ATT. CSheet C12
5BG1-8
L-ST-2010 ATT. CSheet C10 5 BA1-4
L-ST-2010 ATT. BSheet B4
5DA2-6 6" - 24"
L-ST-2010 ATT. BSheet B4
5DA2-8 6" - 24"
L-ST-2010 ATT. GSheet G16
5F9-8 8, 10 12
-
8/9/2019 JPK-056-07-L-1754_rev 0
43/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
L-ST-2010 ATT. ESheet E17
5 P26-B2
()
.
-
8/9/2019 JPK-056-07-L-1754_rev 0
44/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
"C"
-
(2) C- / H- / - / - / B-
. / 2)
. /
2)
. (
)
2)
0 O-3000-B-5037.
-
8/9/2019 JPK-056-07-L-1754_rev 0
45/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
1 O-000-B-5015. . -.
-
8/9/2019 JPK-056-07-L-1754_rev 0
46/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
"D"( - )
-
( ,
)
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
-
8/9/2019 JPK-056-07-L-1754_rev 0
47/245
MECHANICAL AND PIPING JOB PACK JPK 056 07 L 1754 REV 0
"E"
/ /
PO / MR /
MR-056-07-L-69-1
MR-056-07-L-80-1
MR-056-07-L-81-1
MR-056-07-L-82-1,
MR-056-07-L-83-1
MR-056-07-L-84-1
MR-056-07-L-85-1
-
8/9/2019 JPK-056-07-L-1754_rev 0
48/245
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
-
8/9/2019 JPK-056-07-L-1754_rev 0
49/245
C C G JO C J 056 0 5 0
"G"
MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0
-
8/9/2019 JPK-056-07-L-1754_rev 0
50/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
51/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
52/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
53/245
MTO REVI-
-
8/9/2019 JPK-056-07-L-1754_rev 0
54/245
MTO REVI
SION NO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ISOMET- 285
284
283
265
286
277
279
269
270
282
281
288
287
268
280
278
272
275
276
274
267
266
271
273
RIC
NoITEM
No
STOCK
CODELENGTH
UNIT
1 EA 1 1 1 1 2 1
O-3000-L-
O-3000-L-
O-3000-L-
O-3000-L-
O-3000-L-
O-3000-L-
150H01
8" SWING TYPE CHECK VALVE A352LCB CL150 SRF STDF B16.34 316PLT7 (SP-10153)
O-3000-L-
O-3000-L-
O-3000-L-
O-3000-L-
O-3000-L-
O-3000-L-
O-3000-L-
" I
O-3000-L-
O-3000-L-
O-3000-L-
O-3000-L-
O-3000-L-
O-3000-L-
O-3000-L-
O-3000-L-
O-3000-L-
O-3000-L-
O-3000-L-
DESCRIPTION
3 EA 1 1 3
4 EA 1 1 1 1
5 EA 4 2 3 2 1 2 3 3 2
6 EA 4 1 7 EA 3
12" GATE VALVE FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW
4" GATE VALVE FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW
8" GATE VALVE FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW
6" GATE VALVE FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW
14" GATE VALVE FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW
I . ( - )
8 EA 1 1 1 4 4 3 1 4 3 1 4 4 2 3 3
9 EA 2 2 2 2 2 2 2
10 EA 1
11 EA 1
3/4" GATE VALVE SLDWDGIS A350LF2 CL.1 CL150 RF STDF API602 OBB TRM12 HW
1/2" GATE VALVE SLDWDGIS A350LF2 CL.1 CL150 RF STDF API602 OBB TRM12 HW
3" GATE VALVE FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW
150H04
4" GLOBE VALVE PLGDSRS A352LCB CL150 RF STDF B16.34/API6 OBB TRM12 HW
12 EA 1
13 EA 1 13/4" GATE VALVE SLDWDGIS A350LF2 CL.1 CL800 SW API6020 BB TRM12 HW
3/4" GATE VALVE SLDWDGRS A350LF2 CL.1 CL800 SW FNPT API602 OBB TRM12 HW
MTO REVI-0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
-
8/9/2019 JPK-056-07-L-1754_rev 0
55/245
SION NO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ISOMET-
I -5273
-5272
-5281
-5285
-5277
-5274
-5271
-5278
-5286
-5282
-5280
-5288
-5283
-5284
-5287
-5276
-5275
-5269
-5270
-5279
-5265
-5268
-5267
-5266
I
NoITEM
No
STOCK
CODE
LENGTH
UNIT
1 EA 4 4 4
2 EA 4 4 4 4
O-3000-L
O-3000-L
12"GASKET SPWND 316L-FG 1/8"SSSS CL150 B16 20 B165 LS
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
DESCRIPTION O-3000-L
O-3000-L
150H01
O-3000-L
14" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
O-3000-L
3 EA 10 7 3 8 8 7 2 10 7 6 7
4 EA 2
5 EA 1 2 1 1 10 3 1 1
6 EA 1 1 1 1 7 EA 4 1 7
, , , , , . , . ,
6" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
5" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS4" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
8" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL300, B16.20, B16.5, LS
" "
8" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
9 EA 2
10 EA 2 2 2 8 8 6 2 8 6 2 8 8 4 6 6
11 EA 4 4 4 4 4 4 4 1/2" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
, , - , / , , . , . ,
3/4" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
1 1/2" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL300, B16.20, B16.5, LS
150H04
12 EA 2
13 EA 13/4" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
3" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
MTO REVI-0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
-
8/9/2019 JPK-056-07-L-1754_rev 0
56/245
SION NO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ISOMET-
RIC -5272
-5279
-5285
-5287
-5266
-5280
-5268
-5271
-5265
-5269
-5288
-5278
-5274
-5286
-5275
-5276
-5282
-5283
-5277
-5281
-5284
-5270
-5267
-5273
I
No
ITEM
No
STOCK
CODE
LENGTH
UNIT
1 EA 12 12
2 EA 24 24 48
M27x160LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
O-3000-L
O-3000-L
DESCRIPTION O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
150H01
O-3000-L
M27x130LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
3 EA 12 12 12 12
4 EA 24
5 EA 24 24 12 24
6 EA 8 8 8 8
7 EA 32
8 EA 80 32 40 24 64 8 40 16 64 56 48 40 16
M24x140LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
M24x150LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
M24x120LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
M20x135LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
M20x115LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
M20x110LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
9 EA 8 16 8 8 80 24 8 8
10 EA 8 8 8 8
11 EA 8
12 EA 8 56
13 EA 8 8 8 32 32 24 8 32 24 8 32 32 16 24 24
EA
M20x95LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
M16x90LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
M14x65LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
,
M20x100LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
M20x90LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
M14x60LGSTUD-BOLT A320GR L7M/A194GR 7MNUTS
15 EA 8
16 EA 4M14x65LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
150H04
M16x90LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
,
MTO REVI-
SION NO0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
-
8/9/2019 JPK-056-07-L-1754_rev 0
57/245
SION NO
ISOMET-
I5266
5267
5269
5277
5279
5268
5283
5284
5285
5282
5278
5288
5286
5287
5274
5280
5270
5265
5271
5273
5272
5281
5275
5276
I
NoITEM
No
STOCK
CODE
LENGTH
UNIT
1 EA 2
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
DESCRIPTION O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
STANDARD PIPE SUPPORT S3-10"
I " A 1
3 EA 1 4 1
4 EA 1
5 EA 2 2 2
6 EA 1 1 1 7 EA 1 STANDARD PIPE SUPPORT P41-E4
STANDARD PIPE SUPPORT S1-14"
STANDARD PIPE SUPPORT S1-6"
STANDARD PIPE SUPPORT P42-C2
STANDARD PIPE SUPPORT S1-3"
I -
8 EA 1 1
9 EA 2 3 2 1
10 EA 1 2
11 EA 2 4 5 4 2 5 2 2
12 EA 2 2 1
STANDARD PIPE SUPPORT P41-E2
STANDARD PIPE SUPPORT P41-D3
STANDARD PIPE SUPPORT P41-D4
I
STANDARD PIPE SUPPORT P41-E3
STANDARD PIPE SUPPORT P41-D2
14 EA 1
15 EA
16 EA 1 3
17 EA 1 1 1 1 2 1
18 EA 1
STANDARD PIPE SUPPORT P21-C1
STANDARD PIPE SUPPORT HG2-8"
STANDARD PIPE SUPPORT HG1-14"
STANDARD PIPE SUPPORT P41-A1
STANDARD PIPE SUPPORT P21-C2
I -
19 EA 1 2
20 EA 1 1 1 1
21 EA 1 1 2 1 1
22 EA 4 1 1 1
23 EA 4 1 1 1 STANDARD PIPE SUPPORT BS1-4"
STANDARD PIPE SUPPORT BS2-6"
STANDARD PIPE SUPPORT BS1-6"
STANDARD PIPESUPPORTBS1-2"
STANDARD PIPE SUPPORT BS2-8"
STANDARD PIPE SUPPORT DA1-8"
25 EA 1 1
26 EA 1 1
27 EA 1
28 EA 1
29 EA 1
STANDARD PIPE SUPPORT BG2-6"
2" PIPE A333-6, SMLS, XS, BBE (L=0.7m)
2" PIPE A333-6, SMLS, XS, BBE (L=1m)
I
STANDARD PIPE SUPPORT BA1-4"
STANDARD PIPE SUPPORT BG1-8"
31 6" PIPE A333-6, SMLS, STD WT, BBE (L=0.6m) EA 2 1 1 1
32 6" PIPE A333-6, SMLS, STD WT, BBE (L=0.5m) EA 2
33 6" PIPE A333-6, SMLS, STD WT, BBE (L=0.4m) EA 4 1
34 4" PIPE A333-6, SMLS, STD WT, BBE (L=0.3m) EA 4 1 1 1
35 8" PIPE A333-6, EA 1 1 1 1
36 STANDARD PIPE SUPPORT F8N-2 EA 1 1 1
MTO REVI-
SION NO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
-
8/9/2019 JPK-056-07-L-1754_rev 0
58/245
SION NO
ISOMET-
I5265
5266
5267
5268
5269
5270
5271
5272
5273
5274
5275
5276
5277
5278
5279
5280
5281
5282
5283
5284
5285
5286
5287
5288
I
NoITEM
No
STOCK
CODE
LENGTH
UNIT
1 LITRES 0.9 1.8 2.0 0.9 5.2 2.2 4.5 2.0 1.5 0.8
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
O-3
000-L-
DESCRIPTION
"AD" SYSTEM
LOW TEMPERATURE CURE HIGH SOLIDS EPOXY (2-COATS)
2 LITRES 2.4 2.4 2.1 2.5 2.6 3.0 1.5 4.0 1.7 0.5 1.5 0.5 1.7 1.1 2.3 2.4 1.4 1.3 1.9 0.8 0.9 1.3 0.1
3 LITRES 4.2 4.2 3.7 4.4 4.5 5.2 2.7 7.0 3.0 1.0 2.6 0.9 3.0 1.9 3.9 4.2 2.5 2.2 3.4 1.5 1.6 2.3 0.1
4 LITRES 1.8 1.8 1.6 1.9 1.9 2.2 1.1 3.0 1.3 0.4 1.1 0.4 1.3 0.8 1.7 1.8 1.1 1.0 1.4 0.6 0.7 1.0 0.1
TIE-COAT (POLYAMIDE EPOXY(HIGH BUILD))
TOPCOAT (ALIPHATIC POLYURETHANE)
"CA" SYSTEM
PRIMER (ZINC RICH EPOXY)
PAINT QUANTITY IS WITH 100% MARG
-
8/9/2019 JPK-056-07-L-1754_rev 0
59/245
.
. . 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
/ . .
O-3
000-
L-5
283
O-3
000-
L-5
284
O-3
000-
L-5
287
O-3
000-
L-5
288
O-3
000-
L-5
286
O-3
000-
L-5
273
O-3
000-
L-5
274
O-3
000-
L-5
275
O-3
000-
L-5
276
O-3
000-
L-5
282
O-3
000-
L-5
277
O-3
000-
L-5
278
O-3
000-
L-5
279
O-3
000-
L-5
280
O-3
000-
L-5
281
O-3
000-
L-5
285
O-3
000-
L-5
271
O-3
000-
L-5
272
O-3
000-
L-5
265
O-3
000-
L-5
266
O-3
000-
L-5
269
O-3
000-
L-5
270
O-3
000-
L-5
267
O-3
000-
L-5
268
1 2.5 4.0 9.0
2 1 1. 3 1 1.0 1 0. 3 1 1.3
3 12.0
4 22.0 16.7 12.5 3.0 8.2 9.5 6.0 12.5 19.2 8.0 7.0
5 1.3 11.0 29.0 14.0 9.0
6 4.0
8" A333-6, SMLS, SCH 20, BBE
6" A333-6, SMLS, STD WT, BBE
4" A333-6, SMLS, STD WT, BBE
10" A333-6, SMLS, SCH 20, BBE
12" , A333-6, SMLS, SCH 20, BBE
14" A333-6, SMLS, SCH 10, BBE
7 0.3
8 0.2 0.2 0.2 0.8 0.7 0.6 0.2 0.4 0.6 0.2 0.8 0.8 0.4 0.6 0.6
9 18.2
10 34 .0 2 .02" A333-6, SMLS, XS, BBE
4" -
3" A333-6, SMLS, STD WT, BBE
1 1/2" A333-6, SMLS, XS, PE
3/4" , A333-6, SMLS, XS, PE
150H04
. . . - , , ,
-
8/9/2019 JPK-056-07-L-1754_rev 0
60/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
61/245
.. .
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
/ . .
000-L-5287
000-L-5288
000-L-5281
000-L-5282
000-L-5283
000-L-5284
000-L-5285
000-L-5286
000-L-5275
000-L-5276
000-L-5277
000-L-5278
000-L-5279
000-L-5280
000-L-5269
000-L-5270
000-L-5271
000-L-5272
000-L-5273
000-L-5274
000-L-5265
000-L-5266
000-L-5267
000-L-5268
1 2 2 4
2 1 1
3 1 1 1 1 12" WN FLANGE, A350LF2 CL.1 CL150, SCH 20, RF, STDF, B16.5
"
150H01
14" WN FLANGE, A350LF2 CL.1 CL150, SCH 10, RF, STDF, B16.5
14" FLG WN, A350LF2 CL.1 CL150, SCH 10, RF, STDF, B16.5 C/W
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
5 1 1 1 1
6 1
7 9 5 3 8 1 5 2 8 8 6 5
8 2
9 1 1 1 1
, . , , , , . /
12" FLANGE BLD, A350LF2 CL.1 CL150, RF, STDF, B16.5
10" WN FLANGE A350LF2 CL.1 CL150 SCH 20 RF STDF B16.5
8" WN FLANGE, A350LF2 CL.1 CL150, SCH 20, RF, STDF, B16.5
8" WN FLANGE, A350LF2 CL.1 CL300, SCH 20, RF, STDF, B16.5
8" FLG WN, A350LF2 CL.1 CL150, SCH 20, RF, STDF, B16.5 C/W JACKSCREWS
10 2
11 1 2 1 1 8 3 1 1
12 2
13 1 7
14 4
15 4 2
6" FLANGE BLD, A350LF2 CL.1 CL150, RF, STDF, B16.5
4" WN FLANGE, A350LF2 CL.1 CL150, STD WT, RF, STDF, B16.5
4" WN FLANGE, A350LF2 CL.1 CL300, STD WT, RF, STDF, B16.5
3" WN FLANGE, A350LF2 CL.1 CL300, STD WT, RF, STDF, B16.5
6" WN FLANGE, A350LF2 CL.1 CL150, STD WT, RF, STDF, B16.5
8" FLANGE BLD, A350LF2 CL.1 CL150, RF, STDF, B16.5
16 2
17 1 1 1 4 4 3 1 4 3 1 4 4 2 3 3
18 1 2 1 1 2 1 1
19 1 1 1 4 4 2 1 2 2 2 3 2 2 2 220 2 2 2 2 2 2 2
3/4" FLANGE BLD, A350LF2 CL.1 CL150, RF, STDF, B16.51/2" SW FLANGE, A350LF2 CL.1 CL150, XS, RF, STDF, B16.5
"
3/4" SW FLANGE, A350LF2 CL.1 CL150, XS, RF, STDF, B16.5
3/4" FLANGE THRD, A350LF2 CL.1 CL150, RF, STDF, B16.5
1 1/2" SW FLANGE, A350LF2 CL.1 CL300, XS, RF, STDF, B16.5
22 3
23 13/4" SW FLANGE, A350LF2 CL.1 CL150, XS, RF, STDF, B16.5
, . , , , .
150H04
3" WN FLANGE, A350LF2 CL.1 CL150, STD WT, RF, STDF, B16.5
-
8/9/2019 JPK-056-07-L-1754_rev 0
62/245
.. .
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
/ . . 0-L-5282
0-L-5283
0-L-5284
0-L-5288
0-L-5285
0-L-5286
0-L-5287
0-L-5276
0-L-5277
0-L-5278
0-L-5279
0-L-5280
0-L-5281
0-L-5265
0-L-5266
0-L-5267
0-L-5268
0-L-5269
0-L-5270
0-L-5271
0-L-5272
0-L-5273
0-L-5274
0-L-5275
1 1 1 1 1 2 12 1
3 1 1 3 14" FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW
150H01
O-30
O-30
O-30
8" SWING TYPE A352LCB CL150 SRF STDF B16.34 316PLT7 (SP-10153)
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
6" SWING TYPE A352LCB CL150 SRF STDF B16.34 316PLT7 (SP-10153)
O-30
O-30
O-30
O-30
O-30
O-30
O-30
4 1 1 1 1
5 4 2 3 2 1 2 3 3 2
6 4 1
7 3
8 1 1 1 4 4 3 1 4 3 1 4 4 2 3 3
9 2 2 2 2 2 2 2
6" FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW
4" FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW
3/4" SLDWDGIS A350LF2 CL.1 CL150 RF STDF API602 OBB TRM12 HW
1/2" SLDWDGIS A350LF2 CL.1 CL150 RF STDF API602 OBB TRM12 HW
12" FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW
8" FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW
10 1
11 1
12 1
4" PLGDSRS A352LCB CL150 RF STDF B16.34/API6 OBB TRM12 HW
150H04
3/4" SLDWDGRS A350LF2 CL.1 CL800 SW FNPT API602 OBB TRM12
" I F I
3" FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW
I . I
-
8/9/2019 JPK-056-07-L-1754_rev 0
63/245
.. .
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
/ . . 0-L-5284
0-L-5285
0-L-5286
0-L-5287
0-L-5288
0-L-5278
0-L-5279
0-L-5280
0-L-5281
0-L-5282
0-L-5283
0-L-5272
0-L-5273
0-L-5274
0-L-5275
0-L-5276
0-L-5277
0-L-5268
0-L-5269
0-L-5270
0-L-5271
0-L-5265
0-L-5266
0-L-5267
1 4 4 4 2 4 4 4 4
3 10 7 3 8 8 7 2 10 7 6 7
12" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
150H01
14" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
O-30
O-30
O-30
O-30
O-30
O-30
O-30
8" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
4 2
5 1 2 1 1 10 3 1 1
6 1 1 1 1
7 4 1 7
8 4 2
9 2
6" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
5" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
4" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
3" , SPWND, 316L-FG, 1/8"SSSS, CL300, B16.20, B16.5, LS
1 1/2" , SPWND, 316L-FG, 1/8"SSSS, CL300, B16.20, B16.5, LS
8" , SPWND, 316L-FG, 1/8"SSSS, CL300, B16.20, B16.5, LS
10 2 2 2 8 8 6 2 8 6 2 8 8 4 6 6
11 4 4 4 4 4 4 4
12 2
150H04
3" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
3/4" SPWND 316L-FG 1/8"SSSS CL150 B1620 B165 LS
3/4" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
1/2" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
, , , , , , ,
, , , , , . , . ,
-
8/9/2019 JPK-056-07-L-1754_rev 0
64/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
65/245
.. .
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
/
. .
3000-L-5284
3000-L-5285
3000-L-5286
3000-L-5272
3000-L-5273
3000-L-5282
3000-L-5283
3000-L-5287
3000-L-5288
3000-L-5270
3000-L-5271
3000-L-5278
3000-L-5279
3000-L-5280
3000-L-5281
3000-L-5274
3000-L-5275
3000-L-5276
3000-L-5277
3000-L-5266
3000-L-5267
3000-L-5268
3000-L-5269
3000-L-5265
1 2
2 1 3 1 4 1
4 1
O-
O-
O-
O-
O-
S1-8"
O-
O-
O-
O-
O-
O-
O-
O-
O-
O-
O-
O-
O-
O-
O-
O-
O-
O-
O-
S1-3"
S3-10"
S1-6"
5 2 2 2
6 1 1 1
7 1
8 1 1
9 2 3 2 1
P41-E3
P41-E2
S1-14"
P42-C2
P41-E4
2 2 4 5 4 2 5 2 2
12 2 2 1
13 1
14 1
15
P41-D2
-
P41-D3
P41-B2
P21-C2
P41-A1
16 1 3
17 1 1 1 1 2 1
18 1
19 1 2
20 1 1 1 1
21 1 1 2 1 1
DA1-8"
BS2-8"
BS2-6"
P21-C1
HG2-8"
HG1-14"
22 4 1 1 1
23 4 1 1 1
24 1 1
25 1 1
26 1 1
27 1 BA1-4"
BG2-6"
BS1-6"
BS1-4"
BS1-2"
BG1-8"
28 1
29 1 1
31 6" A333-6, SMLS, STD WT, BBE (L=0.6m) 2 1 1 1
32 6" A333-6, SMLS, STD WT, BBE (L=0.5m) 2
33 6" A333-6, SMLS, STD WT, BBE (L=0.4m) 4 1
"
2" A333-6, SMLS, XS, BBE (L=1m)
2" A333-6, SMLS, XS, BBE (L=0.7m)
- , , , ( = . m)
35 1 1 1 1
36 F8N-2 1 1 1
8" A333-6, SMLS, SCH 20, BBE (L=0.2m)
-
8/9/2019 JPK-056-07-L-1754_rev 0
66/245
.. .
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
-5265
-5266
-5267
-5268
-5269
-5270
-5271
-5272
-5273
-5274
-5275
-5276
-5277
-5278
-5279
-5280
-5281
-5282
-5283
-5284
-5285
-5286
-5287
-5288
/ . .
1 0.9 1.8 2.0 0.9 5.2 2.2 4.5 2.0 1.5 0.8
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
O-3000-L
"AD" SYSTEM, (2-)
2 2.4 2.4 2.1 2.5 2.6 3.0 1.5 4.0 1.7 0.5 1.5 0.5 1.7 1.1 2.3 2.4 1.4 1.3 1.9 0.8 0.9 1.3 0.13 4.2 4.2 3.7 4.4 4.5 5.2 2.7 7.0 3.0 1.0 2.6 0.9 3.0 1.9 3.9 4.2 2.5 2.2 3.4 1.5 1.6 2.3 0.14 1.8 1.8 1.6 1.9 1.9 2.2 1.1 3.0 1.3 0.4 1.1 0.4 1.3 0.8 1.7 1.8 1.1 1.0 1.4 0.6 0.7 1.0 0.1
"CA"
()
()
()
100%
-
8/9/2019 JPK-056-07-L-1754_rev 0
67/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
68/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
69/245
MTO REVI-
SION NO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ISOMET-
RIC
NoITEM
No
STOCK
CODE
LENGTH
UNIT O-3000-L-5239
O-3000-L-5244
O-3000-L-5257
O-3000-L-5252
O-3000-L-5243
O-3000-L-5245
O-3000-L-5254
O-3000-L-5255
O-3000-L-5256
O-3000-L-5247
O-3000-L-5250
O-3000-L-5251
O-3000-L-5242
O-3000-L-5246
O-3000-L-5240
O-3000-L-5249
O-3000-L-5248
DESCRIPTION
1 EA 1 1
2 EA 1 2 2 1 3 4 1 1 1
3 EA 1 1 1
4 EA 2
5 EA 3
6 EA 1
10" WN FLG, A350LF2 CL.1, CL150, SCH 20, RF, STDF, B16.5
8" WN FLG, A350LF2 CL1 CL150, SCH 20, RF, STDF, B16.5
4" WN FLG, A350LF2 CL.1, CL150, STDWT, RF, STDF, B16.5
8" FLG BLD, A350LF2 CL.1, CL150, RF, STDF, B16.5
2"WNFLG A350LF2CL1 CL150 XS RF STDF B165
6" WN FLG, A350LF2 CL1, CL150, STDWT, RF, STDF, B16.5
7 EA 1
8 EA 2 2 2 1
9 EA 2 2 2 1
10 EA 1 1
2" FLG BLD, A350LF 2 CL1, CL150, RF, STDF, B16.5
3/4" SW FLG, A350LF2 CL1, CL150, XS, RF, STDF, B16.5
3/4 FLG BLD, A350LF2 CL1, CL150, RF, STDF, B16.5
150HDPE
, , , , , , .
10" STUB FLANGE ASSY LS HDPE PN16 PE100-SDR11 C/W BACK RING PP WITH STEEL CORE CL150 B16.5 (250mm)
11 EA 1
12 EA 2
13 EA 1
14 EA 1
8" WN FLG, A350LF2 CL1, CL600, XS, RTJ, B16.5
6" STUB FLG ASSY LS HDPE PN16 PE100-SDR11 C/W BACK RING PP WITH STEEL CORE CL150 B16.5 (160mm)
2" STUB FLANGE ASSY LS HDPE PN16 PE100 SDR11 C/W BACKING RING PP W ITH STEEL CORE CL150 B16.5 (63mm)
8" FLG WN, A350LF2 CL1, CL600, SCH20, RTJ, B16.5
600H01
15 EA 1
16 EA 1
17 EA 2
18 EA 3 3" WN FLG, A350LF2 CL1, CL150, STDWT, RF, STDF, B16.5
150H04
6" WN FLG, A350LF2 CL1, CL150, STD W T, RF, STDF, B16.5
3/4" FLG SW, A350LF2 CL1, CL600, XS, RTJ, B16.5
3/4" FLG BLD, A350LF2 CL1, CL600, RTJ, B16.6
19 EA 1
20 EA 1
3/4" SW FLG, A350LF2 CL1, CL150, XS, RF, STDF, B16.5
3/4" FLG BLD, A350LF2 CL1, CL150, RF, STDF, B16.5
-
8/9/2019 JPK-056-07-L-1754_rev 0
70/245
MTO REVI-
SION NO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ISOMET-
RIC
NoITEM
No
STOCK
CODELENGTH
UNIT DESCRIPTION O-3000-L-5247
O-3000-L-5250
O-3000-L-5251
O-3000-L-5249
O-3000-L-5242
O-3000-L-5240
O-3000-L-5246
O-3000-L-5248
O-3000-L-5243
O-3000-L-5256
O-3000-L-5254
O-3000-L-5244
O-3000-L-5245
O-3000-L-5252
150H01
O-3000-L-5257
O-3000-L-5255
O-3000-L-5239
1 EA 1 1 1 2 1 1
2 EA 1
3 EA 1
4 EA 1
5 EA 1
6" VALVE-GATE FLXWDGRS, A352LCB, CL150, RF, STDF, API600, OBB, TRM12, HW
8" SWING TYPE CHECK-VALVE, A352LCB, CL150, SRF, STDF, B16.34, 316PLT7 (SP-10153)
8" VALVE-GATE FLXWDGRS, A352LCB, CL150, RF, STDF API600, OBB, TRM12, HW
4" SWING TYPE CHECK-VALVE, A352LCB, CL150, SRF, STDF, B16.34, 316PLT7 (SP-10153)
4" VALVE-GATE FLXWDGRS, A352LCB, CL150, RF, STDF API600, OBB, TRM12, HW
" I6 EA 1
7 EA 1
8 EA 2 2 2 1
600H01
" I
2" VALVE-GATE, FLXWDGRS, A352LCB, CL150, RF, STDF, API600, OBB, TRM 12, HW
- - - - - I
LONG FROM CENTER LINE OF VALVE TO HANDWHEEL TYPE-1
3/4" VALVE-GATE SLDWDGIS, A350LF2 CL1, CL150, RF, STDF API602OBB, TRM12, HW
10 EA 1
11 EA 1
12 EA 1
- , , , , I , , ,
8" SWING TYPE CHECK-VALVE, LUGTHRU, A352LCB, CL600, RJ, B16.34, 316PLT7 (SP-10221)
150H04
3/4" VALVE-GATE SLDWDGIS, A350LF2 CL1, CL600, RTJ, API6 02OBB, TRM12, HW
3" VALVE-GATE FLXWDGRS, A352LCB, CL150, RF, STDF, API600, OBB, TRM12, HW
13 EA 2
14 EA 1 3/4" VALVE-GATE SLDWDGIS, A350LF2 CL1, CL800, SW, API602OBB, TRM12, HW
1" VALVE-GATE SLDWDGIS, A350LF2 CL1, CL800, SW, API602OBB, TRM12, HW
-
8/9/2019 JPK-056-07-L-1754_rev 0
71/245
MTO REVI-
SION NO 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
ISOMET-
RIC
NoITEM
No
STOCK
CODE
LENGTH
UNIT -3
000-L-5255
DESCRIPTION -3
000-L-5239
-3000-L-5243
-3000-L-5242
-3000-L-5240
-3000-L-5251
-3000-L-5250
-3000-L-5244
-3000-L-5245
-3000-L-5256
-3000-L-5257
-3000-L-5252
-3000-L-5249
-3000-L-5246
-3000-L-5254
-3000-L-5248
-3000-L-5247
I
1 EA 1 1
2 EA 1 1
3 EA 2 1 1
4 EA 1 2 2 2 1 6 2 2 1
EA
8" INSLKT WITHOUT GASKET CL.150 B16.5 PLNPHN 1/8" FLATR DPHNWS ZNWS PHNS1 NCB
I I
150H01
10" INSLKT WITHOUT GASKET CL150 B16.5 PLNPHN 1/8" FLATR DPHNWS ZNWS PHNS1 NCB
6"GASKET SPWND 316L-FG 1/8"SSSS CL150 B1620 B165 LS
8" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
10" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
6 EA 4
7 EA 2
8 EA 2
9 EA 4 4 4 2
2" GASKET, SPWND, 316L-FG, 1/8''SSSS, CL150, B16.20, B16.5, LS
3/4" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
, , , , , . , . ,
4" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
2" INSLKT WITHOUT GASKET CL150 B16.5 PLNPHN 1/8" FLATR DPHNWS ZNWS PHNS1 NCB
1
10 EA 1
11 EA 3
12 EA 2
8" GASKET, OVLRNG, SS135HB, CL600, B16.20, B16.5
8" INSLKT, CL600, B16.5, PLNPHN, OVLRNG, DPHNWS, ZNWS, PHNS1, NCC
3/4" GASKET, OVLRNG, SS135HB, CL600, B16.20, B16.5
13 EA 2
14 EA 1
15 EA 3
16 EA 2
6" INSLKT WITHOUT GASKET CL150 B16.5 PLNPHN 1/8" FLATR DPHNWS ZNWS PHNS1 NCB
150H04
3" INSLKT, CL150, B16.5, PLNPHN, 1/8", FLATR, DPHNWS, ZNW S, PHNSL, NCB
3" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
3/4" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
17 EA 2
18 EA 2 2" GASKET, RF EPDM STEEL CORE CL 150 PE100-SDR11 B16.21, B16.5
150HDPE
6" GASKET, RF EPDM STEEL CORE CL 150 PE100-SDR11 B16.21, B16.5
-
8/9/2019 JPK-056-07-L-1754_rev 0
72/245
MTO REVI-
SION NO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ISOMET-
RIC
No
ITEM
No
STOCK
CODE
LENGTH
UNIT O-3000-L-5246
O-3000-L-5244
150H01
O-3000-L-5239
O-3000-L-5257
O-3000-L-5254
O-3000-L-5245
O-3000-L-5242
O-3000-L-5250
O-3000-L-5252
O-3000-L-5240
O-3000-L-5256
O-3000-L-5243
O-3000-L-5251
O-3000-L-5249
O-3000-L-5248
O-3000-L-5247
O-3000-L-5255
DESCRIPTION
1 EA 16 16 16 8
2 EA 8
3 EA 32
4 EA 8 5 EA 16 8 8
6 EA
M16x85 LG STUDBOLTS C/W 2 NUTS A320L7M/7M
M18x125 LG STUD-BOLT AND TWO NUTS A182 GR F55 (25%-CR. ALLOY STEEL) C/W W ASHERS
M18x130 LG STUD-BOLT AND TWO NUTS A182 GR F55 (25%-CR. ALLOY STEEL) C/W W ASHERS
M16x105 LG STUD-BOLT AND TWO NUTS A182 GR F55 (25%-CR. ALLOY STEEL) C/W W ASHERS
M16x90 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
M14x65 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
7 EA 16
8 EA 8 16 16 16 8 32 8 8 8
9 EA 12 12
10 EA 12
M20x110 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
M22x130 LG STUD-BOLT AND TWO NUTS A182 GR F55 (25%-CR. ALLOY STEEL) C/W W ASHERS
M30 x205 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
M20x100 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
600H01
11 EA 24
12 EA 8
13 EA 8
14 EA 8
M30 x190 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
150H04
M14x65 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
M16x90 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
M16 x90 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
15 EA 4
16 EA 16
M16x105 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS
M18x125 LG STUD-BOLT & TWO NUTS A182 GR F55 (25%-CR. ALLOY STEEL) C/W WASHERS
,
MTO REVI-
-
8/9/2019 JPK-056-07-L-1754_rev 0
73/245
MTO REVI
SION NO 1 1 0 1 0 0 0 0 0 0 0 1 1 1 1 0 0
I39
46
48
47
57
50
51
43
54
49
56
45
40
42
44
52
55
I -
RIC
NoITEM
No
STOCK
CODE
LENGTH
UNIT O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
I ''
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
DESCRIPTION O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
2 EA 1 1
3 EA 9 3 3 12 1
4 EA 1
5 EA 4 5 12 5 6 3 5 8 4 8 2
6 EA 1 11
STANDARD PIPE SUPPORT HG1-B
I -
STANDARD PIPE SUPPORT F9-8
STANDARD PIPE SUPPORT HG1-A
STANDARD PIPE SUPPORT DA2-8''
STANDARD PIPE SUPPORT P21-B1
7 EA 1 2
8 EA 3
9 EA 1
10 EA 1 1
11 EA 2
12 EA 1
STANDARD PIPE SUPPORT P52-A1
STANDARD PIPE SUPPORT P51-F4
STANDARD PIPE SUPPORT P51-D2
STANDARDPIPE SUPPORT P61-A1
STANDARD PIPE SUPPORT P21-B2
STANDARD PIPE SUPPORT P21-C4
13 EA 2
14 EA 1 1
15 EA 1
16 EA 10 12
17 EA 3
STANDARD PIPE SUPPORT S1-14''
STANDARD PIPE SUPPORT S3-10''
STANDARD PIPE SUPPORT P8-A2
I
STANDARD PIPE SUPPORT S3-14''
STANDARD PIPE SUPPORT S3-3"
18 EA 19 7
19 EA 31 8 11 7 6 13 8
20 EA 1 15
21 EA 1 1 1
22 EA 5
23 EA 1
STANDARD PIPE SUPPORT UG-2"(CS)
STANDARD PIPE SUPPORT S3-8''
STANDARD PIPE SUPPORT S1-8''
STANDARD PIPE SUPPORT F9-7
STANDARD PIPE SUPPORT S3-6"
STANDARD PIPE SUPPORT P51-D4
24 EA 1
25 EA 1
26 EA 5
27 EA 1 STANDARD PIPE SUPPORT P51-D2
STANDARD PIPE SUPPORT P26-A2
STANDARD PIPE SUPPORT P21-C5
STANDARD PIPE SUPPORT S3-4"
MTO REVI-
-
8/9/2019 JPK-056-07-L-1754_rev 0
74/245
MTO REVI
SION NO 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0
52
54
55
56
57
46
47
48
49
50
51
39
40
42
43
44
45
ISOMET-
RIC
NoITEM
No
STOCK
CODE
LENGTH
UNITDESCRIPTION
"AD" SYSTEM
I I I
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
O-3
000-L-5
2
. . . . . . . . . . . . . .
2 LITRES 21.4 26.1 32.2 11.3 11.8 6.5 8.2 15.3 0.4 0.4 7.7 14.6 0.3 6.0
3 LITRES 1.4 1.4 0.1 0.8 0.2 0.2 1.3 9.3 95.3
"EH" SYSTEM
COAL TAR EPOXY (3-COATS)
I I I
TOPCOAT (LOW TEMPERATURE CURE HIGH SOLIDS EPOXY)
4 LITRES 0.1 2.1
5 LITRES 0.1 3.6
6 LITRES 0.1 1.5
PRIMER (ZINC RICH EPOXY)
TIE-COAT (POLYAMIDE EPOXY(HIGH BUILD))
TOPCOAT (ALIPHATIC POLYURETHANE OR ACRYLIC)
"CA" SYSTEM
PAINT QUANTITY IS WITH 100% MARG
-
8/9/2019 JPK-056-07-L-1754_rev 0
75/245
.. .
1 1 1 1 0 0 0 0 0 0 0 1 1 1 1 0 1
0-L-5
246
0-L-5
247
0-L-5
242
0-L-5
243
0-L-5
245
0-L-5
239
0-L-5
240
0-L-5
244
0-L-5
252
0-L-5
254
0-L-5
255
0-L-5
256
0-L-5
248
0-L-5
249
0-L-5
250
0-L-5
251
0-L-5
257
. .
1 83.0 99.0 2 2.0 2.0
O-3
00
O-3
00
150H01
14" , A333-6, SMLS, SCH 10, BBE
O-3
00
O-3
00
O-3
00
O-3
00
O-3
00
"
O-3
00
10" , A333-6, SMLS, SCH 20, BBE
O-3
00
O-3
00
O-3
00
O-3
00
O-3
00
O-3
00
O-3
00
O-3
00
O-3
00
1 . 6 .5 6 . 6.1 6. 6.5 .5
4 114.0 44.05 1.3 6 0.4 0.4 0.4 0.2
6" , A333-6, SMLS, STD WT, BBE
150HDPE
3/4" , A333-6, SMLS, XS, PE
, - , , ,
4" , A333-6, SMLS, STDWT, BBE
7 6 8 2.4 2.4 9 3.5
10 29.0
12" , PN16, HDPE, PE PE100-SDR11 (315mm)
10" , PN16, HDPE, PE PE100-SDR11 (250mm)
8" , PN16, HDPE, PE PE100-SDR11 (200mm)
1
2" PN 16 HDPE PE PE100 SDR11 (63mm)
11 49.0 12 0.2
13 175.0
8" , A333-6, SMLS, XS, BBE
150H048" , A333-6, SMLS, SCH 20, BBE
3/4" , A333-6, SMLS, XS, PE
14 1.0
15 45.0 16 70.0 17 0.5 18 0.2
3" , A333-6, SMLS, STDWT, BBE
1" , A333-6, SMLS, XS, PE
3/4" , A333-6, SMLS, XS, PE
6" , A333-6, SMLS, STD WT, BBE
2' , A333-6, SMLS, XS, BBE
-
8/9/2019 JPK-056-07-L-1754_rev 0
76/245
.. .
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
-
8/9/2019 JPK-056-07-L-1754_rev 0
77/245
/ . .
-3000-L-5239
-3000-L-5240
-3000-L-5242
-3000-L-5243
-3000-L-5244
-3000-L-5245
-3000-L-5246
-3000-L-5247
-3000-L-5248
-3000-L-5249
-3000-L-5250
-3000-L-5251
-3000-L-5252
-3000-L-5254
-3000-L-5255
-3000-L-5256
-3000-L-5257
1 1 1
2 1 2 2 1 3 4 1 1 1
3 1 1 1
4 2
O O O O O O O O O O O O O O O O O
8" , A350LF2 CL.1, CL150, RF, STDF, B16.5
6" WN , A350LF2 CL1, CL150, STDWT, RF, STDF, B16.5
150H01
10" WN , A350LF2 CL.1, CL150, SCH 20, RF, STDF, B16.5
8" WN , A350LF2 CL1 CL150, SCH 20, RF, STDF, B16.5
5 3
6 1
7 1
8 2 2 2 1
9 2 2 2 1 3/4 , A350LF2 CL1, CL150, RF, STDF, B16.5
4" WN , A350LF2 CL.1, CL150, STDWT, RF, STDF, B16.5
2" WN , A350LF2 CL1, CL150, XS, RF, STDF, B16.5
2" , A350LF 2 CL1, CL150, RF, STDF, B16.5
3/4" SW , A350LF2 CL1, CL150, XS, RF, STDF, B16.5
10 1 1
11 1
12 2
150HDPE
10" ASSY LS HDPE PN16 PE100-SDR11 C/W BACKRING PP CL150 B16.5 (250mm)6" ASSY LS HDPE PN16 PE100-SDR11 C/W BACK RINGPP CL150 B16.5 (160mm)
2" ASSY LS HDPE PN16 PE100-SDR11 C/W BACK RING
13 1
14 1 15 1
PP CL150 B16.5 (63mm)
8" WN , A350LF2 CL1, CL600, XS, RTJ, B16.5
8" WN, A350LF2 CL1, CL600, SCH20, RTJ, B16.5
600H01
3/4" SW, A350LF2 CL1, CL600, XS, RTJ, B16.5
16 1
17 2
18 3
19 1
150H04
6" WN , A350LF2 CL1, CL150, STD WT, RF, STDF, B16.5
3" WN , A350LF2 CL1, CL150, STDWT, RF, STDF, B16.5
3/4" SW , A350LF2 CL1, CL150, XS, RF, STDF, B16.5
3/4" , A350LF2 CL1, CL600, RTJ, B16.5
20 1 3/4" , A350LF2 CL1, CL150, RF, STDF, B16.5
.
-
8/9/2019 JPK-056-07-L-1754_rev 0
78/245
.. .
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
/ . . 00-L-5244
00-L-5245
00-L-5246
00-L-5247
00-L-5248
00-L-5249
00-L-5250
00-L-5239
00-L-5240
00-L-5242
00-L-5243
00-L-5251
00-L-5252
00-L-5254
00-L-5255
00-L-5256
00-L-5257
1 1 1 1 2 1 1
2 1
3 1
8" SWING TYPE, A352LCB, CL150, SRF, STDF, B16.34, 316PLT7 (SP-10153)
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
8" FLXWDGRS, A352LCB, CL150, RF, STDF API600, OBB, TRM12, HW
" I
6" FLXWDGRS, A352LCB, CL150, RF, STDF, API600, OBB, TRM12, HW
150H01
4 1
5 1
6 1
7 1
8 2 2 2 1
4" FLXWDGRS, A352LCB, CL150, RF, STDF API600, OBB, TRM12, HW
4" SWING TYPE, A352LCB, CL150, SRF, STDF, B16.34, 316PLT7 (SP-10153)
2" AS PER DATE SHEET DS-SP-056-07-102 C/W EXTENDED SPINDLE2500mm LONG FROM CENTER LINE OF VALVE TO HANDWHEEL TYPE-1
2" , FLXWDGRS, A352LCB, CL150, RF, STDF, API600, OBB, TRM 12, HW
3/4" SLDWDGIS, A350LF2 CL1, CL150, RF, STDF API602OBB, TRM12, HW
9 1
10 1
11 1
600H01
8" FLXWDGRS, A352LCB, CL600, RTJ, API600, OBB, TRM12, GO
8" SWING TYPE, LUGTHRU, A352LCB, CL600, RJ, B16.34, 316PLT7 (SP-10221)
8" SLDWDGIS, A350LF2 CL1, CL600, RTJ, API602OBB, TRM12, HW
12 1
13 2
14 1
3" FLXWDGRS, A352LCB, CL150, RF, STDF, API600, OBB, TRM12, HW
3/4" SLDWDGIS, A350LF2 CL1, CL800, SW, API602OBB, TRM12, HW
150H04
1" SLDWDGIS, A350LF2 CL1, CL800, SW, API602OBB, TRM12, HW
.. .
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
-
8/9/2019 JPK-056-07-L-1754_rev 0
79/245
/ . .
-3000-L-5239
-3000-L-5240
-3000-L-5242
-3000-L-5243
-3000-L-5244
-3000-L-5245
-3000-L-5246
-3000-L-5247
-3000-L-5248
-3000-L-5249
-3000-L-5250
-3000-L-5251
-3000-L-5252
-3000-L-5254
-3000-L-5255
-3000-L-5256
-3000-L-5257
1 1 1
2 1 1
3 2 1 1 8" CL.150 B16.5 PLNPHN 1/8" FLATR DPHNWS ZNWSPHNS1NCB
150H01
10" CL150 B16.5 PLNPHN 1/8"FLATR DPHNWS ZNWSPHNS1 NCB
10" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
4 1 2 2 2 1 6 2 2 1
5 2
6 4
7 2
8 2
8" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
2" SPWND, 316L-FG, 1/8''SSSS, CL150, B16.20, B16.5, LS
6" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
4" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
2" CL150 B16.5 PLNPHN 1/8" FLATR DPHNWS ZNWSPHNS1 NCB
9 4 4 4 2
10 1
11 3
12 2
3/4" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
600H01
8" , CL600, B16.5, PLNPHN, OVLRNG, DPHNWS, ZNWS, PHNS1, NCC
8" , OVLRNG, SS135HB, CL600, B16.20, B16.5
3/4" , OVLRNG,SS135HB, CL600, B16.20, B16.5
13 2
14 1
150H04
6" CL150 B16.5 PLNPHN 1/8" FLATR DPHNWS ZNWSPHNS1 NCB
3" , CL150, B16.5, PLNPHN, 1/8", FLATR, DPHNWS, ZNWS, PHNSL, NCB
, , , , . , .
15 3
16 2
17 22" RFEPDMSTEEL CORE CL150PE100-SDR11B1621 B165
150HDPE
, , , , , , , , ,
3" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
3/4" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS
6" RF EPDM STEEL CORE CL 150 PE100-SDR11 B16.21, B16.5
. , .
.. .
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
-
8/9/2019 JPK-056-07-L-1754_rev 0
80/245
/
. .
-3000-L-5
239
-3000-L-5
240
-3000-L-5
242
-3000-L-5
243
-3000-L-5
244
-3000-L-5
245
-3000-L-5
246
-3000-L-5
247
-3000-L-5
248
-3000-L-5
249
-3000-L-5
250
-3000-L-5
251
-3000-L-5
252
-3000-L-5
254
-3000-L-5
255
-3000-L-5
256
-3000-L-5
257
1 16 16 16 8
2
8
3 32
4 8
M16x85 LG STUDBOLTS /2 A320L7M/7M
O O O O O O O O O O O O O O O O O
150H01
M16x90 LG , A320 GR L7M/A194 GR 7M
M16x105 LG A182 GR F55 (25%-CR. . ) /
M14x65 LG , A320 GR L7M/A194 GR 7M
5 16 8 8
6
7 16
8 8 16 16 16 8 32 8 8 8
9 12 12
M18x125 LG A182 GR F55 (25%-CR. . ) /
M18x130 LG A182 GR F55 (25%-CR. . ) /
M20x100 LG , A320 GR L7M/A194 GR 7M
M20x110 LG , A320 GR L7M/A194 GR 7M
M22x130 LG A182 GR F55 (25%-CR. . ) /
10 12
11 24
12 8
600H01
M30 x205 LG , A320 GR L7M/A194 GR 7M
M30 x190 LG , A320 GR L7M/A194 GR 7M
M16 x90 LG , A320 GR L7M/A194 GR 7M
13 8
14 8
15 4
16 16
M16x90 LG , A320 GR L7M/A194 GR 7M
M16x105 LG , A320 GR L7M/A194 GR 7M
M18x125 LG A182 GR F55 (25%-CR. . ) /
150H04
M14x65 LG , A320 GR L7M/A194 GR 7M
.. .
1 1 0 1 0 0 0 0 0 0 0 1 1 1 1 0 0
-
8/9/2019 JPK-056-07-L-1754_rev 0
81/245
/
. .
000-L-5
239
000-L-5
252
000-L-5
240
000-L-5
242
000-L-5
243
000-L-5
244
000-L-5
245
000-L-5
246
000-L-5
254
000-L-5
255
000-L-5
256
000-L-5
257
000-L-5
247
000-L-5
248
000-L-5
249
000-L-5
250
000-L-5
251
1 1 1
2 1 1 3 9 3 3 12 1
DA2-6''
F9-8
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
O-3
DA2-8''
O-3
O-3
O-3
O-3
O-3
5 4 5 12 5 6 3 5 8 4 8 2
6 1 11
7 1 2
8 3
9 1
P21-C4
-
P21-B1
HG1-B
P21-B2
P52-A1
10 P51-D2 1 1
11 2
12 1
13 2
14 1 1
S3-10''
P61-A1
S1-14''
P51-F4
P8-A2
16 10 12
17 3
18 19 7
19
31 8 11 7 6 13 8
20 1 15
S3-14''
S3-3"
S3-6"
S3-8''
UG-2"(CS)
21 1 1 1
22 5
23 1
24 1
25 1
26 5
S1-8''
P51-D4
F9-7
S3-4"
P21-C5
P26-A2
27 1 P1-D2
-
8/9/2019 JPK-056-07-L-1754_rev 0
82/245
.. .
0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0
/ 00-L-5257
00-L-5250
00-L-5251
00-L-5252
00-L-5254
00-L-5255
00-L-5256
00-L-5244
00-L-5245
00-L-5246
00-L-5247
00-L-5248
00-L-5249
00-L-5239
00-L-5240
00-L-5242
00-L-5243
. .
1 21.4 26.1 32.2 11.3 11.8 6.5 8.2 15.3 0.4 0.4 7.7 14.6 0.3 6.0
2 21.4 26.1 32.2 11.3 11.8 6.5 8.2 15.3 0.4 0.4 7.7 14.6 0.3 6.0
,
,
"AD"
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
O-30
3 1.4 1.4 0.1 0.8 0.2 0.2 1.3 9.3 95.3
4 0.1 2.1 ()
"EH"
(3-)
"CA"
5 0.1 3.6
6 0.1 1.4
(())()
-
8/9/2019 JPK-056-07-L-1754_rev 0
83/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
84/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
85/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
86/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
87/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
88/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
89/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
90/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
91/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
92/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
93/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
94/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
95/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
96/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
97/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
98/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
99/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
100/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
101/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
102/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
103/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
104/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
105/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
106/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
107/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
108/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
109/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
110/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
111/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
112/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
113/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
114/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
115/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
116/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
117/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
118/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
119/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
120/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
121/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
122/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
123/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
124/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
125/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
126/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
127/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
128/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
129/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
130/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
131/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
132/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
133/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
134/245
:
PROJECT NUMBER / : X-000-056-07
AFE NUMBER / : 6310110271DOCUMENT TITLE: LINE LIST - UTILITY WATER & TECHNICAL WATER SYSTEM
: - . .
TENGIZCHEVROIL /
PROJECT TITLE: PLANT FIREWATER UPGRADE PROJECT
DOCUMENT NUMBER / : PLL-056-07-B-0028
-
8/9/2019 JPK-056-07-L-1754_rev 0
135/245
REV/ PG TP
REVISION DESCRIPTION /
REVISION DESCRIPTION SHEET
A 4Issued for IFRC
B 4Approved for design
C 4 Re-Issued for review and comment (Phase-4)-(-4)
0 4Approved for construction
-
8/9/2019 JPK-056-07-L-1754_rev 0
136/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
137/245
-
8/9/2019 JPK-056-07-L-1754_rev 0
138/245
Doc No. PHL-056-07-B-0100
PHL-056-07-B-0100
-
8/9/2019 JPK-056-07-L-1754_rev 0
139/245
REVISION DESCRIPTION SHEET
REV..
PARA.
REVISION DESCRIPTION
AIssued for Comment
0Approved for Implementation
-
8/9/2019 JPK-056-07-L-1754_rev 0
140/245
Doc No. PHL-056-07-B-0100
PHL-056-07-B-0100
TABLE OF CONTENTS /
-
8/9/2019 JPK-056-07-L-1754_rev 0
141/245
TABLE OF CONTENTS /
Section
Description
Page.
1 INTRODUCTION.............................................................................................................................................. 6
2 ABBREVIATIONSANDDEFINITIONS................................................................................................................. 7
3 BACKGROUND................................................................................................................................................ 8
3.1 EXISTINGFWSYSTEM............................................................................................................................................ 83.2 UW&TWSYSTEM.............................................................................................................................................. 8
3.3 MAINMODIFICATIONSUNDERPFUPROJECT.............................................................................................................. 94 SWITCHOVERPHILOSOPHY.......................................................................................................................... 10
4.1 STEP1:MAINCONSTRUCTIONPHASE.................................................................................................................... 104.2 STEP2 :COMMISSIONINGOFNEWPUMPS............................................................................................................ 114.3 STEP3:IMPLEMENTTHE SWITCHOVER OFTWSUPPLYTOCONSUMERSFROMNEWTWSYSTEM....................................124.4 STEP4:IMPLEMENTTHESWITCHOVEROFUWSUPPLYTOCONSUMERSFROMTHENEWUWSYSTEM............................124.5 STEP5:MIGRATIONOFEXISTINGMAINSITEDIESELFWPUMPANDCTFFWPUMPSTOTHEINTEGRATEDSTARTUPLOGIC134.6 STEP6:ISOLATETHEOBHFWRINGMAINFROMTHEEXISTINGTWPUMPDISCHARGE.................................................134.7 STEP7:INTEGRATETHEFWRINGMAINATOBHAREAWITHTHEMAINFWHEADER.....................................................144.8 STEP8:STOPPINGOPERATIONOF FWJOCKEYPUMPS(G77/5.5ANDG77/5.6).....................................................144.9 STEP9:ISOLATE REDUNDANTEQUIPMENTFORDEMOLITION.................................................................................... 14
5 REFERENCES................................................................................................................................................. 16
1 .................................................................................................................................................... 21
2 .................................................................................................................. 22
Doc No. PHL-056-07-B-0100
PHL-056-07-B-0100
-
8/9/2019 JPK-056-07-L-1754_rev 0
142/245
Attachment
1. List of Reference P&IDs for PFU project
1.
Doc No. PHL-056-07-B-0100
PHL-056-07-B-0100
1 INTRODUCTION
-
8/9/2019 JPK-056-07-L-1754_rev 0
143/245
1 INTRODUCTION
Tengizchevroil (TCO), a joint venture company between Chevron, Exxon-Mobil, LUKoil, andKazakhstan government, intend to upgrade their existing Fire Water Systems to make thesecompliant with current RoK regulations and to overcome the operational problems faced bythem. The PFU project is being implemented towards this.
In addition to upgrade of FW network (including replacement of FW pumps andmodification of pump start-up sequence/controls, this project also envisages installation ofnew UW pumps and distribution network. The existing TW Pumps are also being replaced.
Considering critical importance of FW,UW and TW systems for the plant operation, newpumps for each service are to be operational before the existing pumps for the sameservice can be decommissioned. This document details the philosophy to be adopted tointegrate the FW, UW and TW systems with the upgraded equipment and distributionnetworks without affecting operation of the main facilities.
Doc No. PHL-056-07-B-0100
PHL-056-07-B-0100
2 ABBREVIATIONS AND DEFINITIONS
-
8/9/2019 JPK-056-07-L-1754_rev 0
144/245
2 ABBREVIATIONS AND DEFINITIONS
The following abbreviations & definitions are used in this document.
CR Control RoomCCR Central Control RoomCTF Crude Tank farmERT Emergency Response TeamFEED Front End Engineering DesignF&G Fire & gasFW Fire WaterHDPE High Density Poly Ethylene
HVAC Heating, Ventilation & Air Conditioning systemJSC Joint Stock CompanyKTL Complex Technological Line, production area in which
the sour crude and gas is sweetened, excluding DMCMFB Minimum Flow BypassMCF Minimum Continuous FlowOBH Off-plot Boiler HousePCV Pressure Control valve
PFU Plant Firewater Upgrade projectP&ID Piping & Instrumentation DiagramPLC Programmable Logic ControllerPSN Production Services NetworkPSV Pressure Safety ValveSCOT Sulphur Claus Off-gas TreatmentSDV Shutdown ValveSoW Scope of Work
-
8/9/2019 JPK-056-07-L-1754_rev 0
145/245
Doc No. PHL-056-07-B-0100
PHL-056-07-B-0100
-
8/9/2019 JPK-056-07-L-1754_rev 0
146/245
3.3 Main Modifications under PFU project
Main modifications envisaged as a part of this project are:
Providing new Electric FW pumps (G-106 A/B) to replace existing Electric FW pumps
(G-97 1/2/3). These new pumps will be housed in a new FW pump house.
Providing new Jockey pumps (G-105 A/B) to replace the existing pumps (G-77/5.5 &
77/5.6 presently being used as Jockey Pumps as well as UW Pumps). These new
Jockey pumps also will be installed in the new FW pump house.
Providing new Utility Water Pumps (G-081A/B) and a UW distribution system,segregated from the FW system. These new pumps will be housed in a new UW/TW
Pump house.
Providing new TW Pumps (G-107A/B) to replace the existing Technical Water Pumps
(G-77/6.1, 6.2, 6.3 and 6.4). These new pumps will be housed in the new UW/TW Pump
house
Installation of suitable overpressure protection for FW network and for underrated
HDPE piping for FW network in Sulphur pads area.
Replacement of existing hydrants / monitors, isolation valves and sections of headers.
Implementation of integrated auto-startup sequence for the revamped FW pump
battery.
Doc No. PHL-056-07-B-0100
PHL-056-07-B-0100
4 SWITCH OVER PHILOSOPHY
-
8/9/2019 JPK-056-07-L-1754_rev 0
147/245
4 SWITCH-OVER PHILOSOPHY
Refer Attachment-1 for the list of reference P&IDs prepared for this project.
This section describes the philosophy to be followed for implementation of proposedmodifications without hampering plant operations and jeopardising safety of the systemswhile switching over operation to the new systems after upgrade. Those existing systems,which will become redundant after upgrade, will be dismantled ONLY after correspondingnew systems start functioning satisfactorily.
The outline of philosophy for enabling switch-over to the upgraded system is divided intothe following 9 distinct steps:
4.1 Step-1 : Main Construction Phase
a) Construction of project scope that does not involve any work on the existing system: likenew pump-houses, pumps and connected piping etc.
There is no impact on working of the existing systems while construction of pump-houses goes on including installation of new pumps and connected pipes up to therespective tie-in locations.
This part of the work also includes the following :
installation of new hydrants/monitors
construction of hydrant/monitor/valve pits at new locations (replacing existinghydrant/monitor/valve pits)
installation of new UW network
installation of Anti s rge control al es / relief al es (e cl ding those in S pads
-
8/9/2019 JPK-056-07-L-1754_rev 0
148/245
Doc No. PHL-056-07-B-0100
PHL-056-07-B-0100
-
8/9/2019 JPK-056-07-L-1754_rev 0
149/245
No. Tie-in No. Location P&ID No.
1 046 New 4 Process Water connection to OBHO-000-B-5020;O-000-B-5015
O-000-B-2006-05607D
2 047New 10 Process Water connection to No.1TW line to Train 5
O-000-B-5020;
O-000-B-5015
O-000-B-2006-05607D
3 048New 10 Process Water connection to No.2TW line to Train 5
O-000-B-5020;
O-000-B-5015O-000-B-2006-05607D
4 049New 6 Process Water connection toChemical Water treatment
O-000-B-5020;
O-000-B-5015
O-000-B-2006-05607D
4.3 STEP-3 : Implement the switch over of TW supply to consumers from new TWsystem
Commission Tie-ins 46, 47, 48 and 49 one by one by opening the isolation valve from thenew TW header and then closing the isolation valve from the existing TW header. Theexisting TW pumps can be stopped one by one, as the TW/PW demand switches to thenew system. Once Process water supply to all the delivery points is switched over to thenew TW system, all existing TW pumps can be stopped, and the existing TW ring main
Doc No. PHL-056-07-B-0100
PHL-056-07-B-0100
Once the Tie-ins are implemented supply can be commissioned from the new UW
-
8/9/2019 JPK-056-07-L-1754_rev 0
150/245
Once the Tie-ins are implemented, supply can be commissioned from the new UWdistribution network, and the temporary supply disconnected.
The following UW consum