MY DAM PROJECT

By Joshua

Page 2: Josh

1. HOOVER DAM’S STORY

2. HOOVER DAM’S BEGINNING CONSTRUCTION

3. HOOVER DAM’S MATERIAL

4. HOOVER DAM’S CONSTRUCTION

5. HOOVER DAM’S ELECTRICITY MAKING

6. HOW HOOVER DAM’S ELECTRICITY WORKS

7. GALLERY

8. BIBLIOGRAPHY

Contents

Page 3: Josh

HOOVER DAM’S STORY

Page 4: Josh

HOOVER DAM’S BEGINNING CONSTRUCTION

• There were 6 big companies building and helping.• Divert the river.• Dynamite was used to make holes. • Four tunnels were placed.• Dynamite was used for 2 years.• Work Men removed over ½ million cubic yards of

blown up remaining rubble.• The tunnels were filled with 3 foot thick walls of

concrete.• High scalars drilled holes and packed them with

dynamite. • they would go back to the explosion area and pry

rock.• In November 1932, the Colorado River followed.

Page 5: Josh

HOOVER DAM MATERIAL • 12 miles upstream there was a good area of rock, sand,

and gravel. • A train then towed the material to a aggregate plant. • There the sand and gravel went through a lot of tests • Then they were screened, graded, and washed. • Once that was done, they stock piled it. • They shipped the material to Hoover Dam.

Page 6: Josh

HOOVER DAM MATERIAL• The material was sent to two mixing plants.• One was located in the canyon bottom and the other

located on the Nevada rim. • There would create concrete for the 4 ½ million cubic

yards of concrete.• Once the concrete was finished, it was dispatched.• Nine cable ways carried the concrete and other

materials over to the dam site.

Hoover Dam Canyon mixing plant Hoover Dam Nevada rim plant

Page 7: Josh

HOOVER DAM’S CONSTRUCTION• The first bucket con concrete was settled on June 6th 1933• Hoover Dam then began its rise on Black Canyon.• The cable ways lifted hundreds of buckets of concrete into the

Dam format until the dam reached its full 660 foot thick base.• Poured in give foot layers of concrete the dam’s interlocking

system moved skyward.• The crews made new records daily.• The crews worked in all conditions. Hot, dry, rainy, snowy, smelly,

etc.• The workers only received 2 days off per year! Christmas and the

fourth of July.

Page 8: Josh

HOOVER DAM’S CONSTRUCTION• People working at night.• On June 1934, 1 year after the first pour, the dam had reached

2/3 of its potential. • Even then Hoover Dam had already reached an extremely

impressive height.• Two spill ways were built.• They were capable of holding 200000 cubic feet of water per

second.• On May 29th 1935 2 ½ years after the dam was built, crews

started to dump the last buckets of cement.• The whole dam was made up of 3 ¼ cubic yard of concrete.• Hoover Dam was completed 2 ½ years ahead of schedule!

Page 9: Josh

HOOVER DAM’S ELECTRICITY MAKING.

• Hoover Dam’s Turbines needed pipes of massive size.

• 18ft-30ft in diameter and six inches in thickness.

• It was impossible to ship units of this size across country. So they made a plant that made the steel pipes.

• The plant made and rolled the 3 miles of pipe needed for Hoover Dam’s electricity.

• In the plant the crew needed special machines and perfect measuring to make the piping perfect.

• After the steel pipes were made, they put it in a giant press that rolled the steel into shape.

Page 10: Josh

HOOVER DAM ELECTRICITY MAKING

• One plate was only a third of a ring.• Three plates put together was 1 a ring.• The rings were 18ft by 11ft.• Two of the ring put together equaled 184

tons.• Carts were made to carry the rings.• A 150ft cable way lifted the rings into the

correct area.• The rings were then pulled into place by a

cable way and held together by pressure pins.

Page 11: Josh

HOW HOOVER DAM’S ELECTRICITY WORKS• Turbine pits were made to hold Hoover Dam’s

17 turbines.• Generator were being installed in 1935.• The first turbine named N2 was completed in

October 26, 1936.• Turbine N2 was built to serve the city of L.A.• Generator after generators were being build

because of California, Nevada, and Arizona. • In 1956 the last generator N8 was being made

after laying empty for over 25 years.

Page 12: Josh

HOOVER DAM’S ELECTRICITY• The turbines consisted of a 95000 Kilowatt, 60 cycle,

16500 volt generator.• The water is controlled by a butterfly.• The parts for the turbines were shipped across 60 rail

cars.• They were pulled over by cable ways and lowered into

the power house.• The parts were then lower into the turbine room.• Then then installed the turbine and then the butterfly

valve to control the water flow.• Once connected to the roaster, the turbine was ready to

work. • It was completed after test runs on December 1, 1961 • After N8 was made, the dam made over 1 and 1/3 million

kilowatts.• Hoover Dam had cost over 171 million dollars in total.

Page 13: Josh

PICTURES OF HOOVER DAM’S TURBINES

Page 14: Josh

GALLERY

Page 15: Josh

• http://www.wateraid.org/news/news/if-i-had-clean-water-there-would-be-no-sickness

• http://www.wateraid.org/news/news/if-i-had-clean-water-there-would-be-no-sickness

• http://www.wateraidamerica.org/what_we_do/clean_water_for_africa_and_asia.aspx?gclid=CJWP6s2S9rUCFahDMgod_lcAbQ

• http://www.potterswithoutborders.com/clean-water-in-africa/?gclid=COD-vtWS9rUCFelaMgodzxsAFw

• http://www.actionagainsthunger.org/impact/water-sanitation-hygiene

• http://www.wsafrica.org/welcome/• http://www.google.com/search?

hl=en&site=&source=hp&q=water+groups+in+africa&oq=water+groups+in+africa&gs_l=mobile-gws-hp.3...198.7985.0.8321.18.18.0.0.0.0.746.4667.7j2j1j1j0j4j1.16.0.les%3B..0.0...1ac.1.5.mobile-gws-hp.s5UGK5HVAeo

• http://en.wikipedia.org/wiki/Hoover_dam

BIBLIOGRAPHY